J O Roofing Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2022 to May 2026
- Last 24 months
- 13 permits filed
39 permits since 2000: 38 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2026 | Completed final sign-off Jun 2026 | 1956 Fell St | re-roofing with hot worksDetails
re-roofing with hot works | $25,000 |
| May 26, 2026 | In progress issued Jun 2026 | 1256 30th Av | re-roofing, asphalt shingle. install 1/2" cdx plywood over existing sub-roof. nail with 10d at 6" perimieter nailing and 12" field nailing.Details
re-roofing, asphalt shingle. install 1/2" cdx plywood over existing sub-roof. nail with 10d at 6" perimieter nailing and 12" field nailing. | $25,000 |
| May 11, 2026 | Completed final sign-off May 2026 | 1081 Geneva Av | re-roofing modified butimen (with torch down) and asphalt shingles systems. remove (e) roofing material. install 1/2" protection board. install one ply sa base. install one play app modified butimen. install one ply underlayment and asphalt shingle roofing system.Details
re-roofing modified butimen (with torch down) and asphalt shingles systems. remove (e) roofing material. install 1/2" protection board. install one ply sa base. install one play app modified butimen. install one ply underlayment and asphalt shingle roofing system. | $16,950 |
| May 1, 2026 | Completed final sign-off Jun 2026 | 474 27th Av | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $35,000 |
| Apr 24, 2026 | Completed final sign-off May 2026 | 1676 Dolores St | reroofing hot worksDetails
reroofing hot works | $20,100 |
| Mar 18, 2026 | Completed final sign-off Mar 2026 | 2758 23rd St | aka 2760 23rd street: re roofing no hot worksDetails
aka 2760 23rd street: re roofing no hot works | $9,500 |
| Aug 22, 2025 | Completed final sign-off Sep 2025 | 263 16th Av | re-roofing with hot worksDetails
re-roofing with hot works | $18,000 |
| Jul 28, 2025 | Completed final sign-off Aug 2025 | 540 Liberty St | re roofing: hot works.Details
re roofing: hot works. | $7,500 |
| May 20, 2025 | Completed final sign-off Jun 2025 | 3711 Market St | re roofing modified bitumen system, remove existing roofing material, install 1/2 protection board, install sa base, install modified bitumen roofing system. (hot work)Details
re roofing modified bitumen system, remove existing roofing material, install 1/2 protection board, install sa base, install modified bitumen roofing system. (hot work) | $19,500 |
| May 13, 2025 | Completed final sign-off Jun 2025 | 440 Scott St | reroofing. no hot works.Details
reroofing. no hot works. | $35,200 |
| Mar 19, 2025 | Completed final sign-off Apr 2025 | 1717 Jones St | re-roofing - with torchDetails
re-roofing - with torch | $22,000 |
| Jan 21, 2025 | Completed final sign-off Jan 2025 | 3445 Fillmore St | reroofingDetails
reroofing | $21,400 |
| Dec 30, 2024 | Completed final sign-off Apr 2025 | 66 Manchester St | reroofing, torch downDetails
reroofing, torch down | $15,400 |
| Sep 24, 2024 | Completed final sign-off Oct 2024 | 184 Amber Dr | re-roofing flat roof about 1500 square feet.Details
re-roofing flat roof about 1500 square feet. | $16,350 |
| Sep 13, 2024 | Completed final sign-off Oct 2024 | 522 Funston Av | re-roofingDetails
re-roofing | $28,200 |
| Aug 30, 2024 | Completed final sign-off Feb 2025 | 172 32nd Av | reroofing.Details
reroofing. | $25,200 |
| Jun 17, 2024 | Completed final sign-off Feb 2025 | 198 32nd Av | reroofingDetails
reroofing | $48,525 |
| Jun 3, 2024 | Completed final sign-off Feb 2025 | 2 Denslowe Dr | reroofingDetails
reroofing | $16,500 |
| May 24, 2024 | Completed final sign-off Jan 2025 | 20 Nadell Ct | reroofingDetails
reroofing | $14,950 |
| May 14, 2024 | Completed final sign-off May 2024 | 80 Ulloa St | reroofingDetails
reroofing | $14,921 |
| May 6, 2024 | Completed final sign-off Feb 2025 | 567 42nd Av | re-roofingDetails
re-roofing | $24,540 |
| Apr 26, 2024 | Completed final sign-off May 2024 | 318 Tara St | reroofingDetails
reroofing | $13,800 |
| Mar 28, 2024 | Completed final sign-off May 2024 | 3465 Broderick St | re-roofingDetails
re-roofing | $42,020 |
| Feb 20, 2024 | Completed final sign-off Mar 2024 | 2832 21st St | re-roofing.Details
re-roofing. | $16,500 |
| Feb 8, 2024 | Completed final sign-off Feb 2025 | 1353 Silver Av | re-roofingDetails
re-roofing | $13,500 |
| Nov 22, 2023 | Completed final sign-off Mar 2024 | 71 Rico Wy | reroofingDetails
reroofing | $40,150 |
| Nov 22, 2023 | Completed final sign-off Jan 2025 | 10 Nadell Ct | reroofingDetails
reroofing | $15,100 |
| Nov 16, 2023 | Completed final sign-off Feb 2025 | 3086 24th St | reroofingDetails
reroofing | $19,080 |
| Oct 20, 2023 | Completed final sign-off Oct 2023 | 182 Desmond St | reroofingDetails
reroofing | $15,050 |
| Oct 17, 2023 | Completed final sign-off Oct 2023 | 466 Munich St | reroofingDetails
reroofing | $12,100 |
| Sep 5, 2023 | Completed final sign-off Sep 2023 | 134 27th St | reroofingDetails
reroofing | $25,800 |
| Aug 14, 2023 | Completed final sign-off Aug 2023 | 183 Cora St | reroofingDetails
reroofing | $13,500 |
| May 24, 2023 | Completed final sign-off Jun 2023 | 1038 Castro St | reroofingDetails
reroofing | $5,100 |
| Mar 27, 2023 | Completed final sign-off Apr 2023 | 541 Hill St | reroofing: asphalt shingles, remove existing roofing material, install astm #30 asphalt, install presidential shake asphat shingles.Details
reroofing: asphalt shingles, remove existing roofing material, install astm #30 asphalt, install presidential shake asphat shingles. | $36,000 |
| Feb 22, 2023 | Completed final sign-off Apr 2024 | 324 17th Av | reroofingDetails
reroofing | $14,000 |
| Feb 14, 2023 | Completed final sign-off Feb 2023 | 415 Justin Dr | reroofingDetails
reroofing | $13,000 |
| Aug 18, 2022 | Completed final sign-off Sep 2022 | 663 Marina Bl | re-roofing mod/ bitmend and asphalt shingles roofing system 1) remove existing roofing materials 2) install protecting board 3) install sa base board 4) install app mod/bitument 5) astm #30 underlayment 6) install landmark pro shinglesDetails
re-roofing mod/ bitmend and asphalt shingles roofing system 1) remove existing roofing materials 2) install protecting board 3) install sa base board 4) install app mod/bitument 5) astm #30 underlayment 6) install landmark pro shingles | $45,000 |
| Jun 28, 2022 | Completed final sign-off Aug 2022 | 2610 Jackson St | reroofingDetails
reroofing | $40,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2022 | 461 Bush St | reroofingDetails
reroofing | $45,000 |