Permit GraphShortlistSan Francisco building permits since 2000

Marc Press

License
3054
State contractor license record
Listed as
architect, designer, engineer
Firm
Kpff Consulting Engineers
Based in
San Francisco
On San Francisco permits
Nov 2004 to Aug 2025

135 permits since 2000 (engineer on 123 permits, architect on 19 permits, designer on 1 permit): 65 completed, 6 in progress, 54 never finaled, 10 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 135.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 20, 2025In progress
issued Nov 2025
1640 Scott StVc & Kw Buildersbuild new elevator pit & hoistway for a machine roomless, gurney-size service elevator (by others). to accomodate the elevator, demolish & rebuild general restroom & accessible guest room/bathroom @ 1st floor. remove 1 guest room/bathroom & replace with office/lounge room @ 2nd floor & remove
Details
Permit
202508062454
Status
reinstated
Filed
Aug 20, 2025
Permit issued
Nov 20, 2025
Declared cost
$850,000
Address
1640 Scott St

build new elevator pit & hoistway for a machine roomless, gurney-size service elevator (by others). to accomodate the elevator, demolish & rebuild general restroom & accessible guest room/bathroom @ 1st floor. remove 1 guest room/bathroom & replace with office/lounge room @ 2nd floor & remove

Open the permit page

$850,000
Apr 24, 2025Expired or cancelled
cancelled May 2025
1640 Scott StVc & Kw Buildersbuild new elevator pit and hoistway for a machine roomless, gurney style service elevator (by others) to access three stories abive grade with control at 3rd fl to accomodate the elevator demolish and rebuild general restroom and accessible guest room/bathroom.
Details
Permit
202504245112
Status
cancelled
Filed
Apr 24, 2025
Declared cost
$850,000
Address
1640 Scott St

build new elevator pit and hoistway for a machine roomless, gurney style service elevator (by others) to access three stories abive grade with control at 3rd fl to accomodate the elevator demolish and rebuild general restroom and accessible guest room/bathroom.

Open the permit page

$850,000
Mar 10, 2025In progress
issued May 2025
1501 Sunnydale AvGuzman Construction Group Inc.priority processing. mayor's dir #17-02. sunnydale block 7: construction of tower crane foundation. this foundation will be intergral with the mat foundation of the building.
Details
Permit
202503051638
Status
issued
Filed
Mar 10, 2025
Permit issued
May 7, 2025
Declared cost
$100,000
Address
1501 Sunnydale Av

priority processing. mayor's dir #17-02. sunnydale block 7: construction of tower crane foundation. this foundation will be intergral with the mat foundation of the building.

Open the permit page

$100,000
Nov 21, 2024In progress
issued Jan 2025
2000 Mckinnon AvOpi Commercial Buildersconstruct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room.
Details
Permit
202411215509
Status
issued
Filed
Nov 21, 2024
Permit issued
Jan 7, 2025
Declared cost
$180,000
Address
2000 Mckinnon Av

construct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room.

Open the permit page

$180,000
Aug 6, 2024In progress
issued Aug 2024
2270 Mckinnon Avinstallation of (6) indicator piles for exploratory purposes of an existing asphalt parking lot. asphault paving and existing structures to remain.
Details
Permit
202408068076
Status
issued
Filed
Aug 6, 2024
Permit issued
Aug 29, 2024
Declared cost
$60,000
Address
2270 Mckinnon Av

installation of (6) indicator piles for exploratory purposes of an existing asphalt parking lot. asphault paving and existing structures to remain.

Open the permit page

$60,000
Sep 22, 2023In progress
issued Aug 2024
967 Mission StNibbi Bros Assoc Inc.mayoral ed 13-01 priority process ab004 - erect 9-story residential apartment building, 95 dwelling units with no basement,type 1a.
Details
Permit
202309227225
Status
issued
Filed
Sep 22, 2023
Permit issued
Aug 19, 2024
Declared cost
$61,000,000
Address
967 Mission St

mayoral ed 13-01 priority process ab004 - erect 9-story residential apartment building, 95 dwelling units with no basement,type 1a.

Open the permit page

$61,000,000
Apr 19, 2023Completed
final sign-off Dec 2024
2000 Mckinnon AvOpi Commercial Buildersrevision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy.
Details
Permit
202304196062
Status
complete
Filed
Apr 19, 2023
Permit issued
Feb 16, 2024
Final sign-off
Dec 16, 2024
Address
2000 Mckinnon Av

revision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy.

Open the permit page

Nov 29, 2022In progress
issued Jun 2024
1501 Sunnydale AvGuzman Construction Group Inc.priority processing. mayor's dir #17-02. erect a 5-story,89 dwelling units,with parking,assembly and offices. type va.
Details
Permit
202211297323
Status
issued
Filed
Nov 29, 2022
Permit issued
Jun 11, 2024
Declared cost
$45,000,000
Address
1501 Sunnydale Av

priority processing. mayor's dir #17-02. erect a 5-story,89 dwelling units,with parking,assembly and offices. type va.

