Denis Henmi
- Listed as
- architect, engineer, pmt consultant/expediter
- Firm
- Kwan Henmi Architect
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Oct 2025
101 permits since 2000 (architect on 99 permits, engineer on 3 permits, pmt consultant/expediter on 1 permit): 66 completed, 4 in progress, 19 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 101.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2025 | In progress issued Oct 2025 | 77 Geary St | Novo Construction Inc | 5th & 6th floors - revision to pa 202409060232 provide anchorage to furniture phone booths; add power outlets at each location n floor & 6 new assistive listening system. fire alarm deferredDetails
5th & 6th floors - revision to pa 202409060232 provide anchorage to furniture phone booths; add power outlets at each location n floor & 6 new assistive listening system. fire alarm deferred | |
| Dec 11, 2024 | In progress issued Mar 2025 | 235 Montgomery St | Acosta And Sons Inc | suite 350. installation and anchoring of two single occupant phone booths. (in response to fire violation notice#: 2408-0175.Details
suite 350. installation and anchoring of two single occupant phone booths. (in response to fire violation notice#: 2408-0175. | $2,000 |
| Sep 6, 2024 | In progress issued May 2025 | 77 Geary St | Novo Construction Inc | provide anchorage to 16 e phonebooths, add 11 exit signs, 8 strobes, new wire mold and power at e phone booths on floors 5/6. new assisted listening systemDetails
provide anchorage to 16 e phonebooths, add 11 exit signs, 8 strobes, new wire mold and power at e phone booths on floors 5/6. new assisted listening system | $36,300 |
| Mar 1, 2024 | In progress issued May 2024 | 420 Berry St | interiror reno or (e)club house, (e)leasing office & (e)hallwy dr & wall modifications. minor demo & constr on non load bearing partitions & mandatory upgrade 20% leasing off to receive (n)finishes, (n) millwork, (n) interior windows & rr of int alum window in kind (e) clubhouse to receive (n)Details
interiror reno or (e)club house, (e)leasing office & (e)hallwy dr & wall modifications. minor demo & constr on non load bearing partitions & mandatory upgrade 20% leasing off to receive (n)finishes, (n) millwork, (n) interior windows & rr of int alum window in kind (e) clubhouse to receive (n) | $150,000 | |
| Mar 1, 2023 | Completed final sign-off Jan 2025 | 111 Townsend St | Novo Construction Inc | revision to ti pa# 202103096205 & 202202258753, phone booths & location & size confirmation on 2nd & 3rd floor. no exterior work.Details
revision to ti pa# 202103096205 & 202202258753, phone booths & location & size confirmation on 2nd & 3rd floor. no exterior work. | |
| Mar 1, 2023 | Completed final sign-off Jan 2025 | 101 Townsend St | Novo Construction Inc | revision to ti pa# 202103096202 & 202202258755, phone booths & location & size confirmation on 2nd & 3rd floor. no exterior work.Details
revision to ti pa# 202103096202 & 202202258755, phone booths & location & size confirmation on 2nd & 3rd floor. no exterior work. | |
| Jul 5, 2022 | Completed final sign-off Feb 2023 | 4 Embarcadero Center | Source Planning And Construction Inc | 30/f: tenant improvement. renovation including non-load bearing partitions, ceiling and finishes. deferred submittals: mep, life safety and sprinkler to be submitted later.Details
30/f: tenant improvement. renovation including non-load bearing partitions, ceiling and finishes. deferred submittals: mep, life safety and sprinkler to be submitted later. | $3,800,000 |
| May 25, 2022 | Expired or cancelled cancelled Jan 2026 | 456 Montgomery St | 4th fl: add non loading bearing partition to divide an exisitng large office into smaller 2 offices. including modification of glazing system, countertop is also added near entry.Details
4th fl: add non loading bearing partition to divide an exisitng large office into smaller 2 offices. including modification of glazing system, countertop is also added near entry. | $20,000 | |
| Apr 27, 2022 | Completed final sign-off Feb 2023 | 4 Embarcadero Center | Source Planning And Construction Inc | 30th floor: demo of non load bearing partitions, doors/glazing, ceilings, finishes, mech, electrical, & plmg. srpinkler permit ref pa# 202204252880Details
