Harold Howell
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Mercury Engineering Group
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Apr 2026
764 permits since 2000 (engineer on 696 permits, architect on 63 permits, authorized agent-others on 4 permits, designer on 2 permits, attorney on 1 permit): 493 completed, 7 in progress, 46 never finaled, 218 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 764.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 2, 2026 | In progress filed Apr 2026, not yet issued | 214 Fair Oaks St | response to nov 202288003/noe 2022008488enf. permit to document as-built conditions. siding to be repalced in-kind at rear. legalize work undertakenn w/o permit to include 311.8 yd of excavation, construction of retaining wall along suth property line (see #201905029623).Details
response to nov 202288003/noe 2022008488enf. permit to document as-built conditions. siding to be repalced in-kind at rear. legalize work undertakenn w/o permit to include 311.8 yd of excavation, construction of retaining wall along suth property line (see #201905029623). | ||
| Jul 28, 2025 | Completed final sign-off Sep 2026 | 3000 16th St | Dajani Construction | remodeling vacant retail space into a coffee and juice shop. no structural work. no exterior work.Details
remodeling vacant retail space into a coffee and juice shop. no structural work. no exterior work. | $125,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 2020 Green St | C L & Y Construction Inc. | revision to pa# 202010066026: revise adu layout and exit; also to perform minor modification to exisisting ground floor patio and stairs in rear yard.Details
revision to pa# 202010066026: revise adu layout and exit; also to perform minor modification to exisisting ground floor patio and stairs in rear yard. | |
| Jun 20, 2025 | In progress issued Jul 2025 | 3665 Clay St | Northbay Home Construction Solutions Inc | 1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath.Details
1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath. | |
| Feb 26, 2025 | Expired or cancelled withdrawn Jul 2026 | 3900 03rd St | Singular Builders | residential- commencement of work not started under previously approved permit application number pa# 2019-0422-8620Details
residential- commencement of work not started under previously approved permit application number pa# 2019-0422-8620 | $45,000 |
| Feb 26, 2025 | Expired or cancelled withdrawn Jul 2026 | 3900 03rd St | Singular Builders | commercial - commencement of work not started under previously approved permit application number pa# 2019-0422-8642Details
commercial - commencement of work not started under previously approved permit application number pa# 2019-0422-8642 | $45,000 |
| Dec 27, 2024 | Expired or cancelled expired Sep 2026 | 15 Shields St | legalization of 149 sqft for unit a into habitable space. revision 202102094322Details
legalization of 149 sqft for unit a into habitable space. revision 202102094322 | $4,000 | |
| Dec 23, 2024 | Expired or cancelled expired Apr 2026 | 15 Shields St | Grey Lake Construction | revision to bpa# 202102094322: 1/f- (n) walk in shower. 2/f- (n) deck guardrail and stair handrails, removal of non-bearing wall between kitchen and dining. (n) rear yard siding, (n) windows and (n) french doors.Details
revision to bpa# 202102094322: 1/f- (n) walk in shower. 2/f- (n) deck guardrail and stair handrails, removal of non-bearing wall between kitchen and dining. (n) rear yard siding, (n) windows and (n) french doors. | |
| Dec 17, 2024 | In progress issued Sep 2025 | 3125 Steiner St | Jawa Builder | new interior remodel & rear room extension. new wall partitions in garage at street level.new extension off kitchen at 2nd level. wall and corridor to hall bath and primary bedroom reworked to create a refrigerator alcove and a more balanced approach to the primary bedroom and full bath.full bath reDetails
new interior remodel & rear room extension. new wall partitions in garage at street level.new extension off kitchen at 2nd level. wall and corridor to hall bath and primary bedroom reworked to create a refrigerator alcove and a more balanced approach to the primary bedroom and full bath.full bath re | $170,000 |
| Nov 22, 2024 | Completed final sign-off Apr 2026 | 1564 Lombard St | S L M Development Inc. | rev 202306210515- rear unit 1564c- change in entry layout. new concrete slab on gradeDetails
rev 202306210515- rear unit 1564c- change in entry layout. new concrete slab on grade | |
