Adrian Mulhall
- Listed as
- authorized agent-others, contractor
- Firm
- Mulhall Construction Inc.
- Based in
- Novato
- On San Francisco permits
- Apr 2009 to May 2026
241 permits since 2000 (contractor on 238 permits, authorized agent-others on 3 permits): 216 completed, 2 in progress, 18 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 241.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2026 | In progress issued Aug 2026 | 2043 19th Av | Giampolini & Co Dba Giampolini/Courtney, Mulhall Construction Inc. | to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof.Details
to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof. | $50,000 |
| Apr 21, 2026 | Completed final sign-off Jun 2026 | 2505 Noriega St | Mulhall Construction Inc. | repair store front at ne corner due to damage sustained from truck collision. to comply with nov 202548434Details
repair store front at ne corner due to damage sustained from truck collision. to comply with nov 202548434 | $15,000 |
| Dec 16, 2025 | Completed final sign-off Mar 2026 | 1558 46th Av | Mulhall Construction Inc. | voluntary strengthening 2022 cebc section a3. earthquake brace and bolt program.Details
voluntary strengthening 2022 cebc section a3. earthquake brace and bolt program. | $18,000 |
| Nov 22, 2024 | Completed final sign-off Jan 2026 | 2250 Green St | Mulhall Construction Inc. | voluntary seismic upgrade per cebc 2022 ch-a4 on ground floor. 1st floor and 2nd floor.Details
voluntary seismic upgrade per cebc 2022 ch-a4 on ground floor. 1st floor and 2nd floor. | $100,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1152 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1077 Oakdale Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 778 Kirkwood Av | Mulhall Construction Inc. | (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.Details
(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1096 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | In progress issued Oct 2024 | 754 Kirkwood Av | Mulhall Construction Inc. | (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.Details
(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1100 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1033 Oakdale Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| Jan 18, 2024 | Completed final sign-off Oct 2024 | 1556 Great Hy | Mulhall Construction Inc. | soft story retrofit per 2022 iebc seismic retrofit programDetails
soft story retrofit per 2022 iebc seismic retrofit program | $25,000 |
| Nov 29, 2023 | Completed final sign-off Apr 2024 | 1498 Fulton St | Mulhall Construction Inc. | to comply with nov 202311512. as per field inspector : obtain a structural evaluation report from engineer. repair sheetrock and stucco in kind.Details
to comply with nov 202311512. as per field inspector : obtain a structural evaluation report from engineer. repair sheetrock and stucco in kind. | $4,000 |
| Aug 18, 2023 | Completed final sign-off Jan 2025 | 670 Monterey Bl | Mulhall Construction Inc. | soft -story retrofit of tier iii structure per 2022 sfebc ch.4d as amended by ab-107.Details
soft -story retrofit of tier iii structure per 2022 sfebc ch.4d as amended by ab-107. | $125,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 784 Kirkwood Av | Mulhall Construction Inc. | work on 10 unit bldg (788-792 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (788-792 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 1130 Palou Av | Mulhall Construction Inc. | work on 10 unit bldg (1148-1152 palou): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (1148-1152 palou): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 1065 Oakdale Av | Mulhall Construction Inc. | work on 7 unit bldg (1071-1077 oakdale): mandatory soft-story retrofit to foundation/basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 7 unit bldg (1071-1077 oakdale): mandatory soft-story retrofit to foundation/basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 1175 Oakdale Av | Mulhall Construction Inc. | work on 6 unit bldg (1183-1187 oakdale): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 6 unit bldg (1183-1187 oakdale): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 766 Kirkwood Av | Mulhall Construction Inc. | work on 10 unit bldg (778-782 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (778-782 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 15, 2023 | Completed final sign-off Feb 2024 | 734 Kirkwood Av | Mulhall Construction Inc. | 742-752 kirkwood/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only.Details
742-752 kirkwood/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only. | $75,000 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 1056 Palou Av | Mulhall Construction Inc. | 1064-1068 palou/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only.Details
