Block 3553, lot 005
450 South Van Ness Ave
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 2
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 3,980 sq ft
- Lot
- 3,750 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2025 | Completed final sign-off Dec 2025 | 450 South Van Ness Av | San Francisco Fire Protection | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75 db in all sleeping areasDetails
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75 db in all sleeping areas | $22,200 |
| Mar 12, 2025 | In progress issued Mar 2025 | 450 South Van Ness Av | The Home Depot Usa Inc | revise pa# 202405091821 to state: unit# 2: replace 6 windows with retrofit vinyl windows. unit# 4: replace 6 windows with vinyl windows. not street visible. no change to size or location. u-factor not more than 0.30.Details
revise pa# 202405091821 to state: unit# 2: replace 6 windows with retrofit vinyl windows. unit# 4: replace 6 windows with vinyl windows. not street visible. no change to size or location. u-factor not more than 0.30. | |
| May 9, 2024 | Completed final sign-off Apr 2025 | 450 South Van Ness Av | The Home Depot Usa Inc | unit 5: replace 12 windows with retfofit vinly windows. no street visible. max u-factor 0.30.Details
unit 5: replace 12 windows with retfofit vinly windows. no street visible. max u-factor 0.30. | $13,372 |
| Oct 30, 2019 | Completed final sign-off Mar 2021 | 450 South Van Ness Av | Mulhall Construction Inc. | soft story retrofit per 2016 cebc appendix a-4Details
soft story retrofit per 2016 cebc appendix a-4 | $60,000 |
| Sep 4, 2018 | Expired or cancelled withdrawn Oct 2019 | 450 South Van Ness Av | seismic upgrade to comply with ordinance 66-13, sfbc charter 43b, 2012 iebc app a-4.Details
seismic upgrade to comply with ordinance 66-13, sfbc charter 43b, 2012 iebc app a-4. | $18,000 | |
| Jun 25, 2018 | Never finaled issued Jun 2018, no final | 450 South Van Ness Av | street spaceDetails
street space | ||
| Feb 3, 2005 | Completed final sign-off Apr 2005 | 450 South Van Ness Av | Ames-Billingsley, Inc. | install 31 areplacement windows, 16 are in front of bldg.Details
install 31 areplacement windows, 16 are in front of bldg. | $11,601 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Home Depot Usa Inc (2), Ames-Billingsley, Inc., Mulhall Construction Inc., San Francisco Fire Protection
- Engineers
- Himmati Engineering
- Designers
- Crime Watch
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.