| Nov 22, 2024 | Completed final sign-off Apr 2026 | 1556 Lombard St | S L M Development Inc. | rev 202103086117- rear unit 1556b- change in entry layout. new concrete slabDetails
rev 202103086117- rear unit 1556b- change in entry layout. new concrete slab | $7,500 |
| Oct 24, 2024 | Completed final sign-off May 2025 | 1141 Church St | Sonoma Build Group Inc | rev 202212168560- correctly document (e) west corridor document no applicability of nfpa 13d sprinklers per info sheet 75-05 and fs-12Details
rev 202212168560- correctly document (e) west corridor document no applicability of nfpa 13d sprinklers per info sheet 75-05 and fs-12 | |
| Sep 17, 2024 | Expired or cancelled expired Apr 2026 | 3665 Clay St | revision to 2022009103826. 1st fl replace window wo1 to be non fire rated and operable. 2nd fl replace window wo2 to be non fire rated and operable. not visibleDetails
revision to 2022009103826. 1st fl replace window wo1 to be non fire rated and operable. 2nd fl replace window wo2 to be non fire rated and operable. not visible | ||
| Aug 9, 2024 | Completed final sign-off May 2025 | 104 Maynard St | E. Arias & Co | demo project that will require: removing 3 rooms in the back of the house, yard included, drywall, roofing wood framing, windows, doors, flooring, and any other material on these structures. (no concrete removal included)Details
demo project that will require: removing 3 rooms in the back of the house, yard included, drywall, roofing wood framing, windows, doors, flooring, and any other material on these structures. (no concrete removal included) | $5,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 908 Post St | 4-Mac Construction | unit 23: new bathroom in sleeping rm # 23. no kitchen to be addedDetails
unit 23: new bathroom in sleeping rm # 23. no kitchen to be added | $21,000 |
| Jun 27, 2024 | In progress issued Sep 2024 | 2415 03rd St | Dajani Construction | ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.Details
ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit. | $70,000 |
| Jun 3, 2024 | In progress issued Sep 2024 | 2415 03rd St | Dajani Construction | rev 202402025206- office ti for interiro revisions. minor changes to layout exterior window wall.Details
rev 202402025206- office ti for interiro revisions. minor changes to layout exterior window wall. | |
| May 30, 2024 | Expired or cancelled expired Sep 2025 | 15 Shields St | (n) bathroom on 2nd fl; reduction of closet sizeDetails
(n) bathroom on 2nd fl; reduction of closet size | $27,000 | |
| May 20, 2024 | Expired or cancelled expired Apr 2026 | 3665 Clay St | revision to pa# 2020-0910-3826; fill in lightwell at grid c, partial lightwell infill at bathroom 2 (grid a), reduce skylight, remove fireplace, reconfigure powder room plumbing, reconfigure bathroom and closet.Details
revision to pa# 2020-0910-3826; fill in lightwell at grid c, partial lightwell infill at bathroom 2 (grid a), reduce skylight, remove fireplace, reconfigure powder room plumbing, reconfigure bathroom and closet. | $30,000 | |
| Apr 9, 2024 | Expired or cancelled withdrawn Dec 2024 | 2495 03rd St | Dajani Construction | install nw window at front elevation - no interior changes.Details
install nw window at front elevation - no interior changes. | $18,000 |
| Mar 15, 2024 | Completed final sign-off Jul 2024 | 2565 03rd St | Dajani Construction | new dishline to existing manufacturing spaceDetails
new dishline to existing manufacturing space | $23,000 |
| Mar 14, 2024 | Completed final sign-off Apr 2025 | 1330 Greenwich St | Sonoma Build Group Inc | revision to bpa#202105110184. basement reduction of 8.3 c.y. of proposed excavation. 1st flr: (n) corridor for construction sequency only to elevatorDetails
revision to bpa#202105110184. basement reduction of 8.3 c.y. of proposed excavation. 1st flr: (n) corridor for construction sequency only to elevator | |
| Feb 26, 2024 | Completed final sign-off Dec 2024 | 3140 Lyon St | Sonoma Build Group Inc | adding shearwall on basement, remove (e) wall on second floor.Details
adding shearwall on basement, remove (e) wall on second floor. | $27,500 |
| Feb 26, 2024 | Expired or cancelled expired Apr 2026 | 534 Naples St | Jose Viera | voluntary foundation repairDetails
voluntary foundation repair | $43,000 |
| Feb 22, 2024 | Completed final sign-off Aug 2024 | 339 Bright St | new deck at rear of house. modify (e) deck to match plans and satisfy nov# 202312514. no habitable space on ground floor.Details
new deck at rear of house. modify (e) deck to match plans and satisfy nov# 202312514. no habitable space on ground floor. | $12,000 | |