1064-1068 palou/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only. | $75,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 1163 Oakdale Av | Mulhall Construction Inc. | work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level onlyDetails
work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level only | $75,000 |
| Aug 11, 2023 | Completed final sign-off Apr 2024 | 1013 Oakdale Av | Mulhall Construction Inc. | work is in 10-unit building at 1013-1017 oakdale. mandatory soft-story retrofit to the foundation/basement level. based on the california existing building code appendix a-4. work limited to the crawl space/basement level only.Details
work is in 10-unit building at 1013-1017 oakdale. mandatory soft-story retrofit to the foundation/basement level. based on the california existing building code appendix a-4. work limited to the crawl space/basement level only. | $75,000 |
| Aug 2, 2023 | Completed final sign-off Dec 2024 | 579 Castro St | Mulhall Construction Inc. | revision to pa 201708013542: mandatory soft story oridinance 66-13 design to comply with 2022 cebc appendix a-4 (for commercial only under 579 castro st). reference to pa #202304125567.Details
revision to pa 201708013542: mandatory soft story oridinance 66-13 design to comply with 2022 cebc appendix a-4 (for commercial only under 579 castro st). reference to pa #202304125567. | $49,000 |
| May 31, 2023 | Completed final sign-off Dec 2023 | 1501 Powell St | Mulhall Construction Inc. | to comply with nov# 202200732. mandatory soft story retrofit per sfbc 2022.Details
to comply with nov# 202200732. mandatory soft story retrofit per sfbc 2022. | $30,000 |
| Apr 12, 2023 | Completed final sign-off Dec 2024 | 577 Castro St | Mulhall Construction Inc. | revision to permit# 201708013542. soft story (residential component) mandatary under ordinance 66-13 design comply with 2022 cebc appendix a4Details
revision to permit# 201708013542. soft story (residential component) mandatary under ordinance 66-13 design comply with 2022 cebc appendix a4 | $200,000 |
| Nov 30, 2022 | Never finaled issued Mar 2023, no final | 320 06th Av | Mulhall Construction Inc. | revision to pa# 2019-1112-6979: recess front moment frame to behind the storefront, relocate shearwalls, relocate rear hardi frames to the bedroom, 1/flr unit entry closet modification; enlarge bathroom in commercial spaceDetails
revision to pa# 2019-1112-6979: recess front moment frame to behind the storefront, relocate shearwalls, relocate rear hardi frames to the bedroom, 1/flr unit entry closet modification; enlarge bathroom in commercial space | $7,000 |
| Aug 4, 2022 | Expired or cancelled withdrawn Jul 2024 | 1011 Union St | Mulhall Construction Inc. | compliance with mandatory seismic retroift programa 2019 cebc appendiz a4 & 2019 sf egb ch 4d.Details
compliance with mandatory seismic retroift programa 2019 cebc appendiz a4 & 2019 sf egb ch 4d. | $5,000 |
| Jun 24, 2022 | Completed final sign-off Nov 2022 | 1145 Green St | Mulhall Construction Inc. | revision to 202201186135. new grade beam detail, new footing detail, no change in scope.Details
revision to 202201186135. new grade beam detail, new footing detail, no change in scope. | |
| Feb 25, 2022 | Completed final sign-off Feb 2024 | 768 Jerrold Av | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. | $75,000 |
| Jan 18, 2022 | Completed final sign-off Nov 2022 | 1145 Green St | Mulhall Construction Inc. | voluntary seismic strengthing.Details
voluntary seismic strengthing. | $40,000 |
| Nov 18, 2021 | Completed final sign-off Apr 2022 | 838 Bay St | Mulhall Construction Inc. | soft story upgrade in compliance with mandotory ordiance per sfbc ch 34b. abate complaint #201986892.Details
soft story upgrade in compliance with mandotory ordiance per sfbc ch 34b. abate complaint #201986892. | $30,000 |
| Sep 15, 2021 | Completed final sign-off Nov 2022 | 2342 Jones St | Mulhall Construction Inc. | foundation improvements @ rear 3-story buildingDetails
foundation improvements @ rear 3-story building | $15,000 |
| Sep 8, 2021 | Completed final sign-off Sep 2021 | 30 Ramona Av | Mulhall Construction Inc. | renew 201808308827Details
renew 201808308827 | |
| Apr 15, 2021 | Completed final sign-off Jun 2022 | 1316 Stockton St | Mulhall Construction Inc. | residential softstory: revision to 201807053816. add plywood shearwalls & steel moment frames in basement & 1st fl. adjusted moment frame & shearwall locations. no change to ada work.Details
residential softstory: revision to 201807053816. add plywood shearwalls & steel moment frames in basement & 1st fl. adjusted moment frame & shearwall locations. no change to ada work. | $76,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2022 | 1316 Stockton St | Mulhall Construction Inc. | commercial softstory: revision to 201807053817. add plywood shearwalls & steel moment frames in basement & 1st fl. adjusted moment frame & shearwall locations. no change to ada work.Details
