Gilman Screens And Kitchens
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Sep 2026
- Last 24 months
- 7 permits filed
69 permits since 2000: 51 completed, 6 in progress, 9 never finaled, 3 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress | 170 King St | revision to pa #202606233712: interior kitchen and guest bedroom remodel @ existing apartment unit. area of work 160.13 sq ft. no change to square footage. | |
| Jun 23, 2026 | In progress | 170 King St | aka 177 townsend st unit# 1131 top floor: interior kitchen & guest bedroom remodel @ (e) apartment unit. area of work = 160.13 sf. kitchen - new oven range, remove oven, wine fridge stack. guest bedroom - rebuild wall to enclose room. no change to sq footage. | $80,000 |
| Mar 20, 2026 | Completed | 1350 California St | to obtain final inspection for work approved under pa 201806212620. all work is complete. | |
| Aug 5, 2025 | In progress | 640 Davis St | interior remodel at (e) general areas. kitchen= 122.71 sf powder bath & wet bar= 42.37 sf master bath= 118.82 sf guest bath= 75.33 sf. no change to square footage | $240,000 |
| Apr 23, 2025 | Completed | 640 Davis St | to obtain final inspection for work approved under pa#: 201706219981 all work is complete. | |
| Jan 31, 2025 | Completed | 1075 14th St | to obtain a final inspection for work approved under pa#202112134305. all work is complete. | |
| Oct 24, 2024 | In progress | 110 Hernandez Av | repair of stucco west elevation and north elevation approx. 1600 sq ft. like for like. | $5,000 |
| Jul 26, 2024 | In progress | 110 Hernandez Av | window revision to center at the above pa#202103116419. windows should be fiberglass | $2,000 |
| Feb 29, 2024 | In progress | 110 Hernandez Av | rev to 2021-0311-6419; remove (e) garage slab at area of new adu for a new conc slab | $32,000 |
| Nov 28, 2023 | Completed | 300 03rd St | interior bath remodel -new shower fixtures and new tile and new tile surround -add new switch with dimmer no change in sq footage | $24,000 |
| Oct 16, 2023 | Completed | 3036 20th Av | interior bath remodel, bath to shower, same location, other plumbing, sink, toilet, like for like, update electrical, like for like, new vanity. | $35,000 |
| Aug 17, 2023 | Completed | 177 Knockash Hl | master bath remodel like for like, new vanity , sinks, counter tops & tub shower, toilet plumbing fixtures 2/ updated electrical, new paint & finishes approx 150sf. | $75,000 |
| Nov 7, 2022 | Completed | 2150 Grove St | remodel master bathroom no structural changes install (n)electrical for exhaust fan and toilet washlet remove and replace any wood due to dry rot, frame in new shower bench seat and pan, replace tempered glass window, same size install (n)vanity, shower and tile fl. | $125,000 |
| Oct 11, 2022 | Completed | 1438 42nd Av | bathroom remodel: replace shower pan and one new circuit for exhaust pan. new framing when needed due to dry rot - sister new 2x4 wall studs (6 total) to existing wall studs. no moving walls. | $10,000 |
| Jun 2, 2022 | Completed | 4515 18th St | interior remodel of extg kitchen and bath: replace extg plumbing, electrical, new appliances and cabinetry, and new flooring. | $120,000 |
| Jan 28, 2022 | Completed | 1075 14th St | revision to pa# 202112134305. addition of washer / dryer (ventless) to closet off (e) bath. | $2,000 |
| Dec 13, 2021 | Expired or cancelled | 1075 14th St | remodel kitchen & bathroom fixtures to remain in place remove non-structural wall between kitchen & dining room; relocate electrical panel as per code | $75,000 |
| Sep 8, 2021 | Completed | 690 Chestnut St | apt #207: kitchen remodel-non structural work/like for like fixtures/upgrade electriacl as needed. h.e. lighting. no moving walls | $45,000 |
| Aug 12, 2021 | Completed | 2735 Clay St | unit b: bathroom remodel. fixtures stay in same location as existing- no structural or footprint changes- update plumbing and electrical. (n) led lights replace exhaust fan. | $33,000 |
| Jun 10, 2021 | Completed | 228 Bay Shore Bl | remodel existing bathroom. replace toilet, vanity, and waste line. no electrical work | $8,000 |
| May 28, 2021 | Completed | 575 Rockdale Dr | one kitchen remodel: remodel kitchen - new cabinets & appliances. not moving walls or footprint. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 | $50,000 |
| Mar 11, 2021 | Never finaled | 110 Hernandez Av | remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program) | $300,000 |
| Dec 29, 2020 | Completed | 3520 21st St | replace 2 existing skylights in bathroom | $4,000 |
