Back to kitchen remodel contractors
Gilman Screens And Kitchens
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Sep 2026
- Last 24 months
- 7 permits filed
69 permits since 2000: 51 completed, 6 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
41 kitchen remodel permits: 30 completed, 3 in progress, 6 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 170 King St | revision to pa #202606233712: interior kitchen and guest bedroom remodel @ existing apartment unit. area of work 160.13 sq ft. no change to square footage.Details
revision to pa #202606233712: interior kitchen and guest bedroom remodel @ existing apartment unit. area of work 160.13 sq ft. no change to square footage. | |
| Jun 23, 2026 | In progress issued Jul 2026 | 170 King St | aka 177 townsend st unit# 1131 top floor: interior kitchen & guest bedroom remodel @ (e) apartment unit. area of work = 160.13 sf. kitchen - new oven range, remove oven, wine fridge stack. guest bedroom - rebuild wall to enclose room. no change to sq footage.Details
aka 177 townsend st unit# 1131 top floor: interior kitchen & guest bedroom remodel @ (e) apartment unit. area of work = 160.13 sf. kitchen - new oven range, remove oven, wine fridge stack. guest bedroom - rebuild wall to enclose room. no change to sq footage. | $80,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 640 Davis St | interior remodel at (e) general areas. kitchen= 122.71 sf powder bath & wet bar= 42.37 sf master bath= 118.82 sf guest bath= 75.33 sf. no change to square footageDetails
interior remodel at (e) general areas. kitchen= 122.71 sf powder bath & wet bar= 42.37 sf master bath= 118.82 sf guest bath= 75.33 sf. no change to square footage | $240,000 |
| Jun 2, 2022 | Completed final sign-off Dec 2022 | 4515 18th St | interior remodel of extg kitchen and bath: replace extg plumbing, electrical, new appliances and cabinetry, and new flooring.Details
interior remodel of extg kitchen and bath: replace extg plumbing, electrical, new appliances and cabinetry, and new flooring. | $120,000 |
| Dec 13, 2021 | Expired or cancelled expired Mar 2025 | 1075 14th St | remodel kitchen & bathroom fixtures to remain in place remove non-structural wall between kitchen & dining room; relocate electrical panel as per codeDetails
remodel kitchen & bathroom fixtures to remain in place remove non-structural wall between kitchen & dining room; relocate electrical panel as per code | $75,000 |
| Sep 8, 2021 | Completed final sign-off Mar 2022 | 690 Chestnut St | apt #207: kitchen remodel-non structural work/like for like fixtures/upgrade electriacl as needed. h.e. lighting. no moving wallsDetails
apt #207: kitchen remodel-non structural work/like for like fixtures/upgrade electriacl as needed. h.e. lighting. no moving walls | $45,000 |
| May 28, 2021 | Completed final sign-off Dec 2021 | 575 Rockdale Dr | one kitchen remodel: remodel kitchen - new cabinets & appliances. not moving walls or footprint. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3Details
one kitchen remodel: remodel kitchen - new cabinets & appliances. not moving walls or footprint. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 | $50,000 |
| Mar 11, 2021 | Never finaled issued Mar 2023, no final | 110 Hernandez Av | remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program)Details
remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program) | $300,000 |
| Feb 28, 2020 | Completed final sign-off Jul 2020 | 3417 Divisadero St | remodel kitchen & bath in lower unit only. not moving wallsDetails
remodel kitchen & bath in lower unit only. not moving walls | $130,200 |
| Jul 23, 2019 | Completed final sign-off Jul 2020 | 767 Corbett Av | unit #7: remodel master bath, replace kitchen counters and sink, replace vanity and sink in guest bath.Details
unit #7: remodel master bath, replace kitchen counters and sink, replace vanity and sink in guest bath. | $43,815 |
