- 0 permits filed
36 permits since 2000: 29 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2020 | Completed final sign-off Aug 2021 | 259 Collingwood St | remove and replace 37 linear ft of foundation.Details
remove and replace 37 linear ft of foundation. | $80,160 |
| May 24, 2017 | Completed final sign-off Dec 2017 | 4150 17th St | unit 23 -to comply w/nov #201775486 dated 4/13/2017 - excavate soil for installation of neighbors retaining wall. neighbors (4136- 17th st) retaining wall under pa #201608154981. reinstall soil upon completion of wall.Details
unit 23 -to comply w/nov #201775486 dated 4/13/2017 - excavate soil for installation of neighbors retaining wall. neighbors (4136- 17th st) retaining wall under pa #201608154981. reinstall soil upon completion of wall. | |
| Dec 15, 2016 | Never finaled issued Dec 2016, no final | 4132 17th St | rear building: replace portion of foundation (south side and southwest corner of rear building) per plan, approx.42 linear feet.Details
rear building: replace portion of foundation (south side and southwest corner of rear building) per plan, approx.42 linear feet. | $50,000 |
| Aug 15, 2016 | Completed final sign-off Dec 2017 | 4136 17th St | replacing retaining wall to comply with nov 201447642Details
replacing retaining wall to comply with nov 201447642 | $65,000 |
| Feb 10, 2015 | Completed final sign-off Nov 2015 | 1234 Alabama St | rear bldg - remove & replace 163 linear ft of brick foundation with reinforced concrete.Details
rear bldg - remove & replace 163 linear ft of brick foundation with reinforced concrete. | $39,000 |
| Dec 18, 2013 | Never finaled issued Mar 2014, no final | 80 Jersey St | install 5 buttresses for (e) 8' retaining wall. coat face of wall with mortar.Details
install 5 buttresses for (e) 8' retaining wall. coat face of wall with mortar. | $23,000 |
| Jul 12, 2013 | Completed final sign-off Jul 2013 | 586 London St | replace 3 isolated column footings with deeper footings. 3-24" minimum square x 30" footing.Details
replace 3 isolated column footings with deeper footings. 3-24" minimum square x 30" footing. | $3,800 |
| Jul 12, 2013 | Completed final sign-off Jul 2014 | 1550 O'farrell St | replace failed retaining wall with soldier piles and lagging. 4' tall, 44' ling common area.Details
replace failed retaining wall with soldier piles and lagging. 4' tall, 44' ling common area. | $20,000 |
| Mar 19, 2013 | Completed final sign-off Jan 2014 | 1760 Leavenworth St | foundation repair with 2" diameter steel pipe columns & new concrete grade beam at east end of bldg.Details
foundation repair with 2" diameter steel pipe columns & new concrete grade beam at east end of bldg. | $15,000 |
| Feb 8, 2013 | Completed final sign-off Jan 2014 | 1185 Vallejo St | reinforce extg concrete foundation at west wall with 2"0 steel pipe columns and reinforced concrete grade beams.Details
reinforce extg concrete foundation at west wall with 2"0 steel pipe columns and reinforced concrete grade beams. | $24,500 |
| Nov 19, 2012 | Completed final sign-off Jun 2013 | 114 Congo St | install perimeter foundation, finishes one section of crawl space to 8' ceiling height with slab for storage. exterior stairs to access storage area.Details
install perimeter foundation, finishes one section of crawl space to 8' ceiling height with slab for storage. exterior stairs to access storage area. | $45,000 |
| Oct 5, 2011 | Completed final sign-off Dec 2011 | 61 Garcia Av | install reinforced concrete retaining wall with concrete piers across landslide scarp. backfill w/ drainage & compacted fill. install fence on top of wall. install jute mesh on slope below. edgehill mountain slope area.Details
install reinforced concrete retaining wall with concrete piers across landslide scarp. backfill w/ drainage & compacted fill. install fence on top of wall. install jute mesh on slope below. edgehill mountain slope area. | $27,050 |
| Oct 27, 2009 | Completed final sign-off Dec 2009 | 7 Balhi Ct | foundation repair with pipe pile underpinning @ side & rear of property.Details
foundation repair with pipe pile underpinning @ side & rear of property. | $27,000 |
| Oct 10, 2008 | Completed final sign-off Jan 2010 | 4388 25th St | reinforce existing foundation with pipe pile underpinning per plan.Details
reinforce existing foundation with pipe pile underpinning per plan. | $27,000 |
| Sep 19, 2008 | Expired or cancelled expired Jan 2010 | 1405 Douglass St | sub slab drains and french drainDetails
sub slab drains and french drain | $15,000 |
| Dec 26, 2007 | Completed final sign-off Mar 2008 | 1795 Sanchez St | revision to pa# 2007/12/03/9447 to change rebars on proposed foundation stemwall.Details
revision to pa# 2007/12/03/9447 to change rebars on proposed foundation stemwall. | |
| Dec 3, 2007 | Completed final sign-off Mar 2008 | 1795 Sanchez St | foundation replacement - will not visibly alter existing setbacks. details not shown will conform to existing ubc.Details
