Block 3717, lot 011
155 Main St
- City’s use
- Commercial Office
- Built
- 1985
- Stories
- 19
- Lot
- 9,453 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
141 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2022 | Completed final sign-off Jan 2023 | 160 Spear St | R L H Fire Protection Inc | fire sprinkler permit. relocate 15, add 5 and delete 15 pendent sprinklers. install 18 new upright sprinklers on the 4th floor. ref pa 2022-0915-2537Details
fire sprinkler permit. relocate 15, add 5 and delete 15 pendent sprinklers. install 18 new upright sprinklers on the 4th floor. ref pa 2022-0915-2537 | $13,000 |
| Aug 26, 2022 | Completed final sign-off Sep 2022 | 160 Spear St | Bilcor Inc | install (2) ceiling mount speaker strobes . arch 202203311339Details
install (2) ceiling mount speaker strobes . arch 202203311339 | $1,320 |
| Jul 22, 2022 | Completed final sign-off Aug 2022 | 160 Spear St | Bilcor Inc | 12/fl: install (14) ceiling mount speaker strobes, install (1) smoke detector arch ref 202204051553Details
12/fl: install (14) ceiling mount speaker strobes, install (1) smoke detector arch ref 202204051553 | $9,900 |
| Apr 5, 2022 | Never finaled issued May 2022, no final | 160 Spear St | Peacock Construction | ste 1200: t.i. to include non-structural interior partions and new finishes. mep & fire life safety under separate finishes.Details
ste 1200: t.i. to include non-structural interior partions and new finishes. mep & fire life safety under separate finishes. | $910,162 |
| Nov 10, 2021 | Never finaled issued Nov 2021, no final | 160 Spear St | Sc Builders, Inc | 10th floor: suite 1020: revision to 202106293445. adding mech/electrical t the project.Details
10th floor: suite 1020: revision to 202106293445. adding mech/electrical t the project. | $175,000 |
| Mar 4, 2020 | Never finaled issued Mar 2020, no final | 160 Spear St | Bilcor Inc | 18/f: install 7 ceiling mount speaker strobes, relocate (1) ceiling mount speaker strobe. ref t.i. pa202001232596.Details
18/f: install 7 ceiling mount speaker strobes, relocate (1) ceiling mount speaker strobe. ref t.i. pa202001232596. | $4,620 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 160 Spear St | street spaceDetails
street space | ||
| May 1, 2019 | Completed final sign-off Oct 2019 | 160 Spear St | Skyline Construction | 19th fl - interior improvements to include demo of non-structural partitions. new non structural partitions. millwork finishes. mep fire life safety under separate permit. n/a for maher.Details
19th fl - interior improvements to include demo of non-structural partitions. new non structural partitions. millwork finishes. mep fire life safety under separate permit. n/a for maher. | $350,000 |
| May 1, 2019 | Completed final sign-off Feb 2020 | 160 Spear St | Skyline Construction | 4th fl - interior improvements repair (e) doors, new flooring and new furniture system. mep fire life safety under separate permitDetails
4th fl - interior improvements repair (e) doors, new flooring and new furniture system. mep fire life safety under separate permit | $350,000 |
| Apr 3, 2019 | Completed final sign-off Feb 2020 | 160 Spear St | Skyline Construction | 19th fl: restroom upgrade. consist of replacing all interior restroom finishes, including new lighting, toilet, partitions, sinks and finishes. mep, sprinkler modification under sep. permit.Details
19th fl: restroom upgrade. consist of replacing all interior restroom finishes, including new lighting, toilet, partitions, sinks and finishes. mep, sprinkler modification under sep. permit. | $70,000 |
| Sep 7, 2018 | Never finaled issued Sep 2018, no final | 160 Spear St | Baxter Construction | 10th fl, ste 1025 - project consists of construction of new demising wall. mep deferred submittalDetails
10th fl, ste 1025 - project consists of construction of new demising wall. mep deferred submittal | $50,000 |
| Apr 2, 2018 | Completed final sign-off Apr 2018 | 160 Spear St | Skender Construction Llc | ground flr. minimal ceiling demolition. demolition of gyp soffit, turning sprinkler heads up. safetying off electrical elements and painting new exposed ceiling to match existing. ref. sprinkler permit #201803264548Details
ground flr. minimal ceiling demolition. demolition of gyp soffit, turning sprinkler heads up. safetying off electrical elements and painting new exposed ceiling to match existing. ref. sprinkler permit #201803264548 | $25,000 |
| Mar 27, 2018 | Completed final sign-off May 2019 | 160 Spear St | Bilcor Inc | 2 door lock release pull stations; 5 wall speaker-strobes; 63 ceiling speaker strobe, install 1 facu w/ annuciator, 1 network node; 1 remote ann; 1 smoke control panel; 1 printer; 1 2-way comm panel; power supply; 6 call stations; 170 smoke detectors; 63 duct detectors; 26 iso modulers; cont remarksDetails
2 door lock release pull stations; 5 wall speaker-strobes; 63 ceiling speaker strobe, install 1 facu w/ annuciator, 1 network node; 1 remote ann; 1 smoke control panel; 1 printer; 1 2-way comm panel; power supply; 6 call stations; 170 smoke detectors; 63 duct detectors; 26 iso modulers; cont remarks | $285,500 |
| Sep 20, 2017 | Completed final sign-off Oct 2018 | 160 Spear St | Skyline Construction | 10th floor - provide new lighting & branch circuiting panel. ref pa 201707252918 & #201708252920. n/a maher ordinanceDetails
10th floor - provide new lighting & branch circuiting panel. ref pa 201707252918 & #201708252920. n/a maher ordinance | $5,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 160 Spear St | Martinelli Environmental Graph | add two evacuation maps at ground levelDetails
add two evacuation maps at ground level | $650 |
| Aug 9, 2017 | Never finaled issued Aug 2017, no final | 160 Spear St | street space permit - renewal of permit # m796467Details
street space permit - renewal of permit # m796467 | ||
| Jul 25, 2017 | Completed final sign-off Feb 2018 | 160 Spear St | Skyline Construction | 11th floor restroom areas barrier removal work only. includes replacing restroom stall partitions, sinks, finishes.Details
