Julia Chen
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Julia Y. Chen Design Inc.
- Based in
- Fairfax
- On San Francisco permits
- Jun 2002 to Sep 2026
110 permits since 2000 (engineer on 105 permits, architect on 3 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 76 completed, 8 in progress, 15 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 110.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 480 Gold Mine Dr | Dcs Plumbing Llc | response to complaint 202658166. remove e 2nd fl rear exterior deck. replace e 1st fl rear exterior deck.Details
response to complaint 202658166. remove e 2nd fl rear exterior deck. replace e 1st fl rear exterior deck. | $50,000 |
| May 1, 2026 | In progress issued May 2026 | 2405 Pacific Av | La Torre General Construction | revision to bpa: 202512121623 - convert (e) crawl space to storage with (n) window and door, modify rear window and door (exterior) from garage to yard.Details
revision to bpa: 202512121623 - convert (e) crawl space to storage with (n) window and door, modify rear window and door (exterior) from garage to yard. | $2,500 |
| Mar 11, 2026 | In progress issued Mar 2026 | 21 18th Av | Barrett Karber Built Llc, Ashbury Gen Constructing & Eng | rev to pa# 2025-0728-1723: convert (e) storage rooms to (n) den, gym, bathroom, mudroom, laundry & mech room. on 1st fl. rebuild interior stair from fl. 1-2. remove full bath & expand (e) kitchen, add (n) powder rm & pantry on fl. 2. remodel & relocate (e) bathrooms, convert one bedroom to two (n)Details
rev to pa# 2025-0728-1723: convert (e) storage rooms to (n) den, gym, bathroom, mudroom, laundry & mech room. on 1st fl. rebuild interior stair from fl. 1-2. remove full bath & expand (e) kitchen, add (n) powder rm & pantry on fl. 2. remodel & relocate (e) bathrooms, convert one bedroom to two (n) | $150,000 |
| Dec 12, 2025 | In progress issued Dec 2025 | 2405 Pacific Av | La Torre General Construction | replacement of ext 3/f deck with new and metal stair, partiral seismic retrofit on 1/f garage,kitchen/laundry rm remodels on 3/f,removal of int wall at 2/f dining area,replacement of (e) ext stair and replacement of (e) ext window/doors. reduce deck size.modification to issued permit 202012070396Details
replacement of ext 3/f deck with new and metal stair, partiral seismic retrofit on 1/f garage,kitchen/laundry rm remodels on 3/f,removal of int wall at 2/f dining area,replacement of (e) ext stair and replacement of (e) ext window/doors. reduce deck size.modification to issued permit 202012070396 | $200,000 |
| Oct 23, 2025 | Completed final sign-off Oct 2026 | 3242 Divisadero St | Dcs Plumbing Llc | 3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1.Details
3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1. | $145,000 |
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | Cody Design Build Inc | revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roofDetails
revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roof | |
| May 22, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | Cody Design Build Inc | 1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thruDetails
1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thru | $195,000 |
| May 19, 2025 | Completed final sign-off Jun 2026 | 2344 Cecilia Av | B. Uniacke Construction | (n) conditioned living space at the back of (e) garage the work will include plumbing for bathroom, sauna, and electrical work.Details
(n) conditioned living space at the back of (e) garage the work will include plumbing for bathroom, sauna, and electrical work. | $130,000 |
| Feb 10, 2025 | Completed final sign-off Jun 2025 | 3350 Laguna St | Alvarez Construction & Tile, Inc | unit 101: kitchen remodel - create new opening b/t kitchen and living room. install new electrical and plumbing per plan. install new cabinets, countertops and appliances. master bathroom remodel - install new shower pan, drain, new valve, new toilet, new sink, new tile and new paint.Details
unit 101: kitchen remodel - create new opening b/t kitchen and living room. install new electrical and plumbing per plan. install new cabinets, countertops and appliances. master bathroom remodel - install new shower pan, drain, new valve, new toilet, new sink, new tile and new paint. | $40,000 |
| Dec 10, 2024 | Completed final sign-off May 2025 | 122 Highland Av | Artcraft Construction | (front bldg) to comply with nov 202423517. revision to permit 202408279562. (1) revised guardrail height at open sides of stairs. (2) removal of posts closest to bldg. (3) correction of (e) and (p) drawing to show (e) over hang at floor 3 landing to be replaced.Details
(front bldg) to comply with nov 202423517. revision to permit 202408279562. (1) revised guardrail height at open sides of stairs. (2) removal of posts closest to bldg. (3) correction of (e) and (p) drawing to show (e) over hang at floor 3 landing to be replaced. | |
| Aug 27, 2024 | Completed final sign-off May 2025 | 122 Highland Av | Hon's Construction Inc., Artcraft Construction | revised scope of work 9/23/24: to comply with nov item 2 - demo (e) required rear egress stair & construct (n) required egress stair in kind replacement; nov item 3 - remove & properly dispose of peeling paint & repaint per nov instructions. to comply w/nov 202423517Details
revised scope of work 9/23/24: to comply with nov item 2 - demo (e) required rear egress stair & construct (n) required egress stair in kind replacement; nov item 3 - remove & properly dispose of peeling paint & repaint per nov instructions. to comply w/nov 202423517 | $10,000 |
