Peter Culley
- Listed as
- architect, authorized agent-others, designer, engineer, lessee, pmt consultant/expediter
- Firm
- Consulting Engineer Llc
- Based in
- Tiburon
- On San Francisco permits
- Jan 2003 to Oct 2023
115 permits since 2000 (engineer on 97 permits, architect on 13 permits, designer on 3 permits, authorized agent-others on 1 permit, lessee on 1 permit, pmt consultant/expediter on 1 permit): 89 completed, 1 in progress, 13 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 115.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 26, 2023 | Completed final sign-off Dec 2024 | 591 Vermont St | Handelin Inc Dba Original Construction C | revision to permit# 202307031404: add (2) sheer walls with grade beam and anchor bolts. (10) new post footing with new post. wrap (6) (e) poles with 2 x 12 treated and bolted and nailed in place.Details
revision to permit# 202307031404: add (2) sheer walls with grade beam and anchor bolts. (10) new post footing with new post. wrap (6) (e) poles with 2 x 12 treated and bolted and nailed in place. | $22,500 |
| Apr 11, 2023 | Never finaled issued May 2023, no final | 1342 Revere Av | revision to permit 202011309880. replace one slab and additional foundation in the rear.Details
revision to permit 202011309880. replace one slab and additional foundation in the rear. | ||
| May 18, 2022 | Completed final sign-off Dec 2022 | 2485 Union St | revision to pa# 201707283170. soft story oridinance per sfbc 34b, fema p-807 respond to nov# 202029701 to complete mandatory soft story retrofit program. the remaining scope for this permit is to clarify the seismic connections at the top & bottom of the seismic resisting shearwalls.Details
revision to pa# 201707283170. soft story oridinance per sfbc 34b, fema p-807 respond to nov# 202029701 to complete mandatory soft story retrofit program. the remaining scope for this permit is to clarify the seismic connections at the top & bottom of the seismic resisting shearwalls. | $45,000 | |
| Jan 21, 2022 | Completed final sign-off Feb 2022 | 53 Landers St | Sneed & Co Construction Inc. | revision to pa 2016-0916-7953 remove steel moment frame from original scope & special inspectionsDetails
revision to pa 2016-0916-7953 remove steel moment frame from original scope & special inspections | |
| Mar 30, 2021 | Expired or cancelled cancelled Jan 2026 | 1342 Revere Av | voluntary seismic per ab-094. reference adu pa 202011309880.Details
voluntary seismic per ab-094. reference adu pa 202011309880. | $30,000 | |
| Nov 25, 2020 | In progress issued Sep 2025 | 480 09th Av | new ground floor dwelling unit at rear of property. new moment frame. no expansion of building envelope. no work at front facade.Details
new ground floor dwelling unit at rear of property. new moment frame. no expansion of building envelope. no work at front facade. | ||
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2021 | 2133 Balboa St | 1st fl framing w/structural steel beam to remove 4' of (e) bearing wall at the west side of the entry stairwayDetails
1st fl framing w/structural steel beam to remove 4' of (e) bearing wall at the west side of the entry stairway | $15,000 | |
| Dec 17, 2019 | Completed final sign-off Mar 2021 | 1746 Revere Av | addition of residence unit at 1st fl. level with 1 kitchen, 1.5 baths, 3 bedrooms. partial seismic upgrade with plywood sheerwalls at 1st fl. levelDetails
addition of residence unit at 1st fl. level with 1 kitchen, 1.5 baths, 3 bedrooms. partial seismic upgrade with plywood sheerwalls at 1st fl. level | $80,000 | |
| Dec 10, 2019 | Completed final sign-off Dec 2021 | 1164 Alabama St | Joe Ferrante Construction | legalization of existing studio unit and c0mpliance with ord 43/14 on first floor. verify existing structure complies with lateral forces resistance per 2016 sfebc section 407 change of occupancy from r=3 to r-2.Details
legalization of existing studio unit and c0mpliance with ord 43/14 on first floor. verify existing structure complies with lateral forces resistance per 2016 sfebc section 407 change of occupancy from r=3 to r-2. | $32,000 |
| Sep 11, 2019 | Never finaled issued Nov 2019, no final | 507 Cole St | Kearney & Obanion Inc., Lee & Company Contractors Inc | reconstruct e storage rooms to garage level. no bearing 1 hour fire resistant contructionDetails
reconstruct e storage rooms to garage level. no bearing 1 hour fire resistant contruction | $10,000 |
| Aug 15, 2019 | Expired or cancelled cancelled Jan 2026 | 2819 Buchanan St | foundation upgrade, replace, reinforce with reinforced concrete (e) brick masonry construction's laterally brace garage level front wall w/ steel moment framing and reinforce wall at west end of garage area w/plywood shear wall constructionDetails
