Jack Martinelli
- Listed as
- architect, authorized agent-others, contractor
- Firm
- Martinelli Environmental Graph
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Oct 2026
151 permits since 2000 (contractor on 151 permits, architect on 1 permit, authorized agent-others on 1 permit): 65 completed, 4 in progress, 60 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- George Soskin (5), Charles G Hemminger, George Soskin
- Designers
- Architecture International
Most recent permits
Showing the 100 most recent of 151.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2026 | In progress issued Oct 2026 | 101 Santos St | Martinelli Environmental Graph | evacuation plan and evacuation signage through the bldging. ref 202211297323 s5Details
evacuation plan and evacuation signage through the bldging. ref 202211297323 s5 | $5,000 |
| Oct 15, 2026 | In progress issued Oct 2026 | 1652 Sunnydale Av | Martinelli Environmental Graph | evacuation plan and evacuation signage throughout bldg. ref# 202211146447.Details
evacuation plan and evacuation signage throughout bldg. ref# 202211146447. | $5,000 |
| Jul 16, 2026 | In progress issued Jul 2026 | 160 Freelon St | Martinelli Environmental Graph | evacuation maps. ref to building permit #202209283327Details
evacuation maps. ref to building permit #202209283327 | $1,875 |
| Feb 9, 2026 | Completed final sign-off Mar 2026 | 1300 Polk St | Martinelli Environmental Graph | install wall sign with vinyl letters for sign a for st george churchDetails
install wall sign with vinyl letters for sign a for st george church | $1,000 |
| Nov 24, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Martinelli Environmental Graph | sign a- to be installed double sided non electrical street facing blade sign for "san francisco human service agency"Details
sign a- to be installed double sided non electrical street facing blade sign for "san francisco human service agency" | $1,250 |
| Nov 24, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Martinelli Environmental Graph | sign b-install 32 arylic stick on letters in front of buildling for "san francisco human services agency" share plans with 202511240324Details
sign b-install 32 arylic stick on letters in front of buildling for "san francisco human services agency" share plans with 202511240324 | $800 |
| Nov 13, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Martinelli Environmental Graph | 30/fl- update 3 evac mapsDetails
30/fl- update 3 evac maps | $800 |
| Sep 8, 2025 | Completed final sign-off Oct 2025 | 1 Front St | Martinelli Environmental Graph | 35th fl - update 4 evacuation mapsDetails
35th fl - update 4 evacuation maps | $1,000 |
| Jul 9, 2025 | Expired or cancelled withdrawn Dec 2025 | 150 Oak St | Martinelli Environmental Graph | evacuation maps | $1,800 |
| Aug 16, 2024 | Completed final sign-off Nov 2024 | 39 Tehama St | Martinelli Environmental Graph | sign p-1: install 1 projecting non-electric double faced blade sign. [spera p].Details
sign p-1: install 1 projecting non-electric double faced blade sign. [spera p]. | $4,000 |
| Aug 16, 2024 | Completed final sign-off Apr 2025 | 39 Tehama St | Martinelli Environmental Graph | sign b-1: install 1 electric single faced sign. [spera].Details
sign b-1: install 1 electric single faced sign. [spera]. | $18,000 |
| Aug 16, 2024 | Completed final sign-off Nov 2024 | 39 Tehama St | Martinelli Environmental Graph | sign a-1: install 1 projecting non-electric double faced blade sign. [spera 39].Details
sign a-1: install 1 projecting non-electric double faced blade sign. [spera 39]. | $3,000 |
| Aug 16, 2024 | Completed final sign-off Nov 2024 | 39 Tehama St | Martinelli Environmental Graph | sign b-2: install 1 non-electric single faced sign. [spera].Details
sign b-2: install 1 non-electric single faced sign. [spera]. | $2,500 |
| Aug 16, 2024 | Completed final sign-off Oct 2024 | 525 Market St | Martinelli Environmental Graph | 7th fl evacuation mapsDetails
7th fl evacuation maps | $1,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 340 Fell St | Martinelli Environmental Graph | installation of a non-electric single faced sign. sign type bs2: "rivian"Details
installation of a non-electric single faced sign. sign type bs2: "rivian" | $3,000 |
| Aug 1, 2024 | Completed final sign-off Feb 2025 | 340 Fell St | Martinelli Environmental Graph | installation of electric wall single faced sign. sign type b5. "rivian"Details
