James Howard Westover
- Listed as
- architect
- Firm
- Wda William Duff Architects
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Aug 2026
67 permits since 2000 (architect on 67 permits): 37 completed, 11 in progress, 8 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 2829 Pacific Av | Cook Construction | int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel.Details
int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel. | $1,804,290 |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 488 Folsom St | 56th floor: addition at private roof deck and stair penthouse to the dwelling unit on level 55 and level 56 of a residential towerDetails
56th floor: addition at private roof deck and stair penthouse to the dwelling unit on level 55 and level 56 of a residential tower | $150,000 | |
| Jun 30, 2026 | In progress issued Jul 2026 | 4365 23rd St | Siena Pacific, Inc. | convert (e) living, dining & kitchen into (n) primary suite. construct (n) kitchen & pantry in main floor family roomDetails
convert (e) living, dining & kitchen into (n) primary suite. construct (n) kitchen & pantry in main floor family room | $266,393 |
| Jun 26, 2026 | In progress issued Jul 2026 | 3701 Washington St | The Toboni Group | installation of hot tub on exterior terrace as well as new gate and guardrail.Details
installation of hot tub on exterior terrace as well as new gate and guardrail. | $30,000 |
| May 20, 2026 | In progress issued Jun 2026 | 3701 Washington St | The Toboni Group | remodel. replace (e) side entry door & (e) windows in kind. (n) sauna & cold plunge in basement. (n) mini ac system. (n) finishes. updated guardrail at main stair.Details
remodel. replace (e) side entry door & (e) windows in kind. (n) sauna & cold plunge in basement. (n) mini ac system. (n) finishes. updated guardrail at main stair. | $150,000 |
| Feb 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | Perez Construction Llc. | removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 204, removal of 5 windows & replacement of one window in-kind @ north facade.Details
removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 204, removal of 5 windows & replacement of one window in-kind @ north facade. | $10,000 |
| Aug 14, 2025 | In progress issued Dec 2025 | 3847 21st St | Precision Finish Remodeling Inc | remodel on the third floor of existing sfd (three stories and attic). including: demolition of fireplace and hearth, addition of bathroom, revisions to (e) bathroom and closet layout, new window openings in west facade and new finished througout the floor.Details
remodel on the third floor of existing sfd (three stories and attic). including: demolition of fireplace and hearth, addition of bathroom, revisions to (e) bathroom and closet layout, new window openings in west facade and new finished througout the floor. | $40,000 |
| Apr 24, 2025 | Completed final sign-off Mar 2026 | 2512 Pacific Av | Arrow Builders Inc | remodel single family dwelling, first flr: demo e storage, new finishes, elec,water heater w heat pumps, 2nd flr: new window openings in north wall, demo e kitchen, new kitchen in new location,finishes replacement, new elec/plumbingDetails
remodel single family dwelling, first flr: demo e storage, new finishes, elec,water heater w heat pumps, 2nd flr: new window openings in north wall, demo e kitchen, new kitchen in new location,finishes replacement, new elec/plumbing | $75,000 |
| Feb 27, 2025 | In progress issued Mar 2025 | 3045 Pacific Av | Siena Pacific, Inc. | revision to pa 202111051940 relocation of (e) posts at the 2nd fl rear deck to the edge of the deck. no other modifications to the (e) deckDetails
revision to pa 202111051940 relocation of (e) posts at the 2nd fl rear deck to the edge of the deck. no other modifications to the (e) deck | $1,000 |
| Nov 26, 2024 | In progress issued May 2025 | 139 24th Av | Frank & Grossman Landscaping Contr Inc | voluntary structural improvement to (e) pergola footingDetails
voluntary structural improvement to (e) pergola footing | $30,000 |
| Oct 15, 2024 | In progress issued Sep 2025 | 4365 23rd St | Siena Pacific, Inc. | create new adu in basement ord. 162-16 ab1114. infill (e) lightwell. relocate (e) stair from street level to upper floor to connect to main house. create new stair from street level to new basement adu. earth shoring is required under a separate permit.Details