foundation upgrade, replace, reinforce with reinforced concrete (e) brick masonry construction's laterally brace garage level front wall w/ steel moment framing and reinforce wall at west end of garage area w/plywood shear wall construction | $70,000 | |
| Aug 13, 2019 | Completed final sign-off Sep 2019 | 1875 Oak St | Hough Construction | revision to app#201707252875 for soft story 2016 cebc appendix a-4Details
revision to app#201707252875 for soft story 2016 cebc appendix a-4 | |
| Jul 17, 2019 | Completed final sign-off Aug 2019 | 2765 Hyde St | Terra Nova Industries | temporary shoring in basement to support a partially damaged ground floor structureDetails
temporary shoring in basement to support a partially damaged ground floor structure | $8,033 |
| Jun 18, 2019 | Completed final sign-off Jun 2020 | 1159 Oak St | Hough Construction | voluntary upgrade of e brick foundation w reinforeced concrete raised grade beam against inside face of perimeter raised grade beam construction/ replacement of e brick fdn pads with reinforced concrete constrDetails
voluntary upgrade of e brick foundation w reinforeced concrete raised grade beam against inside face of perimeter raised grade beam construction/ replacement of e brick fdn pads with reinforced concrete constr | $135,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2024 | 30 Presidio Tr | Ggd Inc. | soldier pile and 3x pt plank retaining wall at south property line e partial at sw of west property lineDetails
soldier pile and 3x pt plank retaining wall at south property line e partial at sw of west property line | $150,000 |
| May 6, 2019 | Completed final sign-off Jul 2019 | 485 Liberty St | Armour Construction | reinforcement of foundation sill bolting under floor post * beam connections w/metal plate connectors and reinforcement of "soft story" garage door openings w/structural steel ordinary steel moment frameDetails
reinforcement of foundation sill bolting under floor post * beam connections w/metal plate connectors and reinforcement of "soft story" garage door openings w/structural steel ordinary steel moment frame | $50,000 |
| Nov 29, 2018 | Completed final sign-off Mar 2019 | 1626 North Point St | Armour Construction | replace e dryrot damaged beam at 2nd fl level with lvl member of same or equivalent sizeDetails
replace e dryrot damaged beam at 2nd fl level with lvl member of same or equivalent size | $15,000 |
| Dec 13, 2017 | Completed final sign-off Jul 2018 | 1932 Jefferson St | Armour Construction | voluntary partial lateral bracing of garage level with hardy framing, special moment frame and plywood shear wall maher naDetails
voluntary partial lateral bracing of garage level with hardy framing, special moment frame and plywood shear wall maher na | $90,000 |
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 712 Delta St | interior remodel of both units. 5 bathrooms, two kitchen, recess lighting. new windows - wood framed on the front, vinyl in the rear. new plumbing and new electrical.Details
interior remodel of both units. 5 bathrooms, two kitchen, recess lighting. new windows - wood framed on the front, vinyl in the rear. new plumbing and new electrical. | $90,000 | |
| Oct 19, 2017 | Expired or cancelled withdrawn Mar 2020 | 838 Bay St | sf mandatory seismic retrofit program ch 34 b per 2016 iebc ch a4Details
sf mandatory seismic retrofit program ch 34 b per 2016 iebc ch a4 | $110,000 | |
| Jul 28, 2017 | Completed final sign-off Dec 2017 | 2864 Sacramento St | Mccormack Construction | stud bearin gwall between kitchen and dining rm wi w8 x 40. sttel beam in 4th flDetails
stud bearin gwall between kitchen and dining rm wi w8 x 40. sttel beam in 4th fl | $35,000 |
| Jul 28, 2017 | Completed final sign-off Dec 2022 | 2485 Union St | soft story ordinance per sf bldg code ch 34b, fema p-807Details
soft story ordinance per sf bldg code ch 34b, fema p-807 | $50,000 | |
| Jul 28, 2017 | Completed final sign-off Jan 2019 | 1307 Bay St | Oarcon Inc | soft story ordinance sf building code chptr 34b and fema p807Details
soft story ordinance sf building code chptr 34b and fema p807 | $75,000 |
| Jul 25, 2017 | Completed final sign-off Sep 2019 | 1875 Oak St | Hough Construction | soft story retrofit per sfebc chapter 4 d, 2016 cebc appendix a-4. 2 ome steel frames; hardy frame; plywood shearwalls & (n) reinforced councrete grade beams.Details
soft story retrofit per sfebc chapter 4 d, 2016 cebc appendix a-4. 2 ome steel frames; hardy frame; plywood shearwalls & (n) reinforced councrete grade beams. | $85,000 |
| Jul 25, 2017 | Completed final sign-off Jan 2019 | 425 Euclid Av | Gil Construction & Assoc Inc. | soft story retrofit per sfebc chapter 4 d, 2016 cebc appendix a-4. 3 ome steel frames; plywood shearwalls & (n) reinforced concrete grade beamsDetails
