Block 0632, lot 001E
2735 Clay St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 3
- Units
- 8
- Rooms
- 5 bedrooms, 8 bathrooms
- Building
- 4,500 sq ft
- Lot
- 3,642 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 2735 Clay St | F C Company | permit to be in compliance with complaint #202653854 adding a new washer and dryer, renovation of an existing full bathroom, no reloction to existing exituresDetails
permit to be in compliance with complaint #202653854 adding a new washer and dryer, renovation of an existing full bathroom, no reloction to existing exitures | $5,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 2735 Clay St | E & E General Construction Inc | unit 6: kitchen cabinets replacement like for like.Details
unit 6: kitchen cabinets replacement like for like. | $45,000 |
| Aug 30, 2023 | Never finaled issued Aug 2023, no final | 2735 Clay St | Gateway Roofing And Water Proofing Inc | reroofing | $16,744 |
| Jun 22, 2023 | Completed final sign-off Sep 2023 | 2735 Clay St | Jemico Llc Dba Renewal By Andersen Of Sf | replace (1) winodw at rear non street visible: (e) alum (n) wood comp: same size and location u<.30maxDetails
replace (1) winodw at rear non street visible: (e) alum (n) wood comp: same size and location u<.30max | $6,000 |
| Aug 12, 2021 | Completed final sign-off Dec 2021 | 2735 Clay St | Gilman Screens And Kitchens | unit b: bathroom remodel. fixtures stay in same location as existing- no structural or footprint changes- update plumbing and electrical. (n) led lights replace exhaust fan.Details
unit b: bathroom remodel. fixtures stay in same location as existing- no structural or footprint changes- update plumbing and electrical. (n) led lights replace exhaust fan. | $33,000 |
| May 24, 2017 | Completed final sign-off Jul 2017 | 2735 Clay St | Jemico Llc Dba Renewal By Andersen Of Sf | replace 1 (e) vincyl rear window with wood comp. window (non-visible). no size change, u-factor 0.32.Details
replace 1 (e) vincyl rear window with wood comp. window (non-visible). no size change, u-factor 0.32. | $3,908 |
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 2735 Clay St | street space permit | ||
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 2735 Clay St | street space permit | ||
| Aug 26, 2016 | Completed final sign-off Jun 2017 | 2735 Clay St | Brautovich Construction Inc. | unit #8. upgrade elelctrical wiring, plugs, switches, lights. remove & replace sub floor - insulate joist bays. acoustically upgrade one exterior wall - no structural work. install new crown mold. replace surface boards (e) ext deck. remove & replace (e) cab's at (e) kitchen, replace poly carb panelDetails
unit #8. upgrade elelctrical wiring, plugs, switches, lights. remove & replace sub floor - insulate joist bays. acoustically upgrade one exterior wall - no structural work. install new crown mold. replace surface boards (e) ext deck. remove & replace (e) cab's at (e) kitchen, replace poly carb panel | $45,000 |
| Aug 26, 2016 | Completed final sign-off Jun 2017 | 2735 Clay St | Brautovich Construction Inc. | unit #7 - upgrade ellectrical wiring, plugs, switches, lighting. remove & replace subfloor - insulate joist bays. acoustically upgarde one exterior wall - no structural work. new hardwood floorsDetails
unit #7 - upgrade ellectrical wiring, plugs, switches, lighting. remove & replace subfloor - insulate joist bays. acoustically upgarde one exterior wall - no structural work. new hardwood floors | $35,000 |
| Feb 3, 2016 | Completed final sign-off Feb 2016 | 2735 Clay St | Hough Construction | replace all damaged wooden members in exterior stair and deck at rear wall of building.use pt lumber, comply with sf city building code minimum requirements less 50%.Details
replace all damaged wooden members in exterior stair and deck at rear wall of building.use pt lumber, comply with sf city building code minimum requirements less 50%. | $17,000 |
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 2735 Clay St | Hough Construction | compliance with ab-094, soft story retrofit per sfbc chapter 34b, steel moment frame, plywood shearwalls & replacement of brick foundation at west wall. 2012 iebc appendix a-4. n/a maher ordinanceDetails
compliance with ab-094, soft story retrofit per sfbc chapter 34b, steel moment frame, plywood shearwalls & replacement of brick foundation at west wall. 2012 iebc appendix a-4. n/a maher ordinance | $97,000 |
| May 24, 2013 | Completed final sign-off Jul 2013 | 2735 Clay St | repair 2 supporting beams on stairwell attached to ack of building because of wood rot. to comply with nov 201301791Details
repair 2 supporting beams on stairwell attached to ack of building because of wood rot. to comply with nov 201301791 | $2,000 | |
| May 14, 2012 | Completed final sign-off Aug 2012 | 2735 Clay St | Thd At-Home Services Inc/Home Depot | replace one window, backolf unit not visible from the street, no structural changes, max u factor .40Details
replace one window, backolf unit not visible from the street, no structural changes, max u factor .40 | $2,196 |
| Apr 11, 2012 | Completed final sign-off Aug 2012 | 2735 Clay St | Thd At-Home Services Inc/Home Depot | replace 2 windows, replace in kind, not visable from street, no structural changes, max u-factor .40.Details
replace 2 windows, replace in kind, not visable from street, no structural changes, max u-factor .40. | $2,226 |
| Jul 21, 2003 | Completed final sign-off Oct 2003 | 2735 Clay St | add 5 skylights to atticDetails
add 5 skylights to attic | $1,000 | |
| Jul 16, 2003 | Completed final sign-off Oct 2003 | 2735 Clay St | remodel extg kchn with new cabinets/countertop/sink and new appliancesDetails
remodel extg kchn with new cabinets/countertop/sink and new appliances | $6,000 | |
| Jun 5, 2003 | Completed final sign-off Oct 2003 | 2735 Clay St | ammend illegal construction at roof to restore roof to original state (legal condition)Details
ammend illegal construction at roof to restore roof to original state (legal condition) | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brautovich Construction Inc. (2), Hough Construction (2), Jemico Llc Dba Renewal By Andersen Of Sf (2), Thd At-Home Services Inc/Home Depot (2), E & E General Construction Inc, F C Company, Gateway Roofing And Water Proofing Inc, Gilman Screens And Kitchens
- Engineers
- Kok Jin Ye0, Peter Culley
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.