11th floor restroom areas barrier removal work only. includes replacing restroom stall partitions, sinks, finishes. | $70,000 |
| Jul 25, 2017 | Completed final sign-off Aug 2018 | 160 Spear St | Skyline Construction | 10 floor restroom areas barrier removal work only. includes replacing restroom stall partitions, sinks, finishes.Details
10 floor restroom areas barrier removal work only. includes replacing restroom stall partitions, sinks, finishes. | $70,000 |
| May 9, 2017 | Completed final sign-off Nov 2017 | 160 Spear St | Johnson Controls Fire | fier alarm t.i to ground floor -relocate annunciator relocate 2 fire alarm box, 1 new smoke, 4 new speaker/strobe. ref pa 2016-0706-1707Details
fier alarm t.i to ground floor -relocate annunciator relocate 2 fire alarm box, 1 new smoke, 4 new speaker/strobe. ref pa 2016-0706-1707 | $3,800 |
| May 9, 2017 | Completed final sign-off May 2017 | 160 Spear St | Johnson Controls Fire | fire alarm tenant improvement to 12 floor 4 new speaker/strobe.Details
fire alarm tenant improvement to 12 floor 4 new speaker/strobe. | $3,800 |
| Apr 24, 2017 | Completed final sign-off Oct 2018 | 160 Spear St | Skyline Construction | revision to 201607061707 for lobby redesign & to eliminate door from retail to lobby on 1st floor.Details
revision to 201607061707 for lobby redesign & to eliminate door from retail to lobby on 1st floor. | |
| Apr 11, 2017 | Completed final sign-off May 2017 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler t.i. ref pa 2016-07-06-1707. ground floor only, no work in rear canopy area or 2nd floor. relocated flexhead sprinklers; 28 pendents, 2 uprights. added sprinklers; 2 uprights, 8 pendents. maher n/aDetails
existing fire sprinkler t.i. ref pa 2016-07-06-1707. ground floor only, no work in rear canopy area or 2nd floor. relocated flexhead sprinklers; 28 pendents, 2 uprights. added sprinklers; 2 uprights, 8 pendents. maher n/a | $36,000 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 160 Spear St | Legacy Mechanical & Energy Services, Inc | provide & install 4 ton (hvac) system for supplemental system. off hours use. install ductwork.Details
provide & install 4 ton (hvac) system for supplemental system. off hours use. install ductwork. | $14,000 |
| Dec 8, 2016 | Completed final sign-off Oct 2018 | 160 Spear St | Skyline Construction | revision to 201607061707 for design modification to remove a sliding door & revise finishes, structural & mepDetails
revision to 201607061707 for design modification to remove a sliding door & revise finishes, structural & mep | |
| Oct 20, 2016 | Never finaled issued Oct 2016, no final | 160 Spear St | Johnson Controls Fire | 3rd floor #360 - fire alarm as-built record drawings for pa #2016-0901-6552. adding 2 speakers.Details
3rd floor #360 - fire alarm as-built record drawings for pa #2016-0901-6552. adding 2 speakers. | |
| Sep 28, 2016 | Never finaled issued Sep 2016, no final | 160 Spear St | Johnson Controls Fire | 12th floor - as built record drawing for pa 2016-0714-2319Details
12th floor - as built record drawing for pa 2016-0714-2319 | |
| Sep 1, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Johnson Controls Fire | fire alarm ti to 3rd fl suite 360 9 new speaker/strobes. reference ti 2016.0728.3579Details
fire alarm ti to 3rd fl suite 360 9 new speaker/strobes. reference ti 2016.0728.3579 | $5,000 |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 160 Spear St | Skyline Construction | mechanical & electrical work for ti on the 3rd floor. ref pa 2016-0725-3579Details
mechanical & electrical work for ti on the 3rd floor. ref pa 2016-0725-3579 | $30,000 |
| Jul 28, 2016 | Completed final sign-off Nov 2016 | 160 Spear St | Skyline Construction | demolition and construction of new partitions, glazing, doors ceiling, lighting and plumbing mep, life safety, and sprinkler is under separate permitDetails
demolition and construction of new partitions, glazing, doors ceiling, lighting and plumbing mep, life safety, and sprinkler is under separate permit | $220,000 |
| Jul 20, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Rossi Builders Inc. | 12th flr, #1220 - ref. to pa#201605036421. electrical-to provide new lighting & branch circuiting to existing panel, maintain some (e) power & signal outlet & provide additional new power. n/a ordinance #155-13Details
12th flr, #1220 - ref. to pa#201605036421. electrical-to provide new lighting & branch circuiting to existing panel, maintain some (e) power & signal outlet & provide additional new power. n/a ordinance #155-13 | $30,000 |
| Jul 20, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Rossi Builders Inc. | 4/f #405 - ref. to pa#201605036423, electrical to provide new lighting & branch circuiting to existing panel, maintain some (e) power & signal outlet & provide additional new power. n/a ordinance #155-13Details
4/f #405 - ref. to pa#201605036423, electrical to provide new lighting & branch circuiting to existing panel, maintain some (e) power & signal outlet & provide additional new power. n/a ordinance #155-13 | $10,000 |
| Jul 14, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Johnson Controls Fire | 12th floor, suite 1220 fire alarm tenant improvement - 6 new speaker/strobe. ref #201605036421. n/a maher ordinanceDetails
12th floor, suite 1220 fire alarm tenant improvement - 6 new speaker/strobe. ref #201605036421. n/a maher ordinance | $5,000 |
| Jul 14, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Johnson Controls Fire | 4th floor fire alarm tenant improvement - 1 new speaker/strobe. ref #201605036423. n/a maher ordinanceDetails
4th floor fire alarm tenant improvement - 1 new speaker/strobe. ref #201605036423. n/a maher ordinance | $2,000 |
| Jul 6, 2016 | Completed final sign-off Oct 2018 | 160 Spear St | replace exterior concrete path and hardscape retain extg redwood trees and sculpture. and hdd(n) lightingper plans. n/a for maherDetails
replace exterior concrete path and hardscape retain extg redwood trees and sculpture. and hdd(n) lightingper plans. n/a for maher | $450,000 | |