soft story retrofit per sfebc chapter 4 d, 2016 cebc appendix a-4. 3 ome steel frames; plywood shearwalls & (n) reinforced concrete grade beams | $85,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2018 | 2217 Scott St | Hough Construction | soft story retrofit per sfebc chapter 4 d, 2016 cebc appendix a-4. 3 ome steel frames; 3 plywood shearwalls; hardy frames & (n) reinforced concrete grade beams. n/a maher ordinanceDetails
soft story retrofit per sfebc chapter 4 d, 2016 cebc appendix a-4. 3 ome steel frames; 3 plywood shearwalls; hardy frames & (n) reinforced concrete grade beams. n/a maher ordinance | $80,000 |
| May 15, 2017 | Completed final sign-off Mar 2018 | 2326 Union St | Bbc Construction Inc. | new internal stair between 1st and 2nd fl. new master bath. new lighting. no additional conditioned space or exterior changesDetails
new internal stair between 1st and 2nd fl. new master bath. new lighting. no additional conditioned space or exterior changes | $68,000 |
| Mar 9, 2017 | Completed final sign-off Oct 2017 | 3814 24th St | Tritone Construction | unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms.Details
unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms. | $55,000 |
| Dec 28, 2016 | Completed final sign-off Dec 2019 | 1813 15th St | D K G Construction Inc | adu per ord 162-16. convert garage to single dwelling unit. nfpa-13 sprinklers @ basement only. seismic retrofit under seperate permit #2016-1228-6019Details
adu per ord 162-16. convert garage to single dwelling unit. nfpa-13 sprinklers @ basement only. seismic retrofit under seperate permit #2016-1228-6019 | $600,000 |
| Jul 21, 2016 | Completed final sign-off Aug 2017 | 427 18th Av | Portman Construction Inc. | soft story retrofit. ord sfbc 34b, 2012 iebc appx a4. omf steel frame, plywood shearwalls and hardy frames at garage level with new reinforce concrete grade beams.Details
soft story retrofit. ord sfbc 34b, 2012 iebc appx a4. omf steel frame, plywood shearwalls and hardy frames at garage level with new reinforce concrete grade beams. | $80,000 |
| Jul 21, 2016 | Completed final sign-off Apr 2017 | 150 Carl St | Gil Construction & Assoc Inc. | to comply w/sf soft story retrofit. 2012 iebc appx a4. omf steel frame, plywoos shearwalls, concrete grade beams& padsDetails
to comply w/sf soft story retrofit. 2012 iebc appx a4. omf steel frame, plywoos shearwalls, concrete grade beams& pads | $80,000 |
| Jul 1, 2016 | Completed final sign-off May 2021 | 3691 Market St | Hough Construction | tie back of (e) east exterior wall. foundation and helical piers and tiebacksDetails
tie back of (e) east exterior wall. foundation and helical piers and tiebacks | $40,000 |
| May 19, 2016 | Completed final sign-off Oct 2016 | 2241 Sacramento St | mandatory soft story program per san francisco ordinance #66-13 in compliance with fema p-807 requirements.Details
mandatory soft story program per san francisco ordinance #66-13 in compliance with fema p-807 requirements. | $160,000 | |
| Apr 7, 2016 | Completed final sign-off May 2019 | 1495 07th Av | soft story retrofit per sfbc chpater 34b engineering criterea: 2012 iebc appendix a-4Details
soft story retrofit per sfbc chpater 34b engineering criterea: 2012 iebc appendix a-4 | $100,000 | |
| Mar 16, 2016 | Completed final sign-off Jan 2017 | 355 Octavia St | Nibbi Bros Assoc Inc. | comply with sfbc chapter 34 b and 2012 iebc appendix a-4 madatory soft storyDetails
comply with sfbc chapter 34 b and 2012 iebc appendix a-4 madatory soft story | $145,000 |
| Feb 3, 2016 | Completed final sign-off Mar 2016 | 21 Liberty St | Hough Construction | replace existing unreinforced brick masonry foundations at east wall with reinforced concrete constructionDetails
replace existing unreinforced brick masonry foundations at east wall with reinforced concrete construction | $30,000 |
| Dec 9, 2015 | Completed final sign-off May 2016 | 2107 Union St | Plath & Company Inc | revision to pa#201504224329 & 201507277548, revise of construction detail due to condition exposed by removal of surface finishes. compliance with s.f. ordinance 66-13 & 2012 iebc chapter a-4Details
revision to pa#201504224329 & 201507277548, revise of construction detail due to condition exposed by removal of surface finishes. compliance with s.f. ordinance 66-13 & 2012 iebc chapter a-4 | |
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 2735 Clay St | Hough Construction | compliance with ab-094, soft story retrofit per sfbc chapter 34b, steel moment frame, plywood shearwalls & replacement of brick foundation at west wall. 2012 iebc appendix a-4. n/a maher ordinanceDetails
compliance with ab-094, soft story retrofit per sfbc chapter 34b, steel moment frame, plywood shearwalls & replacement of brick foundation at west wall. 2012 iebc appendix a-4. n/a maher ordinance | $97,000 |
