Joseph P Toboni
- Listed as
- authorized agent-others, contractor
- Firm
- The Toboni Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2026
270 permits since 2000 (contractor on 270 permits, authorized agent-others on 3 permits): 194 completed, 46 in progress, 18 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 270.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 1721 15th St | The Toboni Group | rear bldg: evacuation signaget for new construction, reference pa# 202505065848.Details
rear bldg: evacuation signaget for new construction, reference pa# 202505065848. | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 1721 15th St | The Toboni Group | front bldg, relocate (e) soloar panel array including structural support from rear bldg to the roof; ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revisionDetails
front bldg, relocate (e) soloar panel array including structural support from rear bldg to the roof; ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revision | $25,000 |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 1721 15th St | The Toboni Group | rear bldg, add (n) sqft private roof deck at the 4th level & relocate (e) soloar panel to the front bldg. ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revisionDetails
rear bldg, add (n) sqft private roof deck at the 4th level & relocate (e) soloar panel to the front bldg. ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revision | $75,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 3255 Pacific Av | The Toboni Group | exploratory demo: will do exporatory demo on flrs 1-3 of home.Details
exploratory demo: will do exporatory demo on flrs 1-3 of home. | $5,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 3701 Washington St | The Toboni Group | installation of hot tub on exterior terrace as well as new gate and guardrail.Details
installation of hot tub on exterior terrace as well as new gate and guardrail. | $30,000 |
| Jun 26, 2026 | In progress issued Jun 2026 | 2206 Lake St | The Toboni Group | 3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear deck (less than 50%) non-visible from st. replace finishes @ kitchen 1st fl.Details
3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear deck (less than 50%) non-visible from st. replace finishes @ kitchen 1st fl. | $100,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 540 El Camino Del Mar | The Toboni Group | modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spaDetails
modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spa | $150,000 |
| May 20, 2026 | In progress issued Jun 2026 | 3701 Washington St | The Toboni Group | remodel. replace (e) side entry door & (e) windows in kind. (n) sauna & cold plunge in basement. (n) mini ac system. (n) finishes. updated guardrail at main stair.Details
remodel. replace (e) side entry door & (e) windows in kind. (n) sauna & cold plunge in basement. (n) mini ac system. (n) finishes. updated guardrail at main stair. | $150,000 |
| May 1, 2026 | In progress issued Sep 2026 | 1721 15th St | The Toboni Group | front bldg: evacuation signage for new construction, reference pa# 202505065847.Details
front bldg: evacuation signage for new construction, reference pa# 202505065847. | |
| Apr 27, 2026 | In progress filed Apr 2026, not yet issued | 3621 Clay St | The Toboni Group | revision 202211287189 to include repalcement at gridlines 1-2/c-f1 and adjustment to moment frame along gle and removal of posts at rear deck. cantivlevered deck joists.Details
revision 202211287189 to include repalcement at gridlines 1-2/c-f1 and adjustment to moment frame along gle and removal of posts at rear deck. cantivlevered deck joists. | $15,000 |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 3255 Pacific Av | The Toboni Group | full-gut interior remodel-(n)roof finish, updated facades, rear adu (state program), & basement expansion. proposed revision to north and first 23' - 0" of west facade to be submitted under spearate permit. renovation of rear courtyard & associated landscaping. (e) shed demo under separate permit.Details
full-gut interior remodel-(n)roof finish, updated facades, rear adu (state program), & basement expansion. proposed revision to north and first 23' - 0" of west facade to be submitted under spearate permit. renovation of rear courtyard & associated landscaping. (e) shed demo under separate permit. | $3,700,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 1601 Monterey Bl | The Toboni Group | conversion of an (e) detached garage into accessory recreational space serving the primary residence. replacement of (e) doors, (n) doors and windows/location & interior remodel with the addition of a (n) power room, structural scope provides(n) shear wallsDetails
