Block 0874, lot 003
400 Duboce Ave
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 4
- Units
- 78
- Rooms
- 101 bedrooms, 80 bathrooms
- Building
- 61,414 sq ft
- Lot
- 21,296 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
64 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2024 | Completed final sign-off Feb 2025 | 400 Duboce Av | Bay City Contractors Inc | unit 408- kitchen and bathroom remodel new cabinets, replace fixtures, no exterior work, no interior wall moved. no new wall framing. provide 100 sq in opening for makeup air. terminate exhaust 3' from pl and opening. new washer/dryer.Details
unit 408- kitchen and bathroom remodel new cabinets, replace fixtures, no exterior work, no interior wall moved. no new wall framing. provide 100 sq in opening for makeup air. terminate exhaust 3' from pl and opening. new washer/dryer. | $35,000 |
| Jul 2, 2024 | Completed final sign-off Mar 2026 | 400 Duboce Av | Halyard Inc | upgrade fire alarm system to current codes, nfpa 72 (2022). to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas.Details
upgrade fire alarm system to current codes, nfpa 72 (2022). to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas. | $5,000 |
| Nov 15, 2022 | Completed final sign-off Feb 2023 | 400 Duboce Av | B-Side Inc. | apt #314- remodeling (e) kitchen. no moving walls, no exterior work.Details
apt #314- remodeling (e) kitchen. no moving walls, no exterior work. | $15,000 |
| May 6, 2022 | Never finaled issued Jun 2022, no final | 400 Duboce Av | B-Side Inc. | unit 212: rehab (e) kitchen & bath. install washer & dryer.Details
unit 212: rehab (e) kitchen & bath. install washer & dryer. | $40,000 |
| Apr 5, 2022 | Completed final sign-off Jul 2022 | 400 Duboce Av | B-Side Inc. | apt 109. rehab (e) kitchen and (e) bathroom. no structural work. no moving wall.Details
apt 109. rehab (e) kitchen and (e) bathroom. no structural work. no moving wall. | $30,000 |
| Dec 6, 2021 | Completed final sign-off Jun 2022 | 400 Duboce Av | B-Side Inc. | unit 313: rehabilitate existing bathroom. rehabilitate existing kitchen. install washer and dryer.Details
unit 313: rehabilitate existing bathroom. rehabilitate existing kitchen. install washer and dryer. | $20,000 |
| Oct 20, 2021 | Completed final sign-off Feb 2022 | 400 Duboce Av | B-Side Inc. | unit #412: remodel kitchen and bathroom. no structure work. no moving walls.Details
unit #412: remodel kitchen and bathroom. no structure work. no moving walls. | $30,000 |
| Jan 7, 2021 | Completed final sign-off Mar 2021 | 400 Duboce Av | B-Side Inc. | unit #110: washer/dryer upgrade. no structural work. no moving wallsDetails
unit #110: washer/dryer upgrade. no structural work. no moving walls | $2,500 |
| Nov 4, 2020 | Completed final sign-off Feb 2021 | 400 Duboce Av | B-Side Inc. | unit #409: replace washer and dryerDetails
unit #409: replace washer and dryer | $5,000 |
| Nov 4, 2020 | Never finaled issued Nov 2020, no final | 400 Duboce Av | B-Side Inc. | unit #418: rehab bathroom and rehab kitchen. replace washer and dryer.Details
unit #418: rehab bathroom and rehab kitchen. replace washer and dryer. | $36,000 |
| Nov 2, 2020 | Never finaled issued Nov 2020, no final | 400 Duboce Av | B-Side Inc. | unit 101 - rehab bathroom & kitchen, replace washer/dryerDetails
unit 101 - rehab bathroom & kitchen, replace washer/dryer | $20,000 |
| Aug 13, 2020 | Completed final sign-off Oct 2020 | 400 Duboce Av | B-Side Inc. | unit# 116 - replace washer/dryer. upgrade line.Details
unit# 116 - replace washer/dryer. upgrade line. | $5,000 |
| Aug 10, 2020 | Completed final sign-off Oct 2020 | 400 Duboce Av | B-Side Inc. | unit# 50. rehab bathroom & kiatchen. replace washer, dryer. no structual work. no moving walls.Details
