A-1 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Dec 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 103 days from filing to permit and 365 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2022 | Completed final sign-off May 2024 | 1609 Castro St | 1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylightsDetails
1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylights | $130,000 |
| Jul 23, 2019 | Completed final sign-off Feb 2021 | 602 Mississippi St | remodel units 602, 604. new roof deck at 3rd flr unit 604, new dormers and skylight. removal of rear stairs to unit 604. excavation of basement for new 8' ceiling ht & expansion of unit 602. excavation for new basement level patiosDetails
remodel units 602, 604. new roof deck at 3rd flr unit 604, new dormers and skylight. removal of rear stairs to unit 604. excavation of basement for new 8' ceiling ht & expansion of unit 602. excavation for new basement level patios | $20,000 |
| Dec 14, 2015 | Completed final sign-off Dec 2016 | 871 Dolores St | relocation of unit from 1st flr to basement, remove exterior stairs,new stair from 1st to 2nd flr, remodel upper unit,2 new moment frames with new foundations. seismic upgrade.Details
relocation of unit from 1st flr to basement, remove exterior stairs,new stair from 1st to 2nd flr, remodel upper unit,2 new moment frames with new foundations. seismic upgrade. | $115,000 |
| Jul 29, 2013 | Completed final sign-off Apr 2015 | 226 Valley St | 3 story horizontal & vertical addition at rear with new interior and exterior stairs. nfpa 13d sprinklers to be provided under separate permit.Details
3 story horizontal & vertical addition at rear with new interior and exterior stairs. nfpa 13d sprinklers to be provided under separate permit. | $200,000 |