Gary Meyer
- Listed as
- architect, authorized agent-others, designer
- Firm
- Wayne Myer Works Arch
- Based in
- Oakland
- On San Francisco permits
- Sep 2012 to Mar 2026
83 permits since 2000 (architect on 82 permits, authorized agent-others on 1 permit, designer on 1 permit): 45 completed, 8 in progress, 14 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2026 | In progress issued Apr 2026 | 1424 Alabama St | Inspiration Construction Inc | reconfigure (e) bedroom doors and closets. remodel (e) kitchen. add (2) new skylights. convert unconditioned space on ground floor to media room, wet bar, and full bathroom, add interior stair to 2nd floor.Details
reconfigure (e) bedroom doors and closets. remodel (e) kitchen. add (2) new skylights. convert unconditioned space on ground floor to media room, wet bar, and full bathroom, add interior stair to 2nd floor. | $100,000 |
| Mar 2, 2026 | In progress issued May 2026 | 563 18th Av | Dunros Construction | rebuild (e) deteriorating exterior stair at rear of the building for life/safety purposes. rebuild (e) decks at each of the 3 floor levels in a revised configuration.Details
rebuild (e) deteriorating exterior stair at rear of the building for life/safety purposes. rebuild (e) decks at each of the 3 floor levels in a revised configuration. | $50,000 |
| Oct 27, 2025 | In progress issued Apr 2026 | 1407 Dolores St | A T Prime Builders | revision to permit 202508183269. interior remodel to (e) dwelling units on 2/f and 3/f including 2 (e) kitchens and bathroom and add 1 new bathroom per unit (2 total). add roof deck a top 2nd floor projection. rebuild rear stair in revised configuration. replace all windows and doors on 2nd and 3rdDetails
revision to permit 202508183269. interior remodel to (e) dwelling units on 2/f and 3/f including 2 (e) kitchens and bathroom and add 1 new bathroom per unit (2 total). add roof deck a top 2nd floor projection. rebuild rear stair in revised configuration. replace all windows and doors on 2nd and 3rd | $150,000 |
| Aug 18, 2025 | In progress issued Sep 2025 | 1407 Dolores St | A T Prime Builders | convert rear portion of garage to habitable space and combine with (n) infill addition to create media room, (1) home office, and (1) full bathroom. no sleeping in groundfloor, construct (n) interior stair to connect (n) habitable space to (e) dwelling unitDetails
convert rear portion of garage to habitable space and combine with (n) infill addition to create media room, (1) home office, and (1) full bathroom. no sleeping in groundfloor, construct (n) interior stair to connect (n) habitable space to (e) dwelling unit | $120,000 |
| Dec 10, 2024 | In progress issued Dec 2024 | 44 Woodland Av | North Bay Construction | revision to pa #202207229137 to make a number of minor(non-structural) changes. no work in revision impacts the builidng volume or street facing. remove non-bearing walls at 3rd floor closet, reconfigure powder room, relocate laundryDetails
revision to pa #202207229137 to make a number of minor(non-structural) changes. no work in revision impacts the builidng volume or street facing. remove non-bearing walls at 3rd floor closet, reconfigure powder room, relocate laundry | |
| May 17, 2024 | Completed final sign-off Mar 2025 | 75 Elgin Pk | Red White & Blue Construction Inc. | to comply with nov #201854310, convert unused storage space on 1st floor to media room and full bathroom. construct new interior stair to combine the new living space with the extg 2nd floor unit (75 elgin park)Details
to comply with nov #201854310, convert unused storage space on 1st floor to media room and full bathroom. construct new interior stair to combine the new living space with the extg 2nd floor unit (75 elgin park) | $60,000 |
| May 9, 2024 | Completed final sign-off Aug 2024 | 467 Gates St | Dunros Construction | covert existing full bath into half bath and laundryDetails
covert existing full bath into half bath and laundry | $20,000 |
| Feb 15, 2024 | Completed final sign-off Sep 2024 | 1570 21st Av | Valex Construction | remodel existing kitchen and (2) bathrooms. replace shower with toilet at 2nd bath. relocate door to lightwell.Details