| Aug 1, 2024 | In progress issued Sep 2024 | 1235 05th Av | Kingfish Construction Llc. | interior remodel on 3rd fl. (n) deck on existing flat roof on 2nd fl. (n) windows on rear facade on 3rd fl onlyDetails
interior remodel on 3rd fl. (n) deck on existing flat roof on 2nd fl. (n) windows on rear facade on 3rd fl only | $150,000 |
| Jul 30, 2024 | In progress issued Nov 2024 | 342 Staples Av | Kalix Inc Dbalara Construction | revision to pa# 202401043443. addition of approx 74sf at 2nd floor to create a new master bedroom, and addition of approx 74sf at 1st floor to create a new bedroom. 2 new rear yard sliding glass doors. new rear yard decks and stairs at 1st and 2nd floors. minor elect and mech work.Details
revision to pa# 202401043443. addition of approx 74sf at 2nd floor to create a new master bedroom, and addition of approx 74sf at 1st floor to create a new bedroom. 2 new rear yard sliding glass doors. new rear yard decks and stairs at 1st and 2nd floors. minor elect and mech work. | $85,000 |
| Oct 18, 2023 | In progress issued Dec 2023 | 480 Douglass St | convert (e) 1st fl into an independent unit by modifying 2nd bath, laundry area to make a kitchen and dining. modify bedroom to create a living rm area, add 40 sf from garage to entry. modify 2nd/3rd fl to create 2nd unti w/new bedrooms at 3rd fl.Details
convert (e) 1st fl into an independent unit by modifying 2nd bath, laundry area to make a kitchen and dining. modify bedroom to create a living rm area, add 40 sf from garage to entry. modify 2nd/3rd fl to create 2nd unti w/new bedrooms at 3rd fl. | $325,000 | |
| Sep 8, 2023 | Completed final sign-off Aug 2025 | 944 Rivera St | Norwood Construction | convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patioDetails
convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patio | $285,000 |
| Jul 3, 2023 | Never finaled filed Jul 2023, never issued | 767 Bush St | proposes change of use from dry cleaning to restaurant (take-out only) as a conditional use, scope includes new stair, servery, kitchen, storage & all-gender ada restroom. no exterior work.Details
proposes change of use from dry cleaning to restaurant (take-out only) as a conditional use, scope includes new stair, servery, kitchen, storage & all-gender ada restroom. no exterior work. | $120,000 | |
| May 17, 2023 | Completed final sign-off Aug 2023 | 2216 Clay St | Sean Rattigan Construction | to comply with nov 202303892 - construct a new retaining wall & fence along rear property lineDetails
to comply with nov 202303892 - construct a new retaining wall & fence along rear property line | $6,000 |
| May 10, 2023 | Completed final sign-off Jun 2025 | 415 Shields St | Kalix Inc Dbalara Construction | 1/f: convert (e) garage/storage into new rooms down including one bedroom, one bathroom, a family room and laundry area. relocate water heater, new electrical at remodel area and new heat at 1/f. modify rear yard shed to comply w136(c)(23)Details
1/f: convert (e) garage/storage into new rooms down including one bedroom, one bathroom, a family room and laundry area. relocate water heater, new electrical at remodel area and new heat at 1/f. modify rear yard shed to comply w136(c)(23) | $115,000 |
| Sep 29, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | Jason Liu Construction Company | 2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room.Details
2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room. | $65,000 |
| Jun 8, 2022 | Completed final sign-off Jun 2024 | 665 Alvarado St | Hon's Construction Inc. | respond to complaint 2019-022212enf - construct stepped retaining wall to restore the rear yard to similar condition prior to the complaint; construct new stair as require for yard access due to stepped retaining wallDetails
respond to complaint 2019-022212enf - construct stepped retaining wall to restore the rear yard to similar condition prior to the complaint; construct new stair as require for yard access due to stepped retaining wall | $15,000 |
| Jun 2, 2022 | Completed final sign-off Apr 2023 | 60 Cedro Av | Brady Construction Inc | remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation.Details
remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation. | $125,000 |
| May 20, 2022 | Completed final sign-off Nov 2023 | 2576 26th Av | Kalix Inc Dbalara Construction | rev to pa #2021-0413-8453: 1st fl.minor reconfigure interior add side door convert media room to kitchenette, 2nd fl. add washer & dryer, relocate stairway access to rear yardDetails
rev to pa #2021-0413-8453: 1st fl.minor reconfigure interior add side door convert media room to kitchenette, 2nd fl. add washer & dryer, relocate stairway access to rear yard | $3,000 |
| Mar 14, 2022 | Completed final sign-off Nov 2023 | 2527 14th Av | Norwood Construction | revision to pa# 202112174627. replace (e) foundation with new foundation between (e) lightwell & garage. modify foundation work due to (e) condition.Details
revision to pa# 202112174627. replace (e) foundation with new foundation between (e) lightwell & garage. modify foundation work due to (e) condition. | $5,000 |
| Dec 17, 2021 | Completed final sign-off Nov 2023 | 2527 14th Av | Norwood Construction | 2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @Details
2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @ | $285,100 |