create new adu in basement ord. 162-16 ab1114. infill (e) lightwell. relocate (e) stair from street level to upper floor to connect to main house. create new stair from street level to new basement adu. earth shoring is required under a separate permit. | $985,714 |
| Aug 13, 2024 | Completed final sign-off May 2025 | 8 Seacliff Av | Brian Mac Namara Construction | revision to pa#202407247150, 202406043648 and 202207128251 to address undersized floor framing discovered at 3rd floor sunroom.Details
revision to pa#202407247150, 202406043648 and 202207128251 to address undersized floor framing discovered at 3rd floor sunroom. | $10,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 8 Seacliff Av | Brian Mac Namara Construction | interior kitchen & bathroom remodel. add (n) powerder room @ 1st fl; (n) primary bath @ 2nd fl; replace (e) patio @ dining rm; partial exterior stucco & window replacement to address water damage; exterior stucco and windows to be replaced in kindDetails
interior kitchen & bathroom remodel. add (n) powerder room @ 1st fl; (n) primary bath @ 2nd fl; replace (e) patio @ dining rm; partial exterior stucco & window replacement to address water damage; exterior stucco and windows to be replaced in kind | $350,000 |
| May 23, 2024 | In progress issued Aug 2024 | 2630 Divisadero St | Edgar Mendieta | (n) 6'-0 high fence at side property line, 10'-0" h fence at rear property line, (n) paving and planter at rear yard, outdoor kitchen with propane griddle and pizza oven and sink at rear yard.Details
(n) 6'-0 high fence at side property line, 10'-0" h fence at rear property line, (n) paving and planter at rear yard, outdoor kitchen with propane griddle and pizza oven and sink at rear yard. | $22,000 |
| Mar 28, 2024 | In progress issued Jul 2024 | 55 Ashbury Tr | Union Pierce Construction | relacement of perimeter foundation and concrete slab on grade in garage, new ceiling & lighting in garage rebuilding concrete exterior stair in-kind replacement ofgarage door in-kind. work do not affect public right of wayDetails
relacement of perimeter foundation and concrete slab on grade in garage, new ceiling & lighting in garage rebuilding concrete exterior stair in-kind replacement ofgarage door in-kind. work do not affect public right of way | $30,000 |
| Feb 16, 2024 | Completed final sign-off Mar 2024 | 3673 Jackson St | Van Acker Const Assoc Inc | revision to pa# 202109138255 &202302021218 & 202212017453. shown as-built plans. revising title 24 sheets due to change in mechanical system. removal of the ductless mini split.Details
revision to pa# 202109138255 &202302021218 & 202212017453. shown as-built plans. revising title 24 sheets due to change in mechanical system. removal of the ductless mini split. | |
| Aug 31, 2023 | Completed final sign-off Sep 2024 | 8 Seacliff Av | Brian Mac Namara Construction | revision to pa# 202207269321, remove exterior stucco cladding at the north end of bldg. north side of east & west facade, and full north facade. install new waterproofing membrane and stucco finish to match existing.Details
revision to pa# 202207269321, remove exterior stucco cladding at the north end of bldg. north side of east & west facade, and full north facade. install new waterproofing membrane and stucco finish to match existing. | $25,000 |
| Aug 3, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | P 3 Construction & Remodeling Inc | addition of new deck and stairway to backyard from second level. new fire wall and fence along property line. new door at 2nd flr to access deck. structural upgrades at kitchen. no chnag to maximum path of travel or egress patch.Details
addition of new deck and stairway to backyard from second level. new fire wall and fence along property line. new door at 2nd flr to access deck. structural upgrades at kitchen. no chnag to maximum path of travel or egress patch. | $50,000 |
| Jun 15, 2023 | Expired or cancelled withdrawn Nov 2024 | 3973 Clay St | excavation & foundation replacement,all doors & windows, interior remodel throughout, n roof above 2nd flr bedroom, n interior stair to replace extg, n exterior infill addition below extg cantilevered rm on 2nd flr, n reconfigured patio at rear yard, & n exterior facade finish at rear yard.Details