Open the permit page

$45,000,000
Apr 12, 2022Completed
final sign-off Aug 2023
570 Beale StPromax Builders Inc Dba Procraft Builderrevision to pa 2019-1226-0698. shear wall relocation a 1 story existing shear wall (that was undercovered during demo) to allow for the approved layout of the amenity space. building # 4 - 570 beale st.
Details
Permit
202204122021
Status
complete
Filed
Apr 12, 2022
Permit issued
Apr 28, 2022
Final sign-off
Aug 30, 2023
Address
570 Beale St

revision to pa 2019-1226-0698. shear wall relocation a 1 story existing shear wall (that was undercovered during demo) to allow for the approved layout of the amenity space. building # 4 - 570 beale st.

Open the permit page

Mar 30, 2022Completed
final sign-off Jan 2024
901 16th StTruebeck Constructionrevision to pa#202010055938. it includes work associated with the construction of a transformer vault and adjacent electrical room. transformer room equipment and electrical room equipment to be non-energized until permits associated with permit no. 202101112460 have been approved.
Details
Permit
202203301250
Status
complete
Filed
Mar 30, 2022
Permit issued
Dec 28, 2022
Final sign-off
Jan 29, 2024
Declared cost
$30,000
Address
901 16th St

revision to pa#202010055938. it includes work associated with the construction of a transformer vault and adjacent electrical room. transformer room equipment and electrical room equipment to be non-energized until permits associated with permit no. 202101112460 have been approved.

Open the permit page

$30,000
Apr 2, 2021Never finaled
issued Jan 2023, no final
3 Bayside Village PlC C I Commercial Construction & Improvbuilding 8, podium 3: renovations to existing leasing office and property management.
Details
Permit
202104027832
Status
issued
Filed
Apr 2, 2021
Permit issued
Jan 9, 2023
Declared cost
$1,003,000
Address
3 Bayside Village Pl

building 8, podium 3: renovations to existing leasing office and property management.

Open the permit page

$1,003,000
Mar 9, 2021Expired or cancelled
cancelled Jan 2026
3 Bayside Village Plpodium 3, level p1: new pool equipment room in garage. podium 3, level 1: renovation of existing courtyard.
Details
Permit
202103096204
Status
cancelled
Filed
Mar 9, 2021
Declared cost
$1,920,000
Address
3 Bayside Village Pl

podium 3, level p1: new pool equipment room in garage. podium 3, level 1: renovation of existing courtyard.

Open the permit page

$1,920,000
Mar 5, 2021Expired or cancelled
withdrawn Oct 2021
3 Bayside Village Plpodium 2, level p1: new pool equipment room in garage. podium 2, level 1: renovation of existing courtyard.
Details
Permit
202103055955
Status
withdrawn
Filed
Mar 5, 2021
Declared cost
$1,040,000
Address
3 Bayside Village Pl

podium 2, level p1: new pool equipment room in garage. podium 2, level 1: renovation of existing courtyard.

Open the permit page

$1,040,000
Mar 4, 2021Expired or cancelled
withdrawn Oct 2021
3 Bayside Village Plpodium 1, level 1 p1: new pool equipment room in garage. podium 1, level 1: renovation of existing courtyard.
Details
Permit
202103045896
Status
withdrawn
Filed
Mar 4, 2021
Declared cost
$1,222,145
Address
3 Bayside Village Pl

podium 1, level 1 p1: new pool equipment room in garage. podium 1, level 1: renovation of existing courtyard.

Open the permit page

$1,222,145
Jan 25, 2021Expired or cancelled
cancelled Nov 2024
160 Brannan StRegency General Contractors Incbldg 1, 2, 3. exterior work only, alterations to facade of existing buildings. all buildings: paint exterior. bldg 1: metal canopy at building corner entrance. bldg 3: metal with glass canopies.
Details
Permit
202101253238
Status
cancelled
Filed
Jan 25, 2021
Declared cost
$100,000
Address
160 Brannan St

bldg 1, 2, 3. exterior work only, alterations to facade of existing buildings. all buildings: paint exterior. bldg 1: metal canopy at building corner entrance. bldg 3: metal with glass canopies.

Open the permit page

$100,000
Jan 25, 2021Expired or cancelled
cancelled Nov 2024
570 Beale StRegency General Contractors Incall buildings: paint exteriors building 4: remove fabric canopies at amenity. building 5: metal canopy at building corner entrance. replace corner entrance guardrail.
Details
Permit
202101253237
Status
cancelled
Filed
Jan 25, 2021
Declared cost
$100,000
Address
570 Beale St

all buildings: paint exteriors building 4: remove fabric canopies at amenity. building 5: metal canopy at building corner entrance. replace corner entrance guardrail.

Open the permit page

$100,000
Jan 11, 2021Never finaled
issued Feb 2022, no final
901 16th StTruebeck Constructioncombine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)
Details
Permit
202101112460
Status
issued
Filed
Jan 11, 2021
Permit issued
Feb 14, 2022
Declared cost
$40,000,000
Address
901 16th St

combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)

Open the permit page

$40,000,000
Dec 3, 2019Completed
final sign-off Feb 2021
969 Treat AvGuzman Construction Group Inc.revision to bpa #201810233943. minor structural changes.
Details
Permit
201912038579
Status
complete
Filed
Dec 3, 2019
Permit issued
Feb 20, 2020
Final sign-off
Feb 5, 2021
Address
969 Treat Av

revision to bpa #201810233943. minor structural changes.

Open the permit page

Dec 20, 2018Completed
final sign-off Dec 2020
2230 Jerrold AvPlant Construction Co, Lperect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.
Details
Permit
201812208904
Status
complete
Filed
Dec 20, 2018
Permit issued
Jun 17, 2019
Final sign-off
Dec 2, 2020
Declared cost
$10,471,820
Address
2230 Jerrold Av

erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.