| Jul 29, 2015 | Completed final sign-off May 2017 | 2329 Divisadero St | Sneed & Co Construction Inc. | soft story seismic retrofit done in accordance to 2012 iebc appendix a-4Details
soft story seismic retrofit done in accordance to 2012 iebc appendix a-4 | $15,000 |
| Jul 27, 2015 | Completed final sign-off May 2016 | 2107 Union St | Plath & Company Inc | revision to app#201504224329. revised construction details due to conditions exposed by demolition of surface finishes. compliance with sf ordinance 66-13 and 2012 iebc chapter a-4Details
revision to app#201504224329. revised construction details due to conditions exposed by demolition of surface finishes. compliance with sf ordinance 66-13 and 2012 iebc chapter a-4 | |
| Jul 27, 2015 | Expired or cancelled cancelled Jan 2026 | 405 Buchanan St | partial foundation upgrade. replace extg brick masonary construction at south and east walls with reinforce concrete construction. reinforce 1st floor post and beams constuction . install 1/2" plywood at interior of exterior basement level walls.n/a maherDetails
partial foundation upgrade. replace extg brick masonary construction at south and east walls with reinforce concrete construction. reinforce 1st floor post and beams constuction . install 1/2" plywood at interior of exterior basement level walls.n/a maher | $20,000 | |
| Jul 20, 2015 | Completed final sign-off Jul 2016 | 121 College Av | Hough Construction | replace (e) 2nd floor wooden posts & beams w/structural steel. voluntary seismic bracing at grage level w/omf frames.Details
replace (e) 2nd floor wooden posts & beams w/structural steel. voluntary seismic bracing at grage level w/omf frames. | $17,500 |
| Jun 24, 2015 | Completed final sign-off Sep 2019 | 935 Diamond St | Loughran Construction Inc. | partial replacement of (e) foundations with reinforced concrete, replace 1/f posts & beam line with 2 x 6 stud bearing wall, new concrete garage floors slab.Details
partial replacement of (e) foundations with reinforced concrete, replace 1/f posts & beam line with 2 x 6 stud bearing wall, new concrete garage floors slab. | $50,000 |
| Jun 5, 2015 | Completed final sign-off Jun 2015 | 1616 Taylor St | Sneed & Co Construction Inc. | revision to 201412043068. change plywood shearwall scheduling maher not reqDetails
revision to 201412043068. change plywood shearwall scheduling maher not req | |
| May 27, 2015 | Completed final sign-off Jan 2018 | 968 Sanchez St | Gallagher Construction | renovation of e unconditioned gr fl, addition of bedroom, bath, laundry, storage spaces. remodel bath and some window replacement/alterations at 2nd fl. addition of internal staircase connecting gr and 2nd fls. addition of 2 flat rooted dormers at rear of 3rd flDetails
renovation of e unconditioned gr fl, addition of bedroom, bath, laundry, storage spaces. remodel bath and some window replacement/alterations at 2nd fl. addition of internal staircase connecting gr and 2nd fls. addition of 2 flat rooted dormers at rear of 3rd fl | $150,000 |
| Apr 23, 2015 | Completed final sign-off May 2016 | 1274 Filbert St | Sneed & Co Construction Inc. | voluntary partial lateral load bracing at n. end of garage level with 2-steel moment frames. foundation reinforcement at s.w. & n.w. ends of the west wall with 14" dia drilled concrete piers.Details
voluntary partial lateral load bracing at n. end of garage level with 2-steel moment frames. foundation reinforcement at s.w. & n.w. ends of the west wall with 14" dia drilled concrete piers. | $65,000 |
| Apr 22, 2015 | Completed final sign-off May 2016 | 2107 Union St | Plath & Company Inc | compliance with sf ordinance 66-13 mandatory soft story program. requirements of 2012 iebc appendix chapter a4Details
compliance with sf ordinance 66-13 mandatory soft story program. requirements of 2012 iebc appendix chapter a4 | $83,580 |
| Mar 16, 2015 | Completed final sign-off May 2015 | 608 12th Av | Hough Construction | bolt (e) foundations & lateral bracing of post and beam line supporting rear wall of (e) east wall addition per plan. structural work only. no exterior change. voluntary partial seismic bracing.Details
bolt (e) foundations & lateral bracing of post and beam line supporting rear wall of (e) east wall addition per plan. structural work only. no exterior change. voluntary partial seismic bracing. | $15,000 |
| Feb 9, 2015 | Expired or cancelled expired Aug 2016 | 3191 Pacific Av | Ryan And Ryan Construction Inc | replace 9e) n.w. corner dyyrot danaged wakk styds, "work in common" area. n/a maher ordinanceDetails
replace 9e) n.w. corner dyyrot danaged wakk styds, "work in common" area. n/a maher ordinance | $2,500 |