| Jul 6, 2016 | Completed final sign-off Nov 2018 | 160 Spear St | Skyline Construction | renovation of extg lobby space, replacement of extg level 1 storefront. facade renovation 1st and 2nd floor. add rear canopy. n/a for maherDetails
renovation of extg lobby space, replacement of extg level 1 storefront. facade renovation 1st and 2nd floor. add rear canopy. n/a for maher | $1,100,000 |
| Jun 6, 2016 | Completed final sign-off Jun 2016 | 160 Spear St | R L H Fire Protection Inc | fire sprinklers permit. add 2 pendent sprinkler heads, relocate 1 pendent sprinkler head in ste 230. ti pa# 201604285903. n/a maher ord. 155-16Details
fire sprinklers permit. add 2 pendent sprinkler heads, relocate 1 pendent sprinkler head in ste 230. ti pa# 201604285903. n/a maher ord. 155-16 | $3,518 |
| May 3, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Rossi Builders Inc. | 12th floor suite 1220 -construction of new partitions, glazing, door, and minimal lighting. existing ceiling tile and grid to remain. no plumbing work. code upgrade to main elevator lobby corridor doors. mech, ele, l/s, sprinkler uunder sep permit. n/a maher ordinanceDetails
12th floor suite 1220 -construction of new partitions, glazing, door, and minimal lighting. existing ceiling tile and grid to remain. no plumbing work. code upgrade to main elevator lobby corridor doors. mech, ele, l/s, sprinkler uunder sep permit. n/a maher ordinance | $80,000 |
| Apr 28, 2016 | Completed final sign-off Oct 2016 | 160 Spear St | Rossi Builders Inc. | 2nd floor #230- construction of partition, glazing, door and lighting. no plumbing work, existing ceiling grid and tile to remain. mechanical, electrical, modification is under seperate permit. n/a ordinance #155-13Details
2nd floor #230- construction of partition, glazing, door and lighting. no plumbing work, existing ceiling grid and tile to remain. mechanical, electrical, modification is under seperate permit. n/a ordinance #155-13 | $15,000 |
| Apr 12, 2016 | Completed final sign-off May 2016 | 160 Spear St | Johnson Controls Fire | fire alarm tenant improvement on the16th fl. 3 pull stations 6 smoke detectors, 32 speaker strobes, 1 relay, 1 booster panel; ref 201601217579Details
fire alarm tenant improvement on the16th fl. 3 pull stations 6 smoke detectors, 32 speaker strobes, 1 relay, 1 booster panel; ref 201601217579 | $26,000 |
| Feb 29, 2016 | Completed final sign-off Apr 2016 | 160 Spear St | Johnson Controls Fire | fire alarm tenant improvement to 17th floors. 1 new smoke detector, 6 new door holders, relocate e detector, 2 existing speaker/strobes, remove 1 existing speaker/strobeDetails
fire alarm tenant improvement to 17th floors. 1 new smoke detector, 6 new door holders, relocate e detector, 2 existing speaker/strobes, remove 1 existing speaker/strobe | $5,500 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 160 Spear St | Legacy Partners C D S Inc | 2nd floor suite 280 tenant improvement: demolition of 2 partitions and 1 door.Details
2nd floor suite 280 tenant improvement: demolition of 2 partitions and 1 door. | $6,000 |
| May 8, 2015 | Completed final sign-off Jun 2015 | 160 Spear St | Johnson Controls Fire | 4th floor: fire alarm t.i. install 1 signal card, 5 speaker/strobes and relocate 2 speaker/strobes. ref. t.i. 2015.0416.3753. maher n/a.Details
4th floor: fire alarm t.i. install 1 signal card, 5 speaker/strobes and relocate 2 speaker/strobes. ref. t.i. 2015.0416.3753. maher n/a. | $5,000 |
| May 5, 2015 | Never finaled issued May 2015, no final | 160 Spear St | R L H Fire Protection Inc | 4th flr: fire sprinkler permit, relocate 18, add 6 and delete 1 pendant, relocate 8 and add 1 upright on the 4th flr, t.i. 201504163753; maher n/aDetails
4th flr: fire sprinkler permit, relocate 18, add 6 and delete 1 pendant, relocate 8 and add 1 upright on the 4th flr, t.i. 201504163753; maher n/a | $16,448 |
| Apr 16, 2015 | Never finaled issued May 2015, no final | 160 Spear St | Legacy Partners C D S Inc | 4th flr: minor interior office t.i., including new conference room, open office, meeting rooms & coffee area, mep work included; maher n/aDetails
4th flr: minor interior office t.i., including new conference room, open office, meeting rooms & coffee area, mep work included; maher n/a | $178,000 |
| Dec 19, 2014 | Completed final sign-off Apr 2015 | 160 Spear St | Johnson Controls Fire | 17th flr: fire alarm tenant improvement to 17th flr, provide & install 1 new booster panel, 8 smoke detectors, 1 relay, 17 spearker/strobes, ref. 201406279702; maher n/aDetails
17th flr: fire alarm tenant improvement to 17th flr, provide & install 1 new booster panel, 8 smoke detectors, 1 relay, 17 spearker/strobes, ref. 201406279702; maher n/a | $15,500 |
| Dec 19, 2014 | Never finaled issued Dec 2014, no final | 160 Spear St | Johnson Controls Fire | 18th flr: application to address inspection comments dtd 12-11-14 for permit 201411181778; maher n/a show elevator lobby/doors are locked following sffd admin bulletin #2.10Details
18th flr: application to address inspection comments dtd 12-11-14 for permit 201411181778; maher n/a show elevator lobby/doors are locked following sffd admin bulletin #2.10 | |
| Dec 11, 2014 | Completed final sign-off Mar 2015 | 160 Spear St | Johnson Controls Fire | fire alarm t.i. to 12/f, addition of 12 speaker/strobes. t.i. pa#201411030596, n/a ordinance #155-13Details
fire alarm t.i. to 12/f, addition of 12 speaker/strobes. t.i. pa#201411030596, n/a ordinance #155-13 | $7,000 |
| Nov 18, 2014 | Completed final sign-off Feb 2015 | 160 Spear St | Johnson Controls Fire | 18th flr: fire alarm tenant improvement to 18th flr, 1 booster panel, 6 smokes, 1 relay, 20 speaker/strobes; ref. t.i. 201406279707; maher n/aDetails
18th flr: fire alarm tenant improvement to 18th flr, 1 booster panel, 6 smokes, 1 relay, 20 speaker/strobes; ref. t.i. 201406279707; maher n/a | $14,800 |
| Nov 3, 2014 | Completed final sign-off Apr 2015 | 160 Spear St | Principal Builders Inc. | 12th flr: tenant improvement of floor 2, consisting of non-structural partition demo, replacement, electrical and minor plumbing; maher n/aDetails
