Block 2801, lot 012
4434 23rd St
- City’s use
- Single Family Residential
- Built
- 1903
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,206 sq ft
- Lot
- 2,850 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2022 | Completed final sign-off Jan 2023 | 4434 23rd St | Tom Lee Roofing Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,700 |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 4434 23rd St | Phase 2 Builders | full bathroom renovation to include new fixtures, shower and tiles. plumbing and electrical update. in-kind. no walls to be removed or altered.Details
full bathroom renovation to include new fixtures, shower and tiles. plumbing and electrical update. in-kind. no walls to be removed or altered. | $25,000 |
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 4434 23rd St | street space permitDetails
street space permit | ||
| Sep 24, 2015 | Completed final sign-off Aug 2016 | 4434 23rd St | Phase 2 Builders | 1) relocate stair from garage to 1st floor. 2)enlarge stair from 1st to 2nd floor. 3)remodel extg bedroom 2. 4)convert extg kitchen and bedroom 3 on 1st floor to new master bedroom.5) enlarge extg garage door opening.Details
1) relocate stair from garage to 1st floor. 2)enlarge stair from 1st to 2nd floor. 3)remodel extg bedroom 2. 4)convert extg kitchen and bedroom 3 on 1st floor to new master bedroom.5) enlarge extg garage door opening. | $50,000 |
| Aug 5, 2015 | Completed final sign-off Aug 2016 | 4434 23rd St | Phase 2 Builders | garage framing repairs to include replacement of deteriorated sill plates and wall studs, add new r19 ceiling insulation and drywall. remodel (e) first floor bathroom, replace exhaust fan. new lights shall be led.Details
garage framing repairs to include replacement of deteriorated sill plates and wall studs, add new r19 ceiling insulation and drywall. remodel (e) first floor bathroom, replace exhaust fan. new lights shall be led. | $20,000 |
| May 29, 2015 | Completed final sign-off Oct 2015 | 4434 23rd St | Phase 2 Builders | kitchen remodel - electrical upgrade, plumbing update. new cabinets, appliances, drywall. no walls built new or moved. 10'x11'Details
kitchen remodel - electrical upgrade, plumbing update. new cabinets, appliances, drywall. no walls built new or moved. 10'x11' | $20,000 |
| Apr 26, 2010 | Completed final sign-off May 2010 | 4434 23rd St | Central Bay Roofing & Restoration Inc | reroofingDetails
reroofing | $2,700 |
| Apr 8, 2010 | Expired or cancelled expired Jan 2013 | 4434 23rd St | replace decking on garage roof. repalce siding on front of garage with wood siding to match extg condition.Details
replace decking on garage roof. repalce siding on front of garage with wood siding to match extg condition. | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.