| Aug 15, 2014 | Completed final sign-off Aug 2016 | 3191 Pacific Av | Barry M Nadell Construction Inc | replacement of (e) concrete foundations at south & west walls w/concrete , drilled piers & grade beam. repair of (e) conc retaining wall in west garage with reinforced concrete. "work in common" n/a maher ordinanceDetails
replacement of (e) concrete foundations at south & west walls w/concrete , drilled piers & grade beam. repair of (e) conc retaining wall in west garage with reinforced concrete. "work in common" n/a maher ordinance | $35,000 |
| Aug 15, 2014 | Completed final sign-off Nov 2014 | 3488 22nd St | Sneed & Co Construction Inc. | revision to pa #2014.0602.7248 - moved location of interior grade beam, revised foundation plan at rear wall to show (e) conditions, revised locations of side wall plywood shear walls, revised connection of moment frames to 2nd floor. n/a maher ordinanceDetails
revision to pa #2014.0602.7248 - moved location of interior grade beam, revised foundation plan at rear wall to show (e) conditions, revised locations of side wall plywood shear walls, revised connection of moment frames to 2nd floor. n/a maher ordinance | |
| Jul 25, 2014 | Completed final sign-off Sep 2015 | 2858 Vallejo St | Hough Construction | reinforce or replace extg unreinforced brick foundations with reinforced concrete construction.Details
reinforce or replace extg unreinforced brick foundations with reinforced concrete construction. | $30,000 |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 2945 Scott St | Dawson - Clinton Gen Contr Corp | revision to app#201311152022. substitute steel moment frame for hardy frame, re-use extg w 18 bmDetails
revision to app#201311152022. substitute steel moment frame for hardy frame, re-use extg w 18 bm | |
| Jul 8, 2014 | Completed final sign-off Jun 2016 | 179 Mendosa Av | construct (n) open deck @ 1st floor level of west wall. convert (e) windows @ 1st floor level of west wall to sliding doors.Details
construct (n) open deck @ 1st floor level of west wall. convert (e) windows @ 1st floor level of west wall to sliding doors. | $7,500 | |
| Jun 18, 2014 | Completed final sign-off Dec 2015 | 686 19th Av | revision to appl #201401317512 - doing underpinning to right wall.Details
revision to appl #201401317512 - doing underpinning to right wall. | ||
| Jun 2, 2014 | Completed final sign-off Nov 2014 | 3488 22nd St | soft story- seismic retrofit per sfbc34b, 2012 iebc, appendix chapter a4. n/a ordinance #155-13. remove a post to facilitate moment frame installation.Details
soft story- seismic retrofit per sfbc34b, 2012 iebc, appendix chapter a4. n/a ordinance #155-13. remove a post to facilitate moment frame installation. | $65,000 | |
| Apr 4, 2014 | Completed final sign-off May 2014 | 2383 Union St | Consolidated Construction Inc | remove non compliant gate and fence structure and replace in compliance with nov 201456091Details
remove non compliant gate and fence structure and replace in compliance with nov 201456091 | $15,000 |
| Mar 26, 2014 | Completed final sign-off Aug 2014 | 1048 Haight St | Hough Construction | partial replacement of (e) brick masonry foundation at rear (north) and of 1/f level, reinforce of 1/f of rear wall with 2 hardy braced frames, new concrete slab on grade floor at rear 1/f unit.Details
partial replacement of (e) brick masonry foundation at rear (north) and of 1/f level, reinforce of 1/f of rear wall with 2 hardy braced frames, new concrete slab on grade floor at rear 1/f unit. | $25,000 |
| Jan 23, 2014 | Completed final sign-off Jun 2016 | 179 Mendosa Av | replace (e) deck guardrail @ 2nd level.Details
replace (e) deck guardrail @ 2nd level. | $2,000 | |
| Nov 25, 2013 | Completed final sign-off Jan 2016 | 210 23rd Av | Handelin Inc Dba Original Construction C | horizontally expand 2nd floor on the rear of house, over existing ground and first floor structure to expand the master bedroom and add master bathDetails
horizontally expand 2nd floor on the rear of house, over existing ground and first floor structure to expand the master bedroom and add master bath | $125,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2014 | 2945 Scott St | Dawson - Clinton Gen Contr Corp | remodel existing bathroom, new door and railing at existing 3rd floor roof deck. seismic improvements at garageDetails
remodel existing bathroom, new door and railing at existing 3rd floor roof deck. seismic improvements at garage | $50,000 |
| Nov 8, 2013 | Expired or cancelled expired May 2016 | 230 Duncan St | revision to pa# 2006-0207-3988-structural changesDetails
revision to pa# 2006-0207-3988-structural changes | ||
| Aug 26, 2013 | Never finaled issued Oct 2013, no final | 1 21st Av | Rwr Construction Inc | reinforce east 1/2 of rear wall of e foundatoin with helical steel piles and tie backs. relevel sunroom floor and superstructureDetails