conversion of an (e) detached garage into accessory recreational space serving the primary residence. replacement of (e) doors, (n) doors and windows/location & interior remodel with the addition of a (n) power room, structural scope provides(n) shear walls | $75,000 |
| Feb 24, 2026 | In progress issued Feb 2026 | 3701 Washington St | The Toboni Group | bathroom update: replacing bathroom fixtures & light fixtures.Details
bathroom update: replacing bathroom fixtures & light fixtures. | $700,000 |
| Jan 29, 2026 | In progress issued Feb 2026 | 1721 15th St | The Toboni Group | temporary shoring at west and south property lines for (n) bldg to be built under bpa: 202505065847 and 202505065848Details
temporary shoring at west and south property lines for (n) bldg to be built under bpa: 202505065847 and 202505065848 | |
| Dec 18, 2025 | In progress issued Jan 2026 | 1601 Monterey Bl | The Toboni Group | revision 202511179730 to include structrual detailsDetails
revision 202511179730 to include structrual details | |
| Dec 15, 2025 | In progress issued Dec 2025 | 3621 Clay St | The Toboni Group | new wood fence in rear yard on west sideDetails
new wood fence in rear yard on west side | $2,500 |
| Dec 5, 2025 | In progress issued Feb 2026 | 540 El Camino Del Mar | The Toboni Group | structural revisions to pa 202507150799Details
structural revisions to pa 202507150799 | |
| Nov 18, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | The Toboni Group | shoring revisions to bpa# 202507150799Details
shoring revisions to bpa# 202507150799 | |
| Nov 17, 2025 | In progress issued Dec 2025 | 1601 Monterey Bl | The Toboni Group | exterior work and rear yard only. new sports court, trellis, 5' and 8' high property line fences, planters and associated structural work. refer to permit# 202510036676 for previous rear yard demo work.Details
exterior work and rear yard only. new sports court, trellis, 5' and 8' high property line fences, planters and associated structural work. refer to permit# 202510036676 for previous rear yard demo work. | $100,000 |
| Oct 31, 2025 | Completed final sign-off Apr 2026 | 3521 Sacramento St | The Toboni Group | minor drywall remove and repatch for replacement of existing hvac unit, in residential unit onlyDetails
minor drywall remove and repatch for replacement of existing hvac unit, in residential unit only | $10,000 |
| Oct 24, 2025 | In progress issued Oct 2025 | 3621 Clay St | The Toboni Group | revision to pa # 202510036747 sideyard finishes.Details
revision to pa # 202510036747 sideyard finishes. | $2 |
| Oct 17, 2025 | In progress issued Jan 2026 | 1601 Monterey Bl | The Toboni Group | int.remodel: replacement of ext wdws & doors. addition of state adu at the basement level. addition of 3 dormer windows at the rear and (n) skylights at the roof. vertical alterations exempt from neighbor notifications per 311Details
int.remodel: replacement of ext wdws & doors. addition of state adu at the basement level. addition of 3 dormer windows at the rear and (n) skylights at the roof. vertical alterations exempt from neighbor notifications per 311 | $1,718,690 |
| Oct 15, 2025 | In progress issued Dec 2025 | 1601 Monterey Bl | The Toboni Group | replace 64 ft of property line retaining walls with new soldier piles and laggingDetails
replace 64 ft of property line retaining walls with new soldier piles and lagging | $10,000 |
| Oct 3, 2025 | In progress issued Oct 2025 | 1601 Monterey Bl | The Toboni Group | rear yard demo work- removal of rear yard pavers, landscape, and water fountain.Details
rear yard demo work- removal of rear yard pavers, landscape, and water fountain. | $300 |
| Oct 3, 2025 | In progress issued Oct 2025 | 3621 Clay St | The Toboni Group | sideyard concrete slab replacementDetails
sideyard concrete slab replacement | $6,000 |
| Aug 26, 2025 | In progress issued Sep 2025 | 1601 Monterey Bl | The Toboni Group | dry rot and minor assbestos removal/remediation at mechanical room, kitchen hood, bath fans, and furnace ducting.Details
dry rot and minor assbestos removal/remediation at mechanical room, kitchen hood, bath fans, and furnace ducting. | $2,000 |
| Jul 29, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | The Toboni Group | interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075.Details
interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075. | $650,000 |
| Jul 17, 2025 | Completed final sign-off Jun 2026 | 3447 Clay St | The Toboni Group | revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f.Details
revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f. | $10,000 |
| Jul 14, 2025 | In progress issued Jul 2025 | 294 Page St | The Toboni Group | (n) french door at 2nd level rear facade. demo (e) 2nd level tupet door and replace with window. repair of all windows approved on cofa #2024-003477prj/coaDetails
(n) french door at 2nd level rear facade. demo (e) 2nd level tupet door and replace with window. repair of all windows approved on cofa #2024-003477prj/coa | $10,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 540 El Camino Del Mar | The Toboni Group | subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.Details
subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade. | $15,000 |
| Jun 2, 2025 | In progress issued Aug 2025 | 3575 Clay St | The Toboni Group | rev 202411265790: revise framing at new dormer, rmove framing for previously proposed chimney and beam & retianing wall revisions.Details
rev 202411265790: revise framing at new dormer, rmove framing for previously proposed chimney and beam & retianing wall revisions. | |
| May 23, 2025 | In progress issued Jan 2026 | 1721 15th St | The Toboni Group | rear bldg: construction of a 3 story residential type iii-a over i-a building with 4 residential dwelling units.Details
rear bldg: construction of a 3 story residential type iii-a over i-a building with 4 residential dwelling units. | $510,000 |
| May 23, 2025 | In progress issued Jan 2026 | 1721 15th St | The Toboni Group | front bldg: construction of a 6 story residential type iii-a over i-a building with 48 residential dwelling units.Details
front bldg: construction of a 6 story residential type iii-a over i-a building with 48 residential dwelling units. | $6,900,000 |
| May 22, 2025 | In progress issued Jun 2025 | 540 El Camino Del Mar | The Toboni Group | remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced.Details
remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced. | $250,000 |
| May 21, 2025 | In progress issued Jun 2025 | 3621 Clay St | The Toboni Group | add (n) in ground soaking pool 8' x 8' in rear yard. pool equipment on 2nd circuit pump equipment next to the houseDetails
add (n) in ground soaking pool 8' x 8' in rear yard. pool equipment on 2nd circuit pump equipment next to the house | $8,000 |
| May 15, 2025 | In progress issued Nov 2025 | 1721 15th St | The Toboni Group | demolition of a 1 story type v-b commercial building.Details
demolition of a 1 story type v-b commercial building. | $90,000 |
| May 9, 2025 | Completed final sign-off Dec 2025 | 207 Cherry St | The Toboni Group | remodel of (e) 2/f bathrooms and primary closet. no added sqft or changes to (e) exteriror envelope. no mechanical work in scope, electrical modification as required by code.Details
remodel of (e) 2/f bathrooms and primary closet. no added sqft or changes to (e) exteriror envelope. no mechanical work in scope, electrical modification as required by code. | $25,000 |
| Feb 20, 2025 | Completed final sign-off Aug 2026 | 2855 Pacific Av | The Toboni Group | interior remodel within (e) building. partial work at side facade lightwell. includes structural, electrical & plumbing workDetails
interior remodel within (e) building. partial work at side facade lightwell. includes structural, electrical & plumbing work | $650,000 |
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 663 Marina Bl | The Toboni Group | intallation of new cabinets at primary closet and bathroom(level 2). level 2 bathroom will be converted to additional closet space. existing plumbing lines will be shut off and capped.Details
intallation of new cabinets at primary closet and bathroom(level 2). level 2 bathroom will be converted to additional closet space. existing plumbing lines will be shut off and capped. | $30,000 |
| Jan 29, 2025 | Completed final sign-off Aug 2026 | 2855 Pacific Av | The Toboni Group | exploratory demolition to explore framing conditions(kitchen, lower level media). restore installation and drywall. like for like.Details
exploratory demolition to explore framing conditions(kitchen, lower level media). restore installation and drywall. like for like. | $2,000 |
| Jan 15, 2025 | In progress issued Mar 2025 | 2430 Pacific Av | The Toboni Group | revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes.Details
revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes. | $275,000 |
| Jan 9, 2025 | Completed final sign-off Aug 2025 | 2747 Vallejo St | The Toboni Group | replace finishes in kitchen and bathroom, no change to any mep locations. all fixtures location to remain, replace tiles, stone, and refinish cabinets.Details
replace finishes in kitchen and bathroom, no change to any mep locations. all fixtures location to remain, replace tiles, stone, and refinish cabinets. | $500,000 |
| Dec 24, 2024 | In progress issued May 2025 | 3575 Clay St | The Toboni Group | new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical.Details
new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical. | $850,000 |
| Nov 20, 2024 | In progress issued Mar 2025 | 2420 Pacific Av | The Toboni Group | new retaining wall at west property lineDetails
new retaining wall at west property line | $10,000 |
| Nov 20, 2024 | In progress issued Mar 2025 | 2430 Pacific Av | The Toboni Group | new retaining wall at east property line. all other work under 202405091833Details
new retaining wall at east property line. all other work under 202405091833 | $10,000 |
| Nov 18, 2024 | Completed final sign-off Jun 2026 | 3447 Clay St | The Toboni Group | interior remodel within existing building footprint, new exterior doors and 35 sf. insfill at east exterior 1st level facade. to include kitchen and 5 bath remodel, structural.Details
interior remodel within existing building footprint, new exterior doors and 35 sf. insfill at east exterior 1st level facade. to include kitchen and 5 bath remodel, structural. | $450,000 |
| Nov 14, 2024 | Completed final sign-off Jun 2026 | 3447 Clay St | The Toboni Group | exploratory demolition + expose asbestos+ other toxic material - restore installation + drywallDetails
exploratory demolition + expose asbestos+ other toxic material - restore installation + drywall | $2,500 |
| Oct 28, 2024 | Completed final sign-off Sep 2026 | 3575 Clay St | The Toboni Group | exploratory demolition to expose asbestos and other toxic material. restore installation and drywall. replacement gypboard to be 5/8" type x w/ 5d cooler nails @ 4" o.c. or equivalent screws. maintain fire rating.Details
exploratory demolition to expose asbestos and other toxic material. restore installation and drywall. replacement gypboard to be 5/8" type x w/ 5d cooler nails @ 4" o.c. or equivalent screws. maintain fire rating. | $2,500 |
| Sep 6, 2024 | In progress issued Sep 2024 | 2420 Pacific Av | The Toboni Group | replace/repair (e) front entry stair cladding in-kind due to leaks & cracking of (e) stone cladding on treads & risers. less than 50% repair work.Details
replace/repair (e) front entry stair cladding in-kind due to leaks & cracking of (e) stone cladding on treads & risers. less than 50% repair work. | $90,000 |
| Aug 2, 2024 | In progress issued Oct 2024 | 2430 Pacific Av | The Toboni Group | interior remodel on all levels. revised stair in rear. new roof deck with operable skylightDetails
interior remodel on all levels. revised stair in rear. new roof deck with operable skylight | $250,000 |
| Aug 2, 2024 | Completed final sign-off Feb 2025 | 294 Page St | The Toboni Group | revision to pa 202403137671 revised structural set according to findings on site during demo. minor interior work added to attic level - built in cabinetry added in between studs of existing wallDetails
revision to pa 202403137671 revised structural set according to findings on site during demo. minor interior work added to attic level - built in cabinetry added in between studs of existing wall | |
| Aug 1, 2024 | Completed final sign-off Mar 2025 | 3305 17th St | The Toboni Group | change address for residential occupancy only for new construction re: 2100 mission st at apn 3576/001 per pa #201406239172s, new address for resiential-3305 1th streetDetails
change address for residential occupancy only for new construction re: 2100 mission st at apn 3576/001 per pa #201406239172s, new address for resiential-3305 1th street | |
| May 16, 2024 | In progress issued May 2024 | 3621 Clay St | The Toboni Group | revision to previously approved bpa #202211287189. add new 8' dormer on east side of house. no changesd to mep. no work in prowDetails
revision to previously approved bpa #202211287189. add new 8' dormer on east side of house. no changesd to mep. no work in prow | $10,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 3621 Clay St | The Toboni Group | perimeter site retaining walls. (at rear)Details
