Block 1082, lot 002
1343 Lyon St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 3,070 sq ft
- Lot
- 3,288 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2021 | Never finaled issued Sep 2021, no final | 1343 Lyon St | Im Roofing Co | reroofing.Details
reroofing. | $17,860 |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 1341 Lyon St | street space permitDetails
street space permit | ||
| Aug 12, 2013 | Never finaled issued Aug 2013, no final | 1341 Lyon St | street space permitDetails
street space permit | ||
| Aug 12, 2013 | Completed final sign-off Mar 2014 | 1341 Lyon St | replace (e) decks and stair at rear facade.Details
replace (e) decks and stair at rear facade. | $7,500 | |
| Jun 25, 2013 | Completed final sign-off Sep 2014 | 1341 Lyon St | revision to appl #2013.05.22.7690: repair in kind as required @ the rear portion of bldg with new framing; roof framing plan & details @ skylights as previously approved.Details
revision to appl #2013.05.22.7690: repair in kind as required @ the rear portion of bldg with new framing; roof framing plan & details @ skylights as previously approved. | $900 | |
| May 22, 2013 | Completed final sign-off Sep 2014 | 1341 Lyon St | 1) interior remodel at 3 floors. 2) replace extg kitchens at 1st and 2nd floors. 3) add new master baths at 1st and 2nd floors. 4) convert portion of garage to new storage.Details
1) interior remodel at 3 floors. 2) replace extg kitchens at 1st and 2nd floors. 3) add new master baths at 1st and 2nd floors. 4) convert portion of garage to new storage. | $95,000 | |
| Mar 19, 2013 | Completed final sign-off Sep 2014 | 1341 Lyon St | Hough Construction | replace (e) brick foundations with reinforced concrete & brace 1st floor level with steel moment frames (2) & plywood shearwalls.Details
replace (e) brick foundations with reinforced concrete & brace 1st floor level with steel moment frames (2) & plywood shearwalls. | $150,000 |
| Mar 12, 2013 | Completed final sign-off Sep 2014 | 1341 Lyon St | (n) front steps, railing & landing @ front entry; (n) garage door; replace all windows @ front facade w/ (n) dual-glazed wood windows; to match historic profiles; add ballister rail @ porch in kind ; add ballister rail @ porch roof; changed window @ front bayDetails
(n) front steps, railing & landing @ front entry; (n) garage door; replace all windows @ front facade w/ (n) dual-glazed wood windows; to match historic profiles; add ballister rail @ porch in kind ; add ballister rail @ porch roof; changed window @ front bay | $14,000 | |
| May 2, 2005 | Completed final sign-off May 2005 | 1343 Lyon St | Painting The Town (Lic= C-33 & Hic) | put in 2 posts for stairwellfix hinges on door. patching the ceiling work to respond to this complaiDetails
put in 2 posts for stairwellfix hinges on door. patching the ceiling work to respond to this complai | $1,200 |
| May 24, 2004 | Completed final sign-off Sep 2004 | 1341 Lyon St | Crown General Roofing | reroofingDetails
reroofing | $13,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Crown General Roofing, Hough Construction, Im Roofing Co, Painting The Town (Lic= C-33 & Hic)
- Architects
- Andrew Levine (2)
- Engineers
- Peter A. Culley
- Authorized agent-otherss
- Kevin Devlin
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.