Block 0918, lot 003D
2265 Beach St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 4
- Units
- 10
- Rooms
- 13 bedrooms, 14 bathrooms
- Building
- 9,385 sq ft
- Lot
- 4,687 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 27, 2019 | Completed final sign-off Apr 2020 | 2265 Beach St | Crime Watch Security Sys Llc | upgrade existing fire alarm system and to provide notification in new adu and sprinkler monitoring. reference pa# 2017-1129-5058 & #2018-1218-8583Details
upgrade existing fire alarm system and to provide notification in new adu and sprinkler monitoring. reference pa# 2017-1129-5058 & #2018-1218-8583 | $7,000 |
| Jul 29, 2019 | Never finaled issued Jul 2019, no final | 2265 Beach St | streetspaceDetails
streetspace | ||
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 2265 Beach St | street spaceDetails
street space | ||
| Dec 18, 2018 | Completed final sign-off Dec 2019 | 2265 Beach St | Fire Guard Protection Inc. | remove partially sprinklers first floor and install new throughout entire first floor. install double detector valve to (e) riser. install window heads near lobby escape per plans. ref 201711295058/s1 maher naDetails
remove partially sprinklers first floor and install new throughout entire first floor. install double detector valve to (e) riser. install window heads near lobby escape per plans. ref 201711295058/s1 maher na | $30,000 |
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 2265 Beach St | street spaceDetails
street space | ||
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 2265 Beach St | Mulhall Construction Inc. | revision to pa 2017-1129-5058 - add transparent wall panel @ light well. eliminate dropped landing @ entry to unit relocate washer & dryer to garageDetails
revision to pa 2017-1129-5058 - add transparent wall panel @ light well. eliminate dropped landing @ entry to unit relocate washer & dryer to garage | $2,000 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 2265 Beach St | street spaceDetails
street space | ||
| Nov 29, 2017 | Completed final sign-off Jun 2021 | 2265 Beach St | Mulhall Construction Inc. | remove boiler room at rear of building, add accessory dwelling unit at rear of garage per ordinance 162-16. soft story permit #2017-0426-4957 for reference.Details
remove boiler room at rear of building, add accessory dwelling unit at rear of garage per ordinance 162-16. soft story permit #2017-0426-4957 for reference. | $80,000 |
| Jul 27, 2017 | Never finaled issued Jul 2017, no final | 2265 Beach St | street spaceDetails
street space | ||
| Apr 26, 2017 | Completed final sign-off Dec 2019 | 2265 Beach St | Mulhall Construction Inc. | mandatory soft story retrofit per soft story mandate using fema p-807.Details
mandatory soft story retrofit per soft story mandate using fema p-807. | $50,000 |
| Jan 7, 2013 | Completed final sign-off Jun 2013 | 2265 Beach St | Wu's Construction | apt#9 remove old kitkchen cabinets & counter, install new cabinets & counterop upgrade electrical to code in kitchen only, change in wall plumbing frm meta to copper in this unit kitchen only.apt#3 change in wall plumbing from metal pipe to copper in this unit, only in kitchen ,move expose copperDetails
apt#9 remove old kitkchen cabinets & counter, install new cabinets & counterop upgrade electrical to code in kitchen only, change in wall plumbing frm meta to copper in this unit kitchen only.apt#3 change in wall plumbing from metal pipe to copper in this unit, only in kitchen ,move expose copper | $6,000 |
| Mar 6, 2012 | Never finaled issued Mar 2012, no final | 2265 Beach St | kitchen and bathroom remodeling at 2265 beach street apt #2,5, & 8 and bathroom reconfiguration on bathroom at apt #7. involves new millworks at kitchen. new tiles at bathroom.Details
kitchen and bathroom remodeling at 2265 beach street apt #2,5, & 8 and bathroom reconfiguration on bathroom at apt #7. involves new millworks at kitchen. new tiles at bathroom. | $24,000 | |
| Mar 6, 2012 | Never finaled issued Mar 2012, no final | 2265 Beach St | kitchen remodelling at apt #6, lighting shall comply w/ cec 150(k)8. new millworks, painting works, new power outlets, new tiles @ bathroom, new lavatory to replace (e) @ bathroom.Details
kitchen remodelling at apt #6, lighting shall comply w/ cec 150(k)8. new millworks, painting works, new power outlets, new tiles @ bathroom, new lavatory to replace (e) @ bathroom. | $18,000 | |
| Sep 16, 2002 | Never finaled issued Sep 2002, no final | 2265 Beach St | streetspaceDetails
streetspace | ||
| Apr 9, 2002 | Expired or cancelled expired Oct 2002 | 2265 Beach St | 21st Century Home Improvt | remove 11 double hung wooden windows in rear of home & replace w/ double hung pane vinylDetails
remove 11 double hung wooden windows in rear of home & replace w/ double hung pane vinyl | $6,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mulhall Construction Inc. (3), 21st Century Home Improvt, Crime Watch Security Sys Llc, Fire Guard Protection Inc., Wu's Construction
- Architects
- David Teeters (2)
- Engineers
- Nikica Favretto
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.