| Oct 12, 2021 | In progress issued Jul 2024 | 2027 09th Av | Cht Properties Development | horizontal expansion to enlarge existing bedroom at the rear to become a master suite. convert existing ground floor space to become a media room. new interior connecting staircase. new increase of 477sf of conditioned space.Details
horizontal expansion to enlarge existing bedroom at the rear to become a master suite. convert existing ground floor space to become a media room. new interior connecting staircase. new increase of 477sf of conditioned space. | $78,000 |
| Apr 20, 2021 | Completed final sign-off Oct 2021 | 604 Waller St | Qse Construction | revision to mandatory soft story permit 2018 0914 0226 & 2021 0126 3279. revise lenghth of shear wall in garage- rev .2 onlyDetails
revision to mandatory soft story permit 2018 0914 0226 & 2021 0126 3279. revise lenghth of shear wall in garage- rev .2 only | $1,000 |
| Feb 20, 2021 | Never finaled issued Jun 2022, no final | 2954 Laguna St | Kalix Inc Dbalara Construction | new roof deck abover 4th floor, accessed via new stair penthouse replacing (e) roof hatch.Details
new roof deck abover 4th floor, accessed via new stair penthouse replacing (e) roof hatch. | $40,000 |
| Jan 26, 2021 | Completed final sign-off Oct 2021 | 604 Waller St | Qse Construction | revision to pa# 201809140226. replace (e) brick foundation with (n) concrete foundation. change plywood shearwall to strong wall. change hardy frame to plywood shear wall.Details
revision to pa# 201809140226. replace (e) brick foundation with (n) concrete foundation. change plywood shearwall to strong wall. change hardy frame to plywood shear wall. | $100,000 |
| Jan 22, 2021 | Never finaled issued Mar 2023, no final | 323 Hearst Av | in response to nov 202034571, we are applying for a permit for the new work: expand horizontally at rear, expand vertically for new floor level to existing single-family dwelling.Details
in response to nov 202034571, we are applying for a permit for the new work: expand horizontally at rear, expand vertically for new floor level to existing single-family dwelling. | $202,400 | |
| Jan 11, 2021 | Expired or cancelled cancelled Jan 2026 | 122 Highland Av | remove 2 non-code conforming exterior doors & replace with 2 (n) doors. demolish (e) rear egress stair & construct (n) egress stair with smaller footprint. kitchen remodel at 3rd floor.Details
remove 2 non-code conforming exterior doors & replace with 2 (n) doors. demolish (e) rear egress stair & construct (n) egress stair with smaller footprint. kitchen remodel at 3rd floor. | $10,000 | |
| Dec 7, 2020 | Never finaled issued May 2021, no final | 2405 Pacific Av | new laundry & storage on 1st floor. remodel kitchen on 2nd floor. replace existing permitted deck & exterior stairs (pa #465073) on 2nd & 3rd floor with new deck & metal spiral stair. voluntary partial seismic retrofit on 1st floor.Details
new laundry & storage on 1st floor. remodel kitchen on 2nd floor. replace existing permitted deck & exterior stairs (pa #465073) on 2nd & 3rd floor with new deck & metal spiral stair. voluntary partial seismic retrofit on 1st floor. | $200,000 | |
| Nov 21, 2020 | Completed final sign-off Mar 2022 | 2141 Lake St | Able Body Construction Inc | revision to pa# 201707141964 & 201708104445. detail for fire rated wall assembly. energy calculation for forced air system. remove & resize windows on 1st fl. office & pantry layout. bedroom 3, bathroom 2&3 on 3rd fl. relocate skylights. add wall at bedroom 3.Details
revision to pa# 201707141964 & 201708104445. detail for fire rated wall assembly. energy calculation for forced air system. remove & resize windows on 1st fl. office & pantry layout. bedroom 3, bathroom 2&3 on 3rd fl. relocate skylights. add wall at bedroom 3. | $1,000 |
| Nov 10, 2020 | Expired or cancelled withdrawn Jul 2022 | 225 Edgehill Wy | add (2)(n) ext'r decks @ 1st&3rd floor,rear yard. (n) deck primarily located @ rear(northeast facade)of the bldg w/ small portion extending to the side(northwest facade).deck(s)will be approx 185sf.rear side facade windows will be replaced or upgraded to doors for decksDetails
add (2)(n) ext'r decks @ 1st&3rd floor,rear yard. (n) deck primarily located @ rear(northeast facade)of the bldg w/ small portion extending to the side(northwest facade).deck(s)will be approx 185sf.rear side facade windows will be replaced or upgraded to doors for decks | $65,000 | |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 1424 Ulloa St | Brady Construction Inc | enclose (e) unconditioned space adj to garage, new bedroom & bathrom partial demo (e) slapb, new french doors at back wall.Details
enclose (e) unconditioned space adj to garage, new bedroom & bathrom partial demo (e) slapb, new french doors at back wall. | $45,000 |
| Oct 9, 2020 | Completed final sign-off Aug 2025 | 1039 Cabrillo St | Kalix Inc Dbalara Construction | convert a portion of the existing 1st floor garage/storage area into a new accessory dwelling unit per ordinance 162-16 with 1 bedroom, 1 bathroom, kitchen and living. some structural, electrical and mechanical upgrades. new residential fire sprinkler system at 1st floor.Details
convert a portion of the existing 1st floor garage/storage area into a new accessory dwelling unit per ordinance 162-16 with 1 bedroom, 1 bathroom, kitchen and living. some structural, electrical and mechanical upgrades. new residential fire sprinkler system at 1st floor. | $120,000 |