12th flr: tenant improvement of floor 2, consisting of non-structural partition demo, replacement, electrical and minor plumbing; maher n/a | $1,000,000 |
| Oct 8, 2014 | Completed final sign-off Feb 2015 | 160 Spear St | work in #1300, 13th floor: minor interior improvements to create 3 phone rooms at existing open office area 224 sf totalDetails
work in #1300, 13th floor: minor interior improvements to create 3 phone rooms at existing open office area 224 sf total | $20,000 | |
| Sep 30, 2014 | Never finaled issued Oct 2014, no final | 160 Spear St | Sky Rider Equip Co Inc | a retro-fit installation of an exterior maintenance system sky rider has been contracted to design, provide and install permanent equipment(sockets and davits) as well as portable equipment (davits) and a suspended platform. n/a for the maher ordinance #155-13Details
a retro-fit installation of an exterior maintenance system sky rider has been contracted to design, provide and install permanent equipment(sockets and davits) as well as portable equipment (davits) and a suspended platform. n/a for the maher ordinance #155-13 | $20,000 |
| Sep 4, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | R L H Fire Protection Inc | 4th floor fire sprinkler permit - relocate 9 and delete 1 pendent. t.i. pa# 201406279694. n/a ordinance #155-13Details
4th floor fire sprinkler permit - relocate 9 and delete 1 pendent. t.i. pa# 201406279694. n/a ordinance #155-13 | $4,626 |
| Aug 21, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | Johnson Controls Fire | # 1020: fire alarm t.i. to 10th floor. provide and install 1 booster panel. 1 signal module, 1 smoke, and 8 speaker strobes. ref app#201406279699. n/a maher ordinance # 155-13Details
# 1020: fire alarm t.i. to 10th floor. provide and install 1 booster panel. 1 signal module, 1 smoke, and 8 speaker strobes. ref app#201406279699. n/a maher ordinance # 155-13 | $8,800 |
| Aug 21, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | Johnson Controls Fire | 4th floor #405 fire alarm tenant improvement - provide & install 2 new speaker/strobe.Details
4th floor #405 fire alarm tenant improvement - provide & install 2 new speaker/strobe. | $2,800 |
| Aug 21, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | Johnson Controls Fire | 4th floor #400 fire alarm tenant improvement - provide & install 8 new speaker/strobe.Details
4th floor #400 fire alarm tenant improvement - provide & install 8 new speaker/strobe. | $5,600 |
| Aug 1, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | Johnson Controls Fire | fire alarm t.i. at 5/f, 6/f, 7/f to provide and install new power supply with notification appliances and initiating devices at each floor. t.i. pa#201405065051. ti pa# 2014/04/23/3973 ** maher: compliance with ordinance no# 155-13 not required **Details
fire alarm t.i. at 5/f, 6/f, 7/f to provide and install new power supply with notification appliances and initiating devices at each floor. t.i. pa#201405065051. ti pa# 2014/04/23/3973 ** maher: compliance with ordinance no# 155-13 not required ** | $58,000 |
| Jul 31, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | R L H Fire Protection Inc | 10th flr: t.i. 201406279699, fire sprinkler permit, relocate 8 and delete 1 pedant on the 10th flr; maher n/aDetails
10th flr: t.i. 201406279699, fire sprinkler permit, relocate 8 and delete 1 pedant on the 10th flr; maher n/a | $4,112 |
| Jul 16, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | Johnson Controls Fire | fire alram t.i. to 13th floor. 5 new speakers/strobes, remove/demo 8 existing modification appliances, relocate 2 existing devices.Details
fire alram t.i. to 13th floor. 5 new speakers/strobes, remove/demo 8 existing modification appliances, relocate 2 existing devices. | $6,700 |
| Jul 3, 2014 | Completed final sign-off Dec 2014 | 160 Spear St | Sun Graphics | fabricate and install nine (9) emergency evaluation maps - three @ each floor (floor 5/floor 6/floor 7); maher n/aDetails
fabricate and install nine (9) emergency evaluation maps - three @ each floor (floor 5/floor 6/floor 7); maher n/a | $2,000 |
| Jun 27, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | Legacy Partners C D S Inc | suite 1020: office ti consisting of creating conference room at existing open areaDetails
suite 1020: office ti consisting of creating conference room at existing open area | $130,550 |
| Jun 27, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | Legacy Partners C D S Inc | suite 400-405: interior ti at existing office area, new double doors and new break room cabinet with sink.Details
suite 400-405: interior ti at existing office area, new double doors and new break room cabinet with sink. | $75,000 |
| Jun 20, 2014 | Completed final sign-off Jul 2014 | 160 Spear St | Pribuss Engineering Inc | fire sprinkler t.i. add 58, relocates 286 total: 344. t.i. pa# 201405065051. n/a ordinance #155-13.Details
fire sprinkler t.i. add 58, relocates 286 total: 344. t.i. pa# 201405065051. n/a ordinance #155-13. | $177,029 |
| May 23, 2014 | Completed final sign-off Dec 2014 | 160 Spear St | Principal Builders Inc. | mechanical-electrical to demo, install and relocate equipment on 5th, 6th & 7th floor.t-1 phase refer to pa#201405065051 fot t-i work. ** maher: compliance with ordinance no# 155-13 not required **Details
mechanical-electrical to demo, install and relocate equipment on 5th, 6th & 7th floor.t-1 phase refer to pa#201405065051 fot t-i work. ** maher: compliance with ordinance no# 155-13 not required ** | $1,600,000 |
| May 6, 2014 | Completed final sign-off Apr 2015 | 160 Spear St | Principal Builders Inc. | tenant improvement on the 5th, 6th, 7th fl to construct new partitions, doors, finishes. mep on sep permit, fire alarm, sprinklers on separate permitsDetails
tenant improvement on the 5th, 6th, 7th fl to construct new partitions, doors, finishes. mep on sep permit, fire alarm, sprinklers on separate permits | $2,700,000 |