installation of electric wall single faced sign. sign type b5. "rivian" | $2,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 340 Fell St | Martinelli Environmental Graph | installation of a non-electric single faced sign. sign type bl.Details
installation of a non-electric single faced sign. sign type bl. | $1,800 |
| Jul 10, 2024 | Completed final sign-off Aug 2024 | 888 Turk St | Martinelli Environmental Graph | arcylic letters "millinnium" 1" thick & 1/2" think arcylic letter " middle school"Details
arcylic letters "millinnium" 1" thick & 1/2" think arcylic letter " middle school" | $2,800 |
| Jul 10, 2024 | Completed final sign-off Aug 2024 | 888 Turk St | Martinelli Environmental Graph | non-electric, signle faced metal wall sign "millennium"Details
non-electric, signle faced metal wall sign "millennium" | $2,300 |
| Feb 14, 2024 | In progress issued Feb 2024 | 140 New Montgomery St | Martinelli Environmental Graph | 13/f: replace 4 evac maps ref pa# 2022-0201-7102Details
13/f: replace 4 evac maps ref pa# 2022-0201-7102 | $600 |
| Jun 7, 2023 | Completed final sign-off Jun 2023 | 140 New Montgomery St | Martinelli Environmental Graph | (4) evacuation maps: (3) at stairwells and (1) at elevatorDetails
(4) evacuation maps: (3) at stairwells and (1) at elevator | $1,200 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 950 Market St | Martinelli Environmental Graph | install 2 electric, single faced sign. "lne". 46" x 23.5".Details
install 2 electric, single faced sign. "lne". 46" x 23.5". | $3,700 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 950 Market St | Martinelli Environmental Graph | install 1 electroc, single faced sign. "the line". 35" x 11'6".Details
install 1 electroc, single faced sign. "the line". 35" x 11'6". | $8,600 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 950 Market St | Martinelli Environmental Graph | install 1 electric, double faced sign. "tenderheart san francisco". 35" x 32 5/8".Details
install 1 electric, double faced sign. "tenderheart san francisco". 35" x 32 5/8". | $1,200 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 950 Market St | Martinelli Environmental Graph | install 1 electric, single faced sign. "alfred". 21 3/4" x 48".Details
install 1 electric, single faced sign. "alfred". 21 3/4" x 48". | $7,600 |
| Jun 17, 2022 | Never finaled issued Jun 2022, no final | 400 Beale St | Martinelli Environmental Graph | install non-electric single faced wall sign "bridge view"Details
install non-electric single faced wall sign "bridge view" | $5,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 757 Market St | Martinelli Environmental Graph | replace current evacuation mapDetails
replace current evacuation map | $991 |
| Nov 24, 2020 | Completed final sign-off Mar 2021 | 415 Jackson St | Martinelli Environmental Graph | install (1) non-illuminated projecting double-faced blade sign. "sb architects"Details
install (1) non-illuminated projecting double-faced blade sign. "sb architects" | $2,000 |
| Nov 6, 2019 | Completed final sign-off Mar 2020 | 101 Spear St | Martinelli Environmental Graph | evacuation signs on floors 1,2, & 3.Details
evacuation signs on floors 1,2, & 3. | $3,500 |
| Oct 23, 2019 | Completed final sign-off Jan 2020 | 601 California St | Martinelli Environmental Graph | non electric single face sign - "bonhams"Details
non electric single face sign - "bonhams" | $5,000 |
| Sep 11, 2019 | Completed final sign-off Oct 2019 | 2 Bryant St | Martinelli Environmental Graph | to erect non-electrical signageDetails
to erect non-electrical signage | $2,000 |
| Feb 6, 2019 | Completed final sign-off Mar 2020 | 332 Pine St | Martinelli Environmental Graph | evacuation maps 7th floor 2 mapsDetails
evacuation maps 7th floor 2 maps | $400 |
| Dec 18, 2018 | Completed final sign-off Feb 2019 | 364 Bush St | Martinelli Environmental Graph | evacuation mapsDetails
evacuation maps | $400 |
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 1950 17th St | Martinelli Environmental Graph | 4th floor - 3 evacuation signsDetails
4th floor - 3 evacuation signs | $250 |
| Apr 24, 2018 | Never finaled issued Aug 2018, no final | 900 North Point St | Martinelli Environmental Graph | unit 534. to erect non-electric projecting single faced sign. maher n/aDetails
unit 534. to erect non-electric projecting single faced sign. maher n/a | $3,000 |
