19 permits since 2000 (engineer on 19 permits): 19 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 3, 2018 | Completed final sign-off Feb 2019 | 422 Arguello Bl | Gil Construction & Assoc Inc. | soft story seismic retrofit in accordance with sf ordinance 66-13, sfbc chapter 4d utilizing iebc a-4 methodology.Details
soft story seismic retrofit in accordance with sf ordinance 66-13, sfbc chapter 4d utilizing iebc a-4 methodology. | $42,000 |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | revision to 201808026227 shorten first floor. maher n/a.Details
revision to 201808026227 shorten first floor. maher n/a. | |
| Oct 4, 2017 | Completed final sign-off Jan 2023 | 667 33rd Av | soft story retrofit according to sfebc chapter 4d, ordinance no. 66-13. new playwood shearwalls over (e) studs and install of simpsom strong walls w/ new concrete grade beams in the transeverse direction.Details
soft story retrofit according to sfebc chapter 4d, ordinance no. 66-13. new playwood shearwalls over (e) studs and install of simpsom strong walls w/ new concrete grade beams in the transeverse direction. | $100,000 | |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 340 Spruce St | Mulhall Construction Inc. | soft story seismic retrofit per sfebc chapt4d - iebc appx a-4.Details
soft story seismic retrofit per sfebc chapt4d - iebc appx a-4. | $85,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2018 | 1100 Masonic Av | Mulhall Construction Inc. | soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood shear walls with new grade beams. all at the basement level (target story). 2016 cebc appendix a-4.Details
soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood shear walls with new grade beams. all at the basement level (target story). 2016 cebc appendix a-4. | $40,000 |
| Sep 6, 2017 | Completed final sign-off Aug 2018 | 367 Church St | Hough Construction | soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood & simpson strong walls w/new foundations. all at the ground floor level (target story). soft storey rerofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood & simpson strong walls w/new foundations. all at the ground floor level (target story). soft storey rerofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $45,000 |
| Apr 27, 2017 | Completed final sign-off Dec 2017 | 616 Divisadero St | Huff Construction Company Inc | revision to pa# 201612084523 for construction field changes. existing field conditions have more space to alter joist and beam framing. instead of using hangers joist will frame over beams.Details
revision to pa# 201612084523 for construction field changes. existing field conditions have more space to alter joist and beam framing. instead of using hangers joist will frame over beams. | |
| Apr 27, 2017 | Completed final sign-off Jan 2018 | 60 Crestline Dr | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 include 1-5 parking garage and crawl space area.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 include 1-5 parking garage and crawl space area. | $140,000 |
| Apr 21, 2017 | Completed final sign-off Jul 2017 | 1230 Pacific Av | A Plus Builders | revision to pa 2016-0129-8316, revise structural for stairsDetails
revision to pa 2016-0129-8316, revise structural for stairs | |
| Mar 28, 2017 | Completed final sign-off Oct 2017 | 2875 Jackson St | Mulhall Construction Inc. | soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4 | $150,000 |
| May 3, 2016 | Completed final sign-off Jun 2016 | 123 Moultrie St | Kevin Llorente Construction | rebuild entry deck in kind. maher naDetails
rebuild entry deck in kind. maher na | $10,000 |
| Dec 18, 2015 | Completed final sign-off Feb 2016 | 35 Rosemont Pl | Mulhall Construction Inc. | minor kitchen remodel(cabinets only per plan) w/removal of (e) non load bearing wall.Details
minor kitchen remodel(cabinets only per plan) w/removal of (e) non load bearing wall. | $4,000 |
| Sep 30, 2015 | Completed final sign-off Apr 2016 | 455 Cole St | Mulhall Construction Inc. | mandatory seismic strengthening per san francisco soft story ordinance done in conformance with iebc-a4Details
mandatory seismic strengthening per san francisco soft story ordinance done in conformance with iebc-a4 | $100,000 |
| May 26, 2015 | Completed final sign-off Nov 2015 | 657 Cayuga Av | Seabee Construction | install roof in atrium with skylight. install skylight in breakfast nookDetails
install roof in atrium with skylight. install skylight in breakfast nook | $60,000 |
| Feb 6, 2015 | Completed final sign-off May 2015 | 1825 Mission St | Sienna Homes Construction Corporation | 1st floor common area - remove 1 office, add 2 offices,replace light fixtrues, plumbing fixtrues @ both bathrooms (like for like), replace front door, flooring & paint, replace kitchen appliances at common area only next to offices. n/a maher ordinanceDetails
1st floor common area - remove 1 office, add 2 offices,replace light fixtrues, plumbing fixtrues @ both bathrooms (like for like), replace front door, flooring & paint, replace kitchen appliances at common area only next to offices. n/a maher ordinance | $15,485 |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 2727 Polk St | Mulhall Construction Inc. | soft story seismic retrofit. new plywood shearwalls at 1st fl and crawl space. new simpson strong walls at garage. 1 new concrete grade beam. no moment frames. 2012 iebc, appendix a-4Details
soft story seismic retrofit. new plywood shearwalls at 1st fl and crawl space. new simpson strong walls at garage. 1 new concrete grade beam. no moment frames. 2012 iebc, appendix a-4 | $30,000 |
| Apr 23, 2014 | Completed final sign-off Aug 2014 | 1395 16th Av | Mulhall Construction Inc. | soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4.Details
soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4. | $25,000 |
| Apr 23, 2014 | Completed final sign-off Aug 2014 | 1385 16th Av | Mulhall Construction Inc. | soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4.Details
soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4. | $25,000 |
| Sep 4, 2013 | Completed final sign-off Oct 2014 | 1045 Bryant St | Bcci Construction Company | structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17Details
structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17 | $125,000 |