Block 1622, lot 039
2133 Balboa St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2021 | 2133 Balboa St | 1st fl framing w/structural steel beam to remove 4' of (e) bearing wall at the west side of the entry stairwayDetails
1st fl framing w/structural steel beam to remove 4' of (e) bearing wall at the west side of the entry stairway | $15,000 | |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 2135 Balboa St | Velasquez Construction | new roof deck over (e) sun room roof at rear. replace (2) windows & add (1) exterior door at rear.Details
new roof deck over (e) sun room roof at rear. replace (2) windows & add (1) exterior door at rear. | $30,000 |
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 2133 Balboa St | street spaceDetails
street space | ||
| Jan 14, 2019 | Completed final sign-off Jan 2020 | 2133 Balboa St | Velasquez Construction | remodel kitchen, bath, bedrooms, convert (e) wc to full bath, add internal stair to (e) ground floor habitable space, add 2 bedrooms and 1 bath, fill-in under (e) sunroom. no work to 2135 balboa upper floor unit.Details
remodel kitchen, bath, bedrooms, convert (e) wc to full bath, add internal stair to (e) ground floor habitable space, add 2 bedrooms and 1 bath, fill-in under (e) sunroom. no work to 2135 balboa upper floor unit. | $120,000 |
| Jul 2, 2018 | Completed final sign-off Sep 2018 | 2135 Balboa St | revise estimated cost of job to 90,000.00 for app#201804206907Details
revise estimated cost of job to 90,000.00 for app#201804206907 | $55,000 | |
| Jun 6, 2018 | Completed final sign-off Jun 2018 | 2133 Balboa St | S'top Roofing Company Inc | reroofingDetails
reroofing | $11,880 |
| May 17, 2018 | Completed final sign-off Mar 2020 | 2133 Balboa St | Velasquez Construction | revision to pa# 201804206993. water repair from leak, interior bathroom work only. replace damaged drywall and tile as needed in unit 2133Details
revision to pa# 201804206993. water repair from leak, interior bathroom work only. replace damaged drywall and tile as needed in unit 2133 | $2,000 |
| Apr 20, 2018 | Completed final sign-off Sep 2018 | 2135 Balboa St | interior remodel on upper floor unit (2135 balboa st) including: new finishes, casework, partitions, & electrical, plumbing, mechanical upgrades. remove 1 (e) window at side property line & addition of 3 skylights. no changes to lower floors, add 1 bedroomDetails
interior remodel on upper floor unit (2135 balboa st) including: new finishes, casework, partitions, & electrical, plumbing, mechanical upgrades. remove 1 (e) window at side property line & addition of 3 skylights. no changes to lower floors, add 1 bedroom | $35,000 | |
| Apr 20, 2018 | Completed final sign-off Sep 2018 | 2135 Balboa St | replace front windows side by side, same operation, aluminum wood clad. no rough opening changesDetails
replace front windows side by side, same operation, aluminum wood clad. no rough opening changes | $8,980 | |
| Apr 20, 2018 | Completed final sign-off Mar 2020 | 2133 Balboa St | Velasquez Construction | tub/shower remodel in lower unit # 2133Details
tub/shower remodel in lower unit # 2133 | $5,000 |
| Dec 8, 2017 | Completed final sign-off Jan 2018 | 2133 Balboa St | to comply with nov201711511 items 3 & 4: : repair stairs and guardrails at the exterior stairway. lesss than 50% total stairs at side of house. work not visible from street.Details
to comply with nov201711511 items 3 & 4: : repair stairs and guardrails at the exterior stairway. lesss than 50% total stairs at side of house. work not visible from street. | $1,000 | |
| Jul 10, 2014 | Completed final sign-off Jul 2014 | 2135 Balboa St | Madden Construction | install new window (same size, location, style - 4'x 4' vinyl) at kitchen.Details
install new window (same size, location, style - 4'x 4' vinyl) at kitchen. | $600 |
| Jul 9, 2013 | Completed final sign-off Aug 2013 | 2133 Balboa St | Madden Construction | to comply with nov 201307523 - replacing 14 windows total, those on west elevation are visible from street. and replacing sidings, install hardi plank over existing wood sidings at rear on east, south & west elevations.Details
to comply with nov 201307523 - replacing 14 windows total, those on west elevation are visible from street. and replacing sidings, install hardi plank over existing wood sidings at rear on east, south & west elevations. | $50,000 |
| Sep 12, 2006 | Never finaled issued Sep 2006, no final | 2135 Balboa St | street space permitDetails
street space permit |