Jefferson Chen
- License
- C57898
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C57898 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Enertia Designs
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Nov 2026
1,084 permits since 2000 (engineer on 969 permits, architect on 95 permits, designer on 20 permits, authorized agent-others on 3 permits): 730 completed, 111 in progress, 107 never finaled, 136 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- D3 Construction (14), Cbs Construction Inc. (3), Connor Daly Corporation (3), Bradford Construction (2), Cook Construction (2), Javier Magana Construction Services (2), Jose Martinez (2), Michael Paul Murray (2), Strong Builders Construction Inc. (2), Tip Managers Inc. (2), Velox Construction Inc/Velox Des & Const (2), Yefa Construction Inc (2), A-1 Dynamic Builders Inc., Affordable Construction, American Construction, Arcon Construction Corp, Aurora Builders, Bay Cities General Contractor Inc, Bernal Hill Builders Inc, Black Mountain Development, Blue Bend Construction Inc, Chavez Management Group Inc, David M Goray, Doran Construction & Design, E. N. A Construction Inc., Eternity Home Builders Inc, Force Development Company Inc, Gama Construction Inc, Gdh Roofing & Building Inc, General Max Construction, J Farley Construction, Joseph Francis Lockary, Jwl 888 Construction Inc, K & J General Construction, K. Brunner & Associates, Lowry Construction Inc, Mc Gowan Builders, Mobar Construction, Neu Haus Llc, O Donoghue Construction Inc., Olive Construction Corp, Pattani Construction Co Inc, Perez Construction Llc., Pristine Builders Group, Radiant Construction Company, Stephen Mc Elroy Construction Llc., Vega Construction Company
- Architects
- Ryan Knock (14), Mark Topetcher (6), Mike Patrick Larkin (6), Mark Thomas (5), Paul Molina (5), Haynes Nathaniel Matthew & Liu (3), Marc Dimalanta (3), Patrick Perez (3), Marissa Brandon (2), Nicholas Wilkes Polansky (2), Andrew Faust, Bill Guan, James Treman, Jean Orino Architect, Larry Paul, Marshall Schneider, Robert Sauvageau, Stephen Sutro, Steve Maskulka, Tom Mcelroy
- Engineers
- Antonio Jakosalem, Erwin Otoole, Meng Hsiu Chen, Shadie Azab, Steve Kang, Wenda Wang
Most recent permits
Showing the 100 most recent of 1,084.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2026 | In progress filed Nov 2026, not yet issued | 2545 Greenwich St | rev 201309177050:remove below-grd storage area.revert garage plate ht to unchanged.revert 1/f plate ht to unchanged.2/f plate ht to be 1ft higher than approved from 30-8 to 31-8. revise 3/f plan on e/s & move roof deck staircase from interior to exterior.Details
rev 201309177050:remove below-grd storage area.revert garage plate ht to unchanged.revert 1/f plate ht to unchanged.2/f plate ht to be 1ft higher than approved from 30-8 to 31-8. revise 3/f plan on e/s & move roof deck staircase from interior to exterior. | $20,000 | |
| Nov 6, 2026 | In progress issued Nov 2026 | 1358 South Van Ness Av | revision to pa# 2025-1229-2853: add insulated roof maintenace hatch to roof of sructure. no other changes from approved drawings.Details
revision to pa# 2025-1229-2853: add insulated roof maintenace hatch to roof of sructure. no other changes from approved drawings. | $421 | |
| Nov 2, 2026 | In progress filed Nov 2026, not yet issued | 2219 Steiner St | revision to pa: 2025.0115.8337: new slab area; new foundation grade beams, re-design wood framing on 2nd and 3rd floor. (only structural changes.)Details
revision to pa: 2025.0115.8337: new slab area; new foundation grade beams, re-design wood framing on 2nd and 3rd floor. (only structural changes.) | $5,000 | |
| Oct 29, 2026 | In progress issued Oct 2026 | 456 Diamond St | Michael Paul Murray | front stair replacement. remove e front elevation siding to expose and restore original siding beneath.Details
front stair replacement. remove e front elevation siding to expose and restore original siding beneath. | $2,000 |
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 142 Arguello Bl | replacement of (16) windows. replace rear yard facing shake siding with stucco siding, create new sliding doors on gf. remove portion of non- compliant rear portion of building and replace with deck less than 30" above grade. new mech equipment on roof and new access to equipment.Details
replacement of (16) windows. replace rear yard facing shake siding with stucco siding, create new sliding doors on gf. remove portion of non- compliant rear portion of building and replace with deck less than 30" above grade. new mech equipment on roof and new access to equipment. | $12,500 | |
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 142 Arguello Bl | remodel: reconfigure kitchen, baths, living and dining areas. remove interior access stair between levels 1 and 2.Details