reinforce east 1/2 of rear wall of e foundatoin with helical steel piles and tie backs. relevel sunroom floor and superstructure | $45,000 |
| Aug 26, 2013 | Completed final sign-off Dec 2013 | 179 Mendosa Av | repair e steel deck post connection and 2nd fl level. provide 4 x lateral bracing of e 4x4 steel post at 1st fl level. repair e concrete fdnt grade beam, honeycomb pocketsDetails
repair e steel deck post connection and 2nd fl level. provide 4 x lateral bracing of e 4x4 steel post at 1st fl level. repair e concrete fdnt grade beam, honeycomb pockets | $12,500 | |
| May 15, 2013 | Completed final sign-off Jan 2014 | 2456 Steiner St | Mascheroni Construction | installing new elevator & wood shaft.Details
installing new elevator & wood shaft. | $40,000 |
| Apr 2, 2013 | Completed final sign-off Apr 2013 | 2860 Pierce St | Consolidated Construction Inc | revision to appl #2012.12.04.5429 -unit #3 & main residence, 1st & 2nd floor: new powder rooms.Details
revision to appl #2012.12.04.5429 -unit #3 & main residence, 1st & 2nd floor: new powder rooms. | $15,000 |
| Mar 19, 2013 | Completed final sign-off Jan 2014 | 1760 Leavenworth St | Ned Clyde Construction | foundation repair with 2" diameter steel pipe columns & new concrete grade beam at east end of bldg.Details
foundation repair with 2" diameter steel pipe columns & new concrete grade beam at east end of bldg. | $15,000 |
| Mar 19, 2013 | Completed final sign-off Sep 2014 | 1341 Lyon St | Hough Construction | replace (e) brick foundations with reinforced concrete & brace 1st floor level with steel moment frames (2) & plywood shearwalls.Details
replace (e) brick foundations with reinforced concrete & brace 1st floor level with steel moment frames (2) & plywood shearwalls. | $150,000 |
| Mar 18, 2013 | Completed final sign-off Apr 2013 | 2201 Market St | Al's Complete Welding | to comply w/nov #201202241-reinforce base of metal steel support poles, 12 feet high, with welded metal steel shoe-exist'g support poles are for wooden apron over off street parking area of bldg. bldg is currently vacant, accessibility compliance will be filed under t.i. permit once bldg is occupiedDetails
to comply w/nov #201202241-reinforce base of metal steel support poles, 12 feet high, with welded metal steel shoe-exist'g support poles are for wooden apron over off street parking area of bldg. bldg is currently vacant, accessibility compliance will be filed under t.i. permit once bldg is occupied | $1,400 |
| Jan 22, 2013 | Completed final sign-off Apr 2019 | 628 29th St | Hough Construction | raise (e) concrete foundation at west wall to provide 8" min clearence above paving. cast 8" concrete wall adjacent to (e) rear wall. foundation with water barrier 12" min plastic sheetingDetails
raise (e) concrete foundation at west wall to provide 8" min clearence above paving. cast 8" concrete wall adjacent to (e) rear wall. foundation with water barrier 12" min plastic sheeting | $17,500 |
| Dec 14, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | Consolidated Construction Inc | widen extg 9' garage doorway at north and of west wall to 12'. install steel beam over doorway.Details
widen extg 9' garage doorway at north and of west wall to 12'. install steel beam over doorway. | $15,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | Consolidated Construction Inc | new water closets (toilet & sink) on unit #1 @ basement & unit #5 @ 1st floor, kitchen & bath upgrade on unit #4 @ 3rd floor.Details
new water closets (toilet & sink) on unit #1 @ basement & unit #5 @ 1st floor, kitchen & bath upgrade on unit #4 @ 3rd floor. | $40,000 |
| Dec 4, 2012 | Never finaled issued Dec 2012, no final | 1000 Fulton St | Hough Construction | fasten brick masonry basement walls to 1st floor wooden construction.Details
fasten brick masonry basement walls to 1st floor wooden construction. | $50,000 |
| Dec 4, 2012 | Completed final sign-off Feb 2013 | 425 Irving St | Hildebrand Renovation | bearing wall removal, add new beam & support posts @ 2nd floor.Details
bearing wall removal, add new beam & support posts @ 2nd floor. | $10,000 |
| Nov 19, 2012 | Never finaled issued Dec 2012, no final | 1423 Shafter Av | replace (e0 concrete, foundation; reinfornce 2nd floor post & beam connections. install 1/2" plywood at inside face of exterior walls in garage level.Details
replace (e0 concrete, foundation; reinfornce 2nd floor post & beam connections. install 1/2" plywood at inside face of exterior walls in garage level. | $23,000 | |
| Oct 29, 2012 | Completed final sign-off Jan 2013 | 979 Alabama St | Hough Construction | reinforce wall sections at both sides of garage door w/plywood & cast a concrete grade beam beneath the garage doorway.Details
