E. Arias & Co
- Based in
- So San Francisco
- On San Francisco permits
- Mar 2001 to Jul 2026
- Last 24 months
- 19 permits filed
23 permits since 2000: 16 completed, 6 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | Completed final sign-off Jul 2026 | 271 Minerva St | replace (e) garage door and install new electric garage door, in kind in existing opening. no structural modification. existing permit # 202003126918.Details
replace (e) garage door and install new electric garage door, in kind in existing opening. no structural modification. existing permit # 202003126918. | $2,000 |
| Mar 6, 2026 | Completed final sign-off Mar 2026 | 235 Richland Av | re-roofing. no hotworks. ref#: 202602256535.Details
re-roofing. no hotworks. ref#: 202602256535. | $30,000 |
| Feb 25, 2026 | Completed final sign-off Mar 2026 | 235 Richland Av | remove deteriorating roof sheathing and replace with new (in-kind).Details
remove deteriorating roof sheathing and replace with new (in-kind). | $12,000 |
| Feb 5, 2026 | Completed final sign-off Jul 2026 | 271 Minerva St | replace (e) exterior stucco at the front of the house in kind. replace & remove 2 (e) front windows with new vinyl windos in kind. same size & same (e) opening.Details
replace (e) exterior stucco at the front of the house in kind. replace & remove 2 (e) front windows with new vinyl windos in kind. same size & same (e) opening. | $6,000 |
| Feb 3, 2026 | Completed final sign-off Mar 2026 | 141 Webster St | re-roofing (no hotworks) ref pa# 202512121726 for roof repairDetails
re-roofing (no hotworks) ref pa# 202512121726 for roof repair | $10,000 |
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 141 Webster St | remove and dispose of existing roof materials in the existing roof area - replace damaged dryrot, plywood sheathing, install new shingles at roof. in kind repair (roof repair) ref pa# 202602035154 for re-roofing permitDetails
remove and dispose of existing roof materials in the existing roof area - replace damaged dryrot, plywood sheathing, install new shingles at roof. in kind repair (roof repair) ref pa# 202602035154 for re-roofing permit | $17,000 |
| Oct 24, 2025 | In progress issued Oct 2025 | 141 Webster St | in rear, replace approx 600 sq ft oof wood siding in kind. in rear replace 4 windows in kind in existing openings. at side, replace 1 window in kind in existing opening. at front, replace 3 windows in kind in existing openings.Details
in rear, replace approx 600 sq ft oof wood siding in kind. in rear replace 4 windows in kind in existing openings. at side, replace 1 window in kind in existing opening. at front, replace 3 windows in kind in existing openings. | $15,000 |
| Sep 11, 2025 | Completed final sign-off Oct 2025 | 1536 Palou Av | remove unpermitted deck and build a new deck and stairs, same dimensions per section 188.1 planning codeDetails
remove unpermitted deck and build a new deck and stairs, same dimensions per section 188.1 planning code | $23,000 |
| Jul 22, 2025 | In progress issued Nov 2025 | 24 Cortland Av | new 388 sqft; rear room addition. new electrical and plumbing for washer and dryer. 1/2 bathroom and rear stair access to yard.Details
new 388 sqft; rear room addition. new electrical and plumbing for washer and dryer. 1/2 bathroom and rear stair access to yard. | $88,000 |
| Jun 16, 2025 | In progress issued Sep 2025 | 2215 27th Av | to comply with nov 202533169. remodel (e) kitchen and (e) bathroom on 2/f. add a new bathroom on 2/f. add 2 new skylights in new kitchen area.Details
to comply with nov 202533169. remodel (e) kitchen and (e) bathroom on 2/f. add a new bathroom on 2/f. add 2 new skylights in new kitchen area. | $50,000 |
| May 12, 2025 | Completed final sign-off Jul 2025 | 422 London St | legalize "as built" kitchenette and 2 bathrooms on ground floor.Details
legalize "as built" kitchenette and 2 bathrooms on ground floor. | $20,000 |
| Apr 17, 2025 | Completed final sign-off Jun 2025 | 1501 Lincoln Wy | apt 302: revision to pa #202504023558 for added work: removal of loose & damaged concrete around interior window. trim- cleaning/prepping the perimeter; no change to the window opening size/ str. framing. install more cabinets & update flr in kitchen. install sliding window with transome on top.Details
apt 302: revision to pa #202504023558 for added work: removal of loose & damaged concrete around interior window. trim- cleaning/prepping the perimeter; no change to the window opening size/ str. framing. install more cabinets & update flr in kitchen. install sliding window with transome on top. | $5,000 |
| Apr 9, 2025 | Completed final sign-off Aug 2025 | 104 Maynard St | correction to permit pa #202410173142 to install ship-lap siding and to remove stucco finishes at 1st level only, no structural work.Details