| Feb 21, 2024 | Completed final sign-off Apr 2024 | 323 Monterey Bl | to document missing structural sheet s1 from approved and issued permit bpa# 202402055242.Details
to document missing structural sheet s1 from approved and issued permit bpa# 202402055242. | ||
| Feb 5, 2024 | Completed final sign-off Apr 2024 | 323 Monterey Bl | revision to 202203029047: alteration to rear patio & (n) steps. revise bath 3 & bedroom 4 layout on 1st/f. alter rear facade on 1/f & expansion of rear deck on 2nd/f. revise bath 1 & bedroom 1 layout on 3rd/fDetails
revision to 202203029047: alteration to rear patio & (n) steps. revise bath 3 & bedroom 4 layout on 1st/f. alter rear facade on 1/f & expansion of rear deck on 2nd/f. revise bath 1 & bedroom 1 layout on 3rd/f | $7,600 | |
| Feb 5, 2024 | Completed final sign-off Aug 2024 | 740 Shrader St | Sonoma Build Group Inc | voluntary structural upgrade: (e) damaged foundation to be replaced in-kind. new footing & piers (interior only)Details
voluntary structural upgrade: (e) damaged foundation to be replaced in-kind. new footing & piers (interior only) | $7,500 |
| Jan 30, 2024 | Completed final sign-off Aug 2024 | 1835 Wawona St | Sequoia Build Group Inc | existing foundation to be replaced in kind. replace current piers under (e) postsDetails
existing foundation to be replaced in kind. replace current piers under (e) posts | $5,123 |
| Oct 24, 2023 | Completed final sign-off Feb 2024 | 1320 Dolores St | Ignacio Camarillo Reyes | revision to pa# 202204111980. to reflect garage door will not be changed. revision to special inspections and s2.1.Details
revision to pa# 202204111980. to reflect garage door will not be changed. revision to special inspections and s2.1. | $100 |
| Oct 24, 2023 | Expired or cancelled expired Apr 2026 | 787 Broadway | Maven Maintenance Inc | change of use from bar to art exhibit / retail. new ada restroom. new chair liftDetails
change of use from bar to art exhibit / retail. new ada restroom. new chair lift | |
| Oct 24, 2023 | Expired or cancelled expired Apr 2026 | 799 Broadway | Maven Maintenance Inc | change of use from retail to art exhibit/ retail. update e bathroom to be ada compliant, n interior ada door & push button, n interior wallDetails
change of use from retail to art exhibit/ retail. update e bathroom to be ada compliant, n interior ada door & push button, n interior wall | |
| Oct 3, 2023 | Completed final sign-off Apr 2024 | 764 Chestnut St | Sonoma Build Group Inc | to comply with nov 202294463 move right door (764) r" to left front doorDetails
to comply with nov 202294463 move right door (764) r" to left front door | $2,750 |
| Sep 27, 2023 | Never finaled filed Sep 2023, never issued | 201 06th St | soft story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a4.Details
soft story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a4. | $186,172 | |
| Aug 24, 2023 | Completed final sign-off May 2024 | 1609 Castro St | new garage and drivewayDetails
new garage and driveway | $68,732 | |
| Aug 23, 2023 | Never finaled filed Aug 2023, never issued | 1009 Fell St | revision to pa#201702179707, minor revision to document existing structural conditions at foundation and first floor framing plans.Details
revision to pa#201702179707, minor revision to document existing structural conditions at foundation and first floor framing plans. | ||
| Aug 22, 2023 | Expired or cancelled expired Mar 2025 | 201 06th St | response to nov 202290808, to document upgade to sub sidewalk basement steel column and support beam and concrete arches above sidewalkDetails
response to nov 202290808, to document upgade to sub sidewalk basement steel column and support beam and concrete arches above sidewalk | $7,336 | |
| Aug 9, 2023 | Completed final sign-off May 2024 | 112 Woodland Av | Design Line Construction | replacement of damage operable skylight. scope to include additional roof framing.Details
replacement of damage operable skylight. scope to include additional roof framing. | $8,500 |
| Jul 21, 2023 | Completed final sign-off Feb 2024 | 1320 Dolores St | Ignacio Camarillo Reyes | revision to 202204111980 2nd fl infill of 3 windows and 1 window replacement in lightwell. not visable from street.Details
revision to 202204111980 2nd fl infill of 3 windows and 1 window replacement in lightwell. not visable from street. | $5,000 |
| Jun 23, 2023 | Completed final sign-off Jan 2025 | 2341 03rd St | modify existing retail space into barber shop. existing accessible restroom to remain. no extrerior work proposed. satisfy nov 202305053Details
modify existing retail space into barber shop. existing accessible restroom to remain. no extrerior work proposed. satisfy nov 202305053 | $45,000 | |
