Contractors with kitchen remodel permits
Ranked across every kitchen remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Showing contractors with a kitchen remodel permit in the last 5 years. Include inactive contractors
CompletedIn progressNever finaledExpired or cancelled
- 1Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 423 permits: 362 completed, 55 in progress, 4 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 70 days from permit to final inspection.
- 2Valex ConstructionLicense 809059 51 permits: 50 completed, 1 in progress. Last filed Jul 2026. Typically 128 days from permit to final inspection.
- 3Sean M O'reillyLicense 812877 47 permits: 45 completed, 2 in progress. Last filed May 2026. Typically 75 days from permit to final inspection.
- 4Brady ConstructionLicense 539362 94 permits: 92 completed, 1 never finaled, 1 expired or cancelled. Last filed May 2026. Typically 83 days from permit to final inspection.
- 5He & Kuang IncLicense 892144 43 permits: 39 completed, 4 in progress. Last filed Jul 2026. Typically 221 days from permit to final inspection.
- 6Yiu's Construction CoLicense 802681 127 permits: 122 completed, 1 in progress, 4 never finaled. Last filed Jul 2026. Typically 83 days from permit to final inspection.
- 7Sure, Inc.License 561658 727 permits: 678 completed, 8 in progress, 23 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection.
- 8B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Jan 2024. Typically 86 days from permit to final inspection.
- 9Caruso Construction Inc.License 710510 53 permits: 51 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 255 days from permit to final inspection.
- 10Jason Liu Construction CompanyLicense 662067 30 permits: 30 completed. Last filed Sep 2022. Typically 246 days from permit to final inspection.
- 11North Bay ConstructionLicense 896978 55 permits: 50 completed, 4 in progress, 1 expired or cancelled. Last filed Jul 2026. Typically 207 days from permit to final inspection.
- 12Darc Ventures Inc Dba Spl Construction SLicense 938513 70 permits: 67 completed, 1 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 179 days from permit to final inspection.
- 13Urban Builder General Contracting IncLicense 869710 51 permits: 49 completed, 1 in progress, 1 never finaled. Last filed Jul 2025. Typically 206 days from permit to final inspection.
- 14Custom Construction EnterprisesLicense 830244 30 permits: 29 completed, 1 in progress. Last filed Dec 2025. Typically 240 days from permit to final inspection.
- 15Kells Construction Inc.License 746714 29 permits: 28 completed, 1 in progress. Last filed Aug 2026. Typically 90 days from permit to final inspection.
- 16Yefa Construction IncLicense 1047719 31 permits: 28 completed, 3 in progress. Last filed Feb 2026. Typically 290 days from permit to final inspection.
- 17J. Ho Construction IncLicense 680425 169 permits: 158 completed, 2 in progress, 7 never finaled, 2 expired or cancelled. Last filed Apr 2026. Typically 84 days from permit to final inspection.
- 187 Hills ConstructionLicense 1064265 33 permits: 27 completed, 6 in progress. Last filed Sep 2026. Typically 142 days from permit to final inspection.
- 19Saturn Construction CoLicense 861233 66 permits: 61 completed, 3 in progress, 2 never finaled. Last filed Jun 2026. Typically 232 days from permit to final inspection.
- 20Nelson T Lewis Const Co Inc.License 195866 81 permits: 75 completed, 3 in progress, 3 expired or cancelled. Last filed Sep 2026. Typically 87 days from permit to final inspection.
- 21Reliable Construction IncLicense 983658 106 permits: 89 completed, 13 in progress, 3 never finaled, 1 expired or cancelled. Last filed Jul 2026. Typically 191 days from permit to final inspection.
- 22Toni's Construction IncLicense 551504 45 permits: 44 completed, 1 expired or cancelled. Last filed Jan 2026. Typically 135 days from permit to final inspection.
- 23Hubert PennyLicense 809333 94 permits: 86 completed, 4 in progress, 2 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 92 days from permit to final inspection.