| Apr 24, 2018 | Never finaled issued Aug 2018, no final | 900 North Point St | Martinelli Environmental Graph | unit 534. to erect non-electric projecting double faced sign. maher n/aDetails
unit 534. to erect non-electric projecting double faced sign. maher n/a | $500 |
| Apr 24, 2018 | Never finaled issued Aug 2018, no final | 900 North Point St | Martinelli Environmental Graph | unit 534. to erect non-electric projecting double faced sign. maher n/aDetails
unit 534. to erect non-electric projecting double faced sign. maher n/a | $2,500 |
| Apr 24, 2018 | Never finaled issued Aug 2018, no final | 900 North Point St | Martinelli Environmental Graph | unit 534. to erect non-electric wall single faced wall sign. maher n/aDetails
unit 534. to erect non-electric wall single faced wall sign. maher n/a | $1,500 |
| Sep 21, 2017 | Completed final sign-off Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | to obtain final inspection for work approved under pa#201312113968, 201312113969 & 201312113970. all work is complete.Details
to obtain final inspection for work approved under pa#201312113968, 201312113969 & 201312113970. all work is complete. | |
| Sep 21, 2017 | Completed final sign-off Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | to obtain final inspection for work approved under pa#201312113961, 201312113966 & 201312113967. all work is complete.Details
to obtain final inspection for work approved under pa#201312113961, 201312113966 & 201312113967. all work is complete. | |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 160 Spear St | Martinelli Environmental Graph | add two evacuation maps at ground levelDetails
add two evacuation maps at ground level | $650 |
| Apr 10, 2017 | Never finaled issued Apr 2017, no final | 100 California St | Martinelli Environmental Graph | 7th floor - evacuation maps; n/a maherDetails
7th floor - evacuation maps; n/a maher | $1,000 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 595 Market St | Martinelli Environmental Graph | to erect electrical single faced, illuminated channel letters address signDetails
to erect electrical single faced, illuminated channel letters address sign | $6,000 |
| Mar 10, 2017 | Completed final sign-off Jul 2017 | 1710 Scott St | Martinelli Environmental Graph | to erect non-electrical, single faced, non-illuminated dementional letters to bldg facade signageDetails
to erect non-electrical, single faced, non-illuminated dementional letters to bldg facade signage | $16,000 |
| Feb 16, 2017 | Never finaled issued Mar 2017, no final | 1485 Bay Shore Bl | Martinelli Environmental Graph | erect an illuminate single faced wall sign. n/a maher ordinanceDetails
erect an illuminate single faced wall sign. n/a maher ordinance | $19,400 |
| Oct 21, 2016 | Completed final sign-off Nov 2016 | 269 Jefferson St | Martinelli Environmental Graph | install non-electric single face wall sign. maher ord 155-13 naDetails
install non-electric single face wall sign. maher ord 155-13 na | $5,000 |
| Oct 21, 2016 | Completed final sign-off Oct 2017 | 501 Parker Av | Martinelli Environmental Graph | fabricate & install non-electric single face at existing monument.Details
fabricate & install non-electric single face at existing monument. | $2,500 |
| Aug 26, 2016 | Never finaled issued Oct 2016, no final | 2282 Market St | Martinelli Environmental Graph | electric wall sign | $6,000 |
| Jul 11, 2016 | Completed final sign-off Jun 2017 | 1563 Mission St | Martinelli Environmental Graph | install single faced electric sign (illuminated)Details
install single faced electric sign (illuminated) | $20,000 |
| Dec 23, 2015 | Completed final sign-off Mar 2016 | 100 California St | Martinelli Environmental Graph | to erect doorwindow electric sign. n/a for maherDetails
to erect doorwindow electric sign. n/a for maher | $4,000 |
| Dec 23, 2015 | Never finaled issued Dec 2015, no final | 100 California St | Martinelli Environmental Graph | to erect door/window non electrical sign. n/a for maherDetails
to erect door/window non electrical sign. n/a for maher | $4,000 |
| Nov 19, 2015 | Completed final sign-off Dec 2015 | 425 Market St | Martinelli Environmental Graph | fabricate & install (12) evacuation maps, (4) per floor on floors 8,12 & 13. maher naDetails
fabricate & install (12) evacuation maps, (4) per floor on floors 8,12 & 13. maher na | $2,900 |