| Jun 22, 2023 | Completed final sign-off Apr 2024 | 323 Monterey Bl | rev to pa# 202203029047, addition of foundation plan separate to framing for clarity, strengthening detail for rear existing foundation.Details
rev to pa# 202203029047, addition of foundation plan separate to framing for clarity, strengthening detail for rear existing foundation. | ||
| Jun 21, 2023 | Completed final sign-off Apr 2026 | 1564 Lombard St | S L M Development Inc. | add 2 dwelling unit(adu) per local adu program. 1564b: 1-living room, 1-bedroom, 1 bathroom, 1-kitchen (691 sq ft) 1564c: 1-living room, 2-bedrooms, 1 bathroom, 1-kitchen (875 sq ft)Details
add 2 dwelling unit(adu) per local adu program. 1564b: 1-living room, 1-bedroom, 1 bathroom, 1-kitchen (691 sq ft) 1564c: 1-living room, 2-bedrooms, 1 bathroom, 1-kitchen (875 sq ft) | $60,000 |
| May 18, 2023 | Completed final sign-off Nov 2023 | 520 Vermont St | to comply with bid nov 202302647 dated 2/10/2023. voluntary foundation repair on back of building/deckDetails
to comply with bid nov 202302647 dated 2/10/2023. voluntary foundation repair on back of building/deck | $45,000 | |
| Apr 28, 2023 | Completed final sign-off Dec 2025 | 2174 20th Av | Zeus Construction Corp. | revision to pa 2017-0919-9022 remodel & legalize ground floor unit; remodel main floor unit; to comply with 201791662 & 201791661. add 2 bathrooms and 3 skylightsDetails
revision to pa 2017-0919-9022 remodel & legalize ground floor unit; remodel main floor unit; to comply with 201791662 & 201791661. add 2 bathrooms and 3 skylights | $170,000 |
| Apr 27, 2023 | Completed final sign-off Jul 2025 | 1018 Mission St | 4-Mac Construction | relocation of (e) managers unit @ 2nd flr, new bathrooms for rooms on 2-5 flrs, 4 new bathrooms w/grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 flrs, no change to (e) unit count. new ada push button at g/f, new reception counter.Details
relocation of (e) managers unit @ 2nd flr, new bathrooms for rooms on 2-5 flrs, 4 new bathrooms w/grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 flrs, no change to (e) unit count. new ada push button at g/f, new reception counter. | $1,660,000 |
| Apr 19, 2023 | Expired or cancelled expired Apr 2026 | 707 Huron Av | to comply with nov 202287220 remodeling an (e) kitchen and bathroom; no structural changes; new kitchen cabinetry and new bathroom fixtures; verify beam in living room between living room and dining;Details
to comply with nov 202287220 remodeling an (e) kitchen and bathroom; no structural changes; new kitchen cabinetry and new bathroom fixtures; verify beam in living room between living room and dining; | $15,000 | |
| Apr 11, 2023 | Completed final sign-off Jun 2023 | 2565 03rd St | Dajani Construction | ste #320 installation of self contained cooking units for the preparation of pet food. ada restroom upgrade. change of use from light manufacturing to light nanufacturing no overnight pet boarding.Details
ste #320 installation of self contained cooking units for the preparation of pet food. ada restroom upgrade. change of use from light manufacturing to light nanufacturing no overnight pet boarding. | $102,000 |
| Mar 24, 2023 | Expired or cancelled expired Apr 2026 | 955 Hyde St | units 2 & 6: remodel bathroom & kitchens. replace in-kind windows windows (non-street facing). no framing for windows.Details
units 2 & 6: remodel bathroom & kitchens. replace in-kind windows windows (non-street facing). no framing for windows. | $67,300 | |
| Mar 9, 2023 | Completed final sign-off Aug 2023 | 50 Burlwood Dr | Northbay Home Construction Solutions Inc | comply with nov 202301395. repair damage to front of building. update garage per code. plumbing and elec permits pulled separately to remove illegal toilet and shower stall and fix main lineDetails
comply with nov 202301395. repair damage to front of building. update garage per code. plumbing and elec permits pulled separately to remove illegal toilet and shower stall and fix main line | $21,332 |
| Jan 11, 2023 | Completed final sign-off Dec 2024 | 4661 18th St | Maven Maintenance Inc | remodel of unit 4661, 3rd fl - includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwel, same location. living room converted to new bedroom.Details
remodel of unit 4661, 3rd fl - includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwel, same location. living room converted to new bedroom. | $47,236 |
| Dec 30, 2022 | Completed final sign-off May 2024 | 1609 Castro St | A-1 Construction | 1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylightsDetails
1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylights | $130,000 |
| Dec 28, 2022 | Expired or cancelled expired Dec 2024 | 908 Post St | S F Garage Company Inc. | 3/f-unit 16: install (n) bathroom. there is no existing kitchen in room #16 and no kitchen to be added.Details
3/f-unit 16: install (n) bathroom. there is no existing kitchen in room #16 and no kitchen to be added. | $10,833 |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 707 Huron Av | 1) to legalize adu on ground level area and to satisfy nov#201408112 & nov202287220. adu ordinance 162-16.Details
1) to legalize adu on ground level area and to satisfy nov#201408112 & nov202287220. adu ordinance 162-16. | $45,000 | |
| Dec 28, 2022 | Expired or cancelled expired Dec 2024 | 1337 Greenwich St | S F Garage Company Inc. | revision to 202109148371. increase of ceiling height at 3rd fl kitchen and living roomDetails
revision to 202109148371. increase of ceiling height at 3rd fl kitchen and living room | $4,000 |
| Dec 28, 2022 | Completed final sign-off May 2023 | 2414 Union St | Trejo Construction | 2414 union: demolition of partition at (e) dining room. expasion of (e) water closet. remodel of (e) bathroom. 2416 union: expansion of (e) bathroom.Details
2414 union: demolition of partition at (e) dining room. expasion of (e) water closet. remodel of (e) bathroom. 2416 union: expansion of (e) bathroom. | $50,000 |
| Dec 23, 2022 | Completed final sign-off Dec 2025 | 1068 De Haro St | Northbay Home Construction Solutions Inc | renovation and completion of work begun by previous owner, ref bpa#201609077011 (no-plans). new foundation at rear of building. finish electrical to comply with nov 201405531. new bedroom, bath, and interior stair.Details
renovation and completion of work begun by previous owner, ref bpa#201609077011 (no-plans). new foundation at rear of building. finish electrical to comply with nov 201405531. new bedroom, bath, and interior stair. | $205,000 |
| Dec 16, 2022 | Completed final sign-off May 2025 | 1141 Church St | Sonoma Build Group Inc, S F Garage Company Inc. | comply with notice of enforcement complaint #2021-012809enf. legalization of unauthorized unit.Details
comply with notice of enforcement complaint #2021-012809enf. legalization of unauthorized unit. | $22,735 |
| Dec 8, 2022 | Expired or cancelled expired Dec 2024 | 1337 Greenwich St | S F Garage Company Inc. | (n) rear deck on 3rd fl. minor floor revisions 3rd fl only. ref pa# 202109148371.Details
(n) rear deck on 3rd fl. minor floor revisions 3rd fl only. ref pa# 202109148371. | $27,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2023 | 244 Hartford St | Sasso Construction Inc. | revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction.Details
revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction. | $7,522 |
| Nov 1, 2022 | Completed final sign-off Dec 2025 | 279 Randall St | De Brus Construction Inc, Sequoia Build Group Inc | (n) 735 sf garage in (e) sfd. (n) 246 sf office. modification of front planter for (n) driveway & garage door below front bayDetails
(n) 735 sf garage in (e) sfd. (n) 246 sf office. modification of front planter for (n) driveway & garage door below front bay | $67,332 |
| Oct 27, 2022 | Completed final sign-off Feb 2023 | 157 Julian Av | Best Level Construction Inc | unit 157-b: remodel, 3/f, removal of kitchen wall, new laundry at rearDetails
unit 157-b: remodel, 3/f, removal of kitchen wall, new laundry at rear | $33,338 |
| Oct 14, 2022 | Completed final sign-off Aug 2023 | 1337 Greenwich St | S F Garage Company Inc. | replacement and widening of garage doorDetails
replacement and widening of garage door | $12,325 |
| Sep 23, 2022 | Expired or cancelled expired Mar 2025 | 26 Parnassus Av | S F Garage Company Inc. | permit to document deviation from approved pa 201506128846 and 201606240877 and comply with nov 202294054. legalization of 10' wide garage door, 25% driveway slope, 2 corbels beneath front bay. new metal guard rails at front tradesman stairs. keep skylight previously appproved to remove.Details
permit to document deviation from approved pa 201506128846 and 201606240877 and comply with nov 202294054. legalization of 10' wide garage door, 25% driveway slope, 2 corbels beneath front bay. new metal guard rails at front tradesman stairs. keep skylight previously appproved to remove. | $53,229 |
| Sep 21, 2022 | Completed final sign-off Jan 2026 | 2955 Sacramento St | Sonoma Build Group Inc | renovation and addition of 2 stories to (e) single family residence. addition of (n) 552 sqft studio unit garage floor. proposed unit is by zoning right.Details