| May 5, 2014 | Completed final sign-off May 2014 | 160 Spear St | R L H Fire Protection Inc | # 1300: fire sprinklers permit, relocate 7 pendents and 25 uprights, add 1 pendent & 4 uprights, delete 5 pendents. reference ti 2014.0404.2425. n/a maher ordinance # 155-13.Details
# 1300: fire sprinklers permit, relocate 7 pendents and 25 uprights, add 1 pendent & 4 uprights, delete 5 pendents. reference ti 2014.0404.2425. n/a maher ordinance # 155-13. | $18,504 |
| Apr 23, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | Principal Builders Inc. | 5th,6th, & 7th flrs: interior soft demo of partitions, doors, millwork, a & ceiling to create vacant psace for future t.i. . all ada requirments to be addressed under future t.i. permit & space shall remain vacant per ab-017. all fire alarms/sprinkler will remain.n/a for the maher ordinance #155-13Details
5th,6th, & 7th flrs: interior soft demo of partitions, doors, millwork, a & ceiling to create vacant psace for future t.i. . all ada requirments to be addressed under future t.i. permit & space shall remain vacant per ab-017. all fire alarms/sprinkler will remain.n/a for the maher ordinance #155-13 | $100,000 |
| Apr 4, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | Legacy Partners C D S Inc | suite 1300: interior tenant improvements at existing office area. removing offices and ceilingDetails
suite 1300: interior tenant improvements at existing office area. removing offices and ceiling | $180,000 |
| Apr 2, 2014 | Completed final sign-off Apr 2014 | 160 Spear St | R L H Fire Protection Inc | #360- fire sprinkler permit, relocate 5, add 3 and delete 3 pendents. n/a ordinance #155-13.Details
#360- fire sprinkler permit, relocate 5, add 3 and delete 3 pendents. n/a ordinance #155-13. | $4,112 |
| Mar 5, 2014 | Completed final sign-off Apr 2014 | 160 Spear St | Johnson Controls Fire | fire alarm tenant improvement to 2nd & 19th flr: adding one (1) new smoke sensor, one ceil mount strobe and 27 ceil mount speaker/strobes ref. app# 2014 0214 8522Details
fire alarm tenant improvement to 2nd & 19th flr: adding one (1) new smoke sensor, one ceil mount strobe and 27 ceil mount speaker/strobes ref. app# 2014 0214 8522 | $17,000 |
| Mar 5, 2014 | Completed final sign-off Sep 2014 | 160 Spear St | Legacy Partners C D S Inc | unit 360: minor t.i. to create new offices and an open office area. 2960 sf area of work. n/a for the maher ordinance #155-13Details
unit 360: minor t.i. to create new offices and an open office area. 2960 sf area of work. n/a for the maher ordinance #155-13 | $89,000 |
| Feb 14, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | Legacy Partners C D S Inc | #1900: interior t.i. offfic, conference room, and lounge, break room. n/a for the maher ordinance #155-13Details
#1900: interior t.i. offfic, conference room, and lounge, break room. n/a for the maher ordinance #155-13 | $600,000 |
| Feb 14, 2014 | Completed final sign-off Aug 2014 | 160 Spear St | Legacy Partners C D S Inc | #208: interior t.i. :mail room, conference room, and gym. n/a for the maher ordinance #155-13Details
#208: interior t.i. :mail room, conference room, and gym. n/a for the maher ordinance #155-13 | $65,000 |
| Dec 20, 2013 | Completed final sign-off Sep 2014 | 160 Spear St | Johnson Controls Fire | fire alarm scope reduction to original pa# 201312063495, removing (14) notification appliances from original pa# 201312063495. appliances are no longer in scope.Details
fire alarm scope reduction to original pa# 201312063495, removing (14) notification appliances from original pa# 201312063495. appliances are no longer in scope. | |
| Nov 8, 2013 | Completed final sign-off Jan 2014 | 160 Spear St | R L H Fire Protection Inc | 18th floor:fire sprinkler permit:relocate 11 pendents and 19 uprights, add 6 pendents and 9 uprights, and delete 6 pendents.Details
18th floor:fire sprinkler permit:relocate 11 pendents and 19 uprights, add 6 pendents and 9 uprights, and delete 6 pendents. | $22,616 |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 160 Spear St | Simplexgrinnell Lp. | fire alarm tenant improvement to 17th floor. 10 new speaker/stroves, 1 new synch moduleDetails
fire alarm tenant improvement to 17th floor. 10 new speaker/stroves, 1 new synch module | $6,500 |
| May 17, 2013 | Completed final sign-off May 2013 | 160 Spear St | R L H Fire Protection Inc | relocate & remove fire sprinkler heads per tenant improvement (2 relocate), (2 remove); building permit 201304295708Details
relocate & remove fire sprinkler heads per tenant improvement (2 relocate), (2 remove); building permit 201304295708 | $1,028 |
| May 7, 2012 | Completed final sign-off Jul 2012 | 160 Spear St | Premier Structures Inc | construction of tenant improvements for retail space in approx 718 sq ft of new hair salon. improvement include new water heater, partial height walls to create a breakroom. exsiting sinks to remain. existing lighting, registers, an fire sprinklers toremain.sprinkler & fire alarm revisions under appDetails
construction of tenant improvements for retail space in approx 718 sq ft of new hair salon. improvement include new water heater, partial height walls to create a breakroom. exsiting sinks to remain. existing lighting, registers, an fire sprinklers toremain.sprinkler & fire alarm revisions under app | $80,000 |
| Feb 10, 2012 | Completed final sign-off Mar 2013 | 160 Spear St | Legacy Partners C D S Inc | revision to pa #201112140688 - add one door, revise door swing to (2) doors.Details
revision to pa #201112140688 - add one door, revise door swing to (2) doors. | $500 |
| Feb 6, 2012 | Completed final sign-off Apr 2012 | 160 Spear St | R L H Fire Protection Inc | fire sprinkers only 8th floor: relocate 36, add 2, delete 1 heads. 9th floor: reloate 29, add 3, delete 3 heads. 70 heads total.Details
fire sprinkers only 8th floor: relocate 36, add 2, delete 1 heads. 9th floor: reloate 29, add 3, delete 3 heads. 70 heads total. | $35,000 |
| Mar 2, 2010 | Completed final sign-off Nov 2022 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | 8th floor - relocate fire sprinkler heads per tenant improvement, 3 relocate.Details