perimeter site retaining walls. (at rear) | $15,000 |
| Mar 15, 2024 | Completed final sign-off Mar 2025 | 2430 Pacific Av | The Toboni Group | abatement of asbestos per asbestots report dated 1/15/2024. includes removal of contaminated materials & replacement wjere asbestos is present. interior finishes only entire buildingDetails
abatement of asbestos per asbestots report dated 1/15/2024. includes removal of contaminated materials & replacement wjere asbestos is present. interior finishes only entire building | $65,000 |
| Mar 13, 2024 | Completed final sign-off Feb 2025 | 294 Page St | The Toboni Group | interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair.Details
interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair. | $10,000 |
| Mar 1, 2024 | In progress issued Mar 2024 | 3621 Clay St | The Toboni Group | revision to 202211287187 to correct foundation for adu located at rear of property. changes at facade, roof and ceiling framing, footing detail. no work in public right of way,no mep, or fixture count changechanges @ facade roof framing/ceiling framing , footing detailDetails
revision to 202211287187 to correct foundation for adu located at rear of property. changes at facade, roof and ceiling framing, footing detail. no work in public right of way,no mep, or fixture count changechanges @ facade roof framing/ceiling framing , footing detail | $10,000 |
| Jan 26, 2024 | Completed final sign-off Jan 2026 | 2917 Laguna St | The Toboni Group | remove and replace cabinet faces, kitchen plumbing fixtures and stone countertops. in kindDetails
remove and replace cabinet faces, kitchen plumbing fixtures and stone countertops. in kind | $20,000 |
| Oct 11, 2023 | Completed final sign-off Aug 2024 | 2710 Divisadero St | The Toboni Group | exploratory demo on all floors - no structural work. work in: basement, laundry, hall, and exterior stair, first floor dining room, second floor study, third floor hall 2. approx. 100 sq. of wall area. repairs to be done under future permits. +/- 100 sq. ft. workDetails
exploratory demo on all floors - no structural work. work in: basement, laundry, hall, and exterior stair, first floor dining room, second floor study, third floor hall 2. approx. 100 sq. of wall area. repairs to be done under future permits. +/- 100 sq. ft. work | $5,000 |
| Aug 3, 2023 | Completed final sign-off May 2024 | 2210 Vallejo St | The Toboni Group | replace (8) wood windows in kind, visible from public right of way. replace (1) window frame and sahs on rear facade kitchen (not visible from public right of way) o.g lugsDetails
replace (8) wood windows in kind, visible from public right of way. replace (1) window frame and sahs on rear facade kitchen (not visible from public right of way) o.g lugs | $7,000 |
| Jun 28, 2023 | Completed final sign-off Jul 2023 | 2507 Pacific Av | The Toboni Group | add 2'-4" height wood lattice to existing 6' height wood fence (at rear side)Details
add 2'-4" height wood lattice to existing 6' height wood fence (at rear side) | $1,500 |
| May 24, 2023 | Completed final sign-off Jun 2023 | 1287 03rd Av | The Toboni Group | replace furnace. demo drywall at 15' of ceiling, and repair drywall after work, repair ducting for furnace. remove abandoned interior/ disconnected water pipe. same location as previous. less than 25 ft of new ductworkDetails
replace furnace. demo drywall at 15' of ceiling, and repair drywall after work, repair ducting for furnace. remove abandoned interior/ disconnected water pipe. same location as previous. less than 25 ft of new ductwork | $5,000 |
| May 15, 2023 | Completed final sign-off May 2023 | 1291 03rd Av | The Toboni Group | revision to clarify scope of pa# 202304105385: ground floor until 1291 bath remodel in kind only. 1289 second floor bathroom remodel, replace plumbing fixtures and new lighting. no kitchen work anywhere.Details
revision to clarify scope of pa# 202304105385: ground floor until 1291 bath remodel in kind only. 1289 second floor bathroom remodel, replace plumbing fixtures and new lighting. no kitchen work anywhere. | |
| Apr 10, 2023 | Completed final sign-off May 2023 | 1291 03rd Av | The Toboni Group | 1st floor bathroom remodel- 2nd floor fixtures replacement. kitchen and bathroom remodel. no structural work.Details
1st floor bathroom remodel- 2nd floor fixtures replacement. kitchen and bathroom remodel. no structural work. | $2,500 |