| Feb 27, 2020 | Completed final sign-off Jun 2020 | 718 Cole St | Phase 2 Builders | replace concrete slab-on-grade in garage & storage room, add ne footing & shearwall @ the west exterior wall of the storage roomDetails
replace concrete slab-on-grade in garage & storage room, add ne footing & shearwall @ the west exterior wall of the storage room | $100,000 |
| Oct 24, 2019 | Never finaled issued Aug 2021, no final | 1615 Mason St | Sean Rattigan Construction | vertical addition of a 4th fl master bed & bath with exteriror roof deck and new connecting stairs to 3rd fl. small expansion of 3rd fl dining room area over existing deck @ center courtyard. see pa#201904016778 for related foundation work, planning #2019004528prl.Details
vertical addition of a 4th fl master bed & bath with exteriror roof deck and new connecting stairs to 3rd fl. small expansion of 3rd fl dining room area over existing deck @ center courtyard. see pa#201904016778 for related foundation work, planning #2019004528prl. | $170,000 |
| Oct 7, 2019 | Never finaled issued Jun 2021, no final | 543 Central Av | Kalix Inc Dbalara Construction | convert (e) 1st fl storage room to full bath into useable rooms down w/ 1/2 bath & laundry sink per zoning admin bullitin #1. nsr restriction to be modified to allow for residential occupancy (see app #9305938)Details
convert (e) 1st fl storage room to full bath into useable rooms down w/ 1/2 bath & laundry sink per zoning admin bullitin #1. nsr restriction to be modified to allow for residential occupancy (see app #9305938) | $80,000 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 3749 Scott St | Buzzer 9 Development Inc | remodel (e) kitchen & dining roommDetails
remodel (e) kitchen & dining roomm | $65,000 |
| Aug 14, 2019 | Completed final sign-off Jun 2021 | 1744 Sanchez St | Phase 2 Builders | extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work.Details
extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work. | $225,000 |
| Jul 19, 2019 | Completed final sign-off Aug 2020 | 4407 20th St | Modern Construction Inc | revision to voluntary seismic retrofit 2018-0525-0265 due to change in engineering and engineer of record and layour of shear walls. this permit cost is for the additional structural work for the adu only (lower slab & replace foundation).Details
revision to voluntary seismic retrofit 2018-0525-0265 due to change in engineering and engineer of record and layour of shear walls. this permit cost is for the additional structural work for the adu only (lower slab & replace foundation). | $50,000 |
| Jun 3, 2019 | Expired or cancelled cancelled Jan 2026 | 718 Cole St | Hon's Construction Inc. | partial seismic strengthening of the 1st & 2nd floor at the rear of the existing building.Details
partial seismic strengthening of the 1st & 2nd floor at the rear of the existing building. | $18,000 |
| Apr 19, 2019 | Completed final sign-off Aug 2019 | 721 15th Av | Kalix Inc Dbalara Construction | to comply with nov 201803051 items 2 & 3 - remove & rebuild exterior stair in the lightwellDetails
to comply with nov 201803051 items 2 & 3 - remove & rebuild exterior stair in the lightwell | $18,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2020 | 4407 20th St | Modern Construction Inc | remodel 2nd fl apartment unit. replace existing rear windows.Details
remodel 2nd fl apartment unit. replace existing rear windows. | $60,000 |
| Apr 1, 2019 | Completed final sign-off Sep 2026 | 1615 Mason St | Hon's Construction Inc., Sean Rattigan Construction | foundation work including retaining wall replacement at garage level and framing required to widen garage door. existing garage door to be widened from 8'-0" to 10'-0", foundation work includes new drilled piers, remodel (e) 3rd fl. unit 1615, including kitchen, bathrooms & living roomDetails
foundation work including retaining wall replacement at garage level and framing required to widen garage door. existing garage door to be widened from 8'-0" to 10'-0", foundation work includes new drilled piers, remodel (e) 3rd fl. unit 1615, including kitchen, bathrooms & living room | $350,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 82 06th Av | Anne Hart Design Build | new rear exterior stair connecting existing roof deck on 2nd fl to rear yard in conformance of sf planning code section 136 (a)(14)Details
new rear exterior stair connecting existing roof deck on 2nd fl to rear yard in conformance of sf planning code section 136 (a)(14) | $26,500 |
| Oct 26, 2018 | Completed final sign-off Jun 2020 | 482 Douglass St | C G Adams Construction | remodel 2/f including replace/relocate kitchen, bathrm, bedrm, living rm. new stairs to 1/f. 1/f: 2 new bedrms, 1-1/2 baths, and associated storage/closet. no work at 3rd fl except (n) fahu. new radiant heating at 1/f & 2/f.Details
remodel 2/f including replace/relocate kitchen, bathrm, bedrm, living rm. new stairs to 1/f. 1/f: 2 new bedrms, 1-1/2 baths, and associated storage/closet. no work at 3rd fl except (n) fahu. new radiant heating at 1/f & 2/f. | $285,000 |
| Sep 14, 2018 | Never finaled issued Nov 2018, no final | 604 Waller St | Buhler Construction | mandatory soft story retrofit of the 1st. floor (commercial). appendix a4. provide power oprated door @ commercial.Details
mandatory soft story retrofit of the 1st. floor (commercial). appendix a4. provide power oprated door @ commercial. | $2,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2021 | 604 Waller St | Buhler Construction | mandatory soft story retrofit of the 1st. floor (residential)Details
