Michael Yim
- License
- CE59343
- Professional engineer; the board does not list CE as a license type, so the discipline cannot be read from the number
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up CE59343 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Bay Structural Engineering
- Based in
- Alameda
- On San Francisco permits
- Sep 2017 to Oct 2019
8 permits since 2000 (engineer on 8 permits): 4 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Arris Build Group, Inc. (2), Wk Construction Inc (2), Mulhall Construction Inc., Sgdm Llc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 6
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2019 | Completed final sign-off May 2020 | 678 09th Av | Wk Construction Inc | revision to pa 2017-0914-8099 - replace brick footings under structural with concrete.Details
revision to pa 2017-0914-8099 - replace brick footings under structural with concrete. | $6,000 |
| Sep 14, 2018 | In progress issued Oct 2024 | 2230 Mission St | Arris Build Group, Inc. | **residential**. soft story retrofit installation of plywood shear walls & foundation per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4.Details
**residential**. soft story retrofit installation of plywood shear walls & foundation per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. | $40,000 |
| Sep 14, 2018 | In progress issued Oct 2024 | 2230 Mission St | Arris Build Group, Inc. | **commercial**. soft story retrofit per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. installation of steel moment frames, plywood shear walls and foundation. the design is per 2016 cebc appendix a-4.Details
**commercial**. soft story retrofit per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. installation of steel moment frames, plywood shear walls and foundation. the design is per 2016 cebc appendix a-4. | $45,000 |
| Sep 12, 2018 | Completed final sign-off Apr 2021 | 2249 Beach St | Mulhall Construction Inc. | soft story retrofit. project involves installation of (2) interior steel moment frames, removal & reinstallation of plywood shearwalls @ front & rear of (e) exterior walls, per 2016 cebc, appx a-4.Details
soft story retrofit. project involves installation of (2) interior steel moment frames, removal & reinstallation of plywood shearwalls @ front & rear of (e) exterior walls, per 2016 cebc, appx a-4. | $65,000 |
| Sep 14, 2017 | Completed final sign-off May 2020 | 678 09th Av | Wk Construction Inc | seismic retrofit of ground level to comply with the soft story retrofit program. the design is per 2016 cebc appendix a-4.Details
seismic retrofit of ground level to comply with the soft story retrofit program. the design is per 2016 cebc appendix a-4. | $25,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2020 | 1550 Clement St | Sgdm Llc | seismic retrofit of ground level to comply with the soft story retrofit program. the design is per 2016 cebc appendix a-4.Details
seismic retrofit of ground level to comply with the soft story retrofit program. the design is per 2016 cebc appendix a-4. | $48,000 |
| Sep 14, 2017 | Expired or cancelled cancelled Jul 2024 | 1476 California St | residential seismic retrofit of ground level to comply w/ the soft story retrofit program & lowering of (e) storage area from 7'-0" ceiling ht to 8'-6" ceiling ht. seismic design is per 2016 cebc app a-4. **maher** project split ref 201808026315Details
residential seismic retrofit of ground level to comply w/ the soft story retrofit program & lowering of (e) storage area from 7'-0" ceiling ht to 8'-6" ceiling ht. seismic design is per 2016 cebc app a-4. **maher** project split ref 201808026315 | $50,000 | |
| Sep 14, 2017 | Expired or cancelled cancelled Jul 2024 | 1476 California St | commercial seismic retrofit of ground level to comply w/ the soft story retrofit program & lowering of (e) storage area from 7'-0" ceiling ht to 8'-6" ceiling ht. seismic design is per 2016 cebc app a-4.Details
commercial seismic retrofit of ground level to comply w/ the soft story retrofit program & lowering of (e) storage area from 7'-0" ceiling ht to 8'-6" ceiling ht. seismic design is per 2016 cebc app a-4. | $30,000 |