Open the permit page

$10,471,820
Oct 11, 2018Completed
final sign-off Nov 2018
1900 Jerrold AvO'dwyer Construction Increpair of one damaged light steel column web and voluntary preotection of existing light steel columns on the loading dock at the san francisco wholesale produce market. maher na
Details
Permit
201810112901
Status
complete
Filed
Oct 11, 2018
Permit issued
Oct 22, 2018
Final sign-off
Nov 16, 2018
Declared cost
$10,000
Address
1900 Jerrold Av

repair of one damaged light steel column web and voluntary preotection of existing light steel columns on the loading dock at the san francisco wholesale produce market. maher na

Open the permit page

$10,000
Oct 9, 2018Never finaled
filed Oct 2018, never issued
1055 Market Stto erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms.
Details
Permit
201810092664
Status
filed
Filed
Oct 9, 2018
Declared cost
$25,250,000
Address
1055 Market St

to erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms.

Open the permit page

$25,250,000
Aug 31, 2018Completed
final sign-off Mar 2021
1532 Harrison StCannon Constructors North Increvision to pa 2016-0725-3262 s1 for 10x10 slab opening at garden level reinforced concrete slab for tower crane ** maher: exempted - see attached approval from dph **
Details
Permit
201808318916
Status
complete
Filed
Aug 31, 2018
Permit issued
Nov 13, 2018
Final sign-off
Mar 30, 2021
Declared cost
$10,000
Address
1532 Harrison St

revision to pa 2016-0725-3262 s1 for 10x10 slab opening at garden level reinforced concrete slab for tower crane ** maher: exempted - see attached approval from dph **

Open the permit page

$10,000
Aug 2, 2018Completed
final sign-off Oct 2020
333 12th StCharles Pankow Builders Ltdoperate tower crane
Details
Permit
201808026239
Status
complete
Filed
Aug 2, 2018
Permit issued
Aug 22, 2018
Final sign-off
Oct 23, 2020
Declared cost
$100,000
Address
333 12th St

operate tower crane

Open the permit page

$100,000
Jun 21, 2018Completed
final sign-off Dec 2018
267 Green Strevision to 201609147705. shortening gl-3 moment frame beam span. change from braced frame to dbl sided shear wall plywood at level b4. revision to gl 3.8 moment frame to continue down to level b2
Details
Permit
201806212519
Status
complete
Filed
Jun 21, 2018
Permit issued
Jul 18, 2018
Final sign-off
Dec 19, 2018
Address
267 Green St

revision to 201609147705. shortening gl-3 moment frame beam span. change from braced frame to dbl sided shear wall plywood at level b4. revision to gl 3.8 moment frame to continue down to level b2

Open the permit page

May 16, 2018Completed
final sign-off Jun 2021
1532 Harrison StCannon Constructors North Inctower crane foundation for new construction. ref pa# 2016/07/25/3262-s. ** maher: exempted - approval from dph attached. **
Details
Permit
201805169297
Status
complete
Filed
May 16, 2018
Permit issued
Nov 15, 2018
Final sign-off
Jun 15, 2021
Declared cost
$8,100
Address
1532 Harrison St

tower crane foundation for new construction. ref pa# 2016/07/25/3262-s. ** maher: exempted - approval from dph attached. **

Open the permit page

$8,100
Mar 29, 2018Never finaled
issued Aug 2018, no final
526 Mission StSwinerton/Webcor Jvrevision to approved permit application #2018/0119/9030 to include tie-in details for tower crabe above level 8
Details
Permit
201803294947
Status
issued
Filed
Mar 29, 2018
Permit issued
Aug 28, 2018
Declared cost
$250,000
Address
526 Mission St

revision to approved permit application #2018/0119/9030 to include tie-in details for tower crabe above level 8

Open the permit page

$250,000
May 17, 2017Never finaled
issued Jul 2017, no final
952 Sutter StPs2 Increvision to app#201703020501. work includes layout change to interior remodel of 3 extg dwelling units on levels 2-4 (units #205,305,405)new slab on grade in crawl space on level 1 for future mech. equip. no exterior work. no change in unit sq ft or occupancy. mep & fire protection under seperate.
Details
Permit
201705176867
Status
issued
Filed
May 17, 2017
Permit issued
Jul 21, 2017
Declared cost
$6,000
Address
952 Sutter St

revision to app#201703020501. work includes layout change to interior remodel of 3 extg dwelling units on levels 2-4 (units #205,305,405)new slab on grade in crawl space on level 1 for future mech. equip. no exterior work. no change in unit sq ft or occupancy. mep & fire protection under seperate.

Open the permit page

$6,000
May 8, 2017Never finaled
issued May 2017, no final
525 Market StA & B Constructionstructural work for new concrete pilaster thrust block below a n low pressure 6" diameter fire hydrant at sidewalk above hydrant and pipes by others
Details
Permit
201705085992
Status
issued
Filed
May 8, 2017
Permit issued
May 16, 2017
Declared cost
$4,000
Address
525 Market St

structural work for new concrete pilaster thrust block below a n low pressure 6" diameter fire hydrant at sidewalk above hydrant and pipes by others

Open the permit page

$4,000
Apr 13, 2017Completed
final sign-off Oct 2020
119 07th Stprovide tower crane foundation plans.
Details
Permit
201704133915
Status
complete
Filed
Apr 13, 2017
Permit issued
Apr 14, 2017
Final sign-off
Oct 23, 2020
Declared cost
$20,000
Address
119 07th St

provide tower crane foundation plans.

