Back to bathroom remodel contractors
Gilman Screens And Kitchens
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Sep 2026
- Last 24 months
- 7 permits filed
69 permits since 2000: 51 completed, 6 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 28 completed, 1 in progress, 6 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2025 | In progress issued Aug 2025 | 640 Davis St | interior remodel at (e) general areas. kitchen= 122.71 sf powder bath & wet bar= 42.37 sf master bath= 118.82 sf guest bath= 75.33 sf. no change to square footageDetails
interior remodel at (e) general areas. kitchen= 122.71 sf powder bath & wet bar= 42.37 sf master bath= 118.82 sf guest bath= 75.33 sf. no change to square footage | $240,000 |
| Nov 28, 2023 | Completed final sign-off Apr 2024 | 300 03rd St | interior bath remodel -new shower fixtures and new tile and new tile surround -add new switch with dimmer no change in sq footageDetails
interior bath remodel -new shower fixtures and new tile and new tile surround -add new switch with dimmer no change in sq footage | $24,000 |
| Oct 16, 2023 | Completed final sign-off Feb 2024 | 3036 20th Av | interior bath remodel, bath to shower, same location, other plumbing, sink, toilet, like for like, update electrical, like for like, new vanity.Details
interior bath remodel, bath to shower, same location, other plumbing, sink, toilet, like for like, update electrical, like for like, new vanity. | $35,000 |
| Aug 17, 2023 | Completed final sign-off Apr 2024 | 177 Knockash Hl | master bath remodel like for like, new vanity , sinks, counter tops & tub shower, toilet plumbing fixtures 2/ updated electrical, new paint & finishes approx 150sf.Details
master bath remodel like for like, new vanity , sinks, counter tops & tub shower, toilet plumbing fixtures 2/ updated electrical, new paint & finishes approx 150sf. | $75,000 |
| Nov 7, 2022 | Completed final sign-off Jun 2023 | 2150 Grove St | remodel master bathroom no structural changes install (n)electrical for exhaust fan and toilet washlet remove and replace any wood due to dry rot, frame in new shower bench seat and pan, replace tempered glass window, same size install (n)vanity, shower and tile fl.Details
remodel master bathroom no structural changes install (n)electrical for exhaust fan and toilet washlet remove and replace any wood due to dry rot, frame in new shower bench seat and pan, replace tempered glass window, same size install (n)vanity, shower and tile fl. | $125,000 |
| Oct 11, 2022 | Completed final sign-off Oct 2022 | 1438 42nd Av | bathroom remodel: replace shower pan and one new circuit for exhaust pan. new framing when needed due to dry rot - sister new 2x4 wall studs (6 total) to existing wall studs. no moving walls.Details
bathroom remodel: replace shower pan and one new circuit for exhaust pan. new framing when needed due to dry rot - sister new 2x4 wall studs (6 total) to existing wall studs. no moving walls. | $10,000 |
| Jun 2, 2022 | Completed final sign-off Dec 2022 | 4515 18th St | interior remodel of extg kitchen and bath: replace extg plumbing, electrical, new appliances and cabinetry, and new flooring.Details
interior remodel of extg kitchen and bath: replace extg plumbing, electrical, new appliances and cabinetry, and new flooring. | $120,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 1075 14th St | revision to pa# 202112134305. addition of washer / dryer (ventless) to closet off (e) bath.Details
revision to pa# 202112134305. addition of washer / dryer (ventless) to closet off (e) bath. | $2,000 |
| Dec 13, 2021 | Expired or cancelled expired Mar 2025 | 1075 14th St | remodel kitchen & bathroom fixtures to remain in place remove non-structural wall between kitchen & dining room; relocate electrical panel as per codeDetails
remodel kitchen & bathroom fixtures to remain in place remove non-structural wall between kitchen & dining room; relocate electrical panel as per code | $75,000 |
| Aug 12, 2021 | Completed final sign-off Dec 2021 | 2735 Clay St | unit b: bathroom remodel. fixtures stay in same location as existing- no structural or footprint changes- update plumbing and electrical. (n) led lights replace exhaust fan.Details
unit b: bathroom remodel. fixtures stay in same location as existing- no structural or footprint changes- update plumbing and electrical. (n) led lights replace exhaust fan. | $33,000 |
| Jun 10, 2021 | Completed final sign-off Sep 2021 | 228 Bay Shore Bl | remodel existing bathroom. replace toilet, vanity, and waste line. no electrical workDetails
remodel existing bathroom. replace toilet, vanity, and waste line. no electrical work | $8,000 |
