Alfredo Vidal Castro
- Listed as
- authorized agent-others, contractor, subcontractor
- Firm
- Vidal Alfredo Construction
- Based in
- San Leandro
- On San Francisco permits
- Feb 2020 to Oct 2024
25 permits since 2000 (contractor on 24 permits, authorized agent-others on 2 permits, subcontractor on 1 permit): 18 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- G B U Construction Development, Jj Construction & Design Inc., Mike Cahalan, Neu Haus Llc, Reliable Construction Inc
- Architects
- Dane Bunton, Jennifer Tulley, Luis Robles, Nakamura Tomassa & Naimark Jan
- Engineers
- Duane Tran (2), Allen Dadafarin, Mike Yim
- Authorized agents
- Grace Orourke
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2024 | In progress issued Oct 2024 | 67 Burlwood Dr | Vidal Alfredo Construction | bathroom remodel like for like. no moving walls. all fixtures to remain in the same location. appprox 40 sq ftDetails
bathroom remodel like for like. no moving walls. all fixtures to remain in the same location. appprox 40 sq ft | $15,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 55 Belmont Av | Vidal Alfredo Construction | revision to pa # 2022-1209-7991 ref pa # 2024-0220-6184 change fillet weld to cjpDetails
revision to pa # 2022-1209-7991 ref pa # 2024-0220-6184 change fillet weld to cjp | |
| Sep 19, 2024 | Completed final sign-off May 2025 | 193 Corbett Av | Vidal Alfredo Construction | removal of a 4ft portion of (e) exterior rear wall for a larger sliding door opening at the 2nd fl of a three story unit, installation of a new header and plywood sheathing/vertical straps on the inside of the remaining wall panels.Details
removal of a 4ft portion of (e) exterior rear wall for a larger sliding door opening at the 2nd fl of a three story unit, installation of a new header and plywood sheathing/vertical straps on the inside of the remaining wall panels. | $15,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 900 Douglass St | Vidal Alfredo Construction | remodel (e) kitchen like for like no relocation. remodel (e) bathroom like for like no relocation. install new subpanel.Details
remodel (e) kitchen like for like no relocation. remodel (e) bathroom like for like no relocation. install new subpanel. | $25,000 |
| Jun 24, 2024 | Completed final sign-off May 2025 | 193 Corbett Av | Vidal Alfredo Construction | remodel kitchen, bathroom, laundry room, like for like no relocation. upgrade main panel to 200 amps, run new electrical from kitchen, bathroom. install new floor upper level/ or refinishDetails
remodel kitchen, bathroom, laundry room, like for like no relocation. upgrade main panel to 200 amps, run new electrical from kitchen, bathroom. install new floor upper level/ or refinish | $30,000 |
| Apr 22, 2024 | Completed final sign-off Jul 2024 | 3015 Ulloa St | Vidal Alfredo Construction | remodel bathroom like for like, upgrade electrical and plumbing, remove tub and install shower.Details
remodel bathroom like for like, upgrade electrical and plumbing, remove tub and install shower. | $10,000 |
| Mar 20, 2024 | Completed final sign-off Aug 2025 | 33 Idora Av | Vidal Alfredo Construction | 1st floor: remove internal stair. 2nd floor: 1)infill recessed entry to create new enty with internal stair. 2) remodel kitchen and bathroom. 3)convert a baby room into an office. 4)raise ceilin by removing ceiling joist.Details
1st floor: remove internal stair. 2nd floor: 1)infill recessed entry to create new enty with internal stair. 2) remodel kitchen and bathroom. 3)convert a baby room into an office. 4)raise ceilin by removing ceiling joist. | $50,000 |
| Feb 20, 2024 | Completed final sign-off Oct 2024 | 55 Belmont Av | Vidal Alfredo Construction | revision to permit 202212097991. install 2 metal c channel over (e) beam.Details
revision to permit 202212097991. install 2 metal c channel over (e) beam. | |
| Jan 19, 2024 | In progress filed Jan 2024, not yet issued | 1495 28th Av | Vidal Alfredo Construction | replace 4 exterior windows in front of house and restucco front of house.Details
replace 4 exterior windows in front of house and restucco front of house. | $20,000 |
| Sep 22, 2023 | Expired or cancelled expired Mar 2025 | 238 Evelyn Wy | Vidal Alfredo Construction | revision to 202110150550, 201907297206 &202002073812. on ground fl, convert office and media rooms to bedrooms, relocate laundry room to garage, convert laundry room to wet bar, add storageroom, add doors and windows.Details
revision to 202110150550, 201907297206 &202002073812. on ground fl, convert office and media rooms to bedrooms, relocate laundry room to garage, convert laundry room to wet bar, add storageroom, add doors and windows. | |
| Sep 14, 2023 | Completed final sign-off Dec 2024 | 261 Texas St | Vidal Alfredo Construction | kitchen remodel like for like no layout changes upgrade plumbing up to code update electrical up to codeDetails
kitchen remodel like for like no layout changes upgrade plumbing up to code update electrical up to code | $25,000 |
| Jul 5, 2023 | Never finaled issued Jul 2023, no final | 862 27th Av | Vidal Alfredo Construction | kitchen remodel like for like no layout changes. no moving walls. replace cabinets, countertops, applicances. electrical & plumbing work.Details
