A-1 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Dec 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2022 | Completed final sign-off May 2024 | 1609 Castro St | 1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylightsDetails
1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylights | $130,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2021 | 602 Mississippi St | excavate down to new patio & basement level from extg back yard & basement level sequentially using hand dug pits as per the demolition & sequencing plan. form new patio & basement level walls & foundation which are to extend up to extg basement level walls. ref app#201907236623Details
excavate down to new patio & basement level from extg back yard & basement level sequentially using hand dug pits as per the demolition & sequencing plan. form new patio & basement level walls & foundation which are to extend up to extg basement level walls. ref app#201907236623 | $50,000 |
| Jul 23, 2019 | Completed final sign-off Feb 2021 | 602 Mississippi St | remodel units 602, 604. new roof deck at 3rd flr unit 604, new dormers and skylight. removal of rear stairs to unit 604. excavation of basement for new 8' ceiling ht & expansion of unit 602. excavation for new basement level patiosDetails
remodel units 602, 604. new roof deck at 3rd flr unit 604, new dormers and skylight. removal of rear stairs to unit 604. excavation of basement for new 8' ceiling ht & expansion of unit 602. excavation for new basement level patios | $20,000 |
| Jul 1, 2019 | Completed final sign-off Feb 2021 | 602 Mississippi St | remodel both kitchens and bathrooms. remove all lathe and plaster throughout. install 5/8 type x sheetrock throughout. 1 kitchen & 1 bath in each unitDetails
remodel both kitchens and bathrooms. remove all lathe and plaster throughout. install 5/8 type x sheetrock throughout. 1 kitchen & 1 bath in each unit | $50,000 |
| Feb 22, 2018 | Never finaled issued Mar 2018, no final | 1041 Florida St | remodel of 2nd floor infill 1st floor to envelope of 2nd flr. conversion of (e) storage on 1st flr. to habitable space.Details
remodel of 2nd floor infill 1st floor to envelope of 2nd flr. conversion of (e) storage on 1st flr. to habitable space. | $50,000 |
| Sep 12, 2017 | Completed final sign-off Mar 2022 | 424 Cole St | soft story upgrade per sfebc chapter 4d design criteria 2016 cebc appendix a-4.Details
soft story upgrade per sfebc chapter 4d design criteria 2016 cebc appendix a-4. | $40,000 |
| Apr 1, 2016 | Completed final sign-off Jan 2017 | 871 Dolores St | replace section of foundation in rear yard at south and east property lineDetails
replace section of foundation in rear yard at south and east property line | $8,000 |
| Apr 1, 2016 | Completed final sign-off Sep 2016 | 865 Dolores St | replace section of property line foundation in rear yard at south property line.Details
replace section of property line foundation in rear yard at south property line. | $8,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2019 | 1359 Minna St | remodel 3 units building with horizontal addition @ rear for basement level & 1st 2 stories. (e) 3 units will be 2 bedroo with 1 remodel bath & 1 new half bath, except 3rd floor unit with 1 new full bath. 3 remodel kitchens.1 new 2 bedrm, 1.5 bath in (e) basement / storage. new roof deck on mainDetails
remodel 3 units building with horizontal addition @ rear for basement level & 1st 2 stories. (e) 3 units will be 2 bedroo with 1 remodel bath & 1 new half bath, except 3rd floor unit with 1 new full bath. 3 remodel kitchens.1 new 2 bedrm, 1.5 bath in (e) basement / storage. new roof deck on main | $350,000 |
| Dec 14, 2015 | Completed final sign-off Dec 2016 | 871 Dolores St | relocation of unit from 1st flr to basement, remove exterior stairs,new stair from 1st to 2nd flr, remodel upper unit,2 new moment frames with new foundations. seismic upgrade.Details
relocation of unit from 1st flr to basement, remove exterior stairs,new stair from 1st to 2nd flr, remodel upper unit,2 new moment frames with new foundations. seismic upgrade. | $115,000 |
| Jul 29, 2013 | Completed final sign-off Apr 2015 | 226 Valley St | 3 story horizontal & vertical addition at rear with new interior and exterior stairs. nfpa 13d sprinklers to be provided under separate permit.Details
3 story horizontal & vertical addition at rear with new interior and exterior stairs. nfpa 13d sprinklers to be provided under separate permit. | $200,000 |