| Sep 11, 2015 | Never finaled issued Sep 2015, no final | 780 Mission St | Martinelli Environmental Graph | to erect non-electrical 2 projecting signs and one letter set. n/a for maher.Details
to erect non-electrical 2 projecting signs and one letter set. n/a for maher. | $4,000 |
| Aug 28, 2015 | Never finaled issued Sep 2015, no final | 2282 Market St | Martinelli Environmental Graph | erect illum sign | $5,200 |
| Aug 28, 2015 | Never finaled issued Sep 2015, no final | 2282 Market St | Martinelli Environmental Graph | erect illum sign | $5,200 |
| Aug 13, 2015 | Never finaled issued Aug 2015, no final | 9 West Portal Av | Martinelli Environmental Graph | illuminated wall sign- electric, single facedDetails
illuminated wall sign- electric, single faced | $6,500 |
| Jul 22, 2015 | Completed final sign-off Jul 2016 | 2130 Fulton St | Martinelli Environmental Graph | refurb/reskin 2 extg signs (monument signs). one sign at the corner of turk st and parker st. one sign at the corner of golden gate ave and masonic ave. each sign is : 213 1/2 " w x 73 1/8 h x 15" depth. n/a for the maher.Details
refurb/reskin 2 extg signs (monument signs). one sign at the corner of turk st and parker st. one sign at the corner of golden gate ave and masonic ave. each sign is : 213 1/2 " w x 73 1/8 h x 15" depth. n/a for the maher. | $14,000 |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 417 Montgomery St | Martinelli Environmental Graph | provide and install 3 evacuation signs for 4th floor.Details
provide and install 3 evacuation signs for 4th floor. | $1,160 |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 735 Fell St | Martinelli Environmental Graph | erect 1/2" waterjet cut aluminum sign over entry way. n/a ordinance #155-13Details
erect 1/2" waterjet cut aluminum sign over entry way. n/a ordinance #155-13 | $1,500 |
| Apr 29, 2015 | Completed final sign-off May 2015 | 1360 Jones St | Martinelli Environmental Graph | evacuation sign only on 12 floors + 1 basement. 23 signs total. no structural work includes in scope. n/a for maher.Details
evacuation sign only on 12 floors + 1 basement. 23 signs total. no structural work includes in scope. n/a for maher. | $10,800 |
| Feb 19, 2015 | Never finaled issued Feb 2015, no final | 50 Hawthorne St | Martinelli Environmental Graph | to erect non electric ground signDetails
to erect non electric ground sign | $10,000 |
| Nov 24, 2014 | Completed final sign-off Dec 2014 | 100 Pine St | Martinelli Environmental Graph | scope of work for this project is evacuation signs only on floors 16,17,28 & 29. 14 signs total, no structural work included in scope; maher n/aDetails
scope of work for this project is evacuation signs only on floors 16,17,28 & 29. 14 signs total, no structural work included in scope; maher n/a | $4,200 |
| Nov 24, 2014 | Never finaled issued Dec 2014, no final | 100 Pine St | Martinelli Environmental Graph | flrs: 33,34 and 35: scope of work for this project is evacuation signs only on floors 33, 34 & 35. seven signs total. no structural work included in scope; maher n/aDetails
flrs: 33,34 and 35: scope of work for this project is evacuation signs only on floors 33, 34 & 35. seven signs total. no structural work included in scope; maher n/a | $2,100 |
| Nov 17, 2014 | Never finaled issued Dec 2014, no final | 100 Pine St | Martinelli Environmental Graph | scope of work for this project is evac signs on floors 23, 24, 26, 27, 30, 31, 32 maher not reqDetails
scope of work for this project is evac signs on floors 23, 24, 26, 27, 30, 31, 32 maher not req | $7,200 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 100 Pine St | Martinelli Environmental Graph | floors 12 - 15, 18 - 22: scope of work for this project is evacuation signs. thirty three signs total, no structural work included in scope. n/a maher ordinanceDetails
floors 12 - 15, 18 - 22: scope of work for this project is evacuation signs. thirty three signs total, no structural work included in scope. n/a maher ordinance | $9,900 |
| Nov 7, 2014 | Never finaled issued Nov 2014, no final | 888 Brannan St | Martinelli Environmental Graph | renew pa#201307031100 (sign permit form 4/7). install 3 illuminated numbers at front awning.Details