remodel: reconfigure kitchen, baths, living and dining areas. remove interior access stair between levels 1 and 2. | $150,000 | |
| Oct 22, 2026 | In progress filed Oct 2026, not yet issued | 4370 Cesar Chavez St | reconstruction e deck at rear yard and new wood stairs. new glass doors at enlarged opening at basement. reconstruction of e deck on 1st fl and glass railing. rebuild e interior stair between basement and 1st fl.Details
reconstruction e deck at rear yard and new wood stairs. new glass doors at enlarged opening at basement. reconstruction of e deck on 1st fl and glass railing. rebuild e interior stair between basement and 1st fl. | $80,000 | |
| Oct 14, 2026 | In progress issued Oct 2026 | 1040 Sanchez St | D3 Construction | (work w/out permit by previous owner): kitchen upgrades included new plumbing fixtures, counter and appliances. lower level includes new 573 s.ft of conditioned space. new steel beam and partially lowering the (e) slab. new furnace.Details
(work w/out permit by previous owner): kitchen upgrades included new plumbing fixtures, counter and appliances. lower level includes new 573 s.ft of conditioned space. new steel beam and partially lowering the (e) slab. new furnace. | $200,000 |
| Oct 8, 2026 | In progress issued Nov 2026 | 224 29th St | excavate west side of property breezeway and access to rear yard and ground floor spaces. revision to 202503071835.Details
excavate west side of property breezeway and access to rear yard and ground floor spaces. revision to 202503071835. | ||
| Oct 6, 2026 | In progress issued Oct 2026 | 1553 35th Av | K & J General Construction | convert 870 sf of (e) un-conditioned floor area to living area. add family room, media room, powder, laundry, bedroom and bath to 1st floor on 2nd floor. remodel kitchen and bath (n) powder. no change to street facing elevation.fully comply w/ nov202662816.Details
convert 870 sf of (e) un-conditioned floor area to living area. add family room, media room, powder, laundry, bedroom and bath to 1st floor on 2nd floor. remodel kitchen and bath (n) powder. no change to street facing elevation.fully comply w/ nov202662816. | $200,000 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 394 Laidley St | rev 201612296232: new entry door at garage level. minor shifting of a handful of interior partition walls. removal of 3 non-egress windows and skylights from scope of work.Details
rev 201612296232: new entry door at garage level. minor shifting of a handful of interior partition walls. removal of 3 non-egress windows and skylights from scope of work. | ||
| Sep 29, 2026 | In progress issued Oct 2026 | 254 08th Av | D3 Construction | create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab.Details
create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab. | $35,000 |
| Sep 24, 2026 | In progress issued Nov 2026 | 845 Vermont St | Pristine Builders Group | revision to pa# 202203089445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind).Details
revision to pa# 202203089445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind). | $15,000 |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1446 Florida St | Gama Construction Inc | revision to 202310048007 and planning prj 2024-011309. install dormers at north and south roof. increase roof height at rear family room. install new interior stair from 1st to 3rd fl. 2 new full baths at 3rd fl. new rear deck. storage converted to living space and 1 new bath. install 1 exteriorDetails
revision to 202310048007 and planning prj 2024-011309. install dormers at north and south roof. increase roof height at rear family room. install new interior stair from 1st to 3rd fl. 2 new full baths at 3rd fl. new rear deck. storage converted to living space and 1 new bath. install 1 exterior | $110,000 |
| Sep 23, 2026 | In progress issued Sep 2026 | 720 Central Av | deck repair in kind replacement of wood railings and supports. in kind replacement of 2 concrete support posts.Details
deck repair in kind replacement of wood railings and supports. in kind replacement of 2 concrete support posts. | $6,680 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 1030 Sanchez St | D3 Construction | revision to approved pa 202512051067 vault @ living/dining space; window revision @ living room not visible from streetDetails
revision to approved pa 202512051067 vault @ living/dining space; window revision @ living room not visible from street | |
| Sep 11, 2026 | In progress issued Oct 2026 | 880 Innes Av | Doran Construction & Design | comply with complaint and nov #202048705 to restore warehouse to previous conditions. work includes: 1) replace roof framing, skylights and roof membrane. 2) replace rear wall at mezzanine level.Details