remodel existing kitchen and (2) bathrooms. replace shower with toilet at 2nd bath. relocate door to lightwell. | $58,000 |
| Nov 9, 2023 | In progress issued Nov 2023 | 112 Day St | revision to pa# 202205244829 & 202112164572. add 3 skylights. increase size of openings between kitchens & living rooms on 2nd & 3rd fl. replace (e) windows at rear facing living room on 3rd fl. expand 2nd fl bathroom into pantry area. change patio to concrete pavers.Details
revision to pa# 202205244829 & 202112164572. add 3 skylights. increase size of openings between kitchens & living rooms on 2nd & 3rd fl. replace (e) windows at rear facing living room on 3rd fl. expand 2nd fl bathroom into pantry area. change patio to concrete pavers. | ||
| Oct 18, 2023 | Completed final sign-off Jun 2025 | 3819 23rd St | Sft Construction Corp | revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional.Details
revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional. | |
| Sep 28, 2023 | Completed final sign-off May 2025 | 326 Lawton St | Sft Construction Corp | enlarge 3rd floor bedroom & add bathroom by raising (e) roofline. new construction to cover (e) lightwell at 2nd floor. no change in building footprint of overall building height.Details
enlarge 3rd floor bedroom & add bathroom by raising (e) roofline. new construction to cover (e) lightwell at 2nd floor. no change in building footprint of overall building height. | $90,000 |
| Jul 11, 2023 | Expired or cancelled withdrawn Dec 2024 | 2060 Polk St | ti to existing retail space including: install power door operator per information sheets da-05 to provide accessible entry, reconfigure existing bathroom to be accessible, install new lighting, no residential guest rooms will be removed converted or demolished.Details
ti to existing retail space including: install power door operator per information sheets da-05 to provide accessible entry, reconfigure existing bathroom to be accessible, install new lighting, no residential guest rooms will be removed converted or demolished. | $75,000 | |
| May 11, 2023 | In progress issued Oct 2024 | 65 Oakwood St | Top-Lyne Construction Company, New Building Inc | add (2) adu to ground floor per ord 162-16 in areas currently used as garage and unused storage. soft story retrofit under separate permit.Details
add (2) adu to ground floor per ord 162-16 in areas currently used as garage and unused storage. soft story retrofit under separate permit. | $250,000 |
| Apr 11, 2023 | Completed final sign-off Dec 2025 | 255 Chenery St | Clashganiff Building And Remodeling | remove (e) deck & construct a 2-story horizontal addition consisting of a home offic,e family room & roof deck. replace (e) egress stair w/ (n) spiral stair adjacent to the addition. approx 5cu excavation required.Details
remove (e) deck & construct a 2-story horizontal addition consisting of a home offic,e family room & roof deck. replace (e) egress stair w/ (n) spiral stair adjacent to the addition. approx 5cu excavation required. | $150,000 |
| Feb 27, 2023 | Expired or cancelled expired Oct 2026 | 44 Woodland Av | North Bay Construction | construct new deck @ 2nd floor with exterior stair & fire wall. add bay window @ rear of (e) 2nd floor.Details
construct new deck @ 2nd floor with exterior stair & fire wall. add bay window @ rear of (e) 2nd floor. | $90,000 |
| Jul 22, 2022 | In progress issued Nov 2024 | 44 Woodland Av | North Bay Construction | convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelopeDetails
convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelope | $145,000 |
| May 31, 2022 | Completed final sign-off Feb 2023 | 665 05th Av | Dunros Construction | convert (e) attic to habitable space, add dormers, add interior stairs connecting attic to 3rd floor - replace 3rd floor tub with shower, enlarge 3rd floor between living and dining. -Details
convert (e) attic to habitable space, add dormers, add interior stairs connecting attic to 3rd floor - replace 3rd floor tub with shower, enlarge 3rd floor between living and dining. - | $120,000 |
| Apr 5, 2022 | Never finaled issued May 2023, no final | 340 Brentwood Av | one story horizontal addition with roof deck at rear consisting of sunroom and enclosed stair down to grade.Details
