Block 4031, lot 028
650 De Haro St
- City’s use
- Multi-Family Residential
- Built
- 1920
- Stories
- 3
- Units
- 3
- Rooms
- 6 bedrooms, 7 bathrooms
- Building
- 5,454 sq ft
- Lot
- 3,354 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 13, 2024 | Completed final sign-off Mar 2025 | 650 De Haro St | Forma Construction | remodel e primary bath. move toilet and add toielet enclosure. replace vanity and countertop. add electric heat mat and replace floor tile and wall tile in shower area. add leds to shower area. kitchen remodel cabinets and countertops in kind. (front bldg)Details
remodel e primary bath. move toilet and add toielet enclosure. replace vanity and countertop. add electric heat mat and replace floor tile and wall tile in shower area. add leds to shower area. kitchen remodel cabinets and countertops in kind. (front bldg) | $70,000 |
| Aug 31, 2022 | Completed final sign-off Jun 2023 | 650 De Haro St | S F Garage Company Inc. | exterior reconfigurate of front facade. ref pa 202202178195.Details
exterior reconfigurate of front facade. ref pa 202202178195. | $37,323 |
| Aug 3, 2022 | Completed final sign-off Nov 2023 | 650 De Haro St | S F Garage Company Inc. | front building rear yard landscaping (n) 8' x 8' spa. electrical and plumbing permit under separate permit. no additional plumbing fixturesDetails
front building rear yard landscaping (n) 8' x 8' spa. electrical and plumbing permit under separate permit. no additional plumbing fixtures | $22,398 |
| Feb 17, 2022 | Completed final sign-off Jun 2023 | 650 De Haro St | S F Garage Company Inc. | (n) roof deck for front building. 488 sf.Details
(n) roof deck for front building. 488 sf. | $5,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 650 De Haro St | Ramos General Construction Inc., Gartan Construction | replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric).Details
replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric). | $50,000 |
| Sep 19, 2019 | Completed final sign-off May 2021 | 650 De Haro St | S F Garage Company Inc. | to obtain a final inspection for work approved under previous permit under pa#201607202830. all work is complete.Details
to obtain a final inspection for work approved under previous permit under pa#201607202830. all work is complete. | |
| Sep 18, 2019 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc. | recommencement and completion of work approved under pa #201612013955, 201111213278, 201607202832.Details
recommencement and completion of work approved under pa #201612013955, 201111213278, 201607202832. | $75,000 |
| Jan 5, 2018 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | legalize (e) 400 sf dwelling unit at 650a de haro st(rear building, lower unit) per ordinance 43-14. provide 20% lanscaping area at front setback, provide 62.5% pearmeable area at front setback, provide 1 (n) 24"box tree within public right of way, provide (n)bicycle parkingDetails
legalize (e) 400 sf dwelling unit at 650a de haro st(rear building, lower unit) per ordinance 43-14. provide 20% lanscaping area at front setback, provide 62.5% pearmeable area at front setback, provide 1 (n) 24"box tree within public right of way, provide (n)bicycle parking | $10,000 |
| May 8, 2017 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | rear bldg. to comply with nov #201653731 (ces). reconfigure front facade. interior remodel. legalize (e) dwelling unit 650b at rear bldg under separate permit 201801057944.Details
rear bldg. to comply with nov #201653731 (ces). reconfigure front facade. interior remodel. legalize (e) dwelling unit 650b at rear bldg under separate permit 201801057944. | $200,000 |
| May 8, 2017 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | front bldg. comply with nov #201653731. new facades , add two floors to frong bldg (650), interior remodel. new elevator front bldg (separate permit).Details
front bldg. comply with nov #201653731. new facades , add two floors to frong bldg (650), interior remodel. new elevator front bldg (separate permit). | $200,000 |
| Dec 1, 2016 | Completed final sign-off May 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | rear bldg -revision to pa #201607202832, property line retaining walls not included in previous permit to be replaced in kind.Details
rear bldg -revision to pa #201607202832, property line retaining walls not included in previous permit to be replaced in kind. | $25,000 |
| Nov 21, 2016 | Completed final sign-off May 2021 | 650 De Haro St | S F Garage Company Inc. | shoring design for bpa 2016-0720-2832Details
shoring design for bpa 2016-0720-2832 | $15,000 |
| Oct 18, 2016 | Never finaled issued Oct 2016, no final | 650 De Haro St | street spaceDetails
street space | ||
| Oct 5, 2016 | Completed final sign-off May 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | front bldg - revision to pa #201607202830: replace walls & stairs in kind.Details
front bldg - revision to pa #201607202830: replace walls & stairs in kind. | |
| Oct 5, 2016 | Completed final sign-off May 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | rear bldg - revision to pa #201607202832: replace stairs in kind not visible from street.Details
rear bldg - revision to pa #201607202832: replace stairs in kind not visible from street. | |
| Jul 20, 2016 | Completed final sign-off May 2021 | 650 De Haro St | Dawson - Clinton Gen Contr Corp | (front bldg)replace foundation in-kind.Details
(front bldg)replace foundation in-kind. | $30,000 |
| Jul 20, 2016 | Completed final sign-off May 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | (rear bldg) replace foundation in-kind.Details
(rear bldg) replace foundation in-kind. | $30,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x.Details
front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x. | $20,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | rear bld: revision to ref pa 201601217654: per inspectors comments: for increased scope of work. replace "all" interior finishes throughout. no changes to, addition of, or removal of walls. all new drywall to be 5/8" type x. no additional fixtures.Details
rear bld: revision to ref pa 201601217654: per inspectors comments: for increased scope of work. replace "all" interior finishes throughout. no changes to, addition of, or removal of walls. all new drywall to be 5/8" type x. no additional fixtures. | $15,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150kDetails
rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150k | $35,000 |