Open the permit page

$20,000
Mar 20, 2017Never finaled
issued Apr 2017, no final
85 02nd StA & B Constructionbasement: repair ceiling of (e) basement that consists of rebar for the above slab, concrete mix and water proofing on top. concrete mix: base master emaco s466c1 or equivalent. work done at northern easterly corner as noted on plans.
Details
Permit
201703201876
Status
issued
Filed
Mar 20, 2017
Permit issued
Apr 3, 2017
Declared cost
$10,000
Address
85 02nd St

basement: repair ceiling of (e) basement that consists of rebar for the above slab, concrete mix and water proofing on top. concrete mix: base master emaco s466c1 or equivalent. work done at northern easterly corner as noted on plans.

Open the permit page

$10,000
Mar 7, 2017Never finaled
issued Mar 2017, no final
500 Pine StPlant Construction Co, Lp3/f & 4/f: structural steel stair with wood finishing & steel handrail, mep/fire/life safety under sep permit ref 201702280233
Details
Permit
201703070796
Status
issued
Filed
Mar 7, 2017
Permit issued
Mar 10, 2017
Declared cost
$175,000
Address
500 Pine St

3/f & 4/f: structural steel stair with wood finishing & steel handrail, mep/fire/life safety under sep permit ref 201702280233

Open the permit page

$175,000
Feb 9, 2017Never finaled
issued Mar 2017, no final
23 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal to an already issued master building permit (pa 2015-1103-1512). scope of work is the rear yard spiral stairs and associated calculations
Details
Permit
201702099025
Status
issued
Filed
Feb 9, 2017
Permit issued
Mar 24, 2017
Address
23 Summit Wy

deferred submittal to an already issued master building permit (pa 2015-1103-1512). scope of work is the rear yard spiral stairs and associated calculations

Open the permit page

Dec 19, 2016Completed
final sign-off Feb 2019
1255 Columbus AvPacific General Constructionrevision to 201306149565 s1: minor structural revisions for foundation and retaining wall with revised geotechnical report. maher na
Details
Permit
201612195260
Status
complete
Filed
Dec 19, 2016
Permit issued
Dec 19, 2016
Final sign-off
Feb 4, 2019
Address
1255 Columbus Av

revision to 201306149565 s1: minor structural revisions for foundation and retaining wall with revised geotechnical report. maher na

Open the permit page

Nov 28, 2016Never finaled
issued Mar 2017, no final
315 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal to master bldg pa 201209119424 which was revised in pa 201407100858. scope of work is the rear yard spiral stairs and associated calculations. original bldg revised/approved under 700 brotherhood way, 201407100858.
Details
Permit
201611283517
Status
issued
Filed
Nov 28, 2016
Permit issued
Mar 24, 2017
Address
315 Summit Wy

deferred submittal to master bldg pa 201209119424 which was revised in pa 201407100858. scope of work is the rear yard spiral stairs and associated calculations. original bldg revised/approved under 700 brotherhood way, 201407100858.

Open the permit page

Sep 23, 2016Completed
final sign-off Sep 2017
28 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064042 (type d1, elev.b) by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238641
Status
complete
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
28 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064042 (type d1, elev.b) by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
16 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046478 (type d1, elev.a)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238628
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
16 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046478 (type d1, elev.a)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
18 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046479 (type d1, elev.c) by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238625
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
18 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046479 (type d1, elev.c) by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
56 Summit WyComstock Crosser & Assoc Develp Co Inc.a - deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064038 (type a, elev.c) by reference to pa #201407100857 master permit & pa #201403100313 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans
Details
Permit
201609238647
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
56 Summit Wy

a - deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064038 (type a, elev.c) by reference to pa #201407100857 master permit & pa #201403100313 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Completed
final sign-off Jun 2017
26 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064041 (type d1, elev.a) by reference to pa #201209119426 master permit & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238640
Status
complete
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Final sign-off
Jun 20, 2017
Declared cost
$3,000
Address
26 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064041 (type d1, elev.a) by reference to pa #201209119426 master permit & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
12 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046477 (type d1, elev.b)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238627
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
12 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046477 (type d1, elev.b)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
17 Summit WyComstock Crosser & Assoc Develp Co Inc.d2 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064045 (type d2, elev.b) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans
Details
Permit
201609238644
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
17 Summit Wy

d2 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064045 (type d2, elev.b) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
2 Summit WyComstock Crosser & Assoc Develp Co Inc.f -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046472 (type f, elev.a) by reference to pa #201209119428 master permit plan & pa #201512165305 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238631
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
2 Summit Wy

f -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046472 (type f, elev.a) by reference to pa #201209119428 master permit plan & pa #201512165305 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
10 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046476 (type d1, elev.a)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238629
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
10 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046476 (type d1, elev.a)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Completed
final sign-off Sep 2017
317 Summit WyComstock Crosser & Assoc Develp Co Inc.g -deferred submittal of roof truss framing & associated calculations @ above address with pa#201605046484 (type g, elev.a) by reference to pa #201209119429 master permit plan & pa #201602129468 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238622
Status
complete
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Final sign-off
Sep 13, 2017
Declared cost
$3,000
Address
317 Summit Wy