mandatory soft story retrofit of the 1st. floor (residential) | $73,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2021 | 2216 Clay St | Synerforce Construction | remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit)Details
remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit) | $150,000 |
| Jun 21, 2018 | Completed final sign-off Aug 2018 | 145 Gardenside Dr | H S Construction And Associates Co | #3 -new opening at wall between living room and kitchen. open 48x77 hole at existing wallDetails
#3 -new opening at wall between living room and kitchen. open 48x77 hole at existing wall | $1,300 |
| May 29, 2018 | Never finaled issued Oct 2018, no final | 318 Moraga St | Anne Hart Design Build | revision to app#201603162181 and 201805088494. update extg sloped roof above kitchen to roof deck accessed from 3rd floor. update not visible from public right of way.Details
revision to app#201603162181 and 201805088494. update extg sloped roof above kitchen to roof deck accessed from 3rd floor. update not visible from public right of way. | $2,000 |
| May 11, 2018 | Never finaled issued Sep 2018, no final | 2335 29th Av | Kalix Inc Dbalara Construction | constuct new retaining wall in the rear yard on the west side over existing retaining wall that is failing, no work at main buildingDetails
constuct new retaining wall in the rear yard on the west side over existing retaining wall that is failing, no work at main building | $20,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 318 Moraga St | Anne Hart Design Build | to comply with nov 201860121. revision to permit 2016-0316-2181 update exterior to finish to plaster updated window/door product/sizes. update exterior rear stairs. updated entry and landscaping. add wash bin at 3rd floor. updated footing design, column locations & beam sizingDetails
to comply with nov 201860121. revision to permit 2016-0316-2181 update exterior to finish to plaster updated window/door product/sizes. update exterior rear stairs. updated entry and landscaping. add wash bin at 3rd floor. updated footing design, column locations & beam sizing | $30,000 |
| Mar 12, 2018 | Completed final sign-off Jan 2019 | 1369 Filbert St | Hon's Construction Inc. | revised basement storage layout which includes an exterior window to (n) exterior door at the rear by modifying (e) opening. fire under separate permit(s).Details
revised basement storage layout which includes an exterior window to (n) exterior door at the rear by modifying (e) opening. fire under separate permit(s). | $10,000 |
| Mar 12, 2018 | Completed final sign-off Jan 2019 | 1369 Filbert St | Hon's Construction Inc. | revision to soft story pa #201709056848, due to field conditions changes of shearwalls and adding short shearwalls above steel moment frame in garage.Details
revision to soft story pa #201709056848, due to field conditions changes of shearwalls and adding short shearwalls above steel moment frame in garage. | |
| Feb 12, 2018 | Completed final sign-off Jul 2022 | 1707 Powell St | Justin Farrelly Incorporated | update to e restaurant, add new mezzanine with new stair and relocate e restrooms. (mep under seperate permit)Details
update to e restaurant, add new mezzanine with new stair and relocate e restrooms. (mep under seperate permit) | $160,000 |
| Jan 22, 2018 | Completed final sign-off Aug 2018 | 1163 Wisconsin St | Service Concrete Company | remove (e) rear north site retaining wall and fence and replace with (n) concrete retainin wall and fence in kind. excavtion depth not to exceed 8'-0"Details
remove (e) rear north site retaining wall and fence and replace with (n) concrete retainin wall and fence in kind. excavtion depth not to exceed 8'-0" | $20,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 459 11th Av | Kalix Inc Dbalara Construction | soft story retrofit of 1st fl meeting the requirements of 2012, 2015 iebc appendiex 4 per 2016 sfebc ch 4dDetails
soft story retrofit of 1st fl meeting the requirements of 2012, 2015 iebc appendiex 4 per 2016 sfebc ch 4d | $50,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2020 | 2216 Clay St | Synerforce Construction | soft story retrofit of basemeht floor meeting 2012 and 2015 iebc appendix 4 per 2016 sfebc ch 4dDetails
soft story retrofit of basemeht floor meeting 2012 and 2015 iebc appendix 4 per 2016 sfebc ch 4d | $150,000 |
| Sep 15, 2017 | Completed final sign-off Apr 2018 | 138 Lower Tr | conversion of e 2nd fl bedroom #3 into powder rm and stair to 1st fl, 1st fl storage area shall convert to new family rm, bedrm, bath and closet with new stair.Details
conversion of e 2nd fl bedroom #3 into powder rm and stair to 1st fl, 1st fl storage area shall convert to new family rm, bedrm, bath and closet with new stair. | $65,000 | |
| Sep 12, 2017 | Completed final sign-off Oct 2018 | 3218 Steiner St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $40,000 | |
| Sep 5, 2017 | Completed final sign-off Jan 2019 | 1369 Filbert St | Hon's Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Dec 22, 2016 | Expired or cancelled expired Mar 2019 | 82 Carr St | Phase 2 Builders | replace e damaged front entry stair in kindDetails
replace e damaged front entry stair in kind | $10,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2018 | 166 Ewing Tr | Phase 2 Builders | insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new windowDetails
insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new window | $100,000 |