excavation & foundation replacement,all doors & windows, interior remodel throughout, n roof above 2nd flr bedroom, n interior stair to replace extg, n exterior infill addition below extg cantilevered rm on 2nd flr, n reconfigured patio at rear yard, & n exterior facade finish at rear yard. | $300,000 | |
| Jun 8, 2023 | Completed final sign-off Dec 2023 | 8 Seacliff Av | Brian Mac Namara Construction | all work on 2nd floor. remodel primary bedroom, closet and study. no new windows/exterior doors.Details
all work on 2nd floor. remodel primary bedroom, closet and study. no new windows/exterior doors. | $95,000 |
| May 17, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | P 3 Construction & Remodeling Inc | interior remodel to include new lighting fixtures at 2nd and 3rd fl. new gas insert to e fireplace unit. int remodel at 3rd fl including primary bedroom and bath, 2nd bath, new laundry rm.structural framing, roofing sep permitDetails
interior remodel to include new lighting fixtures at 2nd and 3rd fl. new gas insert to e fireplace unit. int remodel at 3rd fl including primary bedroom and bath, 2nd bath, new laundry rm.structural framing, roofing sep permit | $50,000 |
| May 2, 2023 | Never finaled issued May 2023, no final | 3975 Clay St | Union Pierce Construction | remove (e) trellis on roof, build new roof deck w/42" high guardrail on roof. no mechanical/electrical/plubming work.Details
remove (e) trellis on roof, build new roof deck w/42" high guardrail on roof. no mechanical/electrical/plubming work. | $10,000 |
| Apr 27, 2023 | Never finaled issued May 2023, no final | 139 24th Av | Jim Murphy & Associates | rev to pa# 202210124206, remodel extg wine storage room 110 and bathroom 107, add power sliding doors at elevator and automatic fire curtain at lower elevator door.Details
rev to pa# 202210124206, remodel extg wine storage room 110 and bathroom 107, add power sliding doors at elevator and automatic fire curtain at lower elevator door. | $30,000 |
| Apr 21, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | P 3 Construction & Remodeling Inc | voluntary structural upgrade at garage. no change to maximum path of travel of egress path. upgrade at garage.Details
voluntary structural upgrade at garage. no change to maximum path of travel of egress path. upgrade at garage. | $50,000 |
| Mar 28, 2023 | Completed final sign-off Apr 2023 | 2667 15th Av | N M S Brosnan Construction | rev to pa# 2018-0109-8193: revision to 3rd fl. windows facing 15th st. window 302 & 303 in home office 304 to be modified to be 302 & 308 operable & 308 fixed door, 300 modified to be casement window. window 310 to be added to master bath 305; omit permitted roof deck under bpa #8193Details
rev to pa# 2018-0109-8193: revision to 3rd fl. windows facing 15th st. window 302 & 303 in home office 304 to be modified to be 302 & 308 operable & 308 fixed door, 300 modified to be casement window. window 310 to be added to master bath 305; omit permitted roof deck under bpa #8193 | |
| Mar 22, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | P 3 Construction & Remodeling Inc | new interior remodel. bathroom relocation at 1/f, new windows and door openings facing backyard. infill of open areas under cantilevered room at 1/f. demolition of (e) trellis structure in backyard. new kitchen & pantry @ 2nd flDetails
new interior remodel. bathroom relocation at 1/f, new windows and door openings facing backyard. infill of open areas under cantilevered room at 1/f. demolition of (e) trellis structure in backyard. new kitchen & pantry @ 2nd fl | $500,000 |
| Mar 8, 2023 | Completed final sign-off Jun 2024 | 76 Rossi Av | Siena Pacific, Inc. | replacement of windows in (e) opening in room 005, 103, 204 and 207 (reflected on plans); replacement of double door in (e) opening w/sliding door inroom 106; replacement of (e) vinyl siding @ rear facade w/wood siding. windows & doors are not visible from streetDetails
replacement of windows in (e) opening in room 005, 103, 204 and 207 (reflected on plans); replacement of double door in (e) opening w/sliding door inroom 106; replacement of (e) vinyl siding @ rear facade w/wood siding. windows & doors are not visible from street | $10,000 |