commercial softstory: revision to 201807053817. add plywood shearwalls & steel moment frames in basement & 1st fl. adjusted moment frame & shearwall locations. no change to ada work. | $76,000 |
| Mar 16, 2020 | Completed final sign-off Dec 2021 | 40 Hugo St | Mulhall Construction Inc. | voluntary seismic retrofit under ab-094 with shearwalls, moment frame, anchor bolts.Details
voluntary seismic retrofit under ab-094 with shearwalls, moment frame, anchor bolts. | $75,000 |
| Feb 6, 2020 | Completed final sign-off Jan 2022 | 1173 Hayes St | Corporate Community Development, Mulhall Construction Inc. | comly with soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
comly with soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $52,000 |
| Feb 6, 2020 | Completed final sign-off Jan 2022 | 1167 Hayes St | Corporate Community Development, Mulhall Construction Inc. | to comply with mandatory soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4Details
to comply with mandatory soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 | $52,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2022 | 501 Hayes St | Mulhall Construction Inc. | residential. compliance with mandatry seismic retrofit program per sfebc chapter 4d, 2016 cebc appendix a-4.Details
residential. compliance with mandatry seismic retrofit program per sfebc chapter 4d, 2016 cebc appendix a-4. | $60,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2022 | 501 Hayes St | Mulhall Construction Inc. | commercial. compliance with mandatry seismic retrofit program per sfebc chapter 4d, 2016 cebc appendix a-4.Details
commercial. compliance with mandatry seismic retrofit program per sfebc chapter 4d, 2016 cebc appendix a-4. | $30,000 |
| Jan 6, 2020 | Completed final sign-off Aug 2020 | 1520 Turk St | Mulhall Construction Inc. | revision to pa 2017-0406-3414 using steel channels @ collectors @ bldg exterior to replace steel straps soft storyDetails
revision to pa 2017-0406-3414 using steel channels @ collectors @ bldg exterior to replace steel straps soft story | $5,000 |
| Jan 6, 2020 | Completed final sign-off Aug 2020 | 1560 Turk St | Mulhall Construction Inc. | revision to pa 2017-0406-3415 using steel channels @ collectors @ bldg exterior to replace steel straps soft storyDetails
revision to pa 2017-0406-3415 using steel channels @ collectors @ bldg exterior to replace steel straps soft story | $10,000 |
| Jan 3, 2020 | Completed final sign-off Oct 2021 | 2060 Green St | Mulhall Construction Inc. | revision to pa #2018-0102-7655: change shearwall layout. change simpson smf to standard smfDetails
revision to pa #2018-0102-7655: change shearwall layout. change simpson smf to standard smf | |
| Oct 30, 2019 | Completed final sign-off Mar 2021 | 450 South Van Ness Av | Mulhall Construction Inc. | soft story retrofit per 2016 cebc appendix a-4Details
soft story retrofit per 2016 cebc appendix a-4 | $60,000 |
| Oct 17, 2019 | Completed final sign-off Feb 2020 | 490 Francisco St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc 2016 appendix a-4 to comply with nov 201803384.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc 2016 appendix a-4 to comply with nov 201803384. | $40,000 |
| May 15, 2019 | Completed final sign-off Nov 2019 | 1900 Leavenworth St | Mulhall Construction Inc. | revisio to 201709148196. replace sheerwall with moment frameDetails
revisio to 201709148196. replace sheerwall with moment frame | $10,000 |
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 1447 Chestnut St | street spaceDetails
street space | ||
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 3225 Laguna St | street spaceDetails
street space | ||
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 10 Capra Wy | street spaceDetails
street space | ||
| Jan 10, 2019 | Completed final sign-off Mar 2021 | 2032 Polk St | Mulhall Construction Inc. | commercial. compliance with mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4. comply with nov #201803503.Details
commercial. compliance with mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4. comply with nov #201803503. | $27,500 |
| Jan 10, 2019 | Completed final sign-off Mar 2021 | 2032 Polk St | Mulhall Construction Inc. | residential. compliance with mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4. comply with nov #201803503.Details
residential. compliance with mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4. comply with nov #201803503. | $82,500 |
| Nov 28, 2018 | Completed final sign-off Mar 2021 | 2443 Fillmore St | Mulhall Construction Inc. | residential. compliance with mandatory seismic retrofit program per 2016 sfebc chaper 4d & 2016 cebc appx a-4. to comply with ces 201803506.Details
residential. compliance with mandatory seismic retrofit program per 2016 sfebc chaper 4d & 2016 cebc appx a-4. to comply with ces 201803506. | $51,000 |