| Oct 31, 2016 | Completed final sign-off Jun 2018 | 2135 California St | F P Investments Inc | add unit per ordinance no# 162-16. convert (e) unconditioned utility / storage area & portion of (e) lightwell into new 2201 sf accessory dwelling unit.Details
add unit per ordinance no# 162-16. convert (e) unconditioned utility / storage area & portion of (e) lightwell into new 2201 sf accessory dwelling unit. | $300,000 |
| Oct 20, 2016 | Expired or cancelled withdrawn Sep 2017 | 138 Lower Tr | add unit per ordinanc no.162-16. bldg out an adu with in the (e) 1st flr storage area. no expansion of bldg envelope. ade includess 1 bedroom, 1 bathroom, kitchen & living rm. 2 (e) water heater and faus for upper units to be relocated/replaced. (n) wh & fau for adu.Details
add unit per ordinanc no.162-16. bldg out an adu with in the (e) 1st flr storage area. no expansion of bldg envelope. ade includess 1 bedroom, 1 bathroom, kitchen & living rm. 2 (e) water heater and faus for upper units to be relocated/replaced. (n) wh & fau for adu. | $86,000 | |
| Jul 15, 2016 | Completed final sign-off Aug 2018 | 143 De Montfort Av | Kalix Inc Dbalara Construction | excavate under existing house to expand e 1st fl/basement to create living space consist of 2 bedroom, 1 bath, family rm, laundry, prayer rm and mech rm, add new interior stair from 1st/basement to 2nd fl. remodel 2nd fl living room, bath, master convert e bedroom on 2nd fl to music rmDetails
excavate under existing house to expand e 1st fl/basement to create living space consist of 2 bedroom, 1 bath, family rm, laundry, prayer rm and mech rm, add new interior stair from 1st/basement to 2nd fl. remodel 2nd fl living room, bath, master convert e bedroom on 2nd fl to music rm | $200,000 |
| Jul 1, 2016 | Completed final sign-off Jun 2018 | 179 Carl St | H C L Construction Inc. | minor remodel on 2nd fl master bathroom, add bathroom @ 2nd fl, convert closet to laundry rm & add 90 sq ft to rear bedroom by extend 2nd fl @ rear & side.Details
minor remodel on 2nd fl master bathroom, add bathroom @ 2nd fl, convert closet to laundry rm & add 90 sq ft to rear bedroom by extend 2nd fl @ rear & side. | $84,000 |
| Feb 26, 2016 | Completed final sign-off Jun 2018 | 2135 California St | F P Investments Inc | interior alterations & remodeling at 12 (e)apartments including related alterations to structural,mech,plmbg & elec systems.alterations @1st flr garage & storage/utility area related to structural/utility changes @residential floors above.no changes to footprint,floor area,occupancy use,height orDetails
interior alterations & remodeling at 12 (e)apartments including related alterations to structural,mech,plmbg & elec systems.alterations @1st flr garage & storage/utility area related to structural/utility changes @residential floors above.no changes to footprint,floor area,occupancy use,height or | $750,000 |
| Dec 18, 2015 | Completed final sign-off May 2017 | 25 Taylor St | Build Group Inc. | t.i. ground floor of (e) 7 story office/theater building. removal of demising wall between (e) adjacent office spaces to create new 1,815 sf dental clinic including selected interior improvements, rev to mezz & storefront. maher not req.Details
t.i. ground floor of (e) 7 story office/theater building. removal of demising wall between (e) adjacent office spaces to create new 1,815 sf dental clinic including selected interior improvements, rev to mezz & storefront. maher not req. | $217,800 |
| Nov 9, 2015 | Completed final sign-off Sep 2016 | 232 Olmstead St | Phase 2 Builders | 1)add new master bedroom and bath on 1st fl. 2)remove extg wall on 2nd fl to open up kitchen to living room. 3)remodel kitchen. 4)remodel bath on 2nd floor.Details
1)add new master bedroom and bath on 1st fl. 2)remove extg wall on 2nd fl to open up kitchen to living room. 3)remodel kitchen. 4)remodel bath on 2nd floor. | $150,000 |
| Oct 14, 2015 | Completed final sign-off Sep 2016 | 2400 Larkin St | Jason Liu Construction Company | replace wall betweed 1-car garage and 2-car garage; replace front wall and widen garage door 5" at 1-car garage; install new rear support wall and replace the roof structure at 1-car garage, roofing under separate permitDetails
replace wall betweed 1-car garage and 2-car garage; replace front wall and widen garage door 5" at 1-car garage; install new rear support wall and replace the roof structure at 1-car garage, roofing under separate permit | $50,000 |
| Sep 24, 2015 | Completed final sign-off Aug 2016 | 4434 23rd St | Phase 2 Builders | 1) relocate stair from garage to 1st floor. 2)enlarge stair from 1st to 2nd floor. 3)remodel extg bedroom 2. 4)convert extg kitchen and bedroom 3 on 1st floor to new master bedroom.5) enlarge extg garage door opening.Details
1) relocate stair from garage to 1st floor. 2)enlarge stair from 1st to 2nd floor. 3)remodel extg bedroom 2. 4)convert extg kitchen and bedroom 3 on 1st floor to new master bedroom.5) enlarge extg garage door opening. | $50,000 |
| Jul 7, 2015 | Completed final sign-off Jun 2016 | 885 Head St | Terence Mcmahon Construction | add roof to (e) deck.Details
add roof to (e) deck. | $25,000 |
| Jun 2, 2015 | Completed final sign-off Apr 2016 | 440 Laidley St | Phase 2 Builders | revision appl. 2015.0506.5482 to provide plan to show change of layout. kitchen and dining room reconfiguration and master closet and bath reconfiguration.Details