one story horizontal addition with roof deck at rear consisting of sunroom and enclosed stair down to grade. | $150,000 | |
| Feb 22, 2022 | Completed final sign-off Jan 2023 | 222 Anderson St | Edri Construction Inc *See Notes* | 1st floor: convert laundry room to bedroom by relocating non bearing wall, remodel (e) bathroom, kitchen remodel. 2nd floor add new bathroom by extending (e) dormer.Details
1st floor: convert laundry room to bedroom by relocating non bearing wall, remodel (e) bathroom, kitchen remodel. 2nd floor add new bathroom by extending (e) dormer. | $90,000 |
| Dec 16, 2021 | Completed final sign-off May 2025 | 112 Day St | convert unoccupied space at ground floor to habitable space. infill at rear of ground floor below (e) 2nd floor. (n) interior stair to connect (n) space to (e) 2nd floor unit. (n) rooms to include media room, 2 home offices, 2 full bathrooms. 26 cy excavationDetails
convert unoccupied space at ground floor to habitable space. infill at rear of ground floor below (e) 2nd floor. (n) interior stair to connect (n) space to (e) 2nd floor unit. (n) rooms to include media room, 2 home offices, 2 full bathrooms. 26 cy excavation | $200,000 | |
| Sep 20, 2021 | Expired or cancelled expired Feb 2025 | 2562 Post St | revision to pa 201806283300 to omit one of two approved accessory dwelling units and keep a portion of the existing garage. minor interior modifications to the remaining proposed unit (#10)Details
revision to pa 201806283300 to omit one of two approved accessory dwelling units and keep a portion of the existing garage. minor interior modifications to the remaining proposed unit (#10) | ||
| Mar 23, 2021 | Expired or cancelled withdrawn Jun 2024 | 73 Elgin Pk | 3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen. add 2 skylights.Details
3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen. add 2 skylights. | $65,000 | |
| Mar 23, 2021 | Expired or cancelled withdrawn Jun 2024 | 75 Elgin Pk | 2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen.Details
2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen. | $55,000 | |
| Mar 16, 2021 | Expired or cancelled withdrawn Jun 2024 | 75 Elgin Pk | to comply with nov# 201854310: 1st fl create (n) 1-br dwelling unit (#75a) in (e) storage, expand footprint under 2nd fl above, install fire sprinkler per nfpa13. 2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen. 3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen.Details
to comply with nov# 201854310: 1st fl create (n) 1-br dwelling unit (#75a) in (e) storage, expand footprint under 2nd fl above, install fire sprinkler per nfpa13. 2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen. 3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen. | $120,000 | |
| Feb 22, 2021 | Completed final sign-off Mar 2022 | 2914 Franklin St | interior remodel at the top unit. relocate kitchen, remodel (e) bathroom, remove walls for new open floor plan. replace (4) windows in lightwell, not visible from street.Details
interior remodel at the top unit. relocate kitchen, remodel (e) bathroom, remove walls for new open floor plan. replace (4) windows in lightwell, not visible from street. | $80,000 | |
| Feb 8, 2021 | Completed final sign-off Mar 2022 | 2914 Franklin St | De Brus Construction Inc | adding a private roof deck, less than 500 sf. for the use of the top unit. access solely from within that unit.Details
adding a private roof deck, less than 500 sf. for the use of the top unit. access solely from within that unit. | $60,000 |
| Nov 13, 2020 | Completed final sign-off Nov 2021 | 179 Downey St | Jonathan Cole Construction | enlarge existing ground floor unit by converting unconditioned space in garage into living space. add bedroom and relocate kitchen & bathroom.Details
enlarge existing ground floor unit by converting unconditioned space in garage into living space. add bedroom and relocate kitchen & bathroom. | $65,000 |
| Nov 2, 2020 | Expired or cancelled cancelled Jan 2026 | 1424 Alabama St | convert unconditional space on ground floor to family room and bathroom. add interior stair to connect 1st floor to 2nd floor. remove wall at 2nd floor to enlarge dining room.Details