unit# 50. rehab bathroom & kiatchen. replace washer, dryer. no structual work. no moving walls. | $35,000 |
| Jul 21, 2020 | Completed final sign-off Oct 2020 | 400 Duboce Av | B-Side Inc. | unit# 303- rehab kitchen. upgrade washer/dryer.Details
unit# 303- rehab kitchen. upgrade washer/dryer. | $15,000 |
| Dec 23, 2019 | Completed final sign-off Jan 2020 | 400 Duboce Av | B-Side Inc. | #308 upgrade extg washer and dryer(to venticle washer/dryer) no structural work and no moving walls.Details
#308 upgrade extg washer and dryer(to venticle washer/dryer) no structural work and no moving walls. | $5,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 400 Duboce Av | B-Side Inc. | apt 113: remodel kitchen & bathroom. install washer/dryer ventless unit. no walls movied, altered, no structural work.Details
apt 113: remodel kitchen & bathroom. install washer/dryer ventless unit. no walls movied, altered, no structural work. | $20,000 |
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 400 Duboce Av | B-Side Inc. | street spaceDetails
street space | |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 400 Duboce Av | street space onlyDetails
street space only | ||
| Oct 9, 2019 | Completed final sign-off Sep 2020 | 400 Duboce Av | B-Side Inc. | apt #414: rehabilitate extg kitchen (open wall between kitchen/living room; add new header) & bathroom; install washer and dryer. all per plans.Details
apt #414: rehabilitate extg kitchen (open wall between kitchen/living room; add new header) & bathroom; install washer and dryer. all per plans. | $38,000 |
| Oct 4, 2019 | Completed final sign-off Dec 2019 | 400 Duboce Av | B-Side Inc. | unit 311 - 3rd flr - remodel kitchen, bath, structural work in kitchen. partial demo of e load-bearing wall in kitchen. ref#201909030483.Details
unit 311 - 3rd flr - remodel kitchen, bath, structural work in kitchen. partial demo of e load-bearing wall in kitchen. ref#201909030483. | $20,000 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 400 Duboce Av | street spaceDetails
street space | ||
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 400 Duboce Av | B-Side Inc. | unit #311: upgrade (e) washer/dryer. paint wall.Details
unit #311: upgrade (e) washer/dryer. paint wall. | $5,000 |
| Jul 9, 2019 | Completed final sign-off Aug 2019 | 400 Duboce Av | B-Side Inc. | install new ventless washer and dryer in unit #104. no structuralDetails
install new ventless washer and dryer in unit #104. no structural | $6,000 |
| Jun 14, 2019 | Completed final sign-off Jan 2020 | 400 Duboce Av | Brighter Bay Builders Inc | #403: rehabilitate (e) kitchen & bathroom. install washer & dryer.Details
#403: rehabilitate (e) kitchen & bathroom. install washer & dryer. | $33,000 |
| Apr 30, 2019 | Completed final sign-off Aug 2019 | 400 Duboce Av | Evolution Energy Solutions Llc | installation of 36 solar thermal modules and (1) 3000 gallon tank for solar plumbing system. tank will be located in basement.Details
installation of 36 solar thermal modules and (1) 3000 gallon tank for solar plumbing system. tank will be located in basement. | $20,000 |
| Apr 18, 2019 | Expired or cancelled cancelled May 2019 | 400 Duboce Av | Axel8 Construction | unit #307: rehabilitate kitchen and bathroomDetails
unit #307: rehabilitate kitchen and bathroom | $20,000 |
| Mar 26, 2019 | Completed final sign-off Aug 2019 | 400 Duboce Av | Hon's Construction Inc. | unit#305 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
unit#305 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $30,000 |
| Jan 24, 2019 | Never finaled issued Jan 2019, no final | 400 Duboce Av | street spaceDetails
street space | ||
| Dec 13, 2018 | Never finaled issued Jan 2019, no final | 400 Duboce Av | Brighter Bay Builders Inc | rehabilitate (e) kitchn & bath. install w/d. convert (e) kitchen to bedroomDetails
