Block 4162, lot 001A
1715 22nd St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 3
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 1,500 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2026 | In progress filed Oct 2026, not yet issued | 1715 22nd St | C D R Construction | 2nd fl unit 1717: 1 interior non load bearing wall installation and doors at living rm, related electrical outlet and switch relocation and interior finishes.Details
2nd fl unit 1717: 1 interior non load bearing wall installation and doors at living rm, related electrical outlet and switch relocation and interior finishes. | $500 |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1715 22nd St | C D R Construction | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as requireDetails
exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |
| Jan 23, 2023 | Expired or cancelled cancelled May 2026 | 1715 22nd St | Vidal Alfredo Construction | install french drain in lower unit approx. 80 linear feet & catch basinDetails
install french drain in lower unit approx. 80 linear feet & catch basin | $5,000 |
| Nov 30, 2020 | Completed final sign-off May 2026 | 1715 22nd St | Vidal Alfredo Construction | remodel "soft story" voluntary and alteration at first floor.Details
remodel "soft story" voluntary and alteration at first floor. | $25,000 |
| Oct 23, 2014 | Completed final sign-off Jan 2015 | 1715 22nd St | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $20,000 |
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 1715 22nd St | street space permit (scaffolding) | ||
| Jul 10, 2014 | Completed final sign-off Sep 2014 | 1715 22nd St | Jemico Llc Dba Renewal By Andersen Of Sf | replace 11 windows, like for like with andersen wood clad, not visable from street, u-factor, 0.40 bedrooms to comply with egress. n/a ordinance #155-13.Details
replace 11 windows, like for like with andersen wood clad, not visable from street, u-factor, 0.40 bedrooms to comply with egress. n/a ordinance #155-13. | $21,399 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C D R Construction (2), Vidal Alfredo Construction (2), Jemico Llc Dba Renewal By Andersen Of Sf, Tom Lee Roofing Inc.
- Architects
- Jennifer Marca (2), Luis Robles
- Authorized agents
- Jimmy Pan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.