| Dec 29, 2020 | Never finaled | 2395 45th Av | like for like bathroom remodel. no changes to fixtures or walls. | $25,000 |
| Aug 26, 2020 | Completed | 3520 21st St | bathroom remodel, no change to footprint, not moving walls | $50,000 |
| Aug 5, 2020 | Never finaled | 2395 45th Av | replacement of 14 windows, 12 street visible, wood interior - aluminium clad exterior, max u-factor 0.32 or better. | $25,000 |
| Jul 16, 2020 | Expired or cancelled | 170 King St | remodeling bathroom 70 sq ft. replace shower pan, and new vanity everything stays in the same place no electrical work. | $25,000 |
| Jun 5, 2020 | Completed | 170 King St | remodel bathroom, shower pan, and new vanity. everything in the same place. no electrical work. | $25,000 |
| Feb 28, 2020 | Never finaled | 222 Duncan St | two front windows to be replaced with wood clad windows. existing is fiberglass windows. double casement and casement fixed casement. replce with marvin ultimate wood clad windows. max u-factor 0.32. or better. | $13,000 |
| Feb 28, 2020 | Completed | 3417 Divisadero St | remodel kitchen & bath in lower unit only. not moving walls | $130,200 |
| Jul 23, 2019 | Completed | 767 Corbett Av | unit #7: remodel master bath, replace kitchen counters and sink, replace vanity and sink in guest bath. | $43,815 |
| Jul 23, 2019 | Completed | 222 Duncan St | remodel kitchen and replace window kitchen in lightwell, same size and location. no walls modified or infilled. | $142,604 |
| Jul 3, 2019 | Completed | 1242 38th Av | remodel kitchen & bedroom and add bedroom window on back of house | $175,000 |
| May 30, 2019 | Completed | 1340 Clay St | unit# 401: revision to pa #201905211273. to include new partition and soffit area, plumbing work - instant hot, new garbage disposal & water filter at kitchen. lighting & electrical. | $1,500 |
| May 21, 2019 | Completed | 1340 Clay St | replace sheetrock, insulation, electrical lighting & switches. replace door. repair in-kind. n/a for maher. | $40,000 |
| May 2, 2019 | Never finaled | 338 Spear St | kitchen remodel: replace old plumbing and electrical fixture same location. new cabinet, fan, light fixture- fresh paint- new tile. | $48,000 |
| Apr 12, 2019 | Completed | 604 Hampshire St | floor and wall tile, replace new plmg and electrical fixtures, new shower tub, new appliances, cabinetry paint. remodel kitchen ad 1 bath and 1 toilet for half bath. | $49,000 |
| Mar 15, 2019 | Completed | 901 Lake St | kitchen remodel & new tile/countertop/pantry appliances/flooring. new electrical plugs to code/ plumbing | $85,000 |
| Jan 8, 2019 | Completed | 599 Chenery St | remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchen | $150,000 |
| Dec 7, 2018 | Completed | 228 Bay Shore Bl | final inspection for work approved under pa# 2015-0814-4276 & 2015-0814-4280. all work is complete. | |
| Nov 21, 2018 | Completed | 77 Carmelita St | full kitchen remodel, remove e cabinets, replace new cabinets, appliances, plumbing, electrical, legalize gr fl full bath | $50,000 |
| Aug 16, 2018 | Completed | 215 Stoneridge Ln | kitchen/bath remodel - remove carpet all unit sf 1068. kitchen remove & replace fix existing cabinets, new floor; bath - remove & replace fixtures, new floor & tile. new light throughout unit | $100,000 |
| Jul 26, 2018 | Completed | 231 Precita Av | remoel bathroom, new flooring,cabinet, countertop vanity, new lighting,convert tub to shower. no walls moved or removed. | $65,000 |
| Jul 10, 2018 | Completed | 327 Hale St | r&r tile, toilet, shower, sink, fan, overhead light at the sink 1 bathroom remodel in kind | $15,000 |
| Jun 27, 2018 | Never finaled | 1809 Jones St | upper unit remodel same floor. full kitchen remodel, r&r (e) cabinets, flooring, appliances, drywall, paint full hallway bathroom remodel bathroom remodel bedroom, new vanities, drywall, paint no structural work | $75,000 |
| Jun 27, 2018 | Completed | 2128 Sutter St | full kitchen remodel, laundry room remodel, replaceing (e) cabinets, new appliances, drywall, floors, paint. one unit remodel | $75,000 |
| Jun 21, 2018 | Never finaled | 1350 California St | remodel kitchen appliances, cabinet, countertop, electrical paint & flooring, bathroom remodel- plumbing, cabinets, countertop, electrical, bathroom tile, no changes to any walls | $150,000 |
| Mar 29, 2018 | Completed | 1520 Taylor St | remodel 1 kitchen and partial remodel two baths, no change in walls & openings. kitchen remodel - remove (e) cabinets install new cabinets, new vanity, new toilets, in existing location & new flooring. nothing w/tubs - not touching. | $75,000 |