comply with complaint and nov #202048705 to restore warehouse to previous conditions. work includes: 1) replace roof framing, skylights and roof membrane. 2) replace rear wall at mezzanine level. | $42,000 |
| Sep 4, 2026 | In progress issued Oct 2026 | 2814 Clay St | revision to permit 2020.0203.3400 s & s1 and 2021.0618.2818. ref pa 202508253853. add roof deck and new open exterior stair from level 3 to roof.Details
revision to permit 2020.0203.3400 s & s1 and 2021.0618.2818. ref pa 202508253853. add roof deck and new open exterior stair from level 3 to roof. | $49,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1127 Hampshire St | D3 Construction | excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard.Details
excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard. | $450,000 |
| Aug 25, 2026 | Completed final sign-off Aug 2026 | 3670 24th St | 3rd fl unit 3670 legalize existing structural alteration consisting of prior reomval of two interior wood posts between family room and kitchen installation of an existing 3 1/2" x 11 1/4: parallam psl beam. see structural drawings and calculationsDetails
3rd fl unit 3670 legalize existing structural alteration consisting of prior reomval of two interior wood posts between family room and kitchen installation of an existing 3 1/2" x 11 1/4: parallam psl beam. see structural drawings and calculations | ||
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 211 Douglass St | alteration of a sfd residence, infill south facing light court at 1st floor. partially infill at 2nd floor, add skylight, remodel kitchen, revise garage door and entry gate at 1st floor.Details
alteration of a sfd residence, infill south facing light court at 1st floor. partially infill at 2nd floor, add skylight, remodel kitchen, revise garage door and entry gate at 1st floor. | $131,694 | |
| Aug 10, 2026 | In progress issued Oct 2026 | 859 28th Av | American Construction | reply old damaged a framed skylight 5'x10' over exterior lightwell above the steps leading to the front door. will be replaced with 2 x 9.5' squared skylights in the newly framed 5'x10'. not visible from street or facing front.Details
reply old damaged a framed skylight 5'x10' over exterior lightwell above the steps leading to the front door. will be replaced with 2 x 9.5' squared skylights in the newly framed 5'x10'. not visible from street or facing front. | $13,755 |
| Jul 28, 2026 | Expired or cancelled withdrawn Aug 2026 | 830 41st Av | (n) 2nd fl. deck to access backyard, 2nd fl. bedroom french doors accesing deck, 1st fl. replace bedroom window to move / replace hobby space window, bring 1st fl. shower+ vanity to code, replace counters, shelving with cabinets and replace utility sink.Details
(n) 2nd fl. deck to access backyard, 2nd fl. bedroom french doors accesing deck, 1st fl. replace bedroom window to move / replace hobby space window, bring 1st fl. shower+ vanity to code, replace counters, shelving with cabinets and replace utility sink. | $75,000 | |
| Jul 24, 2026 | In progress issued Jul 2026 | 30 Lopez Av | Javier Magana Construction Services | revision to 202605271951 for structural framing at door way.Details
revision to 202605271951 for structural framing at door way. | |
| Jul 19, 2026 | In progress filed Jul 2026, not yet issued | 1 Mizpah St | remodel and 3/f addition including 2 bedrooms and 1 bathroom. upgrade foundation. remodel 1/f to include family room and laundry. upgrade electrical system and 200a main panel.Details
remodel and 3/f addition including 2 bedrooms and 1 bathroom. upgrade foundation. remodel 1/f to include family room and laundry. upgrade electrical system and 200a main panel. | $400,000 | |
| Jul 16, 2026 | Completed final sign-off Oct 2026 | 628 Shotwell St | garage/first floor: enlarge garage door from 7'-8" to 8'-6". add rear deck at 3'-0" high max.Details
garage/first floor: enlarge garage door from 7'-8" to 8'-6". add rear deck at 3'-0" high max. | $2,000 | |
| Jul 14, 2026 | In progress issued Aug 2026 | 4370 Cesar Chavez St | D3 Construction | reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sectionsDetails
reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sections | $20,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 2814 Clay St | Neu Haus Llc | removing (e) barrel vauted garage. install new garage door. rebuild (e) exterior stair from sidewalk to front door with rise and run per code. remove (e) exterior stair on west side. (e) interior stair from level 2 to 3 rebuilt per code under separate permit.Details
removing (e) barrel vauted garage. install new garage door. rebuild (e) exterior stair from sidewalk to front door with rise and run per code. remove (e) exterior stair on west side. (e) interior stair from level 2 to 3 rebuilt per code under separate permit. | $49,000 |