| Mar 11, 2021 | Never finaled issued Mar 2023, no final | 110 Hernandez Av | remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program)Details
remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program) | $300,000 |
| Dec 29, 2020 | Never finaled issued Dec 2020, no final | 2395 45th Av | like for like bathroom remodel. no changes to fixtures or walls.Details
like for like bathroom remodel. no changes to fixtures or walls. | $25,000 |
| Dec 29, 2020 | Completed final sign-off Feb 2021 | 3520 21st St | replace 2 existing skylights in bathroomDetails
replace 2 existing skylights in bathroom | $4,000 |
| Aug 26, 2020 | Completed final sign-off Feb 2021 | 3520 21st St | bathroom remodel, no change to footprint, not moving wallsDetails
bathroom remodel, no change to footprint, not moving walls | $50,000 |
| Jul 16, 2020 | Expired or cancelled cancelled Jan 2026 | 170 King St | remodeling bathroom 70 sq ft. replace shower pan, and new vanity everything stays in the same place no electrical work.Details
remodeling bathroom 70 sq ft. replace shower pan, and new vanity everything stays in the same place no electrical work. | $25,000 |
| Jun 5, 2020 | Completed final sign-off Aug 2020 | 170 King St | remodel bathroom, shower pan, and new vanity. everything in the same place. no electrical work.Details
remodel bathroom, shower pan, and new vanity. everything in the same place. no electrical work. | $25,000 |
| Feb 28, 2020 | Completed final sign-off Jul 2020 | 3417 Divisadero St | remodel kitchen & bath in lower unit only. not moving wallsDetails
remodel kitchen & bath in lower unit only. not moving walls | $130,200 |
| Jul 23, 2019 | Completed final sign-off Jul 2020 | 767 Corbett Av | unit #7: remodel master bath, replace kitchen counters and sink, replace vanity and sink in guest bath.Details
unit #7: remodel master bath, replace kitchen counters and sink, replace vanity and sink in guest bath. | $43,815 |
| Apr 12, 2019 | Completed final sign-off Jun 2021 | 604 Hampshire St | floor and wall tile, replace new plmg and electrical fixtures, new shower tub, new appliances, cabinetry paint. remodel kitchen ad 1 bath and 1 toilet for half bath.Details
floor and wall tile, replace new plmg and electrical fixtures, new shower tub, new appliances, cabinetry paint. remodel kitchen ad 1 bath and 1 toilet for half bath. | $49,000 |
| Jan 8, 2019 | Completed final sign-off Oct 2019 | 599 Chenery St | remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchenDetails
remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchen | $150,000 |
| Nov 21, 2018 | Completed final sign-off Jun 2019 | 77 Carmelita St | full kitchen remodel, remove e cabinets, replace new cabinets, appliances, plumbing, electrical, legalize gr fl full bathDetails
full kitchen remodel, remove e cabinets, replace new cabinets, appliances, plumbing, electrical, legalize gr fl full bath | $50,000 |
| Aug 16, 2018 | Completed final sign-off Jun 2019 | 215 Stoneridge Ln | kitchen/bath remodel - remove carpet all unit sf 1068. kitchen remove & replace fix existing cabinets, new floor; bath - remove & replace fixtures, new floor & tile. new light throughout unitDetails
kitchen/bath remodel - remove carpet all unit sf 1068. kitchen remove & replace fix existing cabinets, new floor; bath - remove & replace fixtures, new floor & tile. new light throughout unit | $100,000 |
| Jul 26, 2018 | Completed final sign-off Dec 2018 | 231 Precita Av | remoel bathroom, new flooring,cabinet, countertop vanity, new lighting,convert tub to shower. no walls moved or removed.Details
remoel bathroom, new flooring,cabinet, countertop vanity, new lighting,convert tub to shower. no walls moved or removed. | $65,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2018 | 327 Hale St | r&r tile, toilet, shower, sink, fan, overhead light at the sink 1 bathroom remodel in kindDetails
r&r tile, toilet, shower, sink, fan, overhead light at the sink 1 bathroom remodel in kind | $15,000 |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 1809 Jones St | upper unit remodel same floor. full kitchen remodel, r&r (e) cabinets, flooring, appliances, drywall, paint full hallway bathroom remodel bathroom remodel bedroom, new vanities, drywall, paint no structural workDetails
upper unit remodel same floor. full kitchen remodel, r&r (e) cabinets, flooring, appliances, drywall, paint full hallway bathroom remodel bathroom remodel bedroom, new vanities, drywall, paint no structural work | $75,000 |
| Jun 21, 2018 | Never finaled issued Jun 2018, no final | 1350 California St | remodel kitchen appliances, cabinet, countertop, electrical paint & flooring, bathroom remodel- plumbing, cabinets, countertop, electrical, bathroom tile, no changes to any wallsDetails
