Block 3557, lot 038
367 Church St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 6
- Rooms
- 8 bedrooms, 6 bathrooms
- Building
- 5,550 sq ft
- Lot
- 3,125 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off Dec 2025 | 367 Church St | Continuum Construction | unit 6: to obtain final inspection for work approved under pa 201507313075. all work is complete.Details
unit 6: to obtain final inspection for work approved under pa 201507313075. all work is complete. | |
| Sep 22, 2025 | Completed final sign-off Dec 2025 | 367 Church St | Continuum Construction | unit 6- add (n) wall mount lavatory sink in (e) water closet. recess sink in non load bearing wall.Details
unit 6- add (n) wall mount lavatory sink in (e) water closet. recess sink in non load bearing wall. | $4,000 |
| Feb 29, 2024 | Completed final sign-off Jul 2024 | 367 Church St | Continuum Construction | unit 6:add washer and dryer in unit #6, patching sheetrock for running utilities.Details
unit 6:add washer and dryer in unit #6, patching sheetrock for running utilities. | $5,000 |
| Dec 17, 2018 | Completed final sign-off Jan 2021 | 367 Church St | interior remodel of unit #3 including: relocation of extg kitchen and bedroom. expansion of extg bathroom.Details
interior remodel of unit #3 including: relocation of extg kitchen and bedroom. expansion of extg bathroom. | $27,500 | |
| Sep 6, 2017 | Completed final sign-off Aug 2018 | 367 Church St | Hough Construction | soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood & simpson strong walls w/new foundations. all at the ground floor level (target story). soft storey rerofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood & simpson strong walls w/new foundations. all at the ground floor level (target story). soft storey rerofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $45,000 |
| Jul 31, 2015 | Never finaled issued Jul 2015, no final | 367 Church St | Built By Todd | unit #6: kitchen remodel: replace cabinets, counters, appliances. no structural changes, no walls to be altered or removed.Details
unit #6: kitchen remodel: replace cabinets, counters, appliances. no structural changes, no walls to be altered or removed. | $16,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 367 Church St | Built By Todd | bathroom remodel - replace tub, tile, sink & toilet - #6Details
bathroom remodel - replace tub, tile, sink & toilet - #6 | $7,000 |
| Dec 23, 2014 | Completed final sign-off May 2015 | 367 Church St | Built By Todd | unit #1: bathroom remodel, replace tub, tile, sink, add bath fan. no structural workDetails
unit #1: bathroom remodel, replace tub, tile, sink, add bath fan. no structural work | $10,000 |
| Feb 21, 2012 | Never finaled issued Feb 2012, no final | 367 Church St | A B C Window Contractors | #4 -install 4 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc 1026 for rescue. all windows will be double pane and have a u-factor of 0.30Details
#4 -install 4 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc 1026 for rescue. all windows will be double pane and have a u-factor of 0.30 | $1,740 |
| Feb 21, 2012 | Expired or cancelled expired Jan 2020 | 367 Church St | A B C Window Contractors | #6- install 5 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc 1026 for rescue. all windows will be double pane and have a u-factor of 0.30Details
#6- install 5 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc 1026 for rescue. all windows will be double pane and have a u-factor of 0.30 | $2,330 |
| Jan 24, 2012 | Never finaled issued Jan 2012, no final | 367 Church St | street space permitDetails
street space permit | ||
| Jun 1, 2011 | Never finaled issued Jun 2011, no final | 367 Church St | A B C Window Contractors | #3 & #5- install 12 andersen fibrex windows, window do face street, install 2 vinyl windows i n kind. 2 vinyl window do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue.Details
#3 & #5- install 12 andersen fibrex windows, window do face street, install 2 vinyl windows i n kind. 2 vinyl window do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue. | $9,280 |
| Jul 16, 2007 | Completed final sign-off Jul 2007 | 369 Church St | renew expired pa# 2006/05/18/1879. (replace kitchen cabinets at apt# 3.)Details
renew expired pa# 2006/05/18/1879. (replace kitchen cabinets at apt# 3.) | ||
| Oct 30, 2006 | Completed final sign-off Dec 2006 | 369 Church St | proposed repalce damage rear building foundation.Details
proposed repalce damage rear building foundation. | $6,000 | |
| Oct 30, 2006 | Completed final sign-off Nov 2006 | 369 Church St | New City Construction Group Inc | reroofingDetails
reroofing | $9,000 |
| May 18, 2006 | Expired or cancelled expired Jan 2020 | 369 Church St | replace kitchen cabinets only 4-6 in apt 3Details
replace kitchen cabinets only 4-6 in apt 3 | $5,000 | |
| Jan 31, 2006 | Completed final sign-off Mar 2006 | 371 Church St | change countertop kitchen, no new lights, replace shower tub, bathroom in unit no. 1Details
change countertop kitchen, no new lights, replace shower tub, bathroom in unit no. 1 | $2,500 | |
| Apr 20, 2005 | Completed final sign-off Jun 2005 | 367 Church St | apt 6- cabinet & counter top apt 2 changed cabinet and counter top. kitchen remodel. repair storageDetails
apt 6- cabinet & counter top apt 2 changed cabinet and counter top. kitchen remodel. repair storage | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A B C Window Contractors (3), Built By Todd (3), Continuum Construction (3), Hough Construction, New City Construction Group Inc
- Architects
- Dennis Gillespie, Nick Palter
- Engineers
- Dennis Gillespie, Joshua Marrow, Joyce Cheng
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.