convert unconditional space on ground floor to family room and bathroom. add interior stair to connect 1st floor to 2nd floor. remove wall at 2nd floor to enlarge dining room. | $65,000 | |
| Feb 18, 2020 | Completed final sign-off Nov 2020 | 955 Pine St | revision to 201607202820 to omit expansion into storage space. existing dwelling unit footprint to remain as is maher not reqDetails
revision to 201607202820 to omit expansion into storage space. existing dwelling unit footprint to remain as is maher not req | ||
| Jan 10, 2020 | Never finaled issued Mar 2021, no final | 1020 Filbert St | bldg b. add 1 accessory dwelling unit per ord 162-16. one to ground floor of building "b".Details
bldg b. add 1 accessory dwelling unit per ord 162-16. one to ground floor of building "b". | $80,000 | |
| Jan 10, 2020 | Never finaled issued Mar 2021, no final | 1000 Filbert St | bldg a. add 1 accessory dwelling unit per ord 162-16. one to ground floor of building "a".Details
bldg a. add 1 accessory dwelling unit per ord 162-16. one to ground floor of building "a". | $140,000 | |
| Nov 14, 2019 | Never finaled issued Oct 2023, no final | 253 09th Av | revision to pa# 2019-0805-7913 to include horizontal addition at basement level containing two addition bedrooms.Details
revision to pa# 2019-0805-7913 to include horizontal addition at basement level containing two addition bedrooms. | $20,000 | |
| Oct 23, 2019 | Completed final sign-off Jan 2024 | 970 Chestnut St | add 4 adu's on ground floor per ordinance# 162-16. (3) 1- bedrooms & (1) 2-bedroom.Details
add 4 adu's on ground floor per ordinance# 162-16. (3) 1- bedrooms & (1) 2-bedroom. | $240,000 | |
| Oct 16, 2019 | Never finaled issued Nov 2019, no final | 1004 Filbert St | construct new private roof deck serving one dwelling unit (#1004). convert extg enclosed porch to open stair. reconfigure kitchen of unit #1004Details
construct new private roof deck serving one dwelling unit (#1004). convert extg enclosed porch to open stair. reconfigure kitchen of unit #1004 | $50,000 | |
| Sep 3, 2019 | Expired or cancelled expired Dec 2025 | 1256 Stanyan St | Polytec Construction Company Inc | add dormers to convert portion of e attic into bedroom. remodel e kitchen, replace 7 windows at rear of building, same size and locationDetails
add dormers to convert portion of e attic into bedroom. remodel e kitchen, replace 7 windows at rear of building, same size and location | $90,000 |
| Aug 5, 2019 | Never finaled issued Oct 2019, no final | 253 09th Av | add new 3 bedrooms and 2 bathrooms dwelling unit with kitchen to existing basement.Details
add new 3 bedrooms and 2 bathrooms dwelling unit with kitchen to existing basement. | $120,000 | |
| Jun 27, 2019 | Completed final sign-off Dec 2020 | 48 Miraloma Dr | Partee Construction Co | add units per ord 95-17. add 1 accessory dwelling unit to walk-out basement per ord 95-17.Details
add units per ord 95-17. add 1 accessory dwelling unit to walk-out basement per ord 95-17. | $50,000 |
| May 8, 2019 | Completed final sign-off Oct 2019 | 251 09th Av | 1st fl in fill lightwell, no change to room layout, 2nd fl infill lightwell, add 2nd bath, relocate kitchen, replace 4 windows/doors, add 1 new window at rearDetails
1st fl in fill lightwell, no change to room layout, 2nd fl infill lightwell, add 2nd bath, relocate kitchen, replace 4 windows/doors, add 1 new window at rear | $60,000 | |
| Apr 26, 2019 | Expired or cancelled withdrawn Oct 2022 | 460 Lyon St | relocate portion of existing exterior rear stair from 2nd floor landing to grade (not required for egress)Details
relocate portion of existing exterior rear stair from 2nd floor landing to grade (not required for egress) | $1,000 | |
| Apr 26, 2019 | Completed final sign-off Oct 2019 | 251 09th Av | replace all windows on street facing facade in existing openings (same size, same location)Details
replace all windows on street facing facade in existing openings (same size, same location) | $8,000 | |
| Apr 10, 2019 | Completed final sign-off Apr 2020 | 467 Gates St | Dunros Construction | relocate kitchen within building area. remodel 3rd fl bath. no change to footprint, no change to exteriorDetails