| Apr 6, 2023 | Completed final sign-off May 2024 | 2210 Vallejo St | The Toboni Group | remodel of existing fixtures and finishes of kitchen, laundry, and primary bathroom. replacement in kind of lighting. new flooring throughout.Details
remodel of existing fixtures and finishes of kitchen, laundry, and primary bathroom. replacement in kind of lighting. new flooring throughout. | $150,000 |
| Mar 14, 2023 | Expired or cancelled revoked Jun 2023 | 2507 Pacific Av | The Toboni Group | remove existing non-complying fire escape.Details
remove existing non-complying fire escape. | $5,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | revision to adu pa 2022-0322-0541 - upgrade to (e) wall to create 1 hr rated assembly approx 26" in length; addition of new 1 hr parapet wall 30" in ht along same wall at roof level; work to be performed to create code copliant fire separation based on new property line resulting from proposed newDetails
revision to adu pa 2022-0322-0541 - upgrade to (e) wall to create 1 hr rated assembly approx 26" in length; addition of new 1 hr parapet wall 30" in ht along same wall at roof level; work to be performed to create code copliant fire separation based on new property line resulting from proposed new | $8,500 |
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | revision to 202203220541, close up e accessory windows per dbi pacel map condition of approvalDetails
revision to 202203220541, close up e accessory windows per dbi pacel map condition of approval | |
| Dec 13, 2022 | Completed final sign-off Jun 2023 | 2507 Pacific Av | The Toboni Group | relocate existing gate and existinf newel and new open fence at front setbackDetails
relocate existing gate and existinf newel and new open fence at front setback | $4,000 |
| Dec 9, 2022 | Never finaled filed Dec 2022, never issued | 5250 03rd St | The Toboni Group | erect a 7-story, type 3a over 1a, mixed use building with 100 residential units.Details
erect a 7-story, type 3a over 1a, mixed use building with 100 residential units. | $12,500,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | The Toboni Group | existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures.Details
existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures. | $200,000 |
| Nov 28, 2022 | Completed final sign-off Aug 2024 | 2710 Divisadero St | The Toboni Group | addition of new elevatorDetails
addition of new elevator | $75,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | The Toboni Group | main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry doorDetails
main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry door | $2,400,000 |
| Nov 3, 2022 | Completed final sign-off Apr 2025 | 3410 Washington St | The Toboni Group | exploratory demo of sheetrock only to review existing conditions on level's 1 and 2: additionally review foor hazardous material presents. all sheetrock opening will be patched with 5/8" type x sheetrock. no damage to any existing plywood allowed. affected wall area approximately 1500 sqftDetails
exploratory demo of sheetrock only to review existing conditions on level's 1 and 2: additionally review foor hazardous material presents. all sheetrock opening will be patched with 5/8" type x sheetrock. no damage to any existing plywood allowed. affected wall area approximately 1500 sqft | $1,500 |
| Sep 15, 2022 | Completed final sign-off Apr 2025 | 3410 Washington St | The Toboni Group | interior & exterior alteration including side & rear facade alterations, minor front facade alterations,in kind replacement of window sash, infill below rear sunroom, remodel front planters, garage door widening, n skylights, structural upgrades, new interior finishes fixturesDetails
interior & exterior alteration including side & rear facade alterations, minor front facade alterations,in kind replacement of window sash, infill below rear sunroom, remodel front planters, garage door widening, n skylights, structural upgrades, new interior finishes fixtures | $395,000 |
| Aug 9, 2022 | In progress issued Oct 2024 | 129 Laidley St | The Toboni Group | to construct a 4-story, type vb, single family dwelling building with attached accessory dwelling unit.Details
to construct a 4-story, type vb, single family dwelling building with attached accessory dwelling unit. | $900,000 |
| Aug 9, 2022 | In progress issued Oct 2024 | 129 Laidley St | The Toboni Group | to demolish a 3-story, type v, single family dwelling building.Details
to demolish a 3-story, type v, single family dwelling building. | |