reinforce wall sections at both sides of garage door w/plywood & cast a concrete grade beam beneath the garage doorway. | $5,000 |
| Sep 20, 2012 | Completed final sign-off Oct 2012 | 127 07th Av | Gil Construction & Assoc Inc. | reinforce e post and beam at 2nd fl connections, install additional 5/8" diam silk bolts. reinforce end connections of e steel bar and floor joists truss connection (common area)Details
reinforce e post and beam at 2nd fl connections, install additional 5/8" diam silk bolts. reinforce end connections of e steel bar and floor joists truss connection (common area) | $2,000 |
| Sep 20, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | Consolidated Construction Inc | 3rd floor-reinforce e roof area at se corner of 3rd fl level for roof deck use accessible from 2860 pierce onlyDetails
3rd floor-reinforce e roof area at se corner of 3rd fl level for roof deck use accessible from 2860 pierce only | $25,000 |
| Sep 17, 2012 | Completed final sign-off May 2013 | 1135 Monterey Bl | Kevin Fennelly Construction | bearing wall removal, kitchen remodel, bathroom addition. replace windows in kind @ side of bldg. to verify in field.Details
bearing wall removal, kitchen remodel, bathroom addition. replace windows in kind @ side of bldg. to verify in field. | $40,000 |
| Sep 5, 2012 | Completed final sign-off Jun 2013 | 893 Union St | Pacific Thunder | voluntary structural strengtheningDetails
voluntary structural strengthening | $15,000 |
| Aug 21, 2012 | Never finaled issued Aug 2012, no final | 1725 Turk St | comply w/complaint #201240821- revision to pa #2012.05.01.9536: add non-bearing 1-hr wall partition at garage level.Details
comply w/complaint #201240821- revision to pa #2012.05.01.9536: add non-bearing 1-hr wall partition at garage level. | $2,500 | |
| Aug 9, 2012 | Completed final sign-off Jan 2013 | 527 30th St | Damar Construction And Remodeling Inc | reinforce e brick foundation walls with reinforced concrete. reinforce e stud walls at garage level in plywood. fasten e 2nd floor post and beams with metal fasteners and install addition 5/8" sill batting mudsillDetails
reinforce e brick foundation walls with reinforced concrete. reinforce e stud walls at garage level in plywood. fasten e 2nd floor post and beams with metal fasteners and install addition 5/8" sill batting mudsill | $35,000 |
| Aug 8, 2012 | Completed final sign-off Oct 2012 | 160 Amber Dr | P Langan Construction | repair to existing deck, replace deck members & guradrail.Details
repair to existing deck, replace deck members & guradrail. | $7,500 |
| Jul 27, 2012 | Completed final sign-off Dec 2012 | 85 Toledo Wy | install steel moment frame over garage doorway at street level, verify foundation constructionDetails
install steel moment frame over garage doorway at street level, verify foundation construction | $25,000 | |
| Jun 27, 2012 | Completed final sign-off Aug 2013 | 3631 Cesar Chavez St | Hough Construction | replace/reinforce (e) brick foundations, strengthen front & rear walls at garage level w/1/2" plywood, excavate underfloor area for laundry, repair dryrot damage at garage doorway & 2nd floor rear wall.Details
replace/reinforce (e) brick foundations, strengthen front & rear walls at garage level w/1/2" plywood, excavate underfloor area for laundry, repair dryrot damage at garage doorway & 2nd floor rear wall. | $25,000 |
| Jun 5, 2012 | Completed final sign-off Sep 2012 | 1175 Francisco St | Mighty Moe Construction | revision to 201110277772. steel moment frame revised from 1 bay to 2 bay frame. plywood shearwall w-2 length revisedDetails
revision to 201110277772. steel moment frame revised from 1 bay to 2 bay frame. plywood shearwall w-2 length revised | |
| Jun 1, 2012 | Never finaled issued Jun 2012, no final | 76 Dartmouth St | add 5/8" bolting to permiter wall sill plates @ 48" oc. fasten 2nd floor beam at rear wall to concrete blocks w/bolted metal plate fasters. install 1/2" plywood to inside face of wall panels at ea. side of garage door and at wall at west end of garage.Details
add 5/8" bolting to permiter wall sill plates @ 48" oc. fasten 2nd floor beam at rear wall to concrete blocks w/bolted metal plate fasters. install 1/2" plywood to inside face of wall panels at ea. side of garage door and at wall at west end of garage. | $12,500 | |
| May 1, 2012 | Completed final sign-off Nov 2012 | 1440 Golden Gate Av | install 2 structural moment frames over garage doorways in south wall. install 1/2" plywood at rear (north) and both side walls. install 5/7" phase anchor bolts at 32" oc in all perimeter and interior bearing wallsDetails