rehabilitate (e) kitchn & bath. install w/d. convert (e) kitchen to bedroom | $45,000 |
| Sep 7, 2018 | Completed final sign-off Apr 2019 | 400 Duboce Av | D-Finity Construction Inc | #118- rehabilitate (e) kitchen and bathroom install w/dDetails
#118- rehabilitate (e) kitchen and bathroom install w/d | $30,000 |
| Jun 30, 2017 | Completed final sign-off Jul 2017 | 400 Duboce Av | B-Side Inc. | remodel bathroom in unit #420 to correct nov #201767542, items #2, 3, 4, &6. no alteration of wall, window and door.Details
remodel bathroom in unit #420 to correct nov #201767542, items #2, 3, 4, &6. no alteration of wall, window and door. | $25,000 |
| Jul 26, 2016 | Never finaled issued Jul 2016, no final | 400 Duboce Av | street spaceDetails
street space | ||
| Jun 22, 2016 | Completed final sign-off Oct 2017 | 400 Duboce Av | Wickman Development And Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. add new wood shear walls at basement, add holdowns at ends of shear walls & anchor bolts to (e) foundation.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. add new wood shear walls at basement, add holdowns at ends of shear walls & anchor bolts to (e) foundation. | $100,000 |
| May 20, 2016 | Never finaled issued May 2016, no final | 400 Duboce Av | street spaceDetails
street space | ||
| Apr 29, 2016 | Completed final sign-off Jun 2018 | 400 Duboce Av | Rain Defense | re-roofingDetails
re-roofing | $135,000 |
| Aug 4, 2014 | Completed final sign-off Oct 2014 | 400 Duboce Av | Markoff Structural Pest Control | unit #115: markoff structural wood destroying organismm report #145356, item 1Details
unit #115: markoff structural wood destroying organismm report #145356, item 1 | $38,000 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 400 Duboce Av | street spaceDetails
street space | ||
| Jun 12, 2013 | Expired or cancelled cancelled Jul 2013 | 400 Duboce Av | D3 Construction | unit #313: to obtain final inspection for work approved under permit application 201102110146.Details
unit #313: to obtain final inspection for work approved under permit application 201102110146. | |
| Jun 12, 2013 | Completed final sign-off Jun 2013 | 400 Duboce Av | D3 Construction | unit #313: to obtain final inspection for work approved under permit application 200808048301.Details
unit #313: to obtain final inspection for work approved under permit application 200808048301. | |
| Apr 25, 2013 | Completed final sign-off Jul 2013 | 400 Duboce Av | Schoepp Construction Inc | to obtain final inspection for work approved under pa# 201003097786. all work is completeDetails
to obtain final inspection for work approved under pa# 201003097786. all work is complete | |
| Apr 22, 2013 | Completed final sign-off May 2013 | 400 Duboce Av | Make Ready Maintenance Inc | to obtain final inspection for work approved under pa 201105045353. all work is completeDetails
to obtain final inspection for work approved under pa 201105045353. all work is complete | |
| Jul 20, 2012 | Completed final sign-off Aug 2012 | 400 Duboce Av | D3 Construction | trench walls in kitchen and bath to expose electrical romex wiring and plumbing air gap for inspection. patch and repaint. no change on walls and openingsDetails
trench walls in kitchen and bath to expose electrical romex wiring and plumbing air gap for inspection. patch and repaint. no change on walls and openings | $1,000 |
| Apr 4, 2012 | Completed final sign-off Jun 2012 | 400 Duboce Av | C Green Consulting Dba Anchway Property | revision to app#201112120469. install 4 electric heater as per title 24 compliance.Details
revision to app#201112120469. install 4 electric heater as per title 24 compliance. | $1,000 |