| Feb 14, 2023 | Completed final sign-off Apr 2024 | 139 24th Av | Jim Murphy & Associates | rear bldg: interior remodel of e cottage structure, including kitchen and bath. reframe e floor at kitchen to increase interior head height. new deck structure ,, hot tub and oudoor kitchen adjacent to cottage.Details
rear bldg: interior remodel of e cottage structure, including kitchen and bath. reframe e floor at kitchen to increase interior head height. new deck structure ,, hot tub and oudoor kitchen adjacent to cottage. | $150,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2024 | 3673 Jackson St | Van Acker Const Assoc Inc | remodel (3) bathrooms: primary bath, 4rd floor bath and powder room. all plumbing and electrical fixtures to be replaced.Details
remodel (3) bathrooms: primary bath, 4rd floor bath and powder room. all plumbing and electrical fixtures to be replaced. | $55,000 |
| Oct 12, 2022 | Never finaled issued Nov 2022, no final | 139 24th Av | Jim Murphy & Associates | front building demolish & rebuild (e) concrete footing to expand laundry room on 1st level; excavate and build (n)concrete retaining walls to create (n) storage area at garage level. all work within existing envelope.Details
front building demolish & rebuild (e) concrete footing to expand laundry room on 1st level; excavate and build (n)concrete retaining walls to create (n) storage area at garage level. all work within existing envelope. | $20,000 |
| Aug 31, 2022 | Never finaled issued Sep 2022, no final | 139 24th Av | Jim Murphy & Associates | front building - interior remodel: laundry and playroom, replace spiral stairs to garage w/ (n) elevator . lower sill and replace (e) front window with a door to create access to garage roof terrace. reinforce (e) garage roof framing to support (n) raised tile deck surface.Details
front building - interior remodel: laundry and playroom, replace spiral stairs to garage w/ (n) elevator . lower sill and replace (e) front window with a door to create access to garage roof terrace. reinforce (e) garage roof framing to support (n) raised tile deck surface. | $500,000 |
| Jul 26, 2022 | Completed final sign-off Dec 2023 | 8 Seacliff Av | Brian Mac Namara Construction | partial removal of exterior finishes at the northwest corner of the structure to expose water damaged sheathing & framing; replace damaged windows in-kind in affected area as necessary. apply (n) stucco finish to match (e)Details
partial removal of exterior finishes at the northwest corner of the structure to expose water damaged sheathing & framing; replace damaged windows in-kind in affected area as necessary. apply (n) stucco finish to match (e) | $50,000 |
| Jul 26, 2022 | Completed final sign-off Sep 2024 | 8 Seacliff Av | Brian Mac Namara Construction, Excel Site Services Inc | voluntary structural seismic upgrade including partial foundation replacement. new shear wall and a new steel moment frame at the garageDetails
voluntary structural seismic upgrade including partial foundation replacement. new shear wall and a new steel moment frame at the garage | $100,000 |
| Jul 12, 2022 | Expired or cancelled expired Jul 2025 | 8 Seacliff Av | Brian Mac Namara Construction, Colindres & Associates | 3rd fl sunroom: repair and replace (e) finishes, doors, & windows as needed to address water damage.Details
3rd fl sunroom: repair and replace (e) finishes, doors, & windows as needed to address water damage. | $20,000 |
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 139 24th Av | Jim Murphy & Associates | front bldg-interior remodel: kitchen and baths. reconfigure (e) interior stairs to basement. addition of 2 bathrooms, replace of (e) stairs in rear. replace front windows.Details
front bldg-interior remodel: kitchen and baths. reconfigure (e) interior stairs to basement. addition of 2 bathrooms, replace of (e) stairs in rear. replace front windows. | $300,000 |
| Dec 8, 2021 | Never finaled issued Dec 2021, no final | 55 Ashbury Tr | Union Pierce Construction | remodel of (e) kitchenDetails
remodel of (e) kitchen | $300,000 |
| Nov 5, 2021 | Never finaled issued Jan 2023, no final | 3045 Pacific Av | Siena Pacific, Inc., Moroso Construction Inc | addition of roof deck & retractable skylight, new reconfigured patio @ (e) rear yard, minoe excavation/foundation replacement @ mud rm. new sliding door 1/f rear, new window @ front & rear, replace (e) window & swing door @ living rm east facade w/sliding door, new interior stair to replace (e).Details