8th floor - relocate fire sprinkler heads per tenant improvement, 3 relocate. | $800 |
| Feb 5, 2010 | Completed final sign-off Mar 2010 | 160 Spear St | Berrod Enterprise Inc | 8th floor-construct a ceiling high wall to divide office 208 sq.ft. metal stud 5/8" drywall-with r-13 insulation. relocate light & add new duplex outlet, relocate light switches. reloccate switch & install one alarm speaker strobe. relocate sprinkler head. install (n) base & paint.Details
8th floor-construct a ceiling high wall to divide office 208 sq.ft. metal stud 5/8" drywall-with r-13 insulation. relocate light & add new duplex outlet, relocate light switches. reloccate switch & install one alarm speaker strobe. relocate sprinkler head. install (n) base & paint. | $24,937 |
| Feb 2, 2010 | Completed final sign-off May 2010 | 160 Spear St | Anderson, Rowe & Buckley, Inc. | 17th floor ti to existing fire sprinkler system. one added and one relocated sprinkler head.Details
17th floor ti to existing fire sprinkler system. one added and one relocated sprinkler head. | $500 |
| Jul 14, 2009 | Never finaled issued Jul 2009, no final | 160 Spear St | Cintas Fire Protection | revision to pa# 2009-0520-8805. upgrade of ansul system to ul 300 on the first floor commercial kitchen.Details
revision to pa# 2009-0520-8805. upgrade of ansul system to ul 300 on the first floor commercial kitchen. | $200 |
| May 20, 2009 | Never finaled issued Jun 2009, no final | 160 Spear St | Cintas Fire Protection | upgrade fire suppression system to ul-300 on 1st floor. fire alarm connection separte permitDetails
upgrade fire suppression system to ul-300 on 1st floor. fire alarm connection separte permit | $4,850 |
| Mar 12, 2009 | Completed final sign-off Dec 2009 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | 17th floor relocate 2 fire sprinkelrs per tenant improvements.Details
17th floor relocate 2 fire sprinkelrs per tenant improvements. | $300 |
| Mar 2, 2009 | Completed final sign-off Apr 2009 | 160 Spear St | Starlite Electric Inc. | suite 1700: install 1 speaker, 4 strobes, 1 smoke detector & relocate 1 speaker.Details
suite 1700: install 1 speaker, 4 strobes, 1 smoke detector & relocate 1 speaker. | $5,000 |
| Feb 25, 2009 | Completed final sign-off Apr 2009 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | add, relocate, remove fire sprinklers for tenant improvements. 15 add, 47 relocate, 14 remove.Details
add, relocate, remove fire sprinklers for tenant improvements. 15 add, 47 relocate, 14 remove. | $9,750 |
| Dec 23, 2008 | Completed final sign-off Apr 2009 | 160 Spear St | Starlite Electric Inc. | #1400 - install 26 strobes, 30 speakers, 1 booster panel & 4 relay module. replace 4 smoke detectors, install 1 smoke detector & 2 duct detectors, demo 3 smoke detectors.Details
#1400 - install 26 strobes, 30 speakers, 1 booster panel & 4 relay module. replace 4 smoke detectors, install 1 smoke detector & 2 duct detectors, demo 3 smoke detectors. | $20,000 |
| Dec 3, 2008 | Completed final sign-off Feb 2009 | 160 Spear St | Starlite Electric Inc. | 10th floor: install (9) strobes, (9) speakers, demo existing strobes and speakers, relocate (1) smoke detector.Details
10th floor: install (9) strobes, (9) speakers, demo existing strobes and speakers, relocate (1) smoke detector. | $9,000 |
| Jun 11, 2008 | Completed final sign-off Jun 2008 | 160 Spear St | Rossi Builders Inc. | 3rd floor - renew 200704259622 and 200709273960 for final inspection.Details
3rd floor - renew 200704259622 and 200709273960 for final inspection. | |
| Jun 11, 2008 | Completed final sign-off Jun 2008 | 160 Spear St | Rossi Builders Inc. | 16th floor - renew 200704108432, 200704199206, 200708311562 for final inspection.Details
16th floor - renew 200704108432, 200704199206, 200708311562 for final inspection. | |
| Jun 11, 2008 | Completed final sign-off Jun 2008 | 160 Spear St | Rossi Builders Inc. | 10th floor - renew 200705252261 for final inspection.Details
10th floor - renew 200705252261 for final inspection. | |
| May 22, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | Starlite Electric Inc. | 12th floor, suite# 1220 & #1230: install fire alarm system, 8 strobes, 10 speakers.Details
12th floor, suite# 1220 & #1230: install fire alarm system, 8 strobes, 10 speakers. | $10,000 |
| May 12, 2008 | Completed final sign-off May 2008 | 160 Spear St | Starlite Electric Inc. | add 6 additional smoke detectors, 1 ceiling mount speaker. revision to app #200804159796Details
add 6 additional smoke detectors, 1 ceiling mount speaker. revision to app #200804159796 | $2,500 |
| May 7, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | Starlite Electric Inc. | 12th & 13th floors-install 24 strobes, 26 speakers, 6 smoke detectors, 2 booster panels, relocate 1 pull stationDetails
12th & 13th floors-install 24 strobes, 26 speakers, 6 smoke detectors, 2 booster panels, relocate 1 pull station | $15,000 |
| Apr 30, 2008 | Completed final sign-off May 2008 | 160 Spear St | Starlite Electric Inc. | revision: 200803268060 install 15 speakers and 5 smoke detectors. demo existing speakers.Details
revision: 200803268060 install 15 speakers and 5 smoke detectors. demo existing speakers. | $4,000 |
| Apr 18, 2008 | Completed final sign-off May 2008 | 160 Spear St | Sure Fire Protection | 10th floor: fire sprinkler system on 10th floor. 6 pendents, relocate 7 heads, plug in 1 headDetails
10th floor: fire sprinkler system on 10th floor. 6 pendents, relocate 7 heads, plug in 1 head | $3,000 |
| Apr 15, 2008 | Completed final sign-off May 2008 | 160 Spear St | Starlite Electric Inc. | install 5 strobes, 1 smoke detector, 1 speaker, 1 booster panel. total 8 devices.Details
install 5 strobes, 1 smoke detector, 1 speaker, 1 booster panel. total 8 devices. | $7,000 |
| Apr 15, 2008 | Completed final sign-off May 2008 | 160 Spear St | Starlite Electric Inc. | #1000- install 8 strobes, 2 smoke detectors, 5 speakers. total: 15 devicesDetails
#1000- install 8 strobes, 2 smoke detectors, 5 speakers. total: 15 devices | $10,000 |
