Back to bathroom remodel contractors
A-1 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Dec 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 98 days from filing to permit and 544 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2022 | Completed final sign-off May 2024 | 1609 Castro St | 1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylightsDetails
1st fl: (n) bedroom, (n) laundry, (n) bathroom. 2nd fl: (n) bedroom, relocate stairs to 1st fl, kitchen remodel, new skylights | $130,000 |
| Jul 1, 2019 | Completed final sign-off Feb 2021 | 602 Mississippi St | remodel both kitchens and bathrooms. remove all lathe and plaster throughout. install 5/8 type x sheetrock throughout. 1 kitchen & 1 bath in each unitDetails
remodel both kitchens and bathrooms. remove all lathe and plaster throughout. install 5/8 type x sheetrock throughout. 1 kitchen & 1 bath in each unit | $50,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2019 | 1359 Minna St | remodel 3 units building with horizontal addition @ rear for basement level & 1st 2 stories. (e) 3 units will be 2 bedroo with 1 remodel bath & 1 new half bath, except 3rd floor unit with 1 new full bath. 3 remodel kitchens.1 new 2 bedrm, 1.5 bath in (e) basement / storage. new roof deck on mainDetails
remodel 3 units building with horizontal addition @ rear for basement level & 1st 2 stories. (e) 3 units will be 2 bedroo with 1 remodel bath & 1 new half bath, except 3rd floor unit with 1 new full bath. 3 remodel kitchens.1 new 2 bedrm, 1.5 bath in (e) basement / storage. new roof deck on main | $350,000 |