addition of roof deck & retractable skylight, new reconfigured patio @ (e) rear yard, minoe excavation/foundation replacement @ mud rm. new sliding door 1/f rear, new window @ front & rear, replace (e) window & swing door @ living rm east facade w/sliding door, new interior stair to replace (e). | $700,000 |
| Oct 4, 2021 | Completed final sign-off Mar 2023 | 2405 Washington St | Siena Pacific, Inc. | interior kitchen remodel at unit 1. remodel consists of new kithcen layout, new locations for plumbing fixtures, relocation of 1 bathroom and reduction to powder room. no changes on exterior. exterior work under separate pa 202109138303.Details
interior kitchen remodel at unit 1. remodel consists of new kithcen layout, new locations for plumbing fixtures, relocation of 1 bathroom and reduction to powder room. no changes on exterior. exterior work under separate pa 202109138303. | $80,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2023 | 2405 Washington St | Siena Pacific, Inc. | three (3) new windows at rear of the building. interior remodel under separate permit 202110049743Details
three (3) new windows at rear of the building. interior remodel under separate permit 202110049743 | $20,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2024 | 3673 Jackson St | Van Acker Const Assoc Inc | conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures.Details
conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures. | $1,100,000 |
| Jul 2, 2021 | Expired or cancelled expired Jan 2026 | 65 Borica St | Siena Pacific, Inc. | reconfigure (e) bedroom access @ 1st floorDetails
reconfigure (e) bedroom access @ 1st floor | $78,350 |
| Jun 24, 2021 | Expired or cancelled withdrawn Jul 2021 | 65 Borica St | 1/f: demo/relocation of (e) stair connecting 1/f to basement; ground lvl: reconfigure (4) bedroom access/closets; basemnt: replace (e) foundation, partial excavation of unconditioned space for new livable space w/clear headroom 8'0", new basement to include new exterior light well to back yard forDetails
1/f: demo/relocation of (e) stair connecting 1/f to basement; ground lvl: reconfigure (4) bedroom access/closets; basemnt: replace (e) foundation, partial excavation of unconditioned space for new livable space w/clear headroom 8'0", new basement to include new exterior light well to back yard for | $721,920 | |
| Apr 7, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | remodel of (e) kitchen and powder room in kind.Details
remodel of (e) kitchen and powder room in kind. | $20,000 | |
| Oct 21, 2019 | Completed final sign-off Feb 2022 | 1206 19th St | Vonnegut Thoreau Construction | revision to 201710131186 to replace proposed wood clad windows with metal clad windowsDetails
revision to 201710131186 to replace proposed wood clad windows with metal clad windows | |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 300 Grove St | Cookline Construction Inc | tenant improvement "baia" of existing 2 story restaurant. storefront, new interior non-structural partitions, finishes/casework, lighting and new kitchen equipment. all mechanical, electrical and plumbing work under separate design/build permit. new doorDetails
tenant improvement "baia" of existing 2 story restaurant. storefront, new interior non-structural partitions, finishes/casework, lighting and new kitchen equipment. all mechanical, electrical and plumbing work under separate design/build permit. new door | $300,000 |
| Jul 2, 2019 | Never finaled issued Aug 2019, no final | 944 Market St | Charles Pankow Builders Ltd | demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit.Details
demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit. | $120,509 |
| Nov 7, 2017 | Completed final sign-off Jun 2021 | 1467 Sanchez St | Quinlan Construction | variance for an access stair from 2/f to rear yard in a 5' side setback for "pump out" extension into rear yard. the related assmebly includes a (n) wall along the property line, totaling 75 sq.ft., project related to sfdbi pa#201706149380Details
variance for an access stair from 2/f to rear yard in a 5' side setback for "pump out" extension into rear yard. the related assmebly includes a (n) wall along the property line, totaling 75 sq.ft., project related to sfdbi pa#201706149380 | $850 |