revision appl. 2015.0506.5482 to provide plan to show change of layout. kitchen and dining room reconfiguration and master closet and bath reconfiguration. | $12,000 |
| May 27, 2015 | Completed final sign-off May 2016 | 885 Head St | Terence Mcmahon Construction | replace extg rear deck.Details
replace extg rear deck. | $20,000 |
| May 11, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | M 2 Design (Ck Id) | revision to appl #201504173952 - new plan/engineering to structural attachment point. n/a maher ordinanceDetails
revision to appl #201504173952 - new plan/engineering to structural attachment point. n/a maher ordinance | |
| May 6, 2015 | Completed final sign-off Jan 2017 | 2206 Polk St | Finbarr Collins Construction Inc. | revision to 201410249863 revise dining layout, add walk-in cooler & structural reinforcement of floor & ceiling, mep & life safety shall be design-built on separate permit.Details
revision to 201410249863 revise dining layout, add walk-in cooler & structural reinforcement of floor & ceiling, mep & life safety shall be design-built on separate permit. | |
| Mar 10, 2015 | Completed final sign-off Aug 2015 | 885 Head St | Terence Mcmahon Construction | revision to pa #201501155883 (kitchen & bath remodel) - bedroom closet remodel @ 1st floor, addition bath @ 2nd floor w/ dormers. replace garage & front door.Details
revision to pa #201501155883 (kitchen & bath remodel) - bedroom closet remodel @ 1st floor, addition bath @ 2nd floor w/ dormers. replace garage & front door. | $75,000 |
| Nov 20, 2014 | Completed final sign-off May 2016 | 485 Douglass St | Anne Hart Design Build | 2/f: remodel kitchen & bathroom, replace rear bedroom windows. remodel 1/f to add a new master bedroom, a new bathroom, a laundry room & reconfigure existing interior stair. infill (e) lightwell, new conc. patio & planters, (n) furnace & water heater.Details
2/f: remodel kitchen & bathroom, replace rear bedroom windows. remodel 1/f to add a new master bedroom, a new bathroom, a laundry room & reconfigure existing interior stair. infill (e) lightwell, new conc. patio & planters, (n) furnace & water heater. | $265,000 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 18 Lansing St | Baba Builders Co | unit #301: kitchen remodel and pantry remodel with layout change and removal of interior wall; maher n/aDetails
unit #301: kitchen remodel and pantry remodel with layout change and removal of interior wall; maher n/a | $25,000 |
| Jul 17, 2014 | Completed final sign-off Mar 2016 | 15 Mullen Av | Phase 2 Builders | revision appl 2013.0614.9539. revision to side exterior stair, reduced to 3'-0" wide stair.Details
revision appl 2013.0614.9539. revision to side exterior stair, reduced to 3'-0" wide stair. | |
| Jul 7, 2014 | Never finaled issued Jul 2014, no final | 775 37th Av | Anne Hart Design Build | revision to 201405226514. revise footing design in basement per structural engineerDetails
revision to 201405226514. revise footing design in basement per structural engineer | $1,000 |
| Jun 13, 2014 | Never finaled issued Jun 2014, no final | 1820 Van Ness Av | Kalix Inc Dbalara Construction | interior tenant improvement of approx. 1950 sq.ft. including a new raised floor, offices, conference room, open staff work area, restroom, kitchenette and storage, closets. also included are related heating and cooling system, electrical water/sewer.sprnklr fire alarm under seperate permit.Details
interior tenant improvement of approx. 1950 sq.ft. including a new raised floor, offices, conference room, open staff work area, restroom, kitchenette and storage, closets. also included are related heating and cooling system, electrical water/sewer.sprnklr fire alarm under seperate permit. | $197,000 |
| Dec 19, 2013 | Expired or cancelled cancelled Jan 2020 | 3233 17th St | expansion of dining room & kitchen. addition of new stairs between 1st & 2nd floor and between 2nd floor & the roof. new windows / doors at rear of house. reinforcing of the roof to create a usable roof deck & conversion of the 1st floor 1/2 bath into full bath.Details
expansion of dining room & kitchen. addition of new stairs between 1st & 2nd floor and between 2nd floor & the roof. new windows / doors at rear of house. reinforcing of the roof to create a usable roof deck & conversion of the 1st floor 1/2 bath into full bath. | $65,000 | |
| Jul 22, 2013 | Expired or cancelled expired Mar 2016 | 15 Mullen Av | Phase 2 Builders | revision to pa# 2013-0614-9539-comply with complaint #201312251-replacing property line window at north side, revised window by half bathroom on main fl & removing deletion of (e) window to keep 9e) window by dining room. max u factor .40Details
revision to pa# 2013-0614-9539-comply with complaint #201312251-replacing property line window at north side, revised window by half bathroom on main fl & removing deletion of (e) window to keep 9e) window by dining room. max u factor .40 | $1,000 |
| Jul 1, 2013 | Completed final sign-off Mar 2014 | 1330 22nd Av | Phase 2 Builders | enlarge kitchen by enclosing (e) lightwell & removing (e) stair, convert (e) breakfast room to new master bath, convert (e) toilet room to laundry room & move toilet to (e) hallway bath, remove unpermitted social room & remove illegal bathroom at first floor. revision to pa# 2013.0618.9781.Details
enlarge kitchen by enclosing (e) lightwell & removing (e) stair, convert (e) breakfast room to new master bath, convert (e) toilet room to laundry room & move toilet to (e) hallway bath, remove unpermitted social room & remove illegal bathroom at first floor. revision to pa# 2013.0618.9781. | $30,000 |