- 24Winder Construction Inc.License 1033654 30 permits: 25 completed, 5 in progress. Last filed Aug 2026. Typically 312 days from permit to final inspection.
- 25Jin Qing Construction Corp.License 1030182 27 permits: 25 completed, 2 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 26C J Reed Construction CoLicense 712090 43 permits: 42 completed, 1 never finaled. Last filed Dec 2025. Typically 66 days from permit to final inspection.
- 27D N ConstructionLicense 945873 24 permits: 24 completed. Last filed Jan 2026. Typically 119 days from permit to final inspection.
- 28MrccLicense 821253 25 permits: 24 completed, 1 in progress. Last filed May 2026. Typically 170 days from permit to final inspection.
- 29Lee & Company Contractors IncLicense 951872 41 permits: 39 completed, 1 in progress, 1 never finaled. Last filed Mar 2023. Typically 183 days from permit to final inspection.
- 30Katz GroupLicense 1074133 24 permits: 23 completed, 1 in progress. Last filed Aug 2026. Typically 113 days from permit to final inspection.
- 31Great Ocean Construction Inc.License 1103304 25 permits: 22 completed, 3 in progress. Last filed Jul 2026. Typically 160 days from permit to final inspection.
- 32We Do Construction Inc.License 1096552 35 permits: 22 completed, 13 in progress. Last filed Aug 2026. Typically 190 days from permit to final inspection.
- 33The Sustainable Cbo Inc Dba Oliver MackiLicense 988725 22 permits: 22 completed. Last filed Apr 2025. Typically 152 days from permit to final inspection.
- 34John Woo ConstructionllcLicense 765131 23 permits: 22 completed, 1 in progress. Last filed Aug 2026. Typically 185 days from permit to final inspection.
- 35Robison Nieri White ConstructionLicense 796298 78 permits: 74 completed, 2 never finaled, 2 expired or cancelled. Last filed Sep 2024. Typically 217 days from permit to final inspection.
- 36E B W Builders IncLicense 794942 38 permits: 36 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 142 days from permit to final inspection.
- 37Hang C Construction IncLicense 760153 38 permits: 36 completed, 1 in progress, 1 expired or cancelled. Last filed May 2025. Typically 162 days from permit to final inspection.
- 38Benjamin ShawLicense 646136 21 permits: 21 completed. Last filed May 2022. Typically 141 days from permit to final inspection.
- 39Patrick Coakley ConstructionLicense 819320 21 permits: 21 completed. Last filed Nov 2022. Typically 141 days from permit to final inspection.
- 40Macrobuild CorporationLicense 1024387 21 permits: 21 completed. Last filed May 2022. Typically 288 days from permit to final inspection.
Most recent kitchen remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress | 745 Lakeview Av | addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition. | $199,000 | |
| Oct 1, 2026 | In progress | 3620 Balboa St | upgrade electrical and title 24 for temporary kitchen approved under 202511149684 due to fire damage | $10,000 | |
| Oct 1, 2026 | In progress | 148 Caine Av | to comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl). | $180,000 | |
| Oct 1, 2026 | In progress | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress | 1620 Jones St | units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family area | $90,000 | |
| Oct 1, 2026 | In progress | 738 Elizabeth St | revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house. | ||
| Oct 1, 2026 | In progress | 1972 Green St | add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic. | $85,000 | |
| Oct 1, 2026 | In progress | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Oct 1, 2026 | In progress | 250 King St | Brenes Construction | remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintained | $9,000 |
| Oct 1, 2026 | In progress | 3916 18th St | Custom Tile Works | top fl: remodel kitchen: remove 2 bisecting nonload bearing walls new appliances, fill 2 windows, install 1 new window, replace new skylight @ living room, new cabinets, new on demand 8 relocate water heater, sister new 2x6 to (e) 2x4 cicling joist @ kitchen, move (e) kitchen sink over 18" , 6 new.. | $98,000 |