g -deferred submittal of roof truss framing & associated calculations @ above address with pa#201605046484 (type g, elev.a) by reference to pa #201209119429 master permit plan & pa #201602129468 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
21 Summit WyComstock Crosser & Assoc Develp Co Inc.d2 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064047 (type d2, elev.b) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238646
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
21 Summit Wy

d2 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064047 (type d2, elev.b) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
32 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064044 (type d1, elev.a) by reference to pa #201209119426 master permit & pa #201608185334 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans
Details
Permit
201609238643
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
32 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064044 (type d1, elev.a) by reference to pa #201209119426 master permit & pa #201608185334 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
19 Summit WyComstock Crosser & Assoc Develp Co Inc.d2 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064046 (type d2, elev.c) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans
Details
Permit
201609238645
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
19 Summit Wy

d2 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064046 (type d2, elev.c) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
311 Summit WyComstock Crosser & Assoc Develp Co Inc.b -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046482 (type b, elev.c) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238624
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
311 Summit Wy

b -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046482 (type b, elev.c) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
30 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064043 (type d1, elev.c) by reference to pa #201209119426 master permit & pa #201608185334 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans
Details
Permit
201609238642
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
30 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064043 (type d1, elev.c) by reference to pa #201209119426 master permit & pa #201608185334 master bldg roof truss plan & calculation.this an identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Completed
final sign-off Sep 2017
15 Summit WyComstock Crosser & Assoc Develp Co Inc.d2 - deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046481 (type d2, elev.c) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238616
Status
complete
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Final sign-off
Sep 13, 2017
Declared cost
$3,000
Address
15 Summit Wy

d2 - deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046481 (type d2, elev.c) by reference to pa #201511031512 master permit & pa #201608185332 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Completed
final sign-off Jun 2017
22 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064040 (type d1, elev.c) by reference to pa #201209119426. master permit & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238639
Status
complete
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Final sign-off
Jun 20, 2017
Declared cost
$3,000
Address
22 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201604064040 (type d1, elev.c) by reference to pa #201209119426. master permit & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
20 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046480 (type d1, elev.b)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238626
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
20 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046480 (type d1, elev.b)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Never finaled
issued Oct 2016, no final
8 Summit WyComstock Crosser & Assoc Develp Co Inc.d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046475 (type d1, elev.c)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238630
Status
issued
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Declared cost
$3,000
Address
8 Summit Wy

d1 -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046475 (type d1, elev.c)by reference to pa #201209119426 master permit plan & pa #201608185334 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 23, 2016Completed
final sign-off Sep 2017
313 Summit WyComstock Crosser & Assoc Develp Co Inc.b -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046483 (type b, elev.a) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans
Details
Permit
201609238623
Status
complete
Filed
Sep 23, 2016
Permit issued
Oct 7, 2016
Final sign-off
Sep 13, 2017
Declared cost
$3,000
Address
313 Summit Wy

b -deferred submittal of roof truss framing & associated calculations @ above address w/pa#201605046483 (type b, elev.a) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan & calculation.this is identical reuse of the master bldg & truss permit plans

Open the permit page

$3,000
Sep 14, 2016Completed
final sign-off Dec 2018
267 Green StWickman Development And Constructionsoft story retrofit using iebc appendix a4
Details
Permit
201609147705
Status
complete
Filed
Sep 14, 2016
Permit issued
Dec 22, 2017
Final sign-off
Dec 19, 2018
Declared cost
$175,000
Address
267 Green St

soft story retrofit using iebc appendix a4

Open the permit page

$175,000
Sep 8, 2016Completed
final sign-off Mar 2018
1260 BroadwayWickman Development And Constructionreinforce existing bldg under the sf soft story ordinance. exterior walls will be modified to be new shear walls. new special moment frames will be installed 2012 iebc a4. n/a for maher ordianance no.155-13.
Details
Permit
201609087030
Status
complete
Filed
Sep 8, 2016
Permit issued
May 4, 2017
Final sign-off
Mar 22, 2018
Declared cost
$125,000
Address
1260 Broadway

reinforce existing bldg under the sf soft story ordinance. exterior walls will be modified to be new shear walls. new special moment frames will be installed 2012 iebc a4. n/a for maher ordianance no.155-13.

Open the permit page

$125,000
Jul 12, 2016Expired or cancelled
expired Feb 2019
2075 Market Stcommercial- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, new barrier removal to provide accessible entries. residential permit app# 2016-0712-2104.
Details
Permit
201607122101
Status
expired
Filed
Jul 12, 2016
Permit issued
Sep 9, 2016
Declared cost
$48,375
Address
2075 Market St

commercial- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, new barrier removal to provide accessible entries. residential permit app# 2016-0712-2104.

Open the permit page

$48,375
Jul 12, 2016Expired or cancelled
expired Feb 2019
2075 Market Stresidential- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, no work in residential units, all work under pa#201607122101
Details
Permit
201607122104
Status
expired
Filed
Jul 12, 2016
Permit issued
Sep 9, 2016
Declared cost
$76,625
Address
2075 Market St

residential- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, no work in residential units, all work under pa#201607122101

Open the permit page

$76,625
Jun 22, 2016Completed
final sign-off Oct 2017
400 Duboce AvWickman Development And Constructionsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. add new wood shear walls at basement, add holdowns at ends of shear walls & anchor bolts to (e) foundation.
Details
Permit
201606220566
Status
complete
Filed
Jun 22, 2016
Permit issued
Oct 4, 2016
Final sign-off
Oct 6, 2017
Declared cost
$100,000
Address
400 Duboce Av

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. add new wood shear walls at basement, add holdowns at ends of shear walls & anchor bolts to (e) foundation.