| Nov 28, 2018 | Completed final sign-off Mar 2021 | 2443 Fillmore St | Mulhall Construction Inc. | commercial. compliance with mandatory seismic retrofit program per 2016 sfebc chaper 4d & 2016 cebc appx a-4. to comply with ces 201803506.Details
commercial. compliance with mandatory seismic retrofit program per 2016 sfebc chaper 4d & 2016 cebc appx a-4. to comply with ces 201803506. | $19,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2019 | 1181 Green St | Mulhall Construction Inc. | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809130136.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809130136. | $47,500 |
| Sep 13, 2018 | Completed final sign-off Nov 2019 | 1181 Green St | Mulhall Construction Inc. | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809130134.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809130134. | $47,500 |
| Sep 12, 2018 | Completed final sign-off Apr 2021 | 2249 Beach St | Mulhall Construction Inc. | soft story retrofit. project involves installation of (2) interior steel moment frames, removal & reinstallation of plywood shearwalls @ front & rear of (e) exterior walls, per 2016 cebc, appx a-4.Details
soft story retrofit. project involves installation of (2) interior steel moment frames, removal & reinstallation of plywood shearwalls @ front & rear of (e) exterior walls, per 2016 cebc, appx a-4. | $65,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 2265 Beach St | Mulhall Construction Inc. | revision to pa 2017-1129-5058 - add transparent wall panel @ light well. eliminate dropped landing @ entry to unit relocate washer & dryer to garageDetails
revision to pa 2017-1129-5058 - add transparent wall panel @ light well. eliminate dropped landing @ entry to unit relocate washer & dryer to garage | $2,000 |
| Aug 30, 2018 | Never finaled issued Sep 2018, no final | 30 Ramona Av | Mulhall Construction Inc. | mandatory soft story retrofit per sfbc chapter 34b, using 2016 cebc appendix a4, work limited to gr fl iDetails
mandatory soft story retrofit per sfbc chapter 34b, using 2016 cebc appendix a4, work limited to gr fl i | $75,000 |
| Jul 20, 2018 | Completed final sign-off Mar 2020 | 3124 Laguna St | Mulhall Construction Inc. | seismic strengthening measures to comply with the san francisco soft story retrofit per sfebc ch 4d ordinance, design per iebc appx.a-4. maher n /a.Details
seismic strengthening measures to comply with the san francisco soft story retrofit per sfebc ch 4d ordinance, design per iebc appx.a-4. maher n /a. | $50,000 |
| Jul 5, 2018 | Completed final sign-off Jun 2022 | 1316 Stockton St | Mulhall Construction Inc. | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add plywood shearwalls & steel moment frames at basement & 1st fl. commercial pa #201807053817.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add plywood shearwalls & steel moment frames at basement & 1st fl. commercial pa #201807053817. | $100,000 |
| Jul 5, 2018 | Completed final sign-off Jun 2022 | 1316 Stockton St | Mulhall Construction Inc. | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add plywood shearwalls & steel moment frames at basement & 1st floor. residential pa #201807053816.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add plywood shearwalls & steel moment frames at basement & 1st floor. residential pa #201807053816. | $100,000 |
| May 18, 2018 | Never finaled issued Jun 2018, no final | 115 Haight St | Mulhall Construction Inc. | revision to permit #201609147626, structural elements revised.Details
revision to permit #201609147626, structural elements revised. | |
| May 17, 2018 | Completed final sign-off Jun 2020 | 558 Castro St | Mulhall Construction Inc. | to compliance with mandatory soft seismic retrofit program for commercial. volunterry accessibility upgrade in conjunction with seismic retrofit.Details
to compliance with mandatory soft seismic retrofit program for commercial. volunterry accessibility upgrade in conjunction with seismic retrofit. | $4,640 |
| May 17, 2018 | Completed final sign-off Jun 2020 | 558 Castro St | Mulhall Construction Inc. | compliance with mandatory soft story retrofit program for residential, cebc 2016 app a4 & sfebc 2016 chp 4d.Details
compliance with mandatory soft story retrofit program for residential, cebc 2016 app a4 & sfebc 2016 chp 4d. | $80,000 |
| Apr 10, 2018 | Completed final sign-off Oct 2019 | 577 Columbus Av | Mulhall Construction Inc. | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. disabled access upgrade at entrances and restaurant toilet roomDetails
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. disabled access upgrade at entrances and restaurant toilet room | $199,000 |
| Apr 10, 2018 | Completed final sign-off Oct 2019 | 575 Columbus Av | Mulhall Construction Inc. | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201804105939Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201804105939 | $233,000 |