| Jun 14, 2013 | Completed final sign-off Mar 2016 | 15 Mullen Av | Phase 2 Builders | comply with complaint #201308351-main floor-eliminate (e) bedroom, closet, bathroom. move kitchen & add half bathroom. basement-add 2 bedrooms, 2 bathrooms, interior stairs. remove exterior stairs from main level to gate with new windows & door.Details
comply with complaint #201308351-main floor-eliminate (e) bedroom, closet, bathroom. move kitchen & add half bathroom. basement-add 2 bedrooms, 2 bathrooms, interior stairs. remove exterior stairs from main level to gate with new windows & door. | $50,000 |
| May 24, 2013 | Completed final sign-off Jun 2013 | 2130 Leavenworth St | Green Giant Construction | cut 43" wide radius open in non bearing wall between kichen/dining room to be used as counter top.Details
cut 43" wide radius open in non bearing wall between kichen/dining room to be used as counter top. | $3,200 |
| Apr 10, 2013 | Completed final sign-off Jan 2014 | 8 Juri St | Kunst Bau & Kids | replace (e) railing with new railing at (e) stairs & stair opening interior stairsDetails
replace (e) railing with new railing at (e) stairs & stair opening interior stairs | $1,500 |
| Mar 25, 2013 | Expired or cancelled expired Apr 2019 | 2245 Webster St | Royal Lyon Construction | addition of garage door & ramp and curb cut, fill in (e) side yard on all 3 levels approx614 sq ft)full interior remodel struct. upgrade new rear facade, new kitchen, new bathrms (2.5) new finishes thruout, new elect. thruout. repair (e) staircase. replace stair to garage, new doors & windowsDetails
addition of garage door & ramp and curb cut, fill in (e) side yard on all 3 levels approx614 sq ft)full interior remodel struct. upgrade new rear facade, new kitchen, new bathrms (2.5) new finishes thruout, new elect. thruout. repair (e) staircase. replace stair to garage, new doors & windows | $180,000 |
| Mar 1, 2013 | Completed final sign-off Jan 2015 | 283 Mallorca Wy | Portola Design Build Interiors Developme | revision to 201211154281. revise opening between entry, dining, new opening at upstairs bedrooms. revised property line foundation. add support to existing garage/breezeway wallDetails
revision to 201211154281. revise opening between entry, dining, new opening at upstairs bedrooms. revised property line foundation. add support to existing garage/breezeway wall | |
| Dec 6, 2012 | Completed final sign-off Nov 2013 | 396 Diamond St | Phase 2 Builders | revision to pa# 201210101703 for revised railing design.Details
revision to pa# 201210101703 for revised railing design. | |
| Nov 15, 2012 | Completed final sign-off Jan 2015 | 283 Mallorca Wy | Soria Construction, Portola Design Build Interiors Developme | proposed interior stair connecting ground flr w/2nd flr residence. ground flr office /utility connverted to bedroom, bath w/new window/door openings to rear yard. new footings,slab @ ground flr. relcoate furnace & water heater to garage area. relocate laundry & modify bedrm, dining walls @ 2nd flrDetails
proposed interior stair connecting ground flr w/2nd flr residence. ground flr office /utility connverted to bedroom, bath w/new window/door openings to rear yard. new footings,slab @ ground flr. relcoate furnace & water heater to garage area. relocate laundry & modify bedrm, dining walls @ 2nd flr | $150,000 |
| Sep 23, 2009 | Completed final sign-off Jan 2010 | 115 Rutledge St | Burke Construction | remove structural walls between kitchen and dining room. raise existing kitchen beam for flush ceiling. install new cabinets and fixtures.Details
remove structural walls between kitchen and dining room. raise existing kitchen beam for flush ceiling. install new cabinets and fixtures. | $25,000 |
| Sep 23, 2009 | Completed final sign-off Mar 2011 | 1371 Oak St | Castle Construction Inc. | convert e 1st fl storage to living space (372 sf) construct rear addition (233 sf) for bed and bath below existing kitchen. add 17 sf at breakfast room. new interior stair between 1st and 2nd floor. rebuild deck at e location. install 2 doors and 7 windows at side and rear. new retaining wall.Details
convert e 1st fl storage to living space (372 sf) construct rear addition (233 sf) for bed and bath below existing kitchen. add 17 sf at breakfast room. new interior stair between 1st and 2nd floor. rebuild deck at e location. install 2 doors and 7 windows at side and rear. new retaining wall. | $150,000 |
| Jul 31, 2009 | Completed final sign-off Nov 2009 | 27 Carson St | Top To Bottom Renovation | strengten (e) floor joist for (n) plumbing penetration. revision to appl. #2009/0602/9537.Details
strengten (e) floor joist for (n) plumbing penetration. revision to appl. #2009/0602/9537. | $300 |
| Jun 8, 2009 | Expired or cancelled expired Jan 2011 | 1630 Broderick St | T Bailey Construction | create a larger living room on the first floor by removing (e) bearing and non bearing wall and instaliing new structural beam and postsDetails
create a larger living room on the first floor by removing (e) bearing and non bearing wall and instaliing new structural beam and posts | $2,000 |
| Dec 22, 2008 | Completed final sign-off Feb 2009 | 16 Agua Wy | Jason Liu Construction Company | revision to 200810244997. remodel e bath, remove e tub and sink, relocate showr stall and closetDetails
revision to 200810244997. remodel e bath, remove e tub and sink, relocate showr stall and closet | $1,500 |