| May 31, 2022 | In progress issued Sep 2026 | 849 44th Av | The Toboni Group | interior remodel & horizontal addition at rear of building.new deck above the 1st floor.Details
interior remodel & horizontal addition at rear of building.new deck above the 1st floor. | $200,000 |
| Mar 25, 2022 | Completed final sign-off Mar 2023 | 1259 Clay St | The Toboni Group | revision to pa# 201809170506. new retaining wall at south and east property lines.Details
revision to pa# 201809170506. new retaining wall at south and east property lines. | $10,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | addition of one adu unit at the ground floor under the state adu program.Details
addition of one adu unit at the ground floor under the state adu program. | $140,000 |
| Oct 6, 2021 | Completed final sign-off Aug 2022 | 2700 Pierce St | The Toboni Group | interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kindDetails
interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kind | $200,000 |
| Jul 28, 2021 | Completed final sign-off Jan 2023 | 3569 Washington St | The Toboni Group | revision to pa#202102265437; revised landscape walls in rear yard.Details
revision to pa#202102265437; revised landscape walls in rear yard. | $5,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 600 South Van Ness Av | The Toboni Group | administrative permit to amend the approved, issued & completed permit pa# 2014-01-13-6108 to comply with affordable housing requirements through payment of an in-lieu fee instead of providing on-site bmr units.Details
administrative permit to amend the approved, issued & completed permit pa# 2014-01-13-6108 to comply with affordable housing requirements through payment of an in-lieu fee instead of providing on-site bmr units. | |
| Jun 24, 2021 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group, G Family Incorporated | comply to nov202172831 & 202172219; provide as-built conditions,rev to pa 201406118149, 201406118149, 201709117616, 201908300281, 201912200106, 202001313229 & 202002144497. to address bid requirement of as built conditionsDetails
comply to nov202172831 & 202172219; provide as-built conditions,rev to pa 201406118149, 201406118149, 201709117616, 201908300281, 201912200106, 202001313229 & 202002144497. to address bid requirement of as built conditions | |
| May 20, 2021 | Completed final sign-off Sep 2021 | 224 Presidio Av | The Toboni Group | kitchen fixtures and finishes replacement in-kind.Details
kitchen fixtures and finishes replacement in-kind. | $75,000 |
| May 20, 2021 | Completed final sign-off Sep 2021 | 2342 Washington St | The Toboni Group | waterproofing on windows. patch & repair on stucco. all facade facing windows to be replaced. u factor max 0.30.Details
waterproofing on windows. patch & repair on stucco. all facade facing windows to be replaced. u factor max 0.30. | $35,000 |
| May 20, 2021 | Completed final sign-off Sep 2021 | 3385 Jackson St | The Toboni Group | waterproofing on windows. patch & repair on stucco. all facade facing windows to be reinstalled. u factor max 0.30.Details
waterproofing on windows. patch & repair on stucco. all facade facing windows to be reinstalled. u factor max 0.30. | $35,000 |
| Apr 22, 2021 | Completed final sign-off Jun 2021 | 3 Lupine Av | The Toboni Group | drywall patching/painting replce fire rated door to garage, add additional layer of drywall at ceiling and south wall and ass (4) fire rated recessed light fixture cans. scope at ground floor storage room only.Details
drywall patching/painting replce fire rated door to garage, add additional layer of drywall at ceiling and south wall and ass (4) fire rated recessed light fixture cans. scope at ground floor storage room only. | $20,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 15 Presidio Tr | The Toboni Group | new exterior deck at 2nd level less than 10' above grade. removel of railing from (e) door. work is within required rear + side yard. no facade work. no work in prow.Details
new exterior deck at 2nd level less than 10' above grade. removel of railing from (e) door. work is within required rear + side yard. no facade work. no work in prow. | $75,000 |
| Mar 17, 2021 | Completed final sign-off Apr 2023 | 16 Seacliff Av | The Toboni Group | alter site to previously approved site permit pa#201803284792. no changes to exterior building envelope. basement to be expanded into existing crawl space. additonal revisons: window adjustments, interior layout & new calculations to meet code requirements.Details