| Mar 27, 2008 | Completed final sign-off May 2008 | 160 Spear St | Sure Fire Protection | 15th floor, suite 1500 - add 3 new fire sprinklers, relocate 13 (e) fire sprinkler, plug 4 (e) fire sprinklers.Details
15th floor, suite 1500 - add 3 new fire sprinklers, relocate 13 (e) fire sprinkler, plug 4 (e) fire sprinklers. | $4,000 |
| Mar 26, 2008 | Completed final sign-off May 2008 | 160 Spear St | Starlite Electric Inc. | install 9 strobes, 1 smoke detector, 4 speakers, replace 9 strobes, demo 1 strobe, 1 smoke detector, install 1 booster panelDetails
install 9 strobes, 1 smoke detector, 4 speakers, replace 9 strobes, demo 1 strobe, 1 smoke detector, install 1 booster panel | $15,000 |
| Feb 6, 2008 | Never finaled issued Feb 2008, no final | 160 Spear St | Sure Fire Protection | 11th floor suite 1120 for fire sprinkler, add 1 (n) ssp & relocate 4 (e) ssp's for new wall construction, cut back 1(e) ssp for new ceiling installation.Details
11th floor suite 1120 for fire sprinkler, add 1 (n) ssp & relocate 4 (e) ssp's for new wall construction, cut back 1(e) ssp for new ceiling installation. | $4,800 |
| Feb 6, 2008 | Completed final sign-off May 2008 | 160 Spear St | Sure Fire Protection | relocate 3 (e) ssp's for new wall configuration, plug off 1 (e) pendant on 11th floor.Details
relocate 3 (e) ssp's for new wall configuration, plug off 1 (e) pendant on 11th floor. | $4,800 |
| Jan 30, 2008 | Completed final sign-off May 2008 | 160 Spear St | Starlite Electric Inc. | install 3 strobes, 3 speakers in suite 1140.Details
install 3 strobes, 3 speakers in suite 1140. | $3,500 |
| Jan 30, 2008 | Never finaled issued Jan 2008, no final | 160 Spear St | Starlite Electric Inc. | install 6 strobes,1 smoke detector, 6 speakers in suite 1100Details
install 6 strobes,1 smoke detector, 6 speakers in suite 1100 | $6,500 |
| Jan 30, 2008 | Completed final sign-off Feb 2008 | 160 Spear St | Starlite Electric Inc. | install 3 strobes, 3 speakers in suite 1120.Details
install 3 strobes, 3 speakers in suite 1120. | $3,500 |
| Dec 7, 2007 | Never finaled issued Dec 2007, no final | 160 Spear St | Starlite Electric Inc. | 16th floor (corridor): install 1 smoke detector, relocate 1 strobe & 1 smoke detector.Details
16th floor (corridor): install 1 smoke detector, relocate 1 strobe & 1 smoke detector. | $2,500 |
| Dec 7, 2007 | Completed final sign-off Jan 2008 | 160 Spear St | Starlite Electric Inc. | #1650- 16th floor: install 3 wall-mount strobes, relocate 2 strobes. for cole management.Details
#1650- 16th floor: install 3 wall-mount strobes, relocate 2 strobes. for cole management. | $4,000 |
| Nov 7, 2007 | Never finaled issued Nov 2007, no final | 160 Spear St | street space permitDetails
street space permit | ||
| Oct 29, 2007 | Never finaled issued Oct 2007, no final | 160 Spear St | Sure Fire Protection | 17th floor, suite #1700 - due to the removal of wallss and soffit. plug off (4) existing pendents and relocate (3) existing pendents.Details
17th floor, suite #1700 - due to the removal of wallss and soffit. plug off (4) existing pendents and relocate (3) existing pendents. | $2,800 |
| Oct 17, 2007 | Completed final sign-off Jun 2008 | 160 Spear St | Starlite Electric Inc. | fire alarm modification-add 12 strobes,15 speakers, 7 smoke det.in suite1700Details
fire alarm modification-add 12 strobes,15 speakers, 7 smoke det.in suite1700 | $10,000 |
| Sep 27, 2007 | Never finaled issued Sep 2007, no final | 160 Spear St | Starlite Electric Inc. | 3rd floor - install (5) strobes, (5) speakers.Details
3rd floor - install (5) strobes, (5) speakers. | $10,000 |
| Sep 18, 2007 | Completed final sign-off Feb 2008 | 160 Spear St | Starlite Electric Inc. | revsion to app# 200706265190 /install 1 duct detector for heat pump shut downDetails
revsion to app# 200706265190 /install 1 duct detector for heat pump shut down | |
| Sep 5, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Sure Fire Protection | suite#330. due to new partition walls relocate 6 existing pendents, and add 2 new pendents matche existing pendents.Details
suite#330. due to new partition walls relocate 6 existing pendents, and add 2 new pendents matche existing pendents. | $2,500 |
| Sep 5, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Sure Fire Protection | work @ suite# 1150 only. due to the addition of new 1 hour rated corridor & new walls in the countrywide t.i. space. add 4 new pendent heads & relocate 9 (e) pendents & plug off 1 (e) pendent.Details
work @ suite# 1150 only. due to the addition of new 1 hour rated corridor & new walls in the countrywide t.i. space. add 4 new pendent heads & relocate 9 (e) pendents & plug off 1 (e) pendent. | $4,000 |
| Aug 23, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Starlite Electric Inc. | 11/f- install 11 strobes, 2 smoke detectors, 1 pull station, 13 speakers, 1 booster panel.Details
11/f- install 11 strobes, 2 smoke detectors, 1 pull station, 13 speakers, 1 booster panel. | $15,000 |
| Aug 8, 2007 | Completed final sign-off Mar 2008 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | 4th floor-relocate and add sprinkler per tenant improvements. relocate 47, add 10Details
4th floor-relocate and add sprinkler per tenant improvements. relocate 47, add 10 | $8,440 |
| Aug 2, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Legacy Partners C D S Inc | partial office t.i. 11th. fl.Details
partial office t.i. 11th. fl. | $110,000 |
| Jun 26, 2007 | Completed final sign-off Feb 2008 | 160 Spear St | Starlite Electric Inc. | install 13 strobes, 13 spreakers and 1 smoke detector. remove extg strobes and speakers on 4th floorDetails
install 13 strobes, 13 spreakers and 1 smoke detector. remove extg strobes and speakers on 4th floor | $10,000 |
| Jun 20, 2007 | Never finaled issued Jun 2007, no final | 160 Spear St | street space permitDetails
street space permit | ||
| Jun 8, 2007 | Completed final sign-off Jun 2008 | 160 Spear St | remove existing and gate replaceiwth new in private propert. remove existing court yard concrete walk a planter curbs and replace with new in privat peoperty, remove existing landscpae lights and replace with new in private property.Details