relocate kitchen within building area. remodel 3rd fl bath. no change to footprint, no change to exterior | $60,000 |
| Jan 7, 2019 | Expired or cancelled withdrawn Mar 2019 | 75 Westgate Dr | convert (e) ground flr living space into a dwelling unit to clear complaint 201884631. to comply with nov #201884631 per ordinance 95-17.Details
convert (e) ground flr living space into a dwelling unit to clear complaint 201884631. to comply with nov #201884631 per ordinance 95-17. | $25,000 | |
| Nov 2, 2018 | Completed final sign-off Aug 2020 | 642 Rockdale Dr | Dunros Construction | construct (n) deck on grade & (n) deck @ 2nd flr w/ connecting stair @ rear of bldg. add (2) sliding doors @ 2nd flr deck.Details
construct (n) deck on grade & (n) deck @ 2nd flr w/ connecting stair @ rear of bldg. add (2) sliding doors @ 2nd flr deck. | $45,000 |
| Oct 18, 2018 | Expired or cancelled cancelled Nov 2024 | 2591 47th Av | vertical addition to add 3rd flr. horizontal addition @ rear of 2nd flr. convert unconditioned garage to family room & bedroom. add fire sprinkler system per nfpa13r.Details
vertical addition to add 3rd flr. horizontal addition @ rear of 2nd flr. convert unconditioned garage to family room & bedroom. add fire sprinkler system per nfpa13r. | $200,000 | |
| Jun 28, 2018 | Expired or cancelled expired Feb 2025 | 2562 Post St | add 2 adu within the (e) building envelope to the ground floor of an (e) 8 units. no structural. all bearing & shear addressed by seismic retrofit pa# 2017/08/21/5426 (ordinance# 162-16)Details
add 2 adu within the (e) building envelope to the ground floor of an (e) 8 units. no structural. all bearing & shear addressed by seismic retrofit pa# 2017/08/21/5426 (ordinance# 162-16) | $120,000 | |
| Jun 18, 2018 | Completed final sign-off Dec 2018 | 47 Melrose Av | Dunros Construction | add bathroom to ground floor rear bedroom. legalize 117 sq. ft. extg living space on ground floor.Details
add bathroom to ground floor rear bedroom. legalize 117 sq. ft. extg living space on ground floor. | $50,000 |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 894 22nd St | Henry J Rabbitt & Sons Inc | interior remodel all units in (e) 3-unit building including (e) kitchens and baths and add (1) new bath per unit. remove several walls to provide open kitchen/living/dining each unit. no exterior work.Details
interior remodel all units in (e) 3-unit building including (e) kitchens and baths and add (1) new bath per unit. remove several walls to provide open kitchen/living/dining each unit. no exterior work. | $140,000 |
| May 31, 2018 | Expired or cancelled expired Apr 2026 | 460 Lyon St | add two accessory dwelling units to the ground floor of an existing 7-family dwelling per ordinance 162-16.Details
add two accessory dwelling units to the ground floor of an existing 7-family dwelling per ordinance 162-16. | $150,000 | |
| Mar 30, 2018 | Completed final sign-off Dec 2022 | 580 Noe St | add units per ordinance 162-16. add (3) accessory dwelling units to the walk-out basement level of an existing 2-story 8 unit building, all work within existing building envelope.Details
add units per ordinance 162-16. add (3) accessory dwelling units to the walk-out basement level of an existing 2-story 8 unit building, all work within existing building envelope. | $175,000 | |
| Feb 12, 2018 | Completed final sign-off Sep 2022 | 695 Noe St | Jari Construction Inc | add an adu unit to the ground flr of an existing 5 family dwelling converting it to a 6 dwelling per 162-16 . ref soft story permit:201709127793. structural deferred under separate permit, no cfc.Details
add an adu unit to the ground flr of an existing 5 family dwelling converting it to a 6 dwelling per 162-16 . ref soft story permit:201709127793. structural deferred under separate permit, no cfc. | $90,000 |
| Jan 10, 2018 | Never finaled issued Aug 2019, no final | 667 Castro St | add accessory dwelling unit to lower level of (e) (6) unit bldg converting into (7) unit dwelling. no structural work associated w/ this permit. seismic upgrade under bpa #201703091116Details
add accessory dwelling unit to lower level of (e) (6) unit bldg converting into (7) unit dwelling. no structural work associated w/ this permit. seismic upgrade under bpa #201703091116 | $100,000 | |