| Oct 1, 2026 | In progress | 2412 22nd Av | Kearney Construction Llc | demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodel | $120,000 |
| Sep 30, 2026 | In progress | 267 Bright St | new adu per ca govt code. at 1/f: modify (e) floor space with 1 new bedroom and bathroom, kitchen and laundry. | $85,000 | |
| Sep 30, 2026 | In progress | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 30, 2026 | In progress | 341 Avila St | expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance. | $744,000 | |
| Sep 30, 2026 | In progress | 3232 Buchanan St | Yellow Zone Construction | to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063 | $10,000 |
| Sep 30, 2026 | In progress | 1849 Church St | Hrvc Construction Inc | kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls. | $120,240 |
| Sep 30, 2026 | In progress | 555 Pacific Av | B-Side Inc. | core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitions | $200,000 |
| Sep 29, 2026 | In progress | 663 09th Av | new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear. | $160,000 | |
| Sep 29, 2026 | In progress | 114 Jasper Pl | new adu on 1/f including kitchen, 1 media room, sleeping area, & 1 3-fixture bathroom. | $50,000 | |
| Sep 29, 2026 | In progress | 2929 19th St | legalize existing kitchen. no new construction | ||
| Sep 29, 2026 | In progress | 1034 Noe St | level 1 - demo full bath, pantry, kitchen & laundry for (n) powder room, laundry and room & kitchen, demo 2 window for (n) window; level 2 - demo bath for (n) full bath w/shower, demo primary bath for new full bath w/2 sink vanity, shower & toilet. family room: new door & (n) millwork | $175,000 | |
| Sep 29, 2026 | In progress | 2843 Webster St | unit 205: to reconfigure central hallway and bathroom layout, construct a new dedicated laundry closet with washer/ dryer hookups. convert (e) single bathroom into 1 full bathroom and 1 primary en suite bathroom. remodel kitchen with new cabinets, countertops and appliances. relocate interior non-be | $50,000 | |
| Sep 29, 2026 | In progress | 1715 22nd St | C D R Construction | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |
| Sep 29, 2026 | In progress | 170 King St | Gilman Screens And Kitchens | revision to pa #202606233712: interior kitchen and guest bedroom remodel @ existing apartment unit. area of work 160.13 sq ft. no change to square footage. | |
| Sep 28, 2026 | In progress | 550 Monterey Bl | convert the rear portion of the ground floor living area into a jadu including: convert (e) bedroom into a kitchen by installing kitchen cabinets, a kitchen sink, a electric induction cooktop & a refridgerator. install a new partion and door to separate the new jadu. | $3,000 | |
| Sep 28, 2026 | In progress | 347 Faxon Av | add one powder room at 2nd fl. in kind remodel of existing bathroom and kitchen at 2nd fl. | $40,000 | |
| Sep 28, 2026 | In progress | 229 Hanover St | remodel kitchen and bathroom on the upper floor and remove athe bearing wall between the kitchen and dining room. remodel the existing bathroom, add a new wet-bar and office room on the ground floor. | $140,000 | |
| Sep 28, 2026 | In progress | 263 San Carlos St | revision to #202602055347: change unit #263 from commercial space to dwelling unit. in-fill interior floor opening. add (n) media room, master bedroom, living room, family room, & laundry. relocate/remodel (e) kitchen. remodel (e) bathroom. | $80,000 | |
| Sep 28, 2026 | In progress | 38 Idora Av | Magnolia Development Inc. | remodel existing kitchen and bathroom. new kitchen cabinets, counters and appliances. new bathroom finishes and plumbing fixtures. replace existing kitchen and bathroom windows at side yard, not visible from the street. | $150,000 |
| Sep 28, 2026 | In progress | 3691 Market St | Bai Construction | replace kitchen cabinetry. remove non-bearing walls in kitchen and bathroom. reconfigure existing bathroom. install washer/dryer. replace bathroom door. kitchen sink stays at same location with new kitchen faucet. bathroom faucet and shower fixture will be replaced. no increase in plumbing fixtures. | $20,000 |