Twin Solar Energy

Contractor license
1090183
State license record
Based in
Saratoga
On San Francisco permits
Jul 2022 to Jul 2022
Last 24 months
0 permits filed

1 permit since 2000: 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 11, 2022Completed
final sign-off Oct 2023
370 Dorantes Avinstall 26kw battery backu8p (2x 13kw sunvault & storage system) inside garage. rooftop pv: install 13x sunpower spr-x22-360-e-ac pv modules, solar system size 4.68kw dc.
Details
Permit
202207118205
Status
complete
Filed
Jul 11, 2022
Permit issued
Jun 6, 2023
Final sign-off
Oct 13, 2023
Declared cost
$12,190
Address
370 Dorantes Av

install 26kw battery backu8p (2x 13kw sunvault & storage system) inside garage. rooftop pv: install 13x sunpower spr-x22-360-e-ac pv modules, solar system size 4.68kw dc.

Open the permit page