30th floor: demo of non load bearing partitions, doors/glazing, ceilings, finishes, mech, electrical, & plmg. srpinkler permit ref pa# 202204252880 | $125,000 |
| Mar 29, 2022 | Completed final sign-off Jun 2022 | 475 Brannan St | revision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entryDetails
revision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entry | $2,000 | |
| Feb 25, 2022 | Completed final sign-off Oct 2022 | 101 Townsend St | Novo Construction Inc | 2nd fl - demo of select partitions, ceilings, lighting & finishes. new non-bearing wlls, ceilings, finishes, millwork & lighting. no change of use area or occupancyDetails
2nd fl - demo of select partitions, ceilings, lighting & finishes. new non-bearing wlls, ceilings, finishes, millwork & lighting. no change of use area or occupancy | $200,000 |
| Feb 25, 2022 | Completed final sign-off Oct 2022 | 111 Townsend St | Novo Construction Inc | 2nd fl - demo of select partitions, ceilings, lighting & finishes. new non-bearing wlls, ceilings, finishes, millwork & lighting. no change of use. no exterior workDetails
2nd fl - demo of select partitions, ceilings, lighting & finishes. new non-bearing wlls, ceilings, finishes, millwork & lighting. no change of use. no exterior work | $100,000 |
| Nov 30, 2021 | Completed final sign-off Aug 2022 | 475 Brannan St | Principal Builders Inc. | 3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additionsDetails
3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additions | $800,000 |
| Nov 30, 2021 | Completed final sign-off Aug 2022 | 475 Brannan St | Principal Builders Inc. | 2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades.Details
2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades. | $734,100 |
| Sep 21, 2021 | Completed final sign-off Oct 2022 | 111 Townsend St | Novo Construction Inc | basement: demo select light fixtures, finish upgrades, new partitions, minor lighting rework, saw cut new opening for bldg pass through & 1-hour passagewayDetails
basement: demo select light fixtures, finish upgrades, new partitions, minor lighting rework, saw cut new opening for bldg pass through & 1-hour passageway | $189,000 |
| Sep 21, 2021 | Completed final sign-off Feb 2023 | 101 Townsend St | Novo Construction Inc | basement: demo select interior partitions, storefront, door frames, ceiling tiles, lighting/power/data, new interior partitions, ceiling tiles, minor lighting rework, upgrades power/data & some flloring,k new interconnecting stair @ (e) opening, new ramp & 1-hour passageway @ pass throughDetails
basement: demo select interior partitions, storefront, door frames, ceiling tiles, lighting/power/data, new interior partitions, ceiling tiles, minor lighting rework, upgrades power/data & some flloring,k new interconnecting stair @ (e) opening, new ramp & 1-hour passageway @ pass through | $700,000 |
| Aug 4, 2021 | Completed final sign-off Sep 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 20/f: converting open office area 20024 to a fix office including full neight wall and interior storefront system and new security doors as outlined in accociated document. (e) hvac system to remainDetails
20/f: converting open office area 20024 to a fix office including full neight wall and interior storefront system and new security doors as outlined in accociated document. (e) hvac system to remain | $22,160 |
| Mar 29, 2021 | Completed final sign-off May 2025 | 101 Townsend St | Novo Construction Inc | flip (e) steel picket gate and man door. add new metal mesh panel screens to (e) gate. remove partial (e) deck boards, deck supports and guardrails at 101 townsend. provide new wood slat fence and new security fence door at (e) deck. add guardrail at 2 (e) garage door openings.Details
flip (e) steel picket gate and man door. add new metal mesh panel screens to (e) gate. remove partial (e) deck boards, deck supports and guardrails at 101 townsend. provide new wood slat fence and new security fence door at (e) deck. add guardrail at 2 (e) garage door openings. | $230,000 |