kitchen remodel like for like no layout changes. no moving walls. replace cabinets, countertops, applicances. electrical & plumbing work. | $45,000 |
| Jun 13, 2023 | Completed final sign-off Dec 2023 | 1591 Jackson St | Vidal Alfredo Construction | unit 4: kitchen and bathroom remodel like for like. no relocations. no changes in wall layout.Details
unit 4: kitchen and bathroom remodel like for like. no relocations. no changes in wall layout. | $60,000 |
| May 16, 2023 | Completed final sign-off May 2023 | 2816 21st St | Vidal Alfredo Construction | removal of ext trims for 2 windows, weather seal & flash. installation of ext trims for 2 windows & paint in-kind. in rear. not visible from street.Details
removal of ext trims for 2 windows, weather seal & flash. installation of ext trims for 2 windows & paint in-kind. in rear. not visible from street. | $5,000 |
| Feb 27, 2023 | Completed final sign-off May 2023 | 256 Cotter St | Vidal Alfredo Construction | remodel kitchen like for like in kind.Details
remodel kitchen like for like in kind. | $30,000 |
| Jan 23, 2023 | Expired or cancelled cancelled May 2026 | 1715 22nd St | Vidal Alfredo Construction | install french drain in lower unit approx. 80 linear feet & catch basinDetails
install french drain in lower unit approx. 80 linear feet & catch basin | $5,000 |
| Dec 9, 2022 | Completed final sign-off Oct 2024 | 55 Belmont Av | Vidal Alfredo Construction | remodeling 783 sq ft on 1st floor.closet convert to wet bar 18sq ft.Details
remodeling 783 sq ft on 1st floor.closet convert to wet bar 18sq ft. | $100,000 |
| Jul 26, 2022 | Completed final sign-off Aug 2022 | 531 Kirkham St | Vidal Alfredo Construction | repair dry rot on two walls (corridor to rear of property) in the guest room. replace sub floor insulation, sheetrock work. repaint.all work repair in kind; all work at 1st floor guest room.Details
repair dry rot on two walls (corridor to rear of property) in the guest room. replace sub floor insulation, sheetrock work. repaint.all work repair in kind; all work at 1st floor guest room. | $15,000 |
| Apr 26, 2022 | Completed final sign-off May 2025 | 2547 42nd Av | Vidal Alfredo Construction, Reliable Construction Inc | 1st flr rear addition w/ roof deck above. remodel of interior upstairs. the purpose of this is to create habitable living space on the ground floor for increase access for a disabled client. new windows, doors, stucco, garage door, trash enclosure at front.Details
1st flr rear addition w/ roof deck above. remodel of interior upstairs. the purpose of this is to create habitable living space on the ground floor for increase access for a disabled client. new windows, doors, stucco, garage door, trash enclosure at front. | $500,000 |
| Mar 1, 2022 | Completed final sign-off Oct 2022 | 52 Alma St | Vidal Alfredo Construction | kitchen remodel in kind bathroom remodel in kind. replace cabinets, countertop, no walls or layout change. replace tiles, sink, toilet & tub.Details
kitchen remodel in kind bathroom remodel in kind. replace cabinets, countertop, no walls or layout change. replace tiles, sink, toilet & tub. | $25,000 |
| Oct 15, 2021 | Expired or cancelled expired Mar 2025 | 238 Evelyn Wy | Vidal Alfredo Construction | revision to 201907297206. 1st fl foundation repair to approved app. relocate laundry area. revision to provide details on foundation repairDetails
revision to 201907297206. 1st fl foundation repair to approved app. relocate laundry area. revision to provide details on foundation repair | $1,000 |
| Sep 24, 2021 | Completed final sign-off Apr 2022 | 2138 33rd Av | Vidal Alfredo Construction, Mike Cahalan | replace front stairs in kind. remove old brick staircase sufficient stucco surround . replace ramp and new brick staircase, no changes to be replaced in kind, mortor bed at brick steps, dryrot repair where needed.Details
replace front stairs in kind. remove old brick staircase sufficient stucco surround . replace ramp and new brick staircase, no changes to be replaced in kind, mortor bed at brick steps, dryrot repair where needed. | $18,000 |
| Mar 9, 2021 | Completed final sign-off May 2024 | 24 Exeter St | Vidal Alfredo Construction | this projects alters the ground floor storage to garage area of a single family building and converts the area into california accessory dwelling unit. in addition, an 86 sq ft of first floor habitable area extension is made at the west end of the buildingDetails
this projects alters the ground floor storage to garage area of a single family building and converts the area into california accessory dwelling unit. in addition, an 86 sq ft of first floor habitable area extension is made at the west end of the building | $75,000 |
| Nov 30, 2020 | Completed final sign-off May 2026 | 1715 22nd St | Vidal Alfredo Construction | remodel "soft story" voluntary and alteration at first floor.Details
remodel "soft story" voluntary and alteration at first floor. | $25,000 |
| Feb 3, 2020 | Never finaled issued Jul 2022, no final | 2814 Clay St | G B U Construction Development, Neu Haus Llc, Jj Construction & Design Inc. | rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.Details
rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck. | $500,000 |