| Mar 16, 2018 | Completed | 1388 Gough St | complete unit remodel to include kitchen 2baths and 2 bedrooms. 1500 sf area. no alteration of any (e) wall. no rough framing for new wall | $75,000 |
| Feb 26, 2018 | Completed | 250 Edgehill Wy | kitchen and laundry room remodel. new cabinets, counter tops, flooring, appliances, new lighting in dining room. in kind remodel | $50,000 |
| Feb 13, 2018 | Completed | 2241 Sacramento St | unit #3; kitchen/dining room remodel. new counter tops, cabinets, flooring, lighting, new appliances, like for like, same locations. comply with sfc 1103.7.61 for fire alarm upgrade maher na | $50,000 |
| Jan 30, 2018 | Completed | 1339 27th Av | bathroom & kitchen remodel, new countertops, flooring, cabinets, change tub into shower, new vanity, lights. no structural work. same configuration. | $50,000 |
| Dec 5, 2017 | Completed | 2462 24th Av | kitchen remodel, new cabinets, counter tops, flooring, appliances, recessed lighting. | $50,000 |
| Nov 8, 2017 | Completed | 545 Panorama Dr | kitchen remodel. new cabinets, countertops, appliances, flooring, recessed, like for like | $30,000 |
| Aug 16, 2017 | Completed | 682 Clarendon Av | remodel kitchen & bath | $40,000 |
| Jul 24, 2017 | Never finaled | 1149 Cole St | kitchen remodel: in kind new cabinets, countertops, flooring, lighting, appliances. bathroom remodel - new shower, plumbing, lighting. powder room remodel - new vanity, lighting, fixtures. no walls removed, moved, added or in filled. all existing layouts to remain unchanged. | $42,500 |
| Jul 18, 2017 | Completed | 2380 Bay St | kitchen remodel, like for like, new cbabinets, counterotps, flooring. new appliances, lighting. no moving of walls, doors or windows. | $40,000 |
| Jun 21, 2017 | Expired or cancelled | 640 Davis St | apt #1: kitchen remodel, like for like, new cabinets, counter tops, flooring, appliances. | $35,000 |
| Apr 21, 2017 | Completed | 2770 19th Av | unit #41: one kitchen remodel. remove and replace cabinets, recessed lighting, new flooring, new appliances. | $30,000 |
| Apr 18, 2017 | Completed | 300 03rd St | kitchen remodel, remove & replace cabinets, new flooring, recessed lighting, new plumbing fixtures. | $30,000 |
| Dec 14, 2016 | Never finaled | 601 Van Ness Av | remodel of kitchen and 2 bathrooms. remove & replace cabinets, new counter tops, lights, like for like. bathroom - replace vanities, new lights. | $45,000 |
| Apr 23, 2015 | Completed | 2266 15th Av | basic kitchen remodel. demo existing floor, cabinets, new cabinetry, appliances, plumbing fixtures, upgrade exiting cans to led and all lighting to meet title 24. no change to floor plan | $50,000 |
| Jul 30, 2014 | Completed | 569 Dewey Bl | master bath and guest. 4 lights, 4 switches and 4 receptacle and 2 fans. revision to app#201406027285. replace 2 toilets, 2 sink/faucets, 1 tub and shower valves. new pony wall/closet. replace closet doors with sliders. move main entry to bedroom. new framing fire blocking in both areas. | $20,000 |
| Jun 2, 2014 | Completed | 569 Dewey Bl | remodel of master bath - replace all fixtures w/new in same locations. remodel guest room; replace all fixtures w/new in same location. no change on walls. | $45,000 |
| Jun 2, 2014 | Completed | 1083 Clay St | remodel of kitchen - replace all fixtures w/new in same locations. remodel bathroom; replace all fixtures w/new in same location. no change on walls. | $50,000 |
| Mar 3, 2014 | Completed | 39 Santa Cruz Av | remodel of (e) 1 kitchen and 1 bathroom. replace all fixtures with new in same locations. bring to current code. no dimensioned change of wall, window and door | $40,000 |
| Apr 8, 2011 | Completed | 403 Main St | kitchen remodel. change out cabinets,plumbing, electrical. all kitchen lights are high efficacy leds. | $30,000 |
| Apr 30, 2010 | Completed | 1492 36th Av | remove all (e) cabinetry in kitchen, remove flooring, replace w/ all (n) cabinets & floor coverings. upgrade all electrical to current code. upgrade main electric panel to currents codes. remove (e) appliances & replace w/(n). remove part of non-bearing wall to open kitchen to breakfast nook. | $40,000 |
| May 11, 2009 | Completed | 1242 Francisco St | close in e door to hall and closet. remove e wall between bath and closet. remove e bump out e window to be replaced in e location same size. new 3x6 pocket door to bedroom. upgrade all electrical, fl waterproof can in shwr, n fl cans/sconce | $35,000 |