foundation replacement - will not visibly alter existing setbacks. details not shown will conform to existing ubc. | $23,000 |
| Jul 19, 2007 | Completed final sign-off Dec 2007 | 100 Maywood Dr | remove & replace failed retaining wall 5'6" tall.Details
remove & replace failed retaining wall 5'6" tall. | $45,000 |
| Dec 6, 2006 | Completed final sign-off Feb 2007 | 158 Judson Av | remove and replace a portion of the foundation on the right side and install anchor bolts approx 20 ftDetails
remove and replace a portion of the foundation on the right side and install anchor bolts approx 20 ft | $5,900 |
| Oct 13, 2005 | Completed final sign-off May 2006 | 129 Winfield St | install sloughwall/fence/retaining wall to capture or retain residual soil from hillside. also, install jute mesh & steel mesh & compost to facilitate plant growth.Details
install sloughwall/fence/retaining wall to capture or retain residual soil from hillside. also, install jute mesh & steel mesh & compost to facilitate plant growth. | $20,000 |
| Oct 13, 2005 | Completed final sign-off Dec 2005 | 2620 Sutter St | foundation replacement (partial) per n.o.v#200556962.Details
foundation replacement (partial) per n.o.v#200556962. | $25,000 |
| Oct 13, 2004 | Completed final sign-off Nov 2004 | 3871 Jackson St | install 4 ea. tie-backs 26 ft embedment 2 each 14whalers to reinforce existing retaining wall atDetails
install 4 ea. tie-backs 26 ft embedment 2 each 14whalers to reinforce existing retaining wall at | |
| Jan 14, 2004 | Expired or cancelled expired Nov 2004 | 3871 Jackson St | install 4 ea tie backs 26' embedment, 2 ea 14' steel whaers. to reinforce (e) retaining wall at rearDetails
install 4 ea tie backs 26' embedment, 2 ea 14' steel whaers. to reinforce (e) retaining wall at rear | $20,000 |
| Oct 15, 2003 | Completed final sign-off Jan 2004 | 2619 Sutter St | replacement of old foundation w/new reinforced concrete foundationDetails
replacement of old foundation w/new reinforced concrete foundation | $28,800 |
| Oct 9, 2003 | Completed final sign-off Nov 2003 | 3169 Fillmore St | revision of detail b sheet 2, of top of pipe pile detail from app#200306056318Details
revision of detail b sheet 2, of top of pipe pile detail from app#200306056318 | $13,000 |
| Sep 30, 2003 | Completed final sign-off Nov 2003 | 4416 19th St | remove and replace foundation for front portion at building (2 sides & front)Details
remove and replace foundation for front portion at building (2 sides & front) | $31,800 |
| Jun 5, 2003 | Completed final sign-off Nov 2003 | 3169 Fillmore St | partial foundation releveling on center bearing wall with 4 pipe pilesDetails
partial foundation releveling on center bearing wall with 4 pipe piles | $13,000 |
| Nov 13, 2002 | Completed final sign-off Sep 2003 | 760 Dolores St | install aproximately 32 lineal ft of anchor bloc retaining wall with rock anchor at right rear bldgDetails
install aproximately 32 lineal ft of anchor bloc retaining wall with rock anchor at right rear bldg | $13,000 |
| Aug 28, 2002 | Completed final sign-off Jan 2003 | 32 States St | approx. 50 ft lineal foot long, pier based retaining wall. to the rear of houseDetails
approx. 50 ft lineal foot long, pier based retaining wall. to the rear of house | $56,000 |
| Jul 17, 2002 | Completed final sign-off Aug 2002 | 760 Dolores St | 11 feet long by 5 feet high retaining wall to repair slough outDetails
11 feet long by 5 feet high retaining wall to repair slough out | $18,000 |
| Jul 10, 2002 | Never finaled issued Jul 2002, no final | 49 Carmelita St | rev#200204093409. remove & replace brick foundation add w10x30 i beam in centerDetails
rev#200204093409. remove & replace brick foundation add w10x30 i beam in center | $44,000 |
| Apr 9, 2002 | Completed final sign-off Oct 2002 | 49 Carmelita St | voluntary seismic upgrade- remove & replace (e) brick foundation with (n) reinforced concrete foundaDetails
voluntary seismic upgrade- remove & replace (e) brick foundation with (n) reinforced concrete founda | $44,000 |
| Aug 8, 2001 | Completed final sign-off Nov 2001 | 5135 Anza St | partial foundation underpinning with 9 pipe pilesDetails
partial foundation underpinning with 9 pipe piles | $14,000 |
| May 23, 2001 | Expired or cancelled expired Feb 2002 | 222 States St | paritial fndtn repair w/ new structrl facing wall,3 helical anchor tiebacks ex steps replacmt 3 pipeDetails
paritial fndtn repair w/ new structrl facing wall,3 helical anchor tiebacks ex steps replacmt 3 pipe | $24,500 |
| Oct 25, 2000 | Completed final sign-off Nov 2000 | 945 Elizabeth St | renewal of applications 200002252763, 200003073602 to complete workDetails
renewal of applications 200002252763, 200003073602 to complete work | |
| Mar 7, 2000 | Expired or cancelled expired Nov 2000 | 945 Elizabeth St | hook up new subdrain to sewer, repair existing foundation rev to-200002252763Details
hook up new subdrain to sewer, repair existing foundation rev to-200002252763 | $2,000 |