| Mar 30, 2012 | Completed final sign-off May 2013 | 400 Duboce Av | Make Ready Maintenance Inc | remove & replace kitchen cabinets and tops in 107.install gfci plugs in unit 303 - to abate complaint #201169912. remove & replace kitchen cabinets & tops in 407.Details
remove & replace kitchen cabinets and tops in 107.install gfci plugs in unit 303 - to abate complaint #201169912. remove & replace kitchen cabinets & tops in 407. | $5,000 |
| Jan 13, 2012 | Completed final sign-off Apr 2012 | 400 Duboce Av | D3 Construction | work in unit#204 only - remodel kitchen & bath, relcoate kitchen to living room & reorient kitchen to bedroom. lighting to comply w/cec 150 (k), no change to windows, walls & doors.Details
work in unit#204 only - remodel kitchen & bath, relcoate kitchen to living room & reorient kitchen to bedroom. lighting to comply w/cec 150 (k), no change to windows, walls & doors. | $18,000 |
| Dec 12, 2011 | Completed final sign-off Jun 2012 | 400 Duboce Av | C Green Consulting Dba Anchway Property | unit #215: kitchen and bath remodel, relocate kitchen and remove non-bearing walls.Details
unit #215: kitchen and bath remodel, relocate kitchen and remove non-bearing walls. | $18,000 |
| Dec 9, 2011 | Completed final sign-off Feb 2013 | 400 Duboce Av | Make Ready Maintenance Inc | work in unit 104: remodel kitchen and bathroom.Details
work in unit 104: remodel kitchen and bathroom. | $16,000 |
| Sep 7, 2011 | Completed final sign-off Dec 2011 | 400 Duboce Av | C Green Consulting Dba Anchway Property | unit #319 - kitchen & bathroom remodel, move kitchen to family room, remove non-bearing walls, install new office. sprinlers on separate permit.Details
unit #319 - kitchen & bathroom remodel, move kitchen to family room, remove non-bearing walls, install new office. sprinlers on separate permit. | $18,000 |
| Aug 26, 2011 | Completed final sign-off Oct 2011 | 400 Duboce Av | C Green Consulting Dba Anchway Property | remodel bathroom @ unit 413Details
remodel bathroom @ unit 413 | $12,000 |
| May 25, 2011 | Expired or cancelled expired May 2013 | 400 Duboce Av | C Green Consulting Dba Anchway Property | voluntary strengthening work: provide anchor bolts at every 48" o.c. at existing perimeter footing.Details
voluntary strengthening work: provide anchor bolts at every 48" o.c. at existing perimeter footing. | $15,000 |
| May 4, 2011 | Completed final sign-off May 2013 | 400 Duboce Av | C Green Consulting Dba Anchway Property | remodel kitchen and bath. kitchen new countertops, cabinets. bath new tile surround, floor, rough pressure balanced shower valve with new trim unit 211Details
remodel kitchen and bath. kitchen new countertops, cabinets. bath new tile surround, floor, rough pressure balanced shower valve with new trim unit 211 | $18,000 |
| May 4, 2011 | Completed final sign-off May 2011 | 400 Duboce Av | C Green Consulting Dba Anchway Property | comply with nov 200708811. remove at per nov. remove awningDetails
comply with nov 200708811. remove at per nov. remove awning | $100 |
| Feb 17, 2011 | Completed final sign-off Apr 2011 | 400 Duboce Av | D3 Construction | replace kitchen cabinetry in kitchen, replace tile around tub and loor in bath. replace tile in kitchne floor. no lighting work. no structural work. work in uit 115 only. kitchen approx 6x8 bath 5x8 approxDetails
replace kitchen cabinetry in kitchen, replace tile around tub and loor in bath. replace tile in kitchne floor. no lighting work. no structural work. work in uit 115 only. kitchen approx 6x8 bath 5x8 approx | $13,142 |
| Feb 11, 2011 | Completed final sign-off Mar 2011 | 400 Duboce Av | C Green Consulting Dba Anchway Property | unit # 311: to obtain final inspection for work approved under pa # 200707035880. all work is complete.Details