renovation and addition of 2 stories to (e) single family residence. addition of (n) 552 sqft studio unit garage floor. proposed unit is by zoning right. | $820,000 |
| Sep 7, 2022 | Completed final sign-off Jan 2023 | 2240 Judah St | Harty Development | unit 2240: remodel 2/f, new bathroom; remove fireplace, (e)non load bearing walls btwn living rm/kitchen, new 3rd bedroom; unit 2242: remodel 3/f, new bathroom, remove fireplace & non load bearing walls btwn living rm/kitchen, new 3rd bedroom, new recessed front entry door; remove facade entry gate;Details
unit 2240: remodel 2/f, new bathroom; remove fireplace, (e)non load bearing walls btwn living rm/kitchen, new 3rd bedroom; unit 2242: remodel 3/f, new bathroom, remove fireplace & non load bearing walls btwn living rm/kitchen, new 3rd bedroom, new recessed front entry door; remove facade entry gate; | $83,424 |
| Aug 31, 2022 | Completed final sign-off Jun 2023 | 650 De Haro St | S F Garage Company Inc. | exterior reconfigurate of front facade. ref pa 202202178195.Details
exterior reconfigurate of front facade. ref pa 202202178195. | $37,323 |
| Aug 11, 2022 | Expired or cancelled withdrawn Mar 2025 | 122 Hancock St | reconstruction of non-conforming rear deck and stairs. new 1 window in rear same size and location. max u-factor 0.30 or better.Details
reconstruction of non-conforming rear deck and stairs. new 1 window in rear same size and location. max u-factor 0.30 or better. | $20,000 | |
| Aug 10, 2022 | Expired or cancelled expired Dec 2024 | 908 Post St | S F Garage Company Inc. | install (n) bathroom for 24 on 4th floor. there is no existing kitchen in room #24 and no kitchen to be added.Details
install (n) bathroom for 24 on 4th floor. there is no existing kitchen in room #24 and no kitchen to be added. | $7,500 |
| Aug 4, 2022 | Expired or cancelled expired Feb 2025 | 665 22nd St | Dajani Construction | install a new accessible restroom in a vacant spaceDetails
install a new accessible restroom in a vacant space | $25,000 |
| Aug 3, 2022 | Completed final sign-off Nov 2023 | 650 De Haro St | S F Garage Company Inc. | front building rear yard landscaping (n) 8' x 8' spa. electrical and plumbing permit under separate permit. no additional plumbing fixturesDetails
front building rear yard landscaping (n) 8' x 8' spa. electrical and plumbing permit under separate permit. no additional plumbing fixtures | $22,398 |
| Jul 29, 2022 | Completed final sign-off Oct 2023 | 629 Clayton St | (n) skylight and to comply w/bid nov# 202184063 dated 5/20/22, removal of unit in attic to non-habitable space. (revert top floor to storage -remove bathroom)Details
(n) skylight and to comply w/bid nov# 202184063 dated 5/20/22, removal of unit in attic to non-habitable space. (revert top floor to storage -remove bathroom) | $58,738 | |
| Jul 22, 2022 | Completed final sign-off Feb 2023 | 155 Julian Av | Best Level Construction Inc | unit 155b: remodel 3/f, remove kitchen walls, remodel kitchen, new laundry @ rearDetails
unit 155b: remodel 3/f, remove kitchen walls, remodel kitchen, new laundry @ rear | $33,338 |
| Jul 6, 2022 | Expired or cancelled cancelled Jan 2026 | 1337 Greenwich St | rev to pa202109148371. reduction of deck size / relocation of stairs.Details
rev to pa202109148371. reduction of deck size / relocation of stairs. | ||
| Jun 28, 2022 | Completed final sign-off Dec 2022 | 601 22nd St | Dajani Construction | modify an existing manufacturing space into a limited restaurant/ to go kitchen. no publuc access to space.Details
modify an existing manufacturing space into a limited restaurant/ to go kitchen. no publuc access to space. | $125,000 |
| Jun 17, 2022 | Never finaled filed Jun 2022, never issued | 168 Seville St | rebuild roof deck at rear. remocel 3rd fl (e) bathroom.Details
rebuild roof deck at rear. remocel 3rd fl (e) bathroom. | $17,834 | |
| Jun 16, 2022 | Completed final sign-off Feb 2023 | 19 Roscoe St | S F Garage Company Inc. | voluntary structural upgrade in garage.Details
voluntary structural upgrade in garage. | $32,000 |
| Jun 9, 2022 | Completed final sign-off Mar 2023 | 15 Noe St | Sincere Construction Company Inc | soft story upgrade per chapter 4d. design criteria from cebs appendix chapter a4.Details
soft story upgrade per chapter 4d. design criteria from cebs appendix chapter a4. | $77,000 |
| Jun 6, 2022 | Completed final sign-off Jun 2022 | 249 14th Av | S F Garage Company Inc. | to comply w/correction notice facade revision ref pa 2020-1014-6520Details
to comply w/correction notice facade revision ref pa 2020-1014-6520 | $8,000 |