| Jun 22, 2026 | In progress issued Nov 2026 | 4564 19th St | Black Mountain Development | selective renovation @ all flrs: (n) kitchen cabinetry @ flr 2. enlarge (1) bedroom & replace (1) bathtub w/ (n) shower @ flr 1. (n) wine storage & cabs @ basement. all (n) interior finishes & associated electrical & plumbing all flrs.Details
selective renovation @ all flrs: (n) kitchen cabinetry @ flr 2. enlarge (1) bedroom & replace (1) bathtub w/ (n) shower @ flr 1. (n) wine storage & cabs @ basement. all (n) interior finishes & associated electrical & plumbing all flrs. | $68,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 262 Lexington St | Blue Bend Construction Inc | revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair.Details
revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair. | |
| Jun 17, 2026 | In progress issued Jul 2026 | 830 Cortland Av | Strong Builders Construction Inc. | revision to 202510026606. scope includes additional foundtaion grade beam at rear of building. requested voluntarily by client. replacement of wood frames floor with a concrete slab in addition on the west side. replace (e) door at north side entrance. add (n) window facing street and mep changes.Details
revision to 202510026606. scope includes additional foundtaion grade beam at rear of building. requested voluntarily by client. replacement of wood frames floor with a concrete slab in addition on the west side. replace (e) door at north side entrance. add (n) window facing street and mep changes. | |
| Jun 15, 2026 | In progress issued Oct 2026 | 624 Parnassus Av | Mobar Construction | create new adu within existing legal habitable space on existing first floor of existing single family home. adu per state program 207.2Details
create new adu within existing legal habitable space on existing first floor of existing single family home. adu per state program 207.2 | $58,000 |
| Jun 15, 2026 | In progress issued Oct 2026 | 224 29th St | Yefa Construction Inc | rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls.Details
rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls. | |
| Jun 11, 2026 | In progress issued Jun 2026 | 628 Shotwell St | 3rd flr: bathroom 2 (n) bathtub and relocate toilet. bathroom 4 remove partition wall, (n) bathtub and relocate toilet. (n) electrical and plumbing as required at area of work only.Details
3rd flr: bathroom 2 (n) bathtub and relocate toilet. bathroom 4 remove partition wall, (n) bathtub and relocate toilet. (n) electrical and plumbing as required at area of work only. | $5,000 | |
| May 27, 2026 | In progress issued Jun 2026 | 30 Lopez Av | Javier Magana Construction Services | convert existing storage to new bed and bath.Details
convert existing storage to new bed and bath. | $25,000 |
| May 20, 2026 | In progress issued Jul 2026 | 622 24th Av | Gdh Roofing & Building Inc | 1st/f: remodel e) fl space to n) home office, media rm, bath & laundry. wet bar.Details
1st/f: remodel e) fl space to n) home office, media rm, bath & laundry. wet bar. | $123,000 |
| May 15, 2026 | Completed final sign-off Jul 2026 | 1443 Hudson Av | Connor Daly Corporation | revision 202512182101- footing detail to reflect actual field verified conditionDetails
revision 202512182101- footing detail to reflect actual field verified condition | $34,000 |
| May 12, 2026 | Completed final sign-off Sep 2026 | 556 Waller St | Michael Paul Murray | rear yard new deck and stairs.Details
rear yard new deck and stairs. | $20,000 |
| May 12, 2026 | In progress issued Sep 2026 | 427 Precita Av | Cbs Construction Inc. | $105,000 | |
| May 7, 2026 | In progress filed May 2026, not yet issued | 674 Oak St | conversion of unconditioned space & a portion of unit # 2 @ 1st floor level to a new adu. reconfiguration of 2nd floor stair area within unit# 2 and reconfiguration of openings @ east wall of 1st floor. adu will be added under the state adu program.Details
conversion of unconditioned space & a portion of unit # 2 @ 1st floor level to a new adu. reconfiguration of 2nd floor stair area within unit# 2 and reconfiguration of openings @ east wall of 1st floor. adu will be added under the state adu program. | $75,000 | |
| Apr 30, 2026 | In progress issued Sep 2026 | 511 Elizabeth St | Stephen Mc Elroy Construction Llc. | revision to 202408219182: reduce scope of work to partial renovation & 242 sf rear yard addition to reduce from 492 sf to 242 sf addition. removal of front facade updates.Details
revision to 202408219182: reduce scope of work to partial renovation & 242 sf rear yard addition to reduce from 492 sf to 242 sf addition. removal of front facade updates. | |
| Apr 23, 2026 | In progress issued Sep 2026 | 427 Precita Av | Cbs Construction Inc. | exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174Details
exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174 | $8,000 |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 164 28th St | Arcon Construction Corp | first floor voluntary foundation upgradeDetails
first floor voluntary foundation upgrade | $3,000 |
| Apr 15, 2026 | In progress issued May 2026 | 20 Blake St | D3 Construction | 3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck.Details
3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck. | $80,000 |
| Apr 13, 2026 | In progress issued Oct 2026 | 125 Alma St | General Max Construction | addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.Details
addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony. | $200,000 |
| Apr 10, 2026 | Completed final sign-off Sep 2026 | 758 Great Hy | Jose Martinez | unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place.Details
unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place. | $16,000 |
| Apr 3, 2026 | Completed final sign-off Nov 2026 | 180 Palo Alto Av | Force Development Company Inc | interior renovations to reconfigure interior stair, new kitchen island, new electric fireplace, new gas line at courtyard, and associated electrical. no plumbing fixtures at extended kitchen.Details
interior renovations to reconfigure interior stair, new kitchen island, new electric fireplace, new gas line at courtyard, and associated electrical. no plumbing fixtures at extended kitchen. | $28,000 |
| Mar 18, 2026 | In progress issued May 2026 | 77 Norwich St | Bay Cities General Contractor Inc | first floor/ground floor: adding new living space + rear stairs. second floor: portion of wall at front bedroom to be removed. (n) elec + plumbing as req'd at area of work only.Details
first floor/ground floor: adding new living space + rear stairs. second floor: portion of wall at front bedroom to be removed. (n) elec + plumbing as req'd at area of work only. | $165,000 |
| Mar 5, 2026 | In progress filed Mar 2026, not yet issued | 72 Townsend St | revision to pa #202410082497. clarification of ceiling beam of roof framing plan. existing work with no stuctural update.Details
revision to pa #202410082497. clarification of ceiling beam of roof framing plan. existing work with no stuctural update. | $1,000 | |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 200 Duboce Av | convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior designDetails
convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior design | $1,800,000 | |
| Feb 20, 2026 | In progress issued Feb 2026 | 1443 Hudson Av | Connor Daly Corporation | revision to 202512182101: replace e) window with french doorsDetails
revision to 202512182101: replace e) window with french doors | $500 |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 161 09th Av | add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit.Details
add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit. | $475,000 | |
| Jan 20, 2026 | In progress issued Jan 2026 | 2627 21st St | Jose Martinez | reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodelDetails
reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodel | $100,000 |
| Jan 15, 2026 | In progress issued Mar 2026 | 1358 South Van Ness Av | Bradford Construction | bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all...Details
bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all... | $772,404 |
| Jan 14, 2026 | In progress issued Mar 2026 | 61 Cypress St | Bradford Construction | bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage...Details
bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage... | $171,136 |
| Dec 23, 2025 | In progress issued Jun 2026 | 1030 Sanchez St | D3 Construction | 2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work.Details
2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work. | $488,000 |
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 3516 Clay St | horizontal addition of (e) building footprint, includes full remodel associated in scope of work.Details
horizontal addition of (e) building footprint, includes full remodel associated in scope of work. | $1,900,000 | |
| Dec 18, 2025 | Completed final sign-off Jul 2026 | 1443 Hudson Av | Connor Daly Corporation | ground lvel foundation replacement for existing storage space in the rear of building. lower new slab approx. 4 inches.Details
ground lvel foundation replacement for existing storage space in the rear of building. lower new slab approx. 4 inches. | $34,000 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 754 22nd Av | D3 Construction | first floor/ground floor voluntary structural strengtheningDetails
first floor/ground floor voluntary structural strengthening | $2,000 |
| Dec 10, 2025 | In progress issued Jan 2026 | 427 Precita Av | Cbs Construction Inc. | exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house.Details
exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house. | $435,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 976 Noe St | D3 Construction | 1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed.Details
1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed. | $3,780 |
| Oct 31, 2025 | Completed final sign-off Jan 2026 | 1301 41st Av | Aurora Builders | new home lift from 1st and 2nd flr within (e) building.Details
new home lift from 1st and 2nd flr within (e) building. | $40,000 |
| Oct 20, 2025 | In progress issued May 2026 | 830 Cortland Av | Strong Builders Construction Inc. | ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout.Details
ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout. | $180,000 |
| Oct 16, 2025 | In progress issued Aug 2026 | 548 07th Av | D3 Construction | 1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight.Details
1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight. | $250,000 |
| Oct 14, 2025 | In progress issued Feb 2026 | 2448 Greenwich St | K. Brunner & Associates | rear building. remodel interior of unit including 2 bathrooms and 2 bedrooms. install new tankless water heater and electric mini split heating. new insulation throughout. construct new interior stair and remove spiral stair. new window units at selected locations.Details
rear building. remodel interior of unit including 2 bathrooms and 2 bedrooms. install new tankless water heater and electric mini split heating. new insulation throughout. construct new interior stair and remove spiral stair. new window units at selected locations. | $100,000 |
| Oct 14, 2025 | In progress issued May 2026 | 108 Chattanooga St | Tip Managers Inc. | rear horiz. addition & infill @ 2nd & 3rd flrs; expansion of conditioned living space to 1st flr toliving space to the 1st flr to include guest/exercise rm & bath; reconfigure rear kitchen & dining areas & convert full bath to powder rm @ 2nd fl; renova & reconfigure 3rd flr bedrms & bath to add.Details
rear horiz. addition & infill @ 2nd & 3rd flrs; expansion of conditioned living space to 1st flr toliving space to the 1st flr to include guest/exercise rm & bath; reconfigure rear kitchen & dining areas & convert full bath to powder rm @ 2nd fl; renova & reconfigure 3rd flr bedrms & bath to add. | $300,000 |
| Oct 9, 2025 | In progress issued Nov 2025 | 3531 Vicente St | new deck & stair with roof covering at rear yard. replace rear windows & exterior door w/ marvin units. no work to front of house. no interior work, no new habitable space proposedDetails
new deck & stair with roof covering at rear yard. replace rear windows & exterior door w/ marvin units. no work to front of house. no interior work, no new habitable space proposed | $20,000 | |
| Oct 6, 2025 | Completed final sign-off Feb 2026 | 4117 Cesar Chavez St | E. N. A Construction Inc. | rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath.Details
rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath. | $1,000 |
| Oct 1, 2025 | Completed final sign-off Apr 2026 | 70 Bradford St | David M Goray | partial remodel to single family home to include kitchen and bathroomDetails
partial remodel to single family home to include kitchen and bathroom | $125,000 |
| Sep 12, 2025 | In progress issued Feb 2026 | 4210 22nd St | 1/f: attached adu include remodel and ext of (e) structure.convert (e) area adj and to rear of garage & excavation. 2/f:remove porch area to match neighborhood vernacular of porch entry.mirror plan on g/f and in-fill.extend match structure on w/s.3/f: match roof line back to align with structure.Details
1/f: attached adu include remodel and ext of (e) structure.convert (e) area adj and to rear of garage & excavation. 2/f:remove porch area to match neighborhood vernacular of porch entry.mirror plan on g/f and in-fill.extend match structure on w/s.3/f: match roof line back to align with structure. | $1,050,000 | |
| Sep 3, 2025 | In progress issued Jan 2026 | 33 Retiro Wy | J Farley Construction | revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door.Details
revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door. | |
| Sep 3, 2025 | In progress issued Oct 2025 | 350 Cumberland St | Olive Construction Corp | new garden retaining wall at rear yardDetails
new garden retaining wall at rear yard | $15,980 |
| Aug 20, 2025 | Completed final sign-off Jul 2026 | 1871 25th Av | Velox Construction Inc/Velox Des & Const | revision to pa# 202507090461: 1/f-addition of (n) family room and (n) bathroom. 2/f-remodel (e) kitchen and (e) bathroom. 3/f-remodel (e) bathroom.Details
revision to pa# 202507090461: 1/f-addition of (n) family room and (n) bathroom. 2/f-remodel (e) kitchen and (e) bathroom. 3/f-remodel (e) bathroom. | $130,000 |