| Jul 23, 2019 | Completed final sign-off May 2020 | 222 Duncan St | remodel kitchen and replace window kitchen in lightwell, same size and location. no walls modified or infilled.Details
remodel kitchen and replace window kitchen in lightwell, same size and location. no walls modified or infilled. | $142,604 |
| Jul 3, 2019 | Completed final sign-off Jun 2020 | 1242 38th Av | remodel kitchen & bedroom and add bedroom window on back of houseDetails
remodel kitchen & bedroom and add bedroom window on back of house | $175,000 |
| May 30, 2019 | Completed final sign-off Sep 2019 | 1340 Clay St | unit# 401: revision to pa #201905211273. to include new partition and soffit area, plumbing work - instant hot, new garbage disposal & water filter at kitchen. lighting & electrical.Details
unit# 401: revision to pa #201905211273. to include new partition and soffit area, plumbing work - instant hot, new garbage disposal & water filter at kitchen. lighting & electrical. | $1,500 |
| May 2, 2019 | Never finaled issued May 2019, no final | 338 Spear St | kitchen remodel: replace old plumbing and electrical fixture same location. new cabinet, fan, light fixture- fresh paint- new tile.Details
kitchen remodel: replace old plumbing and electrical fixture same location. new cabinet, fan, light fixture- fresh paint- new tile. | $48,000 |
| Apr 12, 2019 | Completed final sign-off Jun 2021 | 604 Hampshire St | floor and wall tile, replace new plmg and electrical fixtures, new shower tub, new appliances, cabinetry paint. remodel kitchen ad 1 bath and 1 toilet for half bath.Details
floor and wall tile, replace new plmg and electrical fixtures, new shower tub, new appliances, cabinetry paint. remodel kitchen ad 1 bath and 1 toilet for half bath. | $49,000 |
| Mar 15, 2019 | Completed final sign-off Nov 2019 | 901 Lake St | kitchen remodel & new tile/countertop/pantry appliances/flooring. new electrical plugs to code/ plumbingDetails
kitchen remodel & new tile/countertop/pantry appliances/flooring. new electrical plugs to code/ plumbing | $85,000 |
| Jan 8, 2019 | Completed final sign-off Oct 2019 | 599 Chenery St | remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchenDetails
remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchen | $150,000 |
| Nov 21, 2018 | Completed final sign-off Jun 2019 | 77 Carmelita St | full kitchen remodel, remove e cabinets, replace new cabinets, appliances, plumbing, electrical, legalize gr fl full bathDetails
full kitchen remodel, remove e cabinets, replace new cabinets, appliances, plumbing, electrical, legalize gr fl full bath | $50,000 |
| Aug 16, 2018 | Completed final sign-off Jun 2019 | 215 Stoneridge Ln | kitchen/bath remodel - remove carpet all unit sf 1068. kitchen remove & replace fix existing cabinets, new floor; bath - remove & replace fixtures, new floor & tile. new light throughout unitDetails
kitchen/bath remodel - remove carpet all unit sf 1068. kitchen remove & replace fix existing cabinets, new floor; bath - remove & replace fixtures, new floor & tile. new light throughout unit | $100,000 |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 1809 Jones St | upper unit remodel same floor. full kitchen remodel, r&r (e) cabinets, flooring, appliances, drywall, paint full hallway bathroom remodel bathroom remodel bedroom, new vanities, drywall, paint no structural workDetails
upper unit remodel same floor. full kitchen remodel, r&r (e) cabinets, flooring, appliances, drywall, paint full hallway bathroom remodel bathroom remodel bedroom, new vanities, drywall, paint no structural work | $75,000 |
| Jun 27, 2018 | Completed final sign-off Dec 2019 | 2128 Sutter St | full kitchen remodel, laundry room remodel, replaceing (e) cabinets, new appliances, drywall, floors, paint. one unit remodelDetails