| Aug 10, 2017 | Completed final sign-off Mar 2019 | 55 Ashbury Tr | Union Pierce Construction | interior remodel of 3/f, add new bathroom. replace (e) front facade wood windows and doors in kind.Details
interior remodel of 3/f, add new bathroom. replace (e) front facade wood windows and doors in kind. | $140,000 |
| Jun 29, 2016 | Expired or cancelled cancelled Nov 2024 | 1524 Noe St | new garage horizontal addition @ front. convert (e) basement to habitable space with excavation. new 2nd floor horizontal addition & bath remodel. new skylights & decks & 2 new bedrooms.Details
new garage horizontal addition @ front. convert (e) basement to habitable space with excavation. new 2nd floor horizontal addition & bath remodel. new skylights & decks & 2 new bedrooms. | $185,000 | |
| Jun 23, 2016 | Completed final sign-off Oct 2016 | 36 Jordan Av | Upscale Construction Inc. | revision to permit 201406309990; replace existing exterior front entry stair in kind, replace existing driveway side retaining walls in kind.Details
revision to permit 201406309990; replace existing exterior front entry stair in kind, replace existing driveway side retaining walls in kind. | |
| Nov 2, 2012 | Completed final sign-off Jun 2013 | 416 Diamond St | Burradell Construction Inc---See Notes | kitchen remodel & in-fill of (e) exterior lightwell & ground floor laundry roomDetails
kitchen remodel & in-fill of (e) exterior lightwell & ground floor laundry room | $45,000 |
| Sep 26, 2011 | Completed final sign-off Jan 2012 | 367 Collingwood St | Jackson Pacific Builders | kitchen remodel and bath remodel. demo existing exterior deck and remove existing exterior door from kitchen to deck. window replacement at kitchen, breakfast, new kitchen and bath fixtures and finishes.Details
kitchen remodel and bath remodel. demo existing exterior deck and remove existing exterior door from kitchen to deck. window replacement at kitchen, breakfast, new kitchen and bath fixtures and finishes. | $50,000 |
| Feb 11, 2010 | Completed final sign-off Mar 2011 | 466 Hill St | Axis Construction | restoration of front facade, replacement of (e) windows & entry door. replacement of interior doors at bedroom clsoet. convert 2nd floor shower to laundry closet, remodel of (e) front balcony ( making it smaller) & replace (e) balcony guardrail.Details
restoration of front facade, replacement of (e) windows & entry door. replacement of interior doors at bedroom clsoet. convert 2nd floor shower to laundry closet, remodel of (e) front balcony ( making it smaller) & replace (e) balcony guardrail. | $45,000 |
| Aug 13, 2009 | Completed final sign-off Jun 2010 | 77 Van Ness Av | Level 8 Construction Inc | unit reduction from 50 units to 48 units. combine units 804, 806, & 808 by installing two new doors with magnetic hold opens & smoke detectors each side.Details
unit reduction from 50 units to 48 units. combine units 804, 806, & 808 by installing two new doors with magnetic hold opens & smoke detectors each side. | $4,000 |
| Jul 30, 2009 | Completed final sign-off Nov 2009 | 715 Shrader St | Occidental Express | work @ unit#715 only.interior remodel of (e) ground flr. bathrm, bedrm. & media rm. new bathrm., plumbing fixtures, finishes & lighting. installation of (n) gas direct vent fireplace & flue to roof. removal, relocation and replacement of (e) ground flr. windows on south (side) wall. (n) shearwall &Details
work @ unit#715 only.interior remodel of (e) ground flr. bathrm, bedrm. & media rm. new bathrm., plumbing fixtures, finishes & lighting. installation of (n) gas direct vent fireplace & flue to roof. removal, relocation and replacement of (e) ground flr. windows on south (side) wall. (n) shearwall & | $33,000 |
| Jun 15, 2009 | Completed final sign-off Mar 2010 | 70 Henry St | Plath & Company Inc | revision to appl #200903234649 - addition to two skylights to dormer. clarification to window specification per attachment & revised plan a3.8.Details
revision to appl #200903234649 - addition to two skylights to dormer. clarification to window specification per attachment & revised plan a3.8. | $200 |
| Mar 23, 2009 | Completed final sign-off Mar 2010 | 70 Henry St | new dormer and new bath room at 4th fl. new closets at (e) bedrooms. all other work under pa# 2008.03.05.6399. replace front window at top floor, entry doors, and garage door.Details