Open the permit page

$100,000
May 16, 2016Completed
final sign-off Aug 2019
952 Sutter StTrim Fit Constr. - O'reilly Engineering, Delta General Engineering Pcnon-structural interior remodel of existing dwelling unit 101 on level 1. addition of five (n) dwelling units in basement.
Details
Permit
201605167516
Status
complete
Filed
May 16, 2016
Permit issued
Nov 1, 2018
Final sign-off
Aug 28, 2019
Declared cost
$585,858
Address
952 Sutter St

non-structural interior remodel of existing dwelling unit 101 on level 1. addition of five (n) dwelling units in basement.

Open the permit page

$585,858
Apr 22, 2016Never finaled
issued Jul 2016, no final
600 California StThomas Swan Sign Co Incerect (2) single faced electric wall illum sign. maher na
Details
Permit
201604225437
Status
issued
Filed
Apr 22, 2016
Permit issued
Jul 12, 2016
Declared cost
$10,000
Address
600 California St

erect (2) single faced electric wall illum sign. maher na

Open the permit page

$10,000
Apr 22, 2016Never finaled
issued Jul 2016, no final
600 California StThomas Swan Sign Co Incerect single faced electric wall illum sign. maher na
Details
Permit
201604225438
Status
issued
Filed
Apr 22, 2016
Permit issued
Jul 12, 2016
Declared cost
$2,000
Address
600 California St

erect single faced electric wall illum sign. maher na

Open the permit page

$2,000
Feb 19, 2016Completed
final sign-off Sep 2017
66 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing & associated calcs @above address with pa 201511031508(type a,elev.a)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.
Details
Permit
201602190015
Status
complete
Filed
Feb 19, 2016
Permit issued
Mar 4, 2016
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
66 Summit Wy

deferred submittal of roof truss framing & associated calcs @above address with pa 201511031508(type a,elev.a)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.

Open the permit page

$3,000
Feb 19, 2016Completed
final sign-off Sep 2017
76 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing & associated calcs @above address with pa 201511031510(typea,elev.c)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.
Details
Permit
201602190017
Status
complete
Filed
Feb 19, 2016
Permit issued
Mar 4, 2016
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
76 Summit Wy

deferred submittal of roof truss framing & associated calcs @above address with pa 201511031510(typea,elev.c)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.

Open the permit page

$3,000
Feb 19, 2016Completed
final sign-off Sep 2017
80 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing & associated calcs @above address with pa 201511031511(typea,elev.a)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.
Details
Permit
201602190011
Status
complete
Filed
Feb 19, 2016
Permit issued
Mar 4, 2016
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
80 Summit Wy

deferred submittal of roof truss framing & associated calcs @above address with pa 201511031511(typea,elev.a)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.

Open the permit page

$3,000
Feb 19, 2016Completed
final sign-off Sep 2017
60 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing & associated calcs @ above address with pa 201511031507(type a,elev.b)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals. this is identical reuse of the master bldg & truss permit plans.
Details
Permit
201602190014
Status
complete
Filed
Feb 19, 2016
Permit issued
Mar 4, 2016
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
60 Summit Wy

deferred submittal of roof truss framing & associated calcs @ above address with pa 201511031507(type a,elev.b)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals. this is identical reuse of the master bldg & truss permit plans.

Open the permit page

$3,000
Feb 19, 2016Completed
final sign-off Sep 2017
70 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing & associated calcs @above address with pa 201511031509(typea,elev.b)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.
Details
Permit
201602190016
Status
complete
Filed
Feb 19, 2016
Permit issued
Mar 4, 2016
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
70 Summit Wy

deferred submittal of roof truss framing & associated calcs @above address with pa 201511031509(typea,elev.b)ref.to pa201407100857 master permit plan & pa 201403100313 master bldg roof truss plan & cals.this is identical reuse of the master bldg & truss permit plans.

Open the permit page

$3,000
Feb 12, 2016Never finaled
issued Apr 2016, no final
261 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing calculations - building type g (ref pa 2012-0911-9429) as master roof truss plan for building type g
Details
Permit
201602129468
Status
issued
Filed
Feb 12, 2016
Permit issued
Apr 6, 2016
Declared cost
$3,000
Address
261 Summit Wy

deferred submittal of roof truss framing calculations - building type g (ref pa 2012-0911-9429) as master roof truss plan for building type g