full kitchen remodel, laundry room remodel, replaceing (e) cabinets, new appliances, drywall, floors, paint. one unit remodel | $75,000 |
| Jun 21, 2018 | Never finaled issued Jun 2018, no final | 1350 California St | remodel kitchen appliances, cabinet, countertop, electrical paint & flooring, bathroom remodel- plumbing, cabinets, countertop, electrical, bathroom tile, no changes to any wallsDetails
remodel kitchen appliances, cabinet, countertop, electrical paint & flooring, bathroom remodel- plumbing, cabinets, countertop, electrical, bathroom tile, no changes to any walls | $150,000 |
| Mar 29, 2018 | Completed final sign-off Sep 2018 | 1520 Taylor St | remodel 1 kitchen and partial remodel two baths, no change in walls & openings. kitchen remodel - remove (e) cabinets install new cabinets, new vanity, new toilets, in existing location & new flooring. nothing w/tubs - not touching.Details
remodel 1 kitchen and partial remodel two baths, no change in walls & openings. kitchen remodel - remove (e) cabinets install new cabinets, new vanity, new toilets, in existing location & new flooring. nothing w/tubs - not touching. | $75,000 |
| Mar 16, 2018 | Completed final sign-off Jun 2019 | 1388 Gough St | complete unit remodel to include kitchen 2baths and 2 bedrooms. 1500 sf area. no alteration of any (e) wall. no rough framing for new wallDetails
complete unit remodel to include kitchen 2baths and 2 bedrooms. 1500 sf area. no alteration of any (e) wall. no rough framing for new wall | $75,000 |
| Feb 26, 2018 | Completed final sign-off Sep 2018 | 250 Edgehill Wy | kitchen and laundry room remodel. new cabinets, counter tops, flooring, appliances, new lighting in dining room. in kind remodelDetails
kitchen and laundry room remodel. new cabinets, counter tops, flooring, appliances, new lighting in dining room. in kind remodel | $50,000 |
| Feb 13, 2018 | Completed final sign-off Jun 2018 | 2241 Sacramento St | unit #3; kitchen/dining room remodel. new counter tops, cabinets, flooring, lighting, new appliances, like for like, same locations. comply with sfc 1103.7.61 for fire alarm upgrade maher naDetails
unit #3; kitchen/dining room remodel. new counter tops, cabinets, flooring, lighting, new appliances, like for like, same locations. comply with sfc 1103.7.61 for fire alarm upgrade maher na | $50,000 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 1339 27th Av | bathroom & kitchen remodel, new countertops, flooring, cabinets, change tub into shower, new vanity, lights. no structural work. same configuration.Details
bathroom & kitchen remodel, new countertops, flooring, cabinets, change tub into shower, new vanity, lights. no structural work. same configuration. | $50,000 |
| Dec 5, 2017 | Completed final sign-off Mar 2018 | 2462 24th Av | kitchen remodel, new cabinets, counter tops, flooring, appliances, recessed lighting.Details
kitchen remodel, new cabinets, counter tops, flooring, appliances, recessed lighting. | $50,000 |
| Nov 8, 2017 | Completed final sign-off Mar 2018 | 545 Panorama Dr | kitchen remodel. new cabinets, countertops, appliances, flooring, recessed, like for likeDetails
kitchen remodel. new cabinets, countertops, appliances, flooring, recessed, like for like | $30,000 |
| Aug 16, 2017 | Completed final sign-off Mar 2018 | 682 Clarendon Av | remodel kitchen & bathDetails
remodel kitchen & bath | $40,000 |
| Jul 24, 2017 | Never finaled issued Jul 2017, no final | 1149 Cole St | kitchen remodel: in kind new cabinets, countertops, flooring, lighting, appliances. bathroom remodel - new shower, plumbing, lighting. powder room remodel - new vanity, lighting, fixtures. no walls removed, moved, added or in filled. all existing layouts to remain unchanged.Details
kitchen remodel: in kind new cabinets, countertops, flooring, lighting, appliances. bathroom remodel - new shower, plumbing, lighting. powder room remodel - new vanity, lighting, fixtures. no walls removed, moved, added or in filled. all existing layouts to remain unchanged. | $42,500 |