| May 12, 2022 | Completed final sign-off Dec 2025 | 4043 Alemany Bl | Alegria Remodel & Construction Incorpora, Elito T Abalanzar | convert existing garage and portion of living space into new adu unit at the first floor per the state adu program. install new kitchen, install new separate entry door for downstairs adu. upgrade / remodel (e) downstairs bathroom, install tankless water heaters & install clothes washer & dryer.Details
convert existing garage and portion of living space into new adu unit at the first floor per the state adu program. install new kitchen, install new separate entry door for downstairs adu. upgrade / remodel (e) downstairs bathroom, install tankless water heaters & install clothes washer & dryer. | $85,000 |
| May 9, 2022 | Completed final sign-off Nov 2023 | 4663 18th St | Maven Maintenance Inc | remodel unit #4663 on 3rd fl. includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwell.Details
remodel unit #4663 on 3rd fl. includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwell. | $40,000 |
| Apr 28, 2022 | Expired or cancelled expired Mar 2025 | 1018 Mission St | 4-Mac Construction | to comply w/ nov# 20203312: replace (4) fire escape windows with double hung windows (2-5th fl). windows in showers opposite 401 abd 201 to be infilled on separate permit. #4 grab bars to be replaced on seprate permit. street facing wood windows on 2nd floor to be replaced. #5 handrails to be fixedDetails
to comply w/ nov# 20203312: replace (4) fire escape windows with double hung windows (2-5th fl). windows in showers opposite 401 abd 201 to be infilled on separate permit. #4 grab bars to be replaced on seprate permit. street facing wood windows on 2nd floor to be replaced. #5 handrails to be fixed | $30,000 |
| Apr 28, 2022 | Expired or cancelled suspend Sep 2025 | 1403 San Bruno Av | soft story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a-4Details
soft story upgrade per sfebc chapter 4d. design criteria from cebc appendix chapter a-4 | $37,000 | |
| Apr 27, 2022 | Completed final sign-off Dec 2022 | 3136 Steiner St | S F Garage Company Inc. | revision to pa# 202203220539. structural upgrade. infill of north lightwell at 1st level.Details
revision to pa# 202203220539. structural upgrade. infill of north lightwell at 1st level. | $15,500 |
| Apr 26, 2022 | Expired or cancelled expired Sep 2025 | 1229 Underwood Av | demolish a 2-story type-vb commercial building.Details
demolish a 2-story type-vb commercial building. | $20,000 | |
| Apr 26, 2022 | Completed final sign-off Aug 2024 | 1316 Dolores St | S L M Development Inc. | new garage door. replace (e) driveway. (n) metal guardrail at (n) driveway.Details
new garage door. replace (e) driveway. (n) metal guardrail at (n) driveway. | $17,486 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 479 Ellis St | S F Garage Company Inc. | revision to bpa 201812249080. basement: minor flr plan revisions. reconfigure proposed elevator, removal of proposed bar, proposed walls, storage room, fire door at stairway behind kitchen. reconfigure of toter storage, replace proposed patio door with windows, removal of office door, new wall/door.Details
revision to bpa 201812249080. basement: minor flr plan revisions. reconfigure proposed elevator, removal of proposed bar, proposed walls, storage room, fire door at stairway behind kitchen. reconfigure of toter storage, replace proposed patio door with windows, removal of office door, new wall/door. | $20,000 |
| Apr 14, 2022 | Completed final sign-off May 2023 | 524 Oak St | S F Garage Company Inc. | (n) floor plan for all 3 floors. 1st fl: (n) bedroom, windows at front for bedroom egress. excavate portion of front for (n) windows, kitchen, office, laundry. (n) door. remove encloser. 2nd fl: remodel kitchen. relocate laundry. (n) window. 3rd fl: remove int stairs, remodel bath. (n) window.Details
(n) floor plan for all 3 floors. 1st fl: (n) bedroom, windows at front for bedroom egress. excavate portion of front for (n) windows, kitchen, office, laundry. (n) door. remove encloser. 2nd fl: remodel kitchen. relocate laundry. (n) window. 3rd fl: remove int stairs, remodel bath. (n) window. | $75,000 |
| Apr 11, 2022 | Completed final sign-off Feb 2024 | 1320 Dolores St | Ignacio Camarillo Reyes | new garage door. removal of general storage on 1/f. remodel unit #1320 on 2/f.Details
new garage door. removal of general storage on 1/f. remodel unit #1320 on 2/f. | $52,000 |
| Apr 1, 2022 | Expired or cancelled withdrawn Jun 2022 | 601 22nd St | Dajani Construction | modifying an existing manufactoring space into a food production facility with walk up window.Details