| Mar 29, 2018 | Completed final sign-off Jun 2018 | 4417 Cabrillo St | Mulhall Construction Inc. | to obtain final inspection for work approved under pa#201509106652. all work is completed.Details
to obtain final inspection for work approved under pa#201509106652. all work is completed. | |
| Mar 29, 2018 | Never finaled issued Mar 2018, no final | 4417 Cabrillo St | Mulhall Construction Inc. | dry rot repair in garage - 12 linear feetDetails
dry rot repair in garage - 12 linear feet | $12,590 |
| Mar 22, 2018 | Completed final sign-off Oct 2018 | 766 Francisco St | Mulhall Construction Inc. | brick foundation repair/replacement for seismic retrofit under permit app# 201708255980. soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, maher ord 155-13 naDetails
brick foundation repair/replacement for seismic retrofit under permit app# 201708255980. soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, maher ord 155-13 na | $30,000 |
| Mar 9, 2018 | Completed final sign-off Aug 2018 | 668 Page St | Mulhall Construction Inc. | revision to app#201707111583. removal of interior walls and addition of shearwalls per soft story retrofit. electie work done by the owner is not to be passed onto the other tenants to pay. soft story retrofit per sfebc capter 4d: 2016 cebc appendix a-4Details
revision to app#201707111583. removal of interior walls and addition of shearwalls per soft story retrofit. electie work done by the owner is not to be passed onto the other tenants to pay. soft story retrofit per sfebc capter 4d: 2016 cebc appendix a-4 | $1,000 |
| Jan 2, 2018 | Completed final sign-off Oct 2021 | 2060 Green St | Michael Lo Construction & Plumbing, Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov #201714518. maher naDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov #201714518. maher na | $80,000 |
| Dec 11, 2017 | Completed final sign-off Dec 2019 | 3330 Buchanan St | Mulhall Construction Inc. | mandatory soft story retrofit of soft story mandate using fema p-807Details
mandatory soft story retrofit of soft story mandate using fema p-807 | $65,000 |
| Dec 5, 2017 | Completed final sign-off Nov 2020 | 3255 Sacramento St | Mulhall Construction Inc. | deck replacement. not visible from street. like for likeDetails
deck replacement. not visible from street. like for like | $2,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2021 | 2265 Beach St | Mulhall Construction Inc. | remove boiler room at rear of building, add accessory dwelling unit at rear of garage per ordinance 162-16. soft story permit #2017-0426-4957 for reference.Details
remove boiler room at rear of building, add accessory dwelling unit at rear of garage per ordinance 162-16. soft story permit #2017-0426-4957 for reference. | $80,000 |
| Nov 20, 2017 | Completed final sign-off May 2019 | 146 Portola Dr | Mulhall Construction Inc. | to comply with nov 201719801: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4Details
to comply with nov 201719801: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4 | $95,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2020 | 3255 Sacramento St | Mulhall Construction Inc. | mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4, for commercial retail portion (residential portion under pa #201711022925)Details
mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4, for commercial retail portion (residential portion under pa #201711022925) | $25,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2020 | 3255 Sacramento St | Mulhall Construction Inc. | mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4 for residential portion. (commercial under pa #201711022921)Details
mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4 for residential portion. (commercial under pa #201711022921) | $25,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2017 | 303 Arguello Bl | Mulhall Construction Inc. | rev to pa#201702038610: replace hardy special moment frame with (n) ordinary moment frame.Details
rev to pa#201702038610: replace hardy special moment frame with (n) ordinary moment frame. | |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 340 Spruce St | Mulhall Construction Inc. | soft story seismic retrofit per sfebc chapt4d - iebc appx a-4.Details
soft story seismic retrofit per sfebc chapt4d - iebc appx a-4. | $85,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 1447 Chestnut St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4 2016. plywood, shear walls have been added or strengthened and concrete foundations have been added.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4 2016. plywood, shear walls have been added or strengthened and concrete foundations have been added. | $105,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2019 | 1900 Leavenworth St | Mulhall Construction Inc. | compliance with mandatory seismic retrofit program, cebc 2016 app a4 & sfebc 2016 chp 4d.Details