alter site to previously approved site permit pa#201803284792. no changes to exterior building envelope. basement to be expanded into existing crawl space. additonal revisons: window adjustments, interior layout & new calculations to meet code requirements. | $5,000 |
| Mar 15, 2021 | Completed final sign-off Jun 2023 | 2900 Broadway | The Toboni Group | in-place replacement of existing foundation with new mat slab and piers foundation. no change to floor plans or exterior of building.Details
in-place replacement of existing foundation with new mat slab and piers foundation. no change to floor plans or exterior of building. | $200,000 |
| Mar 4, 2021 | Completed final sign-off Jul 2021 | 606 Capp St | The Toboni Group | to comply with planning volation # 2019-006274enf dated 10/2/20. reconfiguration of bicycle parking in (e) structure. removal of hardscape in front yard setback. reconfigure (e) fence at capp st.Details
to comply with planning volation # 2019-006274enf dated 10/2/20. reconfiguration of bicycle parking in (e) structure. removal of hardscape in front yard setback. reconfigure (e) fence at capp st. | $5,000 |
| Feb 27, 2021 | Completed final sign-off Jun 2024 | 2420 Pacific Av | The Toboni Group | exterior modifications including an enlarged balcony at the rear of the building, and a new roof deck with minimum height sliding roof hatch access. this exterior scope of work accompanies an interior scope of work under separate pa #2020-1021-7019.Details
exterior modifications including an enlarged balcony at the rear of the building, and a new roof deck with minimum height sliding roof hatch access. this exterior scope of work accompanies an interior scope of work under separate pa #2020-1021-7019. | $862,000 |
| Feb 26, 2021 | Completed final sign-off Jan 2023 | 3569 Washington St | The Toboni Group | interior remodel within existing footprint. lowering 1st level foundation 12". infill at rear 1st level and 2nd level under existing building footprint.Details
interior remodel within existing footprint. lowering 1st level foundation 12". infill at rear 1st level and 2nd level under existing building footprint. | $65,000 |
| Feb 22, 2021 | Completed final sign-off Apr 2022 | 15 Presidio Tr | The Toboni Group | repair stucco at rear. approx. 150sf 42 windows to be replaced inkind - existing wood to be replaced with wood - all operations to remain the same and with og lugs.Details
repair stucco at rear. approx. 150sf 42 windows to be replaced inkind - existing wood to be replaced with wood - all operations to remain the same and with og lugs. | $20,000 |
| Feb 5, 2021 | Completed final sign-off Jan 2026 | 2900 Broadway | The Toboni Group | interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls.Details
interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls. | $1,500,000 |
| Feb 4, 2021 | Completed final sign-off May 2021 | 2290 03rd St | The Toboni Group | administrative permit to correct the record for the legal number of dwelling units from 71 to 73 dwelling units for pa# 2013-09-25-7711. all addenda were issued with the correct number of 73 dwelling units. no work is required or proposed. this is a permit to correct the record only. * maher: n/a *Details
administrative permit to correct the record for the legal number of dwelling units from 71 to 73 dwelling units for pa# 2013-09-25-7711. all addenda were issued with the correct number of 73 dwelling units. no work is required or proposed. this is a permit to correct the record only. * maher: n/a * | |
| Feb 2, 2021 | Completed final sign-off Jan 2023 | 16 Seacliff Av | The Toboni Group | to comply with nov # 202171914: structural only: temporary shoring for construction of new foundation & retaining wall. no mep. no work in prow.Details
to comply with nov # 202171914: structural only: temporary shoring for construction of new foundation & retaining wall. no mep. no work in prow. | $50,000 |
| Jan 27, 2021 | Completed final sign-off May 2021 | 2855 Filbert St | The Toboni Group | rear yard site work. at rear yard only. no work at interior of building.Details
rear yard site work. at rear yard only. no work at interior of building. | $10,000 |
| Dec 23, 2020 | Completed final sign-off Jan 2021 | 2720 Pierce St | The Toboni Group | exploratory demo due to water damage - no exterior work. no impact to fire safety.Details
exploratory demo due to water damage - no exterior work. no impact to fire safety. | $10,000 |