renew pa#201307031100 (sign permit form 4/7). install 3 illuminated numbers at front awning. | $23,000 |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 100 Pine St | Martinelli Environmental Graph | scope of work for this project is evacuation signage of floors 4,5,6,7,8,9,10 and 11. 32 signs total, no structural work is included in this scope; maher n/aDetails
scope of work for this project is evacuation signage of floors 4,5,6,7,8,9,10 and 11. 32 signs total, no structural work is included in this scope; maher n/a | $9,600 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 1998 Union St | Martinelli Environmental Graph | erect a single faced electric wall signDetails
erect a single faced electric wall sign | $3,500 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 1998 Union St | Martinelli Environmental Graph | erect a projecting double faced signDetails
erect a projecting double faced sign | $2,000 |
| Oct 27, 2014 | Never finaled issued Nov 2014, no final | 100 Pine St | Martinelli Environmental Graph | provide evacuation signs on floors b3,b2,b1,1,2,and 3. twenty-three signs total. no structural work included in this scope. maher n/a.Details
provide evacuation signs on floors b3,b2,b1,1,2,and 3. twenty-three signs total. no structural work included in this scope. maher n/a. | $6,900 |
| Oct 24, 2014 | Completed final sign-off Nov 2014 | 2559 Van Ness Av | Martinelli Environmental Graph | production and installation of 24 evac mapsDetails
production and installation of 24 evac maps | $10,800 |
| Aug 18, 2014 | Never finaled issued Aug 2014, no final | 2 Bryant St | Martinelli Environmental Graph | install evac maps, 3 for the 1st flr, 4 for th4 2nd flr, 3 for the 3rd flr. maher n/aDetails
install evac maps, 3 for the 1st flr, 4 for th4 2nd flr, 3 for the 3rd flr. maher n/a | $2,490 |
| May 22, 2014 | Never finaled filed May 2014, never issued | 1019 Market St | Martinelli Environmental Graph | to erect single faced non electric sign. (compliance with mahner ordinance no;.155-13 not required)Details
to erect single faced non electric sign. (compliance with mahner ordinance no;.155-13 not required) | $3,303 |
| May 13, 2014 | Never finaled issued Oct 2014, no final | 901 Battery St | Martinelli Environmental Graph | erect non electric, non-illuminated, wall, 1 single-faced new sign.Details
erect non electric, non-illuminated, wall, 1 single-faced new sign. | $500 |
| May 1, 2014 | Completed final sign-off Jun 2014 | 400 Clementina St | Martinelli Environmental Graph | evacuation maps( 201106017202) entire building basements to roof 2 lievels 49 ttl maps also known as 26051451, compliance with ordinance #155-13 not requiredDetails
evacuation maps( 201106017202) entire building basements to roof 2 lievels 49 ttl maps also known as 26051451, compliance with ordinance #155-13 not required | $3,000 |
| May 1, 2014 | Completed final sign-off Aug 2017 | 900 Folsom St | Martinelli Environmental Graph | evacuation maps for whole bldg. on all floors- 67 maps. compliance with ordinance #155-13 not required- construction under 201106017208.Details
evacuation maps for whole bldg. on all floors- 67 maps. compliance with ordinance #155-13 not required- construction under 201106017208. | $3,000 |
| Apr 28, 2014 | Never finaled issued Apr 2014, no final | 101 Spear St | Martinelli Environmental Graph | 3rd floor - installation of six evacuation maps. compliance with ordinance # 155-13 n/aDetails
3rd floor - installation of six evacuation maps. compliance with ordinance # 155-13 n/a | $600 |
| Apr 9, 2014 | Expired or cancelled cancelled Jan 2026 | 1234 Great Hy | Martinelli Environmental Graph | to erect electric wall sign | $16,656 |
| Mar 3, 2014 | Expired or cancelled withdrawn Apr 2014 | 900 Folsom St | Martinelli Environmental Graph | evacuation maps from basement to roof. maher 155-13 not requiredDetails
evacuation maps from basement to roof. maher 155-13 not required | $10,000 |
| Mar 3, 2014 | Expired or cancelled withdrawn Apr 2014 | 260 05th St | Martinelli Environmental Graph | evacuation maps floors basement to roof. maher ord 155-13 not requiredDetails
evacuation maps floors basement to roof. maher ord 155-13 not required | $10,000 |
| Dec 11, 2013 | Completed final sign-off Jun 2014 | 260 05th St | Martinelli Environmental Graph | to erect non electric wall sign, single faced compliance with ord 155-13 not requiredDetails
to erect non electric wall sign, single faced compliance with ord 155-13 not required | $7,500 |