| Nov 15, 2017 | Never finaled filed Nov 2017, never issued | 142 Newman St | remove interior stair and add stair at rear of bldg. add roof deck. *footprint of stair-not conditioned area.Details
remove interior stair and add stair at rear of bldg. add roof deck. *footprint of stair-not conditioned area. | $50,000 | |
| Sep 6, 2017 | Completed final sign-off Nov 2018 | 813 Paris St | Jimenez Construction Sf Inc | convert storage space behind garage on ground floor to new master bedroom suite with full bath. remodel kitchen on 2nd floor. replace (e) interior stair connecting the 2 levels. add (1) 36x36 flat skyylight - new and g replacement window at rear.Details
convert storage space behind garage on ground floor to new master bedroom suite with full bath. remodel kitchen on 2nd floor. replace (e) interior stair connecting the 2 levels. add (1) 36x36 flat skyylight - new and g replacement window at rear. | $100,000 |
| Apr 26, 2017 | Completed final sign-off Mar 2018 | 724 Vicente St | Vector Construction Inc. | convert area behind garage on g/f of (e) 2 story residenceto habitable space, new rooms to include family room, bedroom, office and bathroom. all work within existing building envelope.Details
convert area behind garage on g/f of (e) 2 story residenceto habitable space, new rooms to include family room, bedroom, office and bathroom. all work within existing building envelope. | $70,000 |
| Dec 29, 2016 | Completed final sign-off Oct 2021 | 2152 Pine St | add accessory dwelling unit per ordinance 162-16 associated soft-story permit #201609147681, install fire sprinkler system per nfpa13r in the area of the new unit only.Details
add accessory dwelling unit per ordinance 162-16 associated soft-story permit #201609147681, install fire sprinkler system per nfpa13r in the area of the new unit only. | $70,000 | |
| Dec 27, 2016 | Expired or cancelled cancelled Aug 2018 | 2240 Larkin St | add accessory dwelling unit per ordinance no. 162-16, associated soft-story permit #201611233505, install fire sprinklers per nfpa13r in area of new dwelling unit only.Details
add accessory dwelling unit per ordinance no. 162-16, associated soft-story permit #201611233505, install fire sprinklers per nfpa13r in area of new dwelling unit only. | $100,000 | |
| Nov 17, 2016 | Completed final sign-off Jan 2019 | 1320 Page St | Sft Construction Corp | convert(e) garage to dwelling unit under ordl 30-15. associated soft story permit 2016-11-02-1785. install fire sprinkler sym per nfpa13r on entirety of ground floor. retrofit ceiling of g/f w/gypsum board to achieve 2 hr ratingDetails
convert(e) garage to dwelling unit under ordl 30-15. associated soft story permit 2016-11-02-1785. install fire sprinkler sym per nfpa13r on entirety of ground floor. retrofit ceiling of g/f w/gypsum board to achieve 2 hr rating | $100,000 |
| Nov 10, 2016 | Never finaled issued Jan 2018, no final | 520 08th Av | add (n) dwelling unit @ rear of ground level per ord #162-16. associated soft-story permit #201609289018. install fire sprinkler system per nfpa 13r on entirety of ground level. retrofit the ceiling of the entire ground fl w/ gypsum board to achieve a 2-hr fire resistance rating.Details
add (n) dwelling unit @ rear of ground level per ord #162-16. associated soft-story permit #201609289018. install fire sprinkler system per nfpa 13r on entirety of ground level. retrofit the ceiling of the entire ground fl w/ gypsum board to achieve a 2-hr fire resistance rating. | $100,000 | |
| Oct 6, 2016 | Completed final sign-off Jan 2018 | 3939 Cesar Chavez St | Fisher Design + Build | remodel extg kitchen including, removal of extg powder room and bearing wall between kitchen and dining. add new powder room in extg closet. remodel 3rd floor bathroom in kind.Details
remodel extg kitchen including, removal of extg powder room and bearing wall between kitchen and dining. add new powder room in extg closet. remodel 3rd floor bathroom in kind. | $50,000 |
| Sep 16, 2016 | Completed final sign-off May 2020 | 1480 Waller St | Sft Construction Corp | add 1 new dwelling unit @ front of basement per ordinance# 30-15. install fire sprinkler system per nfpa 13r on entirely of basement level. (refer to unit legalization pa# 2016/09/16/8040)Details