install 2 structural moment frames over garage doorways in south wall. install 1/2" plywood at rear (north) and both side walls. install 5/7" phase anchor bolts at 32" oc in all perimeter and interior bearing walls | $50,000 | |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 595 Hill St | Erick Ahlgren Concrete | retaining wall repair 0nly per plan.Details
retaining wall repair 0nly per plan. | $5,000 |
| Mar 16, 2012 | Expired or cancelled cancelled Jan 2026 | 1495 Monterey Bl | upgrade (e) concrete foundations removing loose surface material and restoring profiles with grout. fasten mud sills & posts to the concrete foundations with bolted simpson co. or equal steel plate connectors. fasten 1st floor posts & beams with bolted steel plate connectors.Details
upgrade (e) concrete foundations removing loose surface material and restoring profiles with grout. fasten mud sills & posts to the concrete foundations with bolted simpson co. or equal steel plate connectors. fasten 1st floor posts & beams with bolted steel plate connectors. | $18,500 | |
| Feb 2, 2012 | Never finaled issued Feb 2012, no final | 182 Lippard Av | Koefoed Const Co | street spaceDetails
street space | |
| Dec 20, 2011 | Completed final sign-off Feb 2012 | 182 Lippard Av | Koefoed Const Co | replace (e) urm foundation construction at south & west exterior walls with reinforced concrete. fasten (e) 2nd floor posts & beams with metal plate fasteners.Details
replace (e) urm foundation construction at south & west exterior walls with reinforced concrete. fasten (e) 2nd floor posts & beams with metal plate fasteners. | $18,000 |
| Sep 20, 2011 | Completed final sign-off Oct 2011 | 64 Townsend St | remove & replace raised area concrete floor slab on grade to level floor.Details
remove & replace raised area concrete floor slab on grade to level floor. | $12,000 | |
| Jun 21, 2011 | Never finaled issued Jun 2011, no final | 2207 Scott St | Hough Construction | revision to pa# 2011-0509-5639-detail 1/s2 to reflect higher elevation of base of adjacent building at the new sidewalk.Details
revision to pa# 2011-0509-5639-detail 1/s2 to reflect higher elevation of base of adjacent building at the new sidewalk. | |
| Mar 7, 2011 | Completed final sign-off Sep 2011 | 863 Waller St | Mighty Moe Construction | bolts perimeter wall sill plastes, laterally brace underfloor arears with 1/2 plywood sheerwalls on new concrete grade beam foundations. fasten posts and beams throughout underfloor areas with boldeted steel plate fastenersDetails
bolts perimeter wall sill plastes, laterally brace underfloor arears with 1/2 plywood sheerwalls on new concrete grade beam foundations. fasten posts and beams throughout underfloor areas with boldeted steel plate fasteners | $50,000 |
| Feb 9, 2011 | Completed final sign-off Mar 2011 | 2076 Grove St | Hough Construction | correct faulty foundation grades, partial laterial load bracing of 1st floor level with 4 steel omf frames, remove unbraced brick chimney to roof level, replace with braced metal flue, repair in kind, dry rot damaged rear stair membersDetails
correct faulty foundation grades, partial laterial load bracing of 1st floor level with 4 steel omf frames, remove unbraced brick chimney to roof level, replace with braced metal flue, repair in kind, dry rot damaged rear stair members | $45,000 |
| Sep 28, 2010 | Completed final sign-off Oct 2010 | 57 Noe St | Blk Enterprises Dba Rose Construction | revision to appl #2010-0716-6789: delete to install ssw & footing at garage door (uncovered braced steel frame).Details
revision to appl #2010-0716-6789: delete to install ssw & footing at garage door (uncovered braced steel frame). | |
| Aug 12, 2010 | Completed final sign-off Oct 2010 | 731 47th Av | Doherty Construction | partial lateral bracing of garge level with 2 structural steel frames and 1/2 " plywood panel. repair of e con foundations and installation of 5/8 " sill bolts and 32" ccDetails
partial lateral bracing of garge level with 2 structural steel frames and 1/2 " plywood panel. repair of e con foundations and installation of 5/8 " sill bolts and 32" cc | $50,000 |
| Jul 21, 2010 | Never finaled issued Jul 2010, no final | 1671 Hayes St | foundations and reframing to brace 1st floor for 2007 cbc seismic loadings, plywood shearwalls, structural steel beams in 2nd floor framing. partial strengthening of the buildingDetails
foundations and reframing to brace 1st floor for 2007 cbc seismic loadings, plywood shearwalls, structural steel beams in 2nd floor framing. partial strengthening of the building | $45,000 | |
| Jul 20, 2009 | Completed final sign-off Aug 2009 | 3474 Clay St | Hough Construction | reinforce or replace (e) brick foundations with reinforced concrete foundationsDetails
reinforce or replace (e) brick foundations with reinforced concrete foundations | $47,750 |