correction to permit pa #202410173142 to install ship-lap siding and to remove stucco finishes at 1st level only, no structural work. | $7,000 |
| Apr 2, 2025 | Completed final sign-off Jun 2025 | 1501 Lincoln Wy | unit #302 remove and replace 5 windows. in kind. install new kitchen cabinets. install new kitchen sink in existing location. install 4 outletsDetails
unit #302 remove and replace 5 windows. in kind. install new kitchen cabinets. install new kitchen sink in existing location. install 4 outlets | $8,000 |
| Jan 21, 2025 | Completed final sign-off Jun 2026 | 1743 Larkin St | at 3/f: top unit remodel/relocate (e) kitchen and bathroom. remodel (e) kitchen to home office, add master bath to (e) bedroom, new furnace and w/h. new laundry.Details
at 3/f: top unit remodel/relocate (e) kitchen and bathroom. remodel (e) kitchen to home office, add master bath to (e) bedroom, new furnace and w/h. new laundry. | $89,000 |
| Jan 3, 2025 | In progress issued Jan 2025 | 523 Broadway | administrative permit to correct 202310249342: change occupancy group from a-3 to a-2 on plans only. correct error on plans only.Details
administrative permit to correct 202310249342: change occupancy group from a-3 to a-2 on plans only. correct error on plans only. | |
| Oct 17, 2024 | Completed final sign-off Aug 2025 | 104 Maynard St | stucco repairs less than 50% of the surface area in front of the house, the areas affected includes both sides of the garage door and a portion of the top. the repairs will be focus in specific sections of the stucco ensuring a precise and seamless restoration. not the same as bpa 202410152980.Details
stucco repairs less than 50% of the surface area in front of the house, the areas affected includes both sides of the garage door and a portion of the top. the repairs will be focus in specific sections of the stucco ensuring a precise and seamless restoration. not the same as bpa 202410152980. | $2,000 |
| Oct 15, 2024 | Expired or cancelled withdrawn Jun 2025 | 104 Maynard St | siding repair, repair existing plywood, sheeting as needed, install 2 new windows , one sliding door, cover the existing opening to the existing structure install new james hardie siding with trims. like for like non frontt facingDetails
siding repair, repair existing plywood, sheeting as needed, install 2 new windows , one sliding door, cover the existing opening to the existing structure install new james hardie siding with trims. like for like non frontt facing | $3,500 |
| Oct 15, 2024 | Completed final sign-off May 2025 | 104 Maynard St | front balcony repairs there are some boards the there are some boards that will be needing replacement approx 6-2'x10ft', some flushing around the area that shows like for like not more than 50% of balcony deck. repair in kind less than 50%. replace decking flow and new 2 x 12Details
front balcony repairs there are some boards the there are some boards that will be needing replacement approx 6-2'x10ft', some flushing around the area that shows like for like not more than 50% of balcony deck. repair in kind less than 50%. replace decking flow and new 2 x 12 | $2,000 |
| Aug 9, 2024 | Completed final sign-off May 2025 | 104 Maynard St | demo project that will require: removing 3 rooms in the back of the house, yard included, drywall, roofing wood framing, windows, doors, flooring, and any other material on these structures. (no concrete removal included)Details
demo project that will require: removing 3 rooms in the back of the house, yard included, drywall, roofing wood framing, windows, doors, flooring, and any other material on these structures. (no concrete removal included) | $5,000 |
| Oct 24, 2023 | In progress issued Oct 2024 | 523 Broadway | ti of exist. restaurant. new equipment under (e) hood, new bar service. adding night time entertianment.Details
ti of exist. restaurant. new equipment under (e) hood, new bar service. adding night time entertianment. | $60,000 |
| Mar 12, 2020 | In progress issued Nov 2023 | 271 Minerva St | horizontal addition to current levels: add a bedroom, bathroom and wet bar at level 1, enlarge kitchen and living/dining, relocate 2 bedrooms into 1 bedroom with new bath and 1 office, reloc bath all at level 2. 2 new decks at rear.Details
horizontal addition to current levels: add a bedroom, bathroom and wet bar at level 1, enlarge kitchen and living/dining, relocate 2 bedrooms into 1 bedroom with new bath and 1 office, reloc bath all at level 2. 2 new decks at rear. | $13,000 |
| Mar 16, 2001 | Completed final sign-off Jun 2001 | 173 Lower Tr | install new bath & new gfi & showers install 1 new wetbarDetails
install new bath & new gfi & showers install 1 new wetbar | $6,000 |