remove existing and gate replaceiwth new in private propert. remove existing court yard concrete walk a planter curbs and replace with new in privat peoperty, remove existing landscpae lights and replace with new in private property. | $150,000 | |
| Jun 8, 2007 | Never finaled issued Jun 2007, no final | 160 Spear St | Starlite Electric Inc. | submit as built drawing, relocate one strobe 2007/06/04/2923Details
submit as built drawing, relocate one strobe 2007/06/04/2923 | $500 |
| Jun 4, 2007 | Never finaled issued Jun 2007, no final | 160 Spear St | Starlite Electric Inc. | submission for as-built. 2nd floor. original permit #2007/01/30/2857Details
submission for as-built. 2nd floor. original permit #2007/01/30/2857 | |
| May 25, 2007 | Never finaled issued May 2007, no final | 160 Spear St | California Suppresion Dba Calif. Protect | replace 1 smoke and reinstall 1 stobe and speaker in lobbys. replace 3 smokes, reinstall 1 strobe and speaker in lobby 10. replace 1 smoke in basement elevator recallDetails
replace 1 smoke and reinstall 1 stobe and speaker in lobbys. replace 3 smokes, reinstall 1 strobe and speaker in lobby 10. replace 1 smoke in basement elevator recall | $81,441 |
| Apr 26, 2007 | Never finaled issued Apr 2007, no final | 160 Spear St | California Suppresion Dba Calif. Protect | baement lobby - relocate/change 2 sprinkler heads from uprite to pendant to compensate for new and bar in ceiling.Details
baement lobby - relocate/change 2 sprinkler heads from uprite to pendant to compensate for new and bar in ceiling. | $3,850 |
| Apr 20, 2007 | Never finaled issued Apr 2007, no final | 160 Spear St | California Suppresion Dba Calif. Protect | 160 spear st. #100: add & relocate fire sprinklers to provide equal coverage 2 add, 5 relocateDetails
160 spear st. #100: add & relocate fire sprinklers to provide equal coverage 2 add, 5 relocate | $4,240 |
| Apr 19, 2007 | Never finaled issued Apr 2007, no final | 160 Spear St | California Suppresion Dba Calif. Protect | t.i. demo 4 strobes. install 4 simplex smoke detectors. replace / relocate 4 (e) strobes, provide & install 11 strobes.Details
t.i. demo 4 strobes. install 4 simplex smoke detectors. replace / relocate 4 (e) strobes, provide & install 11 strobes. | $21,978 |
| Apr 12, 2007 | Expired or cancelled expired Apr 2008 | 160 Spear St | California Suppresion Dba Calif. Protect | relocate fire/life safety devices. relocate 2 strobes and 2 speakers on suite#100.Details
relocate fire/life safety devices. relocate 2 strobes and 2 speakers on suite#100. | $6,458 |
| Jan 30, 2007 | Expired or cancelled expired Apr 2008 | 160 Spear St | Starlite Electric Inc. | install 2 new strobe, replace 1 strobe, install 1 smoke detector, install 2 speakers. demo 2 strobes, 2 speakersDetails
install 2 new strobe, replace 1 strobe, install 1 smoke detector, install 2 speakers. demo 2 strobes, 2 speakers | $3,000 |
| Nov 14, 2006 | Completed final sign-off Dec 2006 | 160 Spear St | Starlite Electric Inc. | install 6 wall mount strobes, 5 ceiling mount speakers.Details
install 6 wall mount strobes, 5 ceiling mount speakers. | $10,000 |
| Jul 11, 2006 | Completed final sign-off Sep 2006 | 160 Spear St | Starlite Electric Inc. | relocate 1 strobe, install 2 strobes. install 1 speaker.Details
relocate 1 strobe, install 2 strobes. install 1 speaker. | $2,000 |
| Feb 7, 2006 | Completed final sign-off Mar 2006 | 160 Spear St | Starlite Electric Inc. | install 3 ceiling speaker/strobes, 3 wall strobes, 3 speakers, 3 smoke detectors, 2 booster panel.Details
install 3 ceiling speaker/strobes, 3 wall strobes, 3 speakers, 3 smoke detectors, 2 booster panel. | $10,000 |
| Jan 31, 2006 | Expired or cancelled expired Apr 2007 | 160 Spear St | Starlite Electric Inc. | install 6 speakers, 6 strobes, 3 smoke detectors and 1 booster panel at 2nd and 18th floor corridors. replace 1 booster panelDetails
install 6 speakers, 6 strobes, 3 smoke detectors and 1 booster panel at 2nd and 18th floor corridors. replace 1 booster panel | $10,000 |
| Jan 10, 2006 | Completed final sign-off Apr 2006 | 160 Spear St | Starlite Electric Inc. | install 6 strobes, 5 speakers, 1 smoke, 1 booster panel.Details
install 6 strobes, 5 speakers, 1 smoke, 1 booster panel. | $10,000 |
| Oct 18, 2005 | Completed final sign-off Dec 2005 | 160 Spear St | Mc Millan Electric | 18th floor, verify 2 fire smoke dampers as built ref 200507218296Details
18th floor, verify 2 fire smoke dampers as built ref 200507218296 | $1,500 |
| Sep 20, 2005 | Expired or cancelled expired Apr 2007 | 160 Spear St | Mc Millan Electric | install 10 strobes, 10 speakers & 1 booster panel.Details
install 10 strobes, 10 speakers & 1 booster panel. | $10,000 |
| Oct 3, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | 5/f provide mechanical electrical plumbing and life safety on the 5/f per plan t/i underDetails
5/f provide mechanical electrical plumbing and life safety on the 5/f per plan t/i under | $200,000 | |
| Sep 15, 2003 | Expired or cancelled expired Jan 2005 | 160 Spear St | Starlite Electric Inc. | rev. appl#200309053972, furnish/install 1 strobe, 1 smoke detector, 2 speakers, relocate 1 strobeDetails
rev. appl#200309053972, furnish/install 1 strobe, 1 smoke detector, 2 speakers, relocate 1 strobe | $1,000 |
| Sep 12, 2003 | Never finaled issued Sep 2003, no final | 160 Spear St | Ayoob & Peery Plumbing Co Inc | relocate and add 1 sprk heads per tenant improvements on 17th floorDetails
relocate and add 1 sprk heads per tenant improvements on 17th floor | $1,900 |
| Sep 5, 2003 | Never finaled issued Sep 2003, no final | 160 Spear St | Starlite Electric Inc. | furnish and install (1) strobe. (2) smoke detectors. (2) speakers. relocate(1) strobe. on 17th flDetails
furnish and install (1) strobe. (2) smoke detectors. (2) speakers. relocate(1) strobe. on 17th fl | $10,000 |
| Jun 29, 2001 | Expired or cancelled expired Mar 2004 | 160 Spear St | Crk Construction | oti-1 revision, 2nd floor, el, me, ls, sp.Details
oti-1 revision, 2nd floor, el, me, ls, sp. | $15,000 |