compliance with mandatory seismic retrofit program, cebc 2016 app a4 & sfebc 2016 chp 4d. | $25,000 |
| Sep 12, 2017 | Completed final sign-off Jun 2019 | 865 Filbert St | Mulhall Construction Inc. | soft story retrofit per sfebc ch.4d - 2016 cebc appendex a-4.Details
soft story retrofit per sfebc ch.4d - 2016 cebc appendex a-4. | $50,000 |
| Sep 12, 2017 | Completed final sign-off Jul 2020 | 435 43rd Av | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 | $48,000 |
| Sep 7, 2017 | Completed final sign-off May 2022 | 921 Dolores St | Mulhall Construction Inc., Alex Builder Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $76,986 |
| Sep 6, 2017 | Completed final sign-off Jul 2020 | 4 Lupine Av | Mulhall Construction Inc. | compliance w/ mandatory seismic retrofit program 2016 sfebc sec 4d & 2016 cebc appx a-4Details
compliance w/ mandatory seismic retrofit program 2016 sfebc sec 4d & 2016 cebc appx a-4 | $65,000 |
| Sep 6, 2017 | Completed final sign-off Jul 2020 | 11 Wood St | Mulhall Construction Inc. | soft story retrofit per sfebc ch 4d. 2016 sfbc appendix a4Details
soft story retrofit per sfebc ch 4d. 2016 sfbc appendix a4 | $30,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2018 | 1100 Masonic Av | Mulhall Construction Inc. | soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood shear walls with new grade beams. all at the basement level (target story). 2016 cebc appendix a-4.Details
soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood shear walls with new grade beams. all at the basement level (target story). 2016 cebc appendix a-4. | $40,000 |
| Aug 25, 2017 | Completed final sign-off Oct 2018 | 766 Francisco St | Mulhall Construction Inc. | soft story retrofit for tier 3 structure per sfebc ch 4 as amended by ab107 design base shear for 100% cbc other rational design) at target storyDetails
soft story retrofit for tier 3 structure per sfebc ch 4 as amended by ab107 design base shear for 100% cbc other rational design) at target story | $75,000 |
| Aug 7, 2017 | Completed final sign-off Mar 2019 | 5000 Fulton St | Mulhall Construction Inc. | soft story seismic retrofit in accordance with sf ord 66-13/sfbc ch 4d. target story is strengthend utilizing iebc a4 methodology; soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story seismic retrofit in accordance with sf ord 66-13/sfbc ch 4d. target story is strengthend utilizing iebc a4 methodology; soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $103,000 |
| Aug 7, 2017 | Completed final sign-off Aug 2018 | 3240 Taraval St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $95,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2020 | 2160 Taylor St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d, asce 41-06.Details
soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 |
| Aug 1, 2017 | Never finaled issued Aug 2017, no final | 16 Fountain St | Mulhall Construction Inc. | street spaceDetails
street space | |
| Jul 31, 2017 | Completed final sign-off Nov 2019 | 10 Capra Wy | Mulhall Construction Inc. | soft story rettrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add plywood shear walls & steel special moment frames at g/f. conc. footings added as needed. n/a ordinance #155-13Details
soft story rettrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add plywood shear walls & steel special moment frames at g/f. conc. footings added as needed. n/a ordinance #155-13 | $126,350 |
| Jul 11, 2017 | Completed final sign-off Aug 2018 | 668 Page St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $20,000 |
| Jul 11, 2017 | Completed final sign-off Apr 2018 | 2937 Scott St | Mulhall Construction Inc. | ab-094 voluntary soft story retrofit per 2016 cebc appendix a-4Details
ab-094 voluntary soft story retrofit per 2016 cebc appendix a-4 | $85,000 |
| Jun 20, 2017 | Completed final sign-off Mar 2019 | 101 21st Av | K. Brunner & Associates, Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4 | $60,000 |
| Jun 8, 2017 | Completed final sign-off Feb 2018 | 375 24th Av | Mulhall Construction Inc. | dry rot repair in interior courtyard, approx 600 sq ftDetails
dry rot repair in interior courtyard, approx 600 sq ft | $30,000 |
| Jun 8, 2017 | Completed final sign-off Feb 2018 | 365 24th Av | Mulhall Construction Inc. | dry rot repair in interior courtyard , approx 600Details
dry rot repair in interior courtyard , approx 600 | $30,000 |
| Jun 7, 2017 | Completed final sign-off Nov 2019 | 3225 Laguna St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, add plywood shear walls & steel ordinary moment frames @ ground floor. add concrete footing as needed.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, add plywood shear walls & steel ordinary moment frames @ ground floor. add concrete footing as needed. | $86,500 |