Block 0911, lot 023
663 Marina Blvd
- City’s use
- Single Family Residential
- Built
- 1937
- Stories
- 3
- Units
- 1
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 5,470 sq ft
- Lot
- 4,660 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 663 Marina Bl | The Toboni Group | intallation of new cabinets at primary closet and bathroom(level 2). level 2 bathroom will be converted to additional closet space. existing plumbing lines will be shut off and capped.Details
intallation of new cabinets at primary closet and bathroom(level 2). level 2 bathroom will be converted to additional closet space. existing plumbing lines will be shut off and capped. | $30,000 |
| Aug 18, 2022 | Completed final sign-off Sep 2022 | 663 Marina Bl | J O Roofing Inc | re-roofing mod/ bitmend and asphalt shingles roofing system 1) remove existing roofing materials 2) install protecting board 3) install sa base board 4) install app mod/bitument 5) astm #30 underlayment 6) install landmark pro shinglesDetails
re-roofing mod/ bitmend and asphalt shingles roofing system 1) remove existing roofing materials 2) install protecting board 3) install sa base board 4) install app mod/bitument 5) astm #30 underlayment 6) install landmark pro shingles | $45,000 |
| Jul 26, 2022 | Completed final sign-off Jul 2024 | 663 Marina Bl | Arrow Construction & Remodeling | repair in kind less than 50% of existing entry stairs. facing front. in-kindDetails
repair in kind less than 50% of existing entry stairs. facing front. in-kind | $39,000 |
| Jul 18, 2022 | Completed final sign-off Jul 2024 | 663 Marina Bl | Arrow Construction & Remodeling | revision to 2021 0222 5093. replace (e) stucco & waterproofing with new in kind at front of bldg.Details
revision to 2021 0222 5093. replace (e) stucco & waterproofing with new in kind at front of bldg. | |
| Nov 30, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | Arrow Construction & Remodeling | replacement of extg metal fireplace box with new metal fireplace box.Details
replacement of extg metal fireplace box with new metal fireplace box. | $9,500 |
| Jun 11, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | Arrow Construction & Remodeling | remodel of (e) kitchen.Details
remodel of (e) kitchen. | $240,000 |
| Feb 22, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | Arrow Construction & Remodeling | remodel of (e) north & west facades including (n) moldings & railings. revise front door & sidelite. change 2 2nd level north facing windows into doors. add (n) skylight over (e) master bathrm. no front landscaping work. no foundn work. no soil disturbance greater than 2' below grade. no work onDetails
remodel of (e) north & west facades including (n) moldings & railings. revise front door & sidelite. change 2 2nd level north facing windows into doors. add (n) skylight over (e) master bathrm. no front landscaping work. no foundn work. no soil disturbance greater than 2' below grade. no work on | $240,000 |
| Dec 15, 2020 | Completed final sign-off Jul 2024 | 663 Marina Bl | Arrow Construction & Remodeling | remodel of existing master bathroom and wardrobe. relocate existing non-structural interior wall in that area.Details
remodel of existing master bathroom and wardrobe. relocate existing non-structural interior wall in that area. | $180,000 |
| Sep 21, 2017 | Never finaled issued Sep 2017, no final | 663 Marina Bl | street spaceDetails
street space | ||
| Jul 13, 2016 | Completed final sign-off Aug 2016 | 663 Marina Bl | Upcycle Builders Inc. | interior and exterior painting. minor tile work at two kitchenettes. replace two stair handrails, per code. replace backsplashDetails
interior and exterior painting. minor tile work at two kitchenettes. replace two stair handrails, per code. replace backsplash | $5,000 |
| Oct 8, 2015 | Never finaled issued Oct 2015, no final | 663 Marina Bl | street spaceDetails
street space | ||
| Aug 5, 2015 | Completed final sign-off Feb 2016 | 663 Marina Bl | Creative Designs Construction | remove bearing @ 2/f providing beam & new footing. n/a ordinance #155-13Details
remove bearing @ 2/f providing beam & new footing. n/a ordinance #155-13 | $25,000 |
| Mar 11, 2015 | Completed final sign-off Mar 2015 | 663 Marina Bl | Ren Lei Construction Co | to obtain final inspection for work approved under pa# 9017908 - all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa# 9017908 - all work is complete. n/a for maher. | |
| Feb 9, 2015 | Never finaled issued Feb 2015, no final | 663 Marina Bl | sidewalk repairDetails
sidewalk repair | ||
| Oct 8, 2013 | Expired or cancelled cancelled Jan 2026 | 663 Marina Bl | Ren Lei Construction Co | remove extg bathroom to replace for a new living area.new stairs to retractable roof hatch. remove part of fake sloped roofs. new guardrail and exterior handrails, new deck flooring.Details
remove extg bathroom to replace for a new living area.new stairs to retractable roof hatch. remove part of fake sloped roofs. new guardrail and exterior handrails, new deck flooring. | $20,000 |
| Aug 15, 2013 | Expired or cancelled cancelled Nov 2015 | 663 Marina Bl | Ren Lei Construction Co | 3/f: remove (e) bathrom, to replace for a new living area, new stairs to terrace. terrace floor: remove part of fake sloped roofs, new opening for new stairs, new guardrail and exterior handrails, new deck flooringDetails
3/f: remove (e) bathrom, to replace for a new living area, new stairs to terrace. terrace floor: remove part of fake sloped roofs, new opening for new stairs, new guardrail and exterior handrails, new deck flooring | $10,000 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 663 Marina Bl | street space permitDetails
street space permit | ||
| May 7, 2013 | Completed final sign-off Mar 2015 | 663 Marina Bl | Ren Lei Construction Co | repair & upgrade rear deck, stair,& handrails. replace all windows as in kind new family room, bedroom, bathroom, pair bedroom, office and upgrade internal stairs. remodel kitchen and half bath at 2nd floor with new gas fire place. remodel 3rd floor bedrooms & bathroom. nw 3rd floor master bathroomDetails
repair & upgrade rear deck, stair,& handrails. replace all windows as in kind new family room, bedroom, bathroom, pair bedroom, office and upgrade internal stairs. remodel kitchen and half bath at 2nd floor with new gas fire place. remodel 3rd floor bedrooms & bathroom. nw 3rd floor master bathroom | $145,000 |
| Oct 23, 2007 | Never finaled issued Oct 2007, no final | 663 Marina Bl | street space & sidewalkDetails
street space & sidewalk | ||
| Aug 30, 2006 | Completed final sign-off Oct 2006 | 663 Marina Bl | Armstrong Installation Service | reroofingDetails
reroofing | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.