| Jul 18, 2017 | Completed final sign-off Oct 2017 | 2380 Bay St | kitchen remodel, like for like, new cbabinets, counterotps, flooring. new appliances, lighting. no moving of walls, doors or windows.Details
kitchen remodel, like for like, new cbabinets, counterotps, flooring. new appliances, lighting. no moving of walls, doors or windows. | $40,000 |
| Jun 21, 2017 | Expired or cancelled expired Apr 2025 | 640 Davis St | apt #1: kitchen remodel, like for like, new cabinets, counter tops, flooring, appliances.Details
apt #1: kitchen remodel, like for like, new cabinets, counter tops, flooring, appliances. | $35,000 |
| Apr 21, 2017 | Completed final sign-off Aug 2017 | 2770 19th Av | unit #41: one kitchen remodel. remove and replace cabinets, recessed lighting, new flooring, new appliances.Details
unit #41: one kitchen remodel. remove and replace cabinets, recessed lighting, new flooring, new appliances. | $30,000 |
| Apr 18, 2017 | Completed final sign-off Aug 2017 | 300 03rd St | kitchen remodel, remove & replace cabinets, new flooring, recessed lighting, new plumbing fixtures.Details
kitchen remodel, remove & replace cabinets, new flooring, recessed lighting, new plumbing fixtures. | $30,000 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 601 Van Ness Av | remodel of kitchen and 2 bathrooms. remove & replace cabinets, new counter tops, lights, like for like. bathroom - replace vanities, new lights.Details
remodel of kitchen and 2 bathrooms. remove & replace cabinets, new counter tops, lights, like for like. bathroom - replace vanities, new lights. | $45,000 |
| Apr 23, 2015 | Completed final sign-off Sep 2015 | 2266 15th Av | basic kitchen remodel. demo existing floor, cabinets, new cabinetry, appliances, plumbing fixtures, upgrade exiting cans to led and all lighting to meet title 24. no change to floor planDetails
basic kitchen remodel. demo existing floor, cabinets, new cabinetry, appliances, plumbing fixtures, upgrade exiting cans to led and all lighting to meet title 24. no change to floor plan | $50,000 |
| Jun 2, 2014 | Completed final sign-off Nov 2014 | 1083 Clay St | remodel of kitchen - replace all fixtures w/new in same locations. remodel bathroom; replace all fixtures w/new in same location. no change on walls.Details
remodel of kitchen - replace all fixtures w/new in same locations. remodel bathroom; replace all fixtures w/new in same location. no change on walls. | $50,000 |
| Mar 3, 2014 | Completed final sign-off Aug 2014 | 39 Santa Cruz Av | remodel of (e) 1 kitchen and 1 bathroom. replace all fixtures with new in same locations. bring to current code. no dimensioned change of wall, window and doorDetails
remodel of (e) 1 kitchen and 1 bathroom. replace all fixtures with new in same locations. bring to current code. no dimensioned change of wall, window and door | $40,000 |
| Apr 8, 2011 | Completed final sign-off Jul 2011 | 403 Main St | kitchen remodel. change out cabinets,plumbing, electrical. all kitchen lights are high efficacy leds.Details
kitchen remodel. change out cabinets,plumbing, electrical. all kitchen lights are high efficacy leds. | $30,000 |
| Apr 30, 2010 | Completed final sign-off Aug 2010 | 1492 36th Av | remove all (e) cabinetry in kitchen, remove flooring, replace w/ all (n) cabinets & floor coverings. upgrade all electrical to current code. upgrade main electric panel to currents codes. remove (e) appliances & replace w/(n). remove part of non-bearing wall to open kitchen to breakfast nook.Details
remove all (e) cabinetry in kitchen, remove flooring, replace w/ all (n) cabinets & floor coverings. upgrade all electrical to current code. upgrade main electric panel to currents codes. remove (e) appliances & replace w/(n). remove part of non-bearing wall to open kitchen to breakfast nook. | $40,000 |