Open the permit page

$3,000
Dec 16, 2015Never finaled
issued Mar 2016, no final
276 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of rooftruss framing calculations bldg tye f. reference app#201209119428.
Details
Permit
201512165305
Status
issued
Filed
Dec 16, 2015
Permit issued
Mar 4, 2016
Declared cost
$3,000
Address
276 Summit Wy

deferred submittal of rooftruss framing calculations bldg tye f. reference app#201209119428.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
265 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290141 (type b, elev c) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182949
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
265 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290141 (type b, elev c) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
269 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290144 (type b, elev c) by reference pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182951
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
269 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290144 (type b, elev c) by reference pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
259 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss at above address with pa #201506290142 (type b, elev b) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182948
Status
complete
Filed
Nov 18, 2015
Permit issued
Apr 6, 2016
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
259 Summit Wy

deferred submittal of roof truss at above address with pa #201506290142 (type b, elev b) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
272 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290140 (type b, elev c) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182947
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
272 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290140 (type b, elev c) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
266 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290137 (type b, elev b) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182943
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
266 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290137 (type b, elev b) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
267 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290143 (type b, elev b) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182950
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
267 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290143 (type b, elev b) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
271 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290145 (type b, elev a) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182952
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 15, 2017
Declared cost
$3,000
Address
271 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290145 (type b, elev a) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Never finaled
issued Dec 2015, no final
270 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290139 (type b, elev a) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182946
Status
issued
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Declared cost
$3,000
Address
270 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290139 (type b, elev a) by reference to pa #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Nov 18, 2015Completed
final sign-off Sep 2017
268 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing + associated calcs at above address with pa #201506290138 (type b, elev c) by ref #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.
Details
Permit
201511182945
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 29, 2015
Final sign-off
Sep 19, 2017
Declared cost
$3,000
Address
268 Summit Wy

deferred submittal of roof truss framing + associated calcs at above address with pa #201506290138 (type b, elev c) by ref #201407100858 master permit plan & pa #201403100318 master bldg roof truss plan + calculation. this is an identical reuse of the master bldg + truss permit plans.

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Sep 2017
260 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with 201506098470 (type b, elv a by ref to 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuse of master bldg and truss permit plan
Details
Permit
201510301228
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Sep 27, 2017
Declared cost
$3,000
Address
260 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with 201506098470 (type b, elv a by ref to 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuse of master bldg and truss permit plan

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Sep 2017
258 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof trus framing and associated calculations at above address with pa 201506098469 type b,elev b by ref 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuseof master bldg and truss permit plan
Details
Permit
201510301224
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Sep 27, 2017
Declared cost
$3,000
Address
258 Summit Wy

deferred submittal of roof trus framing and associated calculations at above address with pa 201506098469 type b,elev b by ref 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuseof master bldg and truss permit plan

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Sep 2017
256 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof trus framing and associated calculations at above address with pa 201506098468 type b,elec c by ref 201407100858 master permit plan and 201403100318 master building roof truss plan and calc. identical master bldg and truss permit plans
Details
Permit
201510301220
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Sep 27, 2017
Declared cost
$3,000
Address
256 Summit Wy

deferred submittal of roof trus framing and associated calculations at above address with pa 201506098468 type b,elec c by ref 201407100858 master permit plan and 201403100318 master building roof truss plan and calc. identical master bldg and truss permit plans

Open the permit page

$3,000
Oct 30, 2015Never finaled
issued Nov 2015, no final
252 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with pa 201506098467, type b, elev a by ref 201407100858 master permit 201403100318. master bldg roof truss plan and calc. identical reuse of master bldg and truss plans
Details
Permit
201510301219
Status
issued
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Declared cost
$3,000
Address
252 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with pa 201506098467, type b, elev a by ref 201407100858 master permit 201403100318. master bldg roof truss plan and calc. identical reuse of master bldg and truss plans

Open the permit page

$3,000
Oct 30, 2015Never finaled
issued Nov 2015, no final
230 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof trus framing and associated calculations at above address with pa pa201506098465 type a, elev b by ref to pa 201407100857 master permit plan and 201403100313 master bldg roof truss plan and calculation. identical reuse of master bldg and truss permit plans
Details
Permit
201510301211
Status
issued
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Declared cost
$3,000
Address
230 Summit Wy

deferred submittal of roof trus framing and associated calculations at above address with pa pa201506098465 type a, elev b by ref to pa 201407100857 master permit plan and 201403100313 master bldg roof truss plan and calculation. identical reuse of master bldg and truss permit plans

Open the permit page

$3,000
Oct 30, 2015Never finaled
issued Nov 2015, no final
238 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with 201506098476 type e elev a by ref 201209119427 master permit plan and 201508285526 master bldg roof truss plan and cal. identical reuse of master bldg and truss permit plans
Details
Permit
201510301240
Status
issued
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Declared cost
$3,000
Address
238 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with 201506098476 type e elev a by ref 201209119427 master permit plan and 201508285526 master bldg roof truss plan and cal. identical reuse of master bldg and truss permit plans

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Sep 2017
255 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with pa 201506098473 type b, elev c by ref 201407100858 master permit plan and 201403100318 master bldg roof truss plan and cal. identical reuse of master bldg and truss permit plans
Details
Permit
201510301236
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Sep 27, 2017
Declared cost
$3,000
Address
255 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with pa 201506098473 type b, elev c by ref 201407100858 master permit plan and 201403100318 master bldg roof truss plan and cal. identical reuse of master bldg and truss permit plans

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Sep 2017
251 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with 201506098474 type e, elev a by ref 201209119427 master permit plan and 20150828556 master bldg roof truss plan and cal. identical reuse of master bldg and truss permit plans
Details
Permit
201510301242
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Sep 27, 2017
Declared cost
$3,000
Address
251 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with 201506098474 type e, elev a by ref 201209119427 master permit plan and 20150828556 master bldg roof truss plan and cal. identical reuse of master bldg and truss permit plans