| Dec 11, 2013 | Expired or cancelled expired Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | non electric wall sign; compliance with ord 155-13 not requiredDetails
non electric wall sign; compliance with ord 155-13 not required | $8,000 |
| Dec 11, 2013 | Completed final sign-off Jun 2014 | 260 05th St | Martinelli Environmental Graph | to erect non electric double faced wall sign. compliance with ord 155-13 not requiredDetails
to erect non electric double faced wall sign. compliance with ord 155-13 not required | $7,500 |
| Dec 11, 2013 | Expired or cancelled expired Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | non electric wall sign | $3,700 |
| Dec 11, 2013 | Expired or cancelled expired Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | non electric wall sign. compliance with ordinance #155-13 not reuqired.Details
non electric wall sign. compliance with ordinance #155-13 not reuqired. | $8,000 |
| Dec 11, 2013 | Expired or cancelled expired Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | non electric wall sign double facedDetails
non electric wall sign double faced | $8,000 |
| Dec 11, 2013 | Never finaled issued Apr 2014, no final | 900 Folsom St | Martinelli Environmental Graph | erect non electric double faced projecting signDetails
erect non electric double faced projecting sign | $4,000 |
| Dec 11, 2013 | Expired or cancelled expired Sep 2017 | 900 Folsom St | Martinelli Environmental Graph | non electric wall sign | $2,000 |
| Sep 30, 2013 | Never finaled issued Oct 2013, no final | 644 Polk St | Martinelli Environmental Graph | erect a non-electric single faced attached to (e) spardiel.Details
erect a non-electric single faced attached to (e) spardiel. | $2,000 |
| Sep 17, 2013 | Never finaled issued Sep 2013, no final | 140 New Montgomery St | Martinelli Environmental Graph | fabricate and install evacuation map signs for 140 montgomery. total sign count =113Details
fabricate and install evacuation map signs for 140 montgomery. total sign count =113 | $40,000 |
| Aug 15, 2013 | Completed final sign-off Sep 2022 | 888 Brannan St | Martinelli Environmental Graph | install of 34 evacuation maps from 1-5 floors.Details
install of 34 evacuation maps from 1-5 floors. | $6,000 |
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 248 Utah St | Martinelli Environmental Graph | erect a non electric wall single faced non illuminated new signDetails
erect a non electric wall single faced non illuminated new sign | $5,200 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 888 Brannan St | Martinelli Environmental Graph | to erect electrical projeting sign.install new signDetails
to erect electrical projeting sign.install new sign | $23,000 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 850 Brannan St | Martinelli Environmental Graph | to erect one illuminated electrical projeting sign. fastening to concrete.Details
to erect one illuminated electrical projeting sign. fastening to concrete. | $8,000 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 888 Brannan St | Martinelli Environmental Graph | to erect 2 illuminated electrical projeting sign. to be connected inside bldg lobby.Details
to erect 2 illuminated electrical projeting sign. to be connected inside bldg lobby. | $24,000 |
| Apr 2, 2013 | Never finaled issued Apr 2013, no final | 200 Montgomery St | Martinelli Environmental Graph | 6th floor - (7) evacuation maps to be fabricated & installed of the mills bldg for swig management.Details
6th floor - (7) evacuation maps to be fabricated & installed of the mills bldg for swig management. | $6,122 |
| Jan 15, 2013 | Never finaled issued Jan 2013, no final | 201 03rd St | Martinelli Environmental Graph | to erect projecting electric signDetails
to erect projecting electric sign | $5,800 |
| Jan 15, 2013 | Never finaled issued Jan 2013, no final | 201 03rd St | Martinelli Environmental Graph | to erect 3 projecting non electric signsDetails
to erect 3 projecting non electric signs | $4,500 |
| Jan 15, 2013 | Never finaled issued Jan 2013, no final | 201 03rd St | Martinelli Environmental Graph | to erect 4 projecting electric signsDetails
to erect 4 projecting electric signs | $11,200 |
| Sep 19, 2012 | Completed final sign-off May 2013 | 180 Townsend St | Martinelli Environmental Graph | erect electric, wall, single faced sign.Details
erect electric, wall, single faced sign. | $10,618 |