add 1 new dwelling unit @ front of basement per ordinance# 30-15. install fire sprinkler system per nfpa 13r on entirely of basement level. (refer to unit legalization pa# 2016/09/16/8040) | $100,000 |
| Sep 16, 2016 | Completed final sign-off Jun 2020 | 1480 Waller St | Sft Construction Corp | legalize (e) dwelling unit @ rear of basement. add 1 hour corridor adjacent (e) unit. add fire sprinkler system per nfpa 13-r on entirely of basement level. (refer to adu pa# 2016/09/16/8044)Details
legalize (e) dwelling unit @ rear of basement. add 1 hour corridor adjacent (e) unit. add fire sprinkler system per nfpa 13-r on entirely of basement level. (refer to adu pa# 2016/09/16/8044) | $20,600 |
| Jul 20, 2016 | Completed final sign-off Mar 2021 | 955 Pine St | legalize(e) dwg unit per ord. 43-14 relocate bedroom & add door in lieu of egress window; upgrade exit corridor and storage separation wall to be of 1-hr construction. install gfci outlets & dedicated circuit in kitchen. install fire sprinkler system in unit & access path to unit.Details
legalize(e) dwg unit per ord. 43-14 relocate bedroom & add door in lieu of egress window; upgrade exit corridor and storage separation wall to be of 1-hr construction. install gfci outlets & dedicated circuit in kitchen. install fire sprinkler system in unit & access path to unit. | $32,000 | |
| Dec 9, 2015 | Completed final sign-off Sep 2016 | 52 Santa Rosa Av | Mulhall Construction Inc. | convert existing media room on ground floor to bedroom and add full bath and changing areaDetails
convert existing media room on ground floor to bedroom and add full bath and changing area | $20,000 |
| Nov 24, 2015 | Completed final sign-off Feb 2016 | 563 18th Av | Jimenez Construction Sf Inc | reconfigure interior walls to provide office at master bedroom suite. existing outlets to remain on walls where none indicated.Details
reconfigure interior walls to provide office at master bedroom suite. existing outlets to remain on walls where none indicated. | $12,000 |
| Nov 9, 2015 | Completed final sign-off May 2016 | 1235 35th Av | Vector Construction Inc. | build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stairDetails
build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stair | $100,000 |
| Aug 6, 2015 | Never finaled issued Nov 2015, no final | 523 Teresita Bl | add bathroom and changing room to ground floorDetails
add bathroom and changing room to ground floor | $25,000 | |
| Jun 26, 2015 | Completed final sign-off May 2019 | 371 Coleridge St | Vector Construction Inc. | remove (e) front porch & stair. enlarge (e) entry on north side by approximately 15 sf. raise roof height in area of (e) bedroom #2 to legalize ceiling height. enclose (e) sunrooms to create hat]bitable living space. raise roof height at rear portion of house, including sunrooms to provide min.Details
remove (e) front porch & stair. enlarge (e) entry on north side by approximately 15 sf. raise roof height in area of (e) bedroom #2 to legalize ceiling height. enclose (e) sunrooms to create hat]bitable living space. raise roof height at rear portion of house, including sunrooms to provide min. | $110,000 |
| May 20, 2015 | Completed final sign-off Nov 2016 | 485 Justin Dr | ground floor addition to contain bedroom, bathroom, office & laundry room. ** maher: compliance with ordinance no# 155-13 not required **Details
ground floor addition to contain bedroom, bathroom, office & laundry room. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 | |
| Apr 14, 2015 | Completed final sign-off May 2016 | 436 14th St | Mulhall Construction Inc. | re-build (e) non-compliant stair to meet code. construct parapet to protect skylight to legalize skylight.Details
re-build (e) non-compliant stair to meet code. construct parapet to protect skylight to legalize skylight. | $17,000 |
| Feb 20, 2015 | Completed final sign-off Jun 2015 | 75 Westgate Dr | Vector Construction Inc. | convert unconditioned space on gr floor into family roomDetails
convert unconditioned space on gr floor into family room | $46,400 |
| Feb 20, 2015 | Never finaled issued Jul 2016, no final | 586 Prentiss St | add deck to rear of house connecting 2nd floor to rock face at rear of propertyDetails
