Permit 202112164572
112 Day St
convert unoccupied space at ground floor to habitable space. infill at rear of ground floor below (e) 2nd floor. (n) interior stair to connect (n) space to (e) 2nd floor unit. (n) rooms to include media room, 2 home offices, 2 full bathrooms. 26 cy excavation
- Outcome
- Completed (city status: complete, May 19, 2025)
- Filed
- Dec 16, 2021
- Permit issued
- Mar 10, 2022
- Final sign-off
- May 19, 2025
- Declared cost
- $200,000
- Building use
- 2 family dwelling
- Neighborhood
- Noe Valley
- Contractor
- Owner-builder: the owner is listed as the builder, so no contractor is ranked for this permit
- Project type
- Stairs, Bathroom remodel
- Property
- All permits at this address (block 6633, lot 009)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Owner-builder
- Owner Builder
- Architect
- Gary Meyer, Wayne Myer Works Arch (license C31705), applicant
- Engineer
- Kathryn Briggs, Base Design (license 5732)