Domingo Villaruel
- License
- E18302
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E18302 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Sun Light & Power
- Based in
- Berkeley
- On San Francisco permits
- Jul 2022 to Sep 2023
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nibbi Bros Assoc Inc., Twin Solar Energy
- Architects
- Martha Whitney, Martine Paguin
- Engineers
- Eugene Muntanziza, Jason Ling, Marc Press, Roberto Antonio Lopez
- Authorized agents
- Lucus Loehn
- Subcontractors
- Anthony Joseph Rodondi
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2023 | In progress issued Aug 2024 | 967 Mission St | Nibbi Bros Assoc Inc. | mayoral ed 13-01 priority process ab004 - erect 9-story residential apartment building, 95 dwelling units with no basement,type 1a.Details
mayoral ed 13-01 priority process ab004 - erect 9-story residential apartment building, 95 dwelling units with no basement,type 1a. | $61,000,000 |
| Jul 11, 2022 | Completed final sign-off Oct 2023 | 370 Dorantes Av | Twin Solar Energy | install 26kw battery backu8p (2x 13kw sunvault & storage system) inside garage. rooftop pv: install 13x sunpower spr-x22-360-e-ac pv modules, solar system size 4.68kw dc.Details
install 26kw battery backu8p (2x 13kw sunvault & storage system) inside garage. rooftop pv: install 13x sunpower spr-x22-360-e-ac pv modules, solar system size 4.68kw dc. | $12,190 |