add deck to rear of house connecting 2nd floor to rock face at rear of property | $18,500 | |
| Dec 10, 2014 | Completed final sign-off Feb 2015 | 3250 Ortega St | add bathroom to ground level, no changes to exterior, no work on upper level.Details
add bathroom to ground level, no changes to exterior, no work on upper level. | $12,000 | |
| Aug 21, 2014 | Expired or cancelled expired Feb 2017 | 4630 18th St | Bay Build Design Inc | legalize existing dwelling unit per ordinance #43-14. work to be performed includes lowering kitchen floor slab to provide 7' ceiling height and installing rescue window at bedroom.Details
legalize existing dwelling unit per ordinance #43-14. work to be performed includes lowering kitchen floor slab to provide 7' ceiling height and installing rescue window at bedroom. | $9,500 |
| Jul 1, 2014 | Completed final sign-off May 2015 | 290 Arch St | Maven Maintenance Inc | replace (e) exterior brick entry stair and repair dry rot to porch framing per plan.Details
replace (e) exterior brick entry stair and repair dry rot to porch framing per plan. | $8,000 |
| Jun 27, 2014 | Completed final sign-off Jun 2018 | 918 Minnesota St | enclose (2) (e) decks to provide living space.Details
enclose (2) (e) decks to provide living space. | $25,000 | |
| Apr 21, 2014 | Completed final sign-off Dec 2014 | 3836 24th St | Jimenez Construction Sf Inc | #2- remodel kitchen and bath of existing dwelling unit #2 including removal of non-bearing wall, no changes to exterior.Details
#2- remodel kitchen and bath of existing dwelling unit #2 including removal of non-bearing wall, no changes to exterior. | $15,000 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 3975 26th St | Jimenez Construction Sf Inc | unit #2 - interior improvement: remove non-bearing wall in kitchen area, replace cabinets & appliances, level & replace sunroom flooring, no change to exterior.Details
unit #2 - interior improvement: remove non-bearing wall in kitchen area, replace cabinets & appliances, level & replace sunroom flooring, no change to exterior. | $15,000 |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 4235 24th St | Vector Construction Inc. | revision to 201310250255. omit posts, footings, and beams in front room. remove special inspection requirement for pull torque test for bolt into existing concreteDetails
revision to 201310250255. omit posts, footings, and beams in front room. remove special inspection requirement for pull torque test for bolt into existing concrete | |
| Oct 25, 2013 | Completed final sign-off Apr 2014 | 4235 24th St | Vector Construction Inc. | interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixturesDetails
interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixtures | $50,000 |
| Oct 10, 2013 | Completed final sign-off Feb 2014 | 3977 26th St | Jimenez Construction Sf Inc | unit #1 - remove non-structural walls, replace kitchen cabinets, no changes to exterior.Details
unit #1 - remove non-structural walls, replace kitchen cabinets, no changes to exterior. | $10,000 |
| Jul 3, 2013 | Expired or cancelled expired Feb 2017 | 274 Arlington St | Jimenez Construction Sf Inc | remodel existing bathroom, relocate one non-structural wall at lower unit., no changes to exterior of bldg.Details
remodel existing bathroom, relocate one non-structural wall at lower unit., no changes to exterior of bldg. | $10,000 |
| Jun 26, 2013 | Completed final sign-off Jan 2014 | 517 Belvedere St | Vector Construction Inc. | rebuild (e) wood stair in revised configuration that adds usable decks at 2nd & 3rd fl units.Details
rebuild (e) wood stair in revised configuration that adds usable decks at 2nd & 3rd fl units. | $20,000 |
| Sep 13, 2012 | Completed final sign-off Mar 2013 | 2378 18th Av | Vector Construction Inc. | remodel basement to add media room, bedroo, bathroom, add cabinets to (e) pantry. add door and replace windows on (e) sunroom, all changes within (e) bldg envelop.Details
remodel basement to add media room, bedroo, bathroom, add cabinets to (e) pantry. add door and replace windows on (e) sunroom, all changes within (e) bldg envelop. | $70,000 |