unit # 311: to obtain final inspection for work approved under pa # 200707035880. all work is complete. | |
| Feb 11, 2011 | Expired or cancelled expired May 2013 | 400 Duboce Av | C Green Consulting Dba Anchway Property | unit 313: to obtain final inspection for work approved under pa # 200808048301. all work is complete.Details
unit 313: to obtain final inspection for work approved under pa # 200808048301. all work is complete. | |
| Feb 11, 2011 | Expired or cancelled expired May 2013 | 400 Duboce Av | C Green Consulting Dba Anchway Property | unit # 203: to obtain final inspection for work approved under pa # 201003097786. all work is complete.Details
unit # 203: to obtain final inspection for work approved under pa # 201003097786. all work is complete. | |
| Feb 9, 2011 | Completed final sign-off Feb 2011 | 400 Duboce Av | C Green Consulting Dba Anchway Property | partialdemo and replace about 20% in kind repair dry rot of exterior deck at left side of buildingDetails
partialdemo and replace about 20% in kind repair dry rot of exterior deck at left side of building | $3,500 |
| Mar 9, 2010 | Completed final sign-off Jul 2013 | 400 Duboce Av | Schoepp Construction Inc | install bath glass shower doors in unit #203 only. relocate shower valvesw within same wall.Details
install bath glass shower doors in unit #203 only. relocate shower valvesw within same wall. | $1,500 |
| Aug 4, 2008 | Expired or cancelled expired Mar 2010 | 400 Duboce Av | F B E And Sons General Const | apt#313. kitchen and bathroom remodel. remove and replace cabinet counter floor wall tiles. no structural work. no lighting work.Details
apt#313. kitchen and bathroom remodel. remove and replace cabinet counter floor wall tiles. no structural work. no lighting work. | $15,000 |
| Jul 3, 2007 | Completed final sign-off Mar 2011 | 400 Duboce Av | work @ unit# 311 only. construction of new, non-bearing partition wall to create closet @ new badroom.Details
work @ unit# 311 only. construction of new, non-bearing partition wall to create closet @ new badroom. | $800 | |
| May 14, 2007 | Never finaled issued May 2007, no final | 400 Duboce Av | street spaceDetails
street space | ||
| May 11, 2007 | Completed final sign-off Aug 2007 | 400 Duboce Av | On-Site Maintenance | unit #311- kitchen/bath remodel in kind. no structural changes. building plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor.Details
unit #311- kitchen/bath remodel in kind. no structural changes. building plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. | $15,000 |
| Apr 22, 2005 | Never finaled issued Apr 2005, no final | 400 Duboce Av | street space permit/sidewalk permitDetails
street space permit/sidewalk permit | ||
| Oct 21, 2003 | Completed final sign-off Mar 2004 | 400 Duboce Av | replace main entrance door in compliance with nov#200344049 in kind replacmentDetails
replace main entrance door in compliance with nov#200344049 in kind replacment | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (20), C Green Consulting Dba Anchway Property (11), D3 Construction (5), Make Ready Maintenance Inc (3), Brighter Bay Builders Inc (2), Schoepp Construction Inc (2), Axel8 Construction, Bay City Contractors Inc, D-Finity Construction Inc, Evolution Energy Solutions Llc, F B E And Sons General Const, Halyard Inc, Hon's Construction Inc., Markoff Structural Pest Control, On-Site Maintenance, Rain Defense, Wickman Development And Construction
- Engineers
- Joe Win Kon (2), Daniel Barrnger, Jefferson Chen, Marc Press, Praneeth Lingireddy
- Authorized agent-otherss
- Alina Karelina (2)
- Designers
- Pengcheng Zhao Ryan Michael Brewer
- Pmt consultant/expediters
- Dmitriy Mikheyev
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.