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Sep 2017
257 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with pa 201506098475 type b, elev a by ref to 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuse of master bldg and truss permit
Details
Permit
201510301237
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Sep 27, 2017
Declared cost
$3,000
Address
257 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with pa 201506098475 type b, elev a by ref to 201407100858 master permit plan and 201403100318 master bldg roof truss plan and calc. identical reuse of master bldg and truss permit

Open the permit page

$3,000
Oct 30, 2015Never finaled
issued Nov 2015, no final
226 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with pa 201506098455 type a elev a by ref to 201407100857 master permit plan pa 201403100313 master bldg roof truss plan and calculation. reuse of master bldg and truss permit plans
Details
Permit
201510301207
Status
issued
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Declared cost
$3,000
Address
226 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with pa 201506098455 type a elev a by ref to 201407100857 master permit plan pa 201403100313 master bldg roof truss plan and calculation. reuse of master bldg and truss permit plans

Open the permit page

$3,000
Oct 30, 2015Completed
final sign-off Nov 2016
262 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address pa 201506098471, type b, elev c by ref to 201407100858 master permit plan dna 201403100318 master bldg roof truss plan and calc. identical reuse of master bldg and truss permit
Details
Permit
201510301233
Status
complete
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Final sign-off
Nov 22, 2016
Declared cost
$3,000
Address
262 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address pa 201506098471, type b, elev c by ref to 201407100858 master permit plan dna 201403100318 master bldg roof truss plan and calc. identical reuse of master bldg and truss permit

Open the permit page

$3,000
Oct 30, 2015Never finaled
issued Nov 2015, no final
236 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing and associated calculations at above address with pa 201506098466 type b elev a, by ref to 201407100858 master permit. plan pa 201403100318 master bldg roof truss plan and calculation. reuse of master bldg and truss permit plans
Details
Permit
201510301212
Status
issued
Filed
Oct 30, 2015
Permit issued
Nov 13, 2015
Declared cost
$3,000
Address
236 Summit Wy

deferred submittal of roof truss framing and associated calculations at above address with pa 201506098466 type b elev a, by ref to 201407100858 master permit. plan pa 201403100318 master bldg roof truss plan and calculation. reuse of master bldg and truss permit plans

Open the permit page

$3,000
Aug 28, 2015Never finaled
issued Oct 2015, no final
250 Summit WyComstock Crosser & Assoc Develp Co Inc.deferred submittal of roof truss framing calculations for building "e" (ref app#201209119427).
Details
Permit
201508285526
Status
issued
Filed
Aug 28, 2015
Permit issued
Oct 16, 2015
Declared cost
$3,000
Address
250 Summit Wy

deferred submittal of roof truss framing calculations for building "e" (ref app#201209119427).

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
200 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279496 - type a, elev a. ref pa 201407100857 & 201403100313
Details
Permit
201508265292
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
200 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279496 - type a, elev a. ref pa 201407100857 & 201403100313

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
175 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279501 - type c, elev b. ref pa 201401317504 & 201403100320
Details
Permit
201508265287
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
175 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279501 - type c, elev b. ref pa 201401317504 & 201403100320

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
277 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279499 - type b, elev b. ref pa 201407100858 & 201403100318
Details
Permit
201508265291
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
277 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279499 - type b, elev b. ref pa 201407100858 & 201403100318

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
273 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279497 - type b, elev b. ref pa 201407100858 & 201403100318
Details
Permit
201508265290
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
273 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279497 - type b, elev b. ref pa 201407100858 & 201403100318

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
171 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279500 - type c, elev b. ref pa 201401317504 & 201403100320
Details
Permit
201508265286
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
171 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279500 - type c, elev b. ref pa 201401317504 & 201403100320

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
275 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279498 - type b, elev c. ref pa 201407100858 & 201403100318.
Details
Permit
201508265289
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
275 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279498 - type b, elev c. ref pa 201407100858 & 201403100318.

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
190 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279490 - type a, elev c. ref pa 201407100857 & 201403100313
Details
Permit
201508265293
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
190 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279490 - type a, elev c. ref pa 201407100857 & 201403100313

Open the permit page

$3,000
Aug 26, 2015Never finaled
issued Sep 2015, no final
196 Summit WyComstock Crosser & Assoc Develp Co Inc.deffered subbmittal: roof truss and assoc calcs. ref pa 201502279495 - type a, elev b. ref pa 201407100857 & 201403100313
Details
Permit
201508265294
Status
issued
Filed
Aug 26, 2015
Permit issued
Sep 2, 2015
Declared cost
$3,000
Address
196 Summit Wy

deffered subbmittal: roof truss and assoc calcs. ref pa 201502279495 - type a, elev b. ref pa 201407100857 & 201403100313

Open the permit page

$3,000
May 27, 2015Completed
final sign-off Nov 2015
901 Rankin StJ K Baker Constructionconstruction of structural support for rooftop refrigeration units. this is a deferred submittal for pa #2015.0527.7201. n/a maher ordinance
Details
Permit
201505277202
Status
complete
Filed
May 27, 2015
Permit issued
Jun 25, 2015
Final sign-off
Nov 10, 2015
Declared cost
$8,000
Address
901 Rankin St

construction of structural support for rooftop refrigeration units. this is a deferred submittal for pa #2015.0527.7201. n/a maher ordinance

Open the permit page

$8,000