new dormer and new bath room at 4th fl. new closets at (e) bedrooms. all other work under pa# 2008.03.05.6399. replace front window at top floor, entry doors, and garage door. | $8,500 | |
| Mar 17, 2009 | Completed final sign-off Jun 2010 | 3458 16th St | Hammerhouse Construction | demo extg rear stair. construct new 2 level rear deck.Details
demo extg rear stair. construct new 2 level rear deck. | $15,000 |
| Mar 6, 2009 | Expired or cancelled cancelled Jul 2011 | 47 Sussex St | construction of one story detached garage at rear yard.Details
construction of one story detached garage at rear yard. | $36,708 | |
| Mar 6, 2009 | Expired or cancelled cancelled Jun 2010 | 47 Sussex St | demolition of one story storage shed at rear yard.Details
demolition of one story storage shed at rear yard. | ||
| Jul 23, 2008 | Completed final sign-off Jan 2010 | 41 Cumberland St | horizontal addition @rear. interior remodeling to remove (e) illegal in-law unit on ground flr & construct new bedrm, media rm & bath. 2nd flr-remodel kitchen, new family rm, laundry rm and powdr rm. 3rd flr-addition of master bedrm, master bathrm & remodel of (e) bathrm. addition of rear deck-2ndDetails
horizontal addition @rear. interior remodeling to remove (e) illegal in-law unit on ground flr & construct new bedrm, media rm & bath. 2nd flr-remodel kitchen, new family rm, laundry rm and powdr rm. 3rd flr-addition of master bedrm, master bathrm & remodel of (e) bathrm. addition of rear deck-2nd | $140,000 | |
| Mar 5, 2008 | Expired or cancelled expired Mar 2010 | 70 Henry St | ground floor addition of 420 s.f. with roof deck above. new wood deck over (e) third floor flat roof with guardrails. new dormer over new bathroom at 4th floor. fill in (e) lightwell. interior remodel of both units including kitchens & bathrooms.Details
ground floor addition of 420 s.f. with roof deck above. new wood deck over (e) third floor flat roof with guardrails. new dormer over new bathroom at 4th floor. fill in (e) lightwell. interior remodel of both units including kitchens & bathrooms. | $150,000 | |
| Dec 7, 2007 | Expired or cancelled expired Mar 2010 | 674 Vermont St | int remodel at first floor: conversion of approx 605 sf of garage to habitable space including bedrm, bathrm, family rm & laundry rm. fill in 11 sf. under (e) deck. (2) new french doors @ rear wall and replacement of 2 (e) windows at rear wall. new shear wall @ rear wall.replacDetails
int remodel at first floor: conversion of approx 605 sf of garage to habitable space including bedrm, bathrm, family rm & laundry rm. fill in 11 sf. under (e) deck. (2) new french doors @ rear wall and replacement of 2 (e) windows at rear wall. new shear wall @ rear wall.replac | $85,000 | |
| Jul 5, 2007 | Expired or cancelled expired Oct 2008 | 80 Alvarado St | interior remodel to 2 level flat on 2nd and 3rd floor of a 4 unit building. kitchen and bath remodel.replace exteiror door and window at rear, new frech door opening at rear with collector beam and shear wallDetails
interior remodel to 2 level flat on 2nd and 3rd floor of a 4 unit building. kitchen and bath remodel.replace exteiror door and window at rear, new frech door opening at rear with collector beam and shear wall | $60,000 | |
| Apr 26, 2007 | Expired or cancelled expired Jun 2009 | 4148 23rd St | convert extg basement into bedroom, bathroom, closet and laundry room. repalce extg rear conc stair from basement to rear yard. replace extg front wndw at basement level. replace extg wood beam with steel beam. add shear wall.Details
convert extg basement into bedroom, bathroom, closet and laundry room. repalce extg rear conc stair from basement to rear yard. replace extg front wndw at basement level. replace extg wood beam with steel beam. add shear wall. | $30,000 | |
| May 26, 2005 | Completed final sign-off Nov 2005 | 4334 25th St | 2/f deck replacement with addition of 1/f,deck & stair,removal of scoped shed roof @back of house &Details
2/f deck replacement with addition of 1/f,deck & stair,removal of scoped shed roof @back of house & | $10,000 | |
| May 25, 2005 | Completed final sign-off Nov 2005 | 4334 25th St | Conrad Von Blankenburg | kitchen remodel, master bedroom & bathroom remodel, (new & replace windows) guest bathroom relocatioDetails
kitchen remodel, master bedroom & bathroom remodel, (new & replace windows) guest bathroom relocatio | $100,000 |