| Aug 19, 2025 | In progress issued Feb 2026 | 267 28th Av | D3 Construction | basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet.Details
basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet. | $350,000 |
| Aug 18, 2025 | Completed final sign-off Sep 2026 | 152 Fairmount St | D3 Construction | first floor: replace (e) door and (e) windows with (n) door and psl header second floor: replace rear (e) door in kind. no change to opening dimenionsDetails
first floor: replace (e) door and (e) windows with (n) door and psl header second floor: replace rear (e) door in kind. no change to opening dimenions | $10,000 |
| Aug 13, 2025 | Completed final sign-off Apr 2026 | 628 Shotwell St | Tip Managers Inc. | revision for roof framing on permits 201911197709 and 202504083990.Details
revision for roof framing on permits 201911197709 and 202504083990. | |
| Aug 6, 2025 | Completed final sign-off Aug 2025 | 14 Farview Ct | Eternity Home Builders Inc | revision 202403057152- to convert (e) 2 windows into (n) french door at rear of propertyDetails
revision 202403057152- to convert (e) 2 windows into (n) french door at rear of property | |
| Jul 30, 2025 | In progress issued Aug 2025 | 3929 17th St | Affordable Construction | renovation of existing kitchen and renovation of powder room. replace kitchen window sand door to roof deckDetails
renovation of existing kitchen and renovation of powder room. replace kitchen window sand door to roof deck | $75,000 |
| Jul 28, 2025 | Completed final sign-off Feb 2026 | 284 32nd Av | Lowry Construction Inc | revision to pa#202407233080: 1st flr - new mud room, mech room. 2nd flr - move kitchen wall, new gas fireplace location. 3rd flr - new gas fireplace, move door at primery bedroom, relocate (e) bathroom door.Details
revision to pa#202407233080: 1st flr - new mud room, mech room. 2nd flr - move kitchen wall, new gas fireplace location. 3rd flr - new gas fireplace, move door at primery bedroom, relocate (e) bathroom door. | $20,000 |
| Jun 27, 2025 | In progress issued Jun 2025 | 240 Vicente St | Jwl 888 Construction Inc | rev 202406275391: add 2 inseet beams per structural drawning. garage door replacementDetails
rev 202406275391: add 2 inseet beams per structural drawning. garage door replacement | |
| Jun 26, 2025 | In progress issued Jul 2025 | 1077 Fell St | Velox Construction Inc/Velox Des & Const | revisions for approved pa 202405172393: structural work - this approved plan set inaccurately showed rear wall dimensions. new arch/structural plan show correct dimensions. minor structural revision.Details
revisions for approved pa 202405172393: structural work - this approved plan set inaccurately showed rear wall dimensions. new arch/structural plan show correct dimensions. minor structural revision. | $8,500 |
| Jun 20, 2025 | In progress issued Mar 2026 | 3628 16th St | Mc Gowan Builders | construct an elevator, construct new foundation for elevator and for the entrance next to proposed new elevator. remove (e) chimneyDetails
construct an elevator, construct new foundation for elevator and for the entrance next to proposed new elevator. remove (e) chimney | $20,000 |
| Jun 12, 2025 | Completed final sign-off Jul 2025 | 246 Chenery St | D3 Construction | roof repair to level e lower roof to e roofDetails
roof repair to level e lower roof to e roof | $5,000 |
| May 27, 2025 | Completed final sign-off Nov 2025 | 2 Dawnview Wy | revision to 202312072145 - change railing on deck to trex pre fabucated glass railingDetails
revision to 202312072145 - change railing on deck to trex pre fabucated glass railing | $1,500 | |
| May 16, 2025 | Completed final sign-off May 2026 | 642 Washington St | Radiant Construction Company | revision to pa #202302061437 remove floor opening btwn 1st & 2nd fl. remove non structural wood columns at basement. remove 1 skylight & infill opening. amend fire rated walls at restrooms. minor changes of interior non partition per field adjustment from approved plansDetails
revision to pa #202302061437 remove floor opening btwn 1st & 2nd fl. remove non structural wood columns at basement. remove 1 skylight & infill opening. amend fire rated walls at restrooms. minor changes of interior non partition per field adjustment from approved plans | |
| May 13, 2025 | In progress issued Sep 2026 | 401 Parker Av | alter site to pa# 201807104172. new scope: unit#1: 2 bedrooms with en-suite bath. l/r, kitchen, ffice, laundry & storage. unit#2: 3 bedroom with en-suite bath, powder rm, l/d, family rm, kitchen & storage space. unit# 3: 1 bedrm with en-suite bath, common bath, l/r & kthntt. u4:1 bdrm w/en-ste bthDetails
alter site to pa# 201807104172. new scope: unit#1: 2 bedrooms with en-suite bath. l/r, kitchen, ffice, laundry & storage. unit#2: 3 bedroom with en-suite bath, powder rm, l/d, family rm, kitchen & storage space. unit# 3: 1 bedrm with en-suite bath, common bath, l/r & kthntt. u4:1 bdrm w/en-ste bth | ||