modifying an existing manufactoring space into a food production facility with walk up window. | $125,000 |
| Mar 23, 2022 | Completed final sign-off May 2022 | 2799 Sacramento St | S F Garage Company Inc. | to comply with nov# 201881471. to reflect as built conditions. the project proposes to legitimize the addition of 4 new off street parking spaces - originally approved was 4 - 8 total - 9 permitted as of right.Details
to comply with nov# 201881471. to reflect as built conditions. the project proposes to legitimize the addition of 4 new off street parking spaces - originally approved was 4 - 8 total - 9 permitted as of right. | |
| Mar 22, 2022 | Completed final sign-off Dec 2022 | 3136 Steiner St | voluntary structural upgrade.Details
voluntary structural upgrade. | $28,000 | |
| Mar 18, 2022 | Completed final sign-off Nov 2023 | 15 Noe St | Hong Wei Construction Inc | legalization of unit 15c on 1st flr. unit is 553 sq ft w/ 1 bathrm and a kitchenDetails
legalization of unit 15c on 1st flr. unit is 553 sq ft w/ 1 bathrm and a kitchen | $22,000 |
| Mar 9, 2022 | Expired or cancelled expired Jan 2024 | 1336 Green St | S F Garage Company Inc. | unit 6: to comply with nov#202286619. revision to roof deck per bpa#201912240530. remove 437 sq ft ipe and replace with non combustible tile on bison system.Details
unit 6: to comply with nov#202286619. revision to roof deck per bpa#201912240530. remove 437 sq ft ipe and replace with non combustible tile on bison system. | $8,000 |
| Mar 9, 2022 | Completed final sign-off Jun 2022 | 479 Ellis St | S F Garage Company Inc. | minor revisions on all floors to pa 2018-1224-9080 - basement - bar removed (center expansion of elevator shaft wall addition of 2 layers drywall/gypboard; office reconfigured; reconfigured kitchen; 1st floor - 2 shaft relocated for future tenants; does not go to roof.Details
minor revisions on all floors to pa 2018-1224-9080 - basement - bar removed (center expansion of elevator shaft wall addition of 2 layers drywall/gypboard; office reconfigured; reconfigured kitchen; 1st floor - 2 shaft relocated for future tenants; does not go to roof. | $14,000 |
| Mar 2, 2022 | Completed final sign-off Apr 2024 | 323 Monterey Bl | remodel on all levels of building. no excavation of basement. replace (e) facade windows and entry door in kind. removal of (e) front metal door. new deck at rear. remove false ceiling at 3/f to expose pitched ceiling. remove all laith and plaster and install 5/8 sheetrock in k & b.Details
remodel on all levels of building. no excavation of basement. replace (e) facade windows and entry door in kind. removal of (e) front metal door. new deck at rear. remove false ceiling at 3/f to expose pitched ceiling. remove all laith and plaster and install 5/8 sheetrock in k & b. | $75,000 | |
| Mar 2, 2022 | Completed final sign-off Nov 2022 | 3355 21st St | Maven Maintenance Inc | repair and replace front stairs. repair and replace common stairs in front of bldg.Details
repair and replace front stairs. repair and replace common stairs in front of bldg. | $7,500 |
| Feb 17, 2022 | Completed final sign-off Jun 2023 | 650 De Haro St | S F Garage Company Inc. | (n) roof deck for front building. 488 sf.Details
(n) roof deck for front building. 488 sf. | $5,000 |
| Feb 4, 2022 | Completed final sign-off Aug 2022 | 563 Belvedere St | S F Garage Company Inc. | voluntary structural upgrade of garageDetails
voluntary structural upgrade of garage | $42,000 |
| Feb 3, 2022 | Completed final sign-off Mar 2022 | 614 Elizabeth St | to comply with nov# 202286137. repair front stairs in kind. replace latice at sides with solid wood enclosure and door.Details
to comply with nov# 202286137. repair front stairs in kind. replace latice at sides with solid wood enclosure and door. | $7,500 | |
| Jan 26, 2022 | Completed final sign-off Feb 2023 | 264 Gold Mine Dr | S F Garage Company Inc. | revision to bpa#202012211452 minor floor revisions basement-(n) bathroom / 1st fl: remodel(e)bathroom, (n) laundry closet. 2nd fl: kitchen remodel, remodel master bathroom & closet, relocate common bathroom (n) skylights/facade: replace facade window in kind. (n) garage door,(n) stucco facade.Details
revision to bpa#202012211452 minor floor revisions basement-(n) bathroom / 1st fl: remodel(e)bathroom, (n) laundry closet. 2nd fl: kitchen remodel, remodel master bathroom & closet, relocate common bathroom (n) skylights/facade: replace facade window in kind. (n) garage door,(n) stucco facade. | $30,000 |