remodel kitchen appliances, cabinet, countertop, electrical paint & flooring, bathroom remodel- plumbing, cabinets, countertop, electrical, bathroom tile, no changes to any walls | $150,000 |
| Mar 29, 2018 | Completed final sign-off Sep 2018 | 1520 Taylor St | remodel 1 kitchen and partial remodel two baths, no change in walls & openings. kitchen remodel - remove (e) cabinets install new cabinets, new vanity, new toilets, in existing location & new flooring. nothing w/tubs - not touching.Details
remodel 1 kitchen and partial remodel two baths, no change in walls & openings. kitchen remodel - remove (e) cabinets install new cabinets, new vanity, new toilets, in existing location & new flooring. nothing w/tubs - not touching. | $75,000 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 1339 27th Av | bathroom & kitchen remodel, new countertops, flooring, cabinets, change tub into shower, new vanity, lights. no structural work. same configuration.Details
bathroom & kitchen remodel, new countertops, flooring, cabinets, change tub into shower, new vanity, lights. no structural work. same configuration. | $50,000 |
| Aug 16, 2017 | Completed final sign-off Mar 2018 | 682 Clarendon Av | remodel kitchen & bathDetails
remodel kitchen & bath | $40,000 |
| Jul 24, 2017 | Never finaled issued Jul 2017, no final | 1149 Cole St | kitchen remodel: in kind new cabinets, countertops, flooring, lighting, appliances. bathroom remodel - new shower, plumbing, lighting. powder room remodel - new vanity, lighting, fixtures. no walls removed, moved, added or in filled. all existing layouts to remain unchanged.Details
kitchen remodel: in kind new cabinets, countertops, flooring, lighting, appliances. bathroom remodel - new shower, plumbing, lighting. powder room remodel - new vanity, lighting, fixtures. no walls removed, moved, added or in filled. all existing layouts to remain unchanged. | $42,500 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 601 Van Ness Av | remodel of kitchen and 2 bathrooms. remove & replace cabinets, new counter tops, lights, like for like. bathroom - replace vanities, new lights.Details
remodel of kitchen and 2 bathrooms. remove & replace cabinets, new counter tops, lights, like for like. bathroom - replace vanities, new lights. | $45,000 |
| Jul 30, 2014 | Completed final sign-off Jan 2015 | 569 Dewey Bl | master bath and guest. 4 lights, 4 switches and 4 receptacle and 2 fans. revision to app#201406027285. replace 2 toilets, 2 sink/faucets, 1 tub and shower valves. new pony wall/closet. replace closet doors with sliders. move main entry to bedroom. new framing fire blocking in both areas.Details
master bath and guest. 4 lights, 4 switches and 4 receptacle and 2 fans. revision to app#201406027285. replace 2 toilets, 2 sink/faucets, 1 tub and shower valves. new pony wall/closet. replace closet doors with sliders. move main entry to bedroom. new framing fire blocking in both areas. | $20,000 |
| Jun 2, 2014 | Completed final sign-off Nov 2014 | 1083 Clay St | remodel of kitchen - replace all fixtures w/new in same locations. remodel bathroom; replace all fixtures w/new in same location. no change on walls.Details
remodel of kitchen - replace all fixtures w/new in same locations. remodel bathroom; replace all fixtures w/new in same location. no change on walls. | $50,000 |
| Jun 2, 2014 | Completed final sign-off Jan 2015 | 569 Dewey Bl | remodel of master bath - replace all fixtures w/new in same locations. remodel guest room; replace all fixtures w/new in same location. no change on walls.Details
remodel of master bath - replace all fixtures w/new in same locations. remodel guest room; replace all fixtures w/new in same location. no change on walls. | $45,000 |
| Mar 3, 2014 | Completed final sign-off Aug 2014 | 39 Santa Cruz Av | remodel of (e) 1 kitchen and 1 bathroom. replace all fixtures with new in same locations. bring to current code. no dimensioned change of wall, window and doorDetails
remodel of (e) 1 kitchen and 1 bathroom. replace all fixtures with new in same locations. bring to current code. no dimensioned change of wall, window and door | $40,000 |
| May 11, 2009 | Completed final sign-off Oct 2009 | 1242 Francisco St | close in e door to hall and closet. remove e wall between bath and closet. remove e bump out e window to be replaced in e location same size. new 3x6 pocket door to bedroom. upgrade all electrical, fl waterproof can in shwr, n fl cans/sconceDetails
close in e door to hall and closet. remove e wall between bath and closet. remove e bump out e window to be replaced in e location same size. new 3x6 pocket door to bedroom. upgrade all electrical, fl waterproof can in shwr, n fl cans/sconce | $35,000 |