| May 13, 2025 | Completed final sign-off Nov 2025 | 3782 21st St | Cook Construction | revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrationsDetails
revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrations | $5,000 |
| May 1, 2025 | In progress issued May 2026 | 1057 Pacific Av | O Donoghue Construction Inc. | vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit.Details
vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit. | $915,000 |
| Apr 29, 2025 | Completed final sign-off Jun 2026 | 738 33rd Av | Joseph Francis Lockary | demolish a 98 sf add on room structure built onto the existing 2nd fl rear of house. add a new 152 sf family room addition to existing 2nd fl rear of house. add a new 168 sf deck to 2nd fl rear of houseDetails
demolish a 98 sf add on room structure built onto the existing 2nd fl rear of house. add a new 152 sf family room addition to existing 2nd fl rear of house. add a new 168 sf deck to 2nd fl rear of house | $180,000 |
| Apr 21, 2025 | Completed final sign-off Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | revision to permit 202210144345. voluntary foundation reinforcement of crawl space. (front building)Details
revision to permit 202210144345. voluntary foundation reinforcement of crawl space. (front building) | $30,000 |
| Apr 18, 2025 | In progress issued Aug 2025 | 20 Blake St | D3 Construction | 2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as neededDetails
2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as needed | |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 2821 Franklin St | Vega Construction Company | revision to 201909303123 glass guard 2nd fl rear balcony frameless glass.Details
revision to 201909303123 glass guard 2nd fl rear balcony frameless glass. | $11,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | Cook Construction | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Apr 3, 2025 | In progress issued Jun 2026 | 1 Corbett Av | Chavez Management Group Inc | second floor: to comply with n.o.v. #200564030.to legalize existing unauthorized dwelling unit through udu program.to legalize as-built: bedroom 1& 2, bathroom 1 & kitchen. change of occupancy from r3 to r2.Details
second floor: to comply with n.o.v. #200564030.to legalize existing unauthorized dwelling unit through udu program.to legalize as-built: bedroom 1& 2, bathroom 1 & kitchen. change of occupancy from r3 to r2. | $7,163 |
| Mar 26, 2025 | Completed final sign-off Oct 2025 | 194 Guerrero St | relocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition.Details
relocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition. | ||
| Mar 26, 2025 | In progress issued May 2025 | 226 Louisburg St | A-1 Dynamic Builders Inc. | rev pa 202407186748, relocate minisplit to rear, remove door from adu to garage. (e) water heater & furnace remain same location.Details
rev pa 202407186748, relocate minisplit to rear, remove door from adu to garage. (e) water heater & furnace remain same location. | |
| Mar 25, 2025 | Completed final sign-off May 2025 | 35 Alpine Tr | unit 1; revision to 201510018577. modification and submission of rescue (ladder) route: 3 ft + wide route. revise garage door to remain as is no workDetails
unit 1; revision to 201510018577. modification and submission of rescue (ladder) route: 3 ft + wide route. revise garage door to remain as is no work | ||
| Mar 19, 2025 | In progress issued Jul 2025 | 224 29th St | Yefa Construction Inc | renovation/expansion & dwelling unit addition to (e) single family. create 3-story residence via horizontal & vertical addition for 2 apartments & attached garage for 2 car parking.Details
renovation/expansion & dwelling unit addition to (e) single family. create 3-story residence via horizontal & vertical addition for 2 apartments & attached garage for 2 car parking. | $1,425,000 |
| Mar 12, 2025 | Expired or cancelled expired Jun 2026 | 1590 22nd Av | Perez Construction Llc. | revision to 202407176698. revise north property line foundation detail due to e monolithic foundationDetails
revision to 202407176698. revise north property line foundation detail due to e monolithic foundation | |
| Mar 10, 2025 | In progress issued Oct 2025 | 2219 Steiner St | Bernal Hill Builders Inc | proposed horizontal and vertical additional to (e) 2-unit building. reconfigure units layouts, new facade new exterior materials, windows and doors. expand (e) roof deck, add 4th floor.Details
proposed horizontal and vertical additional to (e) 2-unit building. reconfigure units layouts, new facade new exterior materials, windows and doors. expand (e) roof deck, add 4th floor. | $430,000 |