| Mar 29, 2021 | Completed final sign-off Oct 2022 | 111 Townsend St | Novo Construction Inc | demo (e) glass wall and door and recessed fire roll down door & soffit at board room. add (n) 2 hr rated wall to backfill demo'd wall. demo (e) glass all at huddle room. add new wall & door to reconfigure huddle room into two sep rooms.Details
demo (e) glass wall and door and recessed fire roll down door & soffit at board room. add (n) 2 hr rated wall to backfill demo'd wall. demo (e) glass all at huddle room. add new wall & door to reconfigure huddle room into two sep rooms. | $200,000 |
| Mar 29, 2021 | Completed final sign-off May 2025 | 111 Townsend St | Novo Construction Inc | flip (e) steel picket gate and man door. add new metal mesh panel screens to (e) gate. remove partial (e) deck boards, deck supports and guardrails at 101 townsend. provide new wood slat fence and new security fence door at (e) deck. add guardrail at 2 (e) garage door openings.Details
flip (e) steel picket gate and man door. add new metal mesh panel screens to (e) gate. remove partial (e) deck boards, deck supports and guardrails at 101 townsend. provide new wood slat fence and new security fence door at (e) deck. add guardrail at 2 (e) garage door openings. | $70,000 |
| Mar 29, 2021 | Completed final sign-off Feb 2023 | 101 Townsend St | Novo Construction Inc | sawcut (e) concrete flr slab opening at ground level for future stair. add temp barricade around new slab opening. change room function of (e) all hands space to new open collaboration space. add new interview suite with high ceiling and lighting. add new reception desk and mother's room.Details
sawcut (e) concrete flr slab opening at ground level for future stair. add temp barricade around new slab opening. change room function of (e) all hands space to new open collaboration space. add new interview suite with high ceiling and lighting. add new reception desk and mother's room. | $1,000,000 |
| Mar 9, 2021 | Completed final sign-off Jan 2025 | 111 Townsend St | Novo Construction Inc | demolish a few fixed offices/phones/conferences including interior partitions,storefronts,doors/frames,ceiling tiles & power/data. a addition wire mesh partition & casework @ coffe area is being removed. new scope includes a few offices/phones/conferences w/(n)ceiling tiles,lighting,power/dataDetails
demolish a few fixed offices/phones/conferences including interior partitions,storefronts,doors/frames,ceiling tiles & power/data. a addition wire mesh partition & casework @ coffe area is being removed. new scope includes a few offices/phones/conferences w/(n)ceiling tiles,lighting,power/data | $200,000 |
| Mar 5, 2021 | Completed final sign-off Jun 2021 | 665 03rd St | Team Commercial Construction Inc. | decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.Details
decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project. | $80,000 |
| Nov 6, 2020 | Expired or cancelled withdrawn Dec 2021 | 345 04th St | t.i. of 40,783 sf of office space on 7 fls (ground to 7th ) & misc on rooftop. electrical panels, branch circuiting & distribution to outlets, hvac & plumbing equipment & lighting. mech hvac terminal units & downstream hvac. restroom exhaust connections. plumbing fixture connection in t.i. space.Details
t.i. of 40,783 sf of office space on 7 fls (ground to 7th ) & misc on rooftop. electrical panels, branch circuiting & distribution to outlets, hvac & plumbing equipment & lighting. mech hvac terminal units & downstream hvac. restroom exhaust connections. plumbing fixture connection in t.i. space. | $3,000,000 | |
| Nov 6, 2020 | Expired or cancelled withdrawn Dec 2021 | 345 04th St | tenant improvelemt of 40,783 sf of office space on 7 floors (ground to 7th level) and misc on rooftop. installation of new non-load bearing partitions, millwork, ceilings, lighting, plumbing fixtures & finishes. no change of use, area of occupancy. only a new countertop being added at roof level.Details
tenant improvelemt of 40,783 sf of office space on 7 floors (ground to 7th level) and misc on rooftop. installation of new non-load bearing partitions, millwork, ceilings, lighting, plumbing fixtures & finishes. no change of use, area of occupancy. only a new countertop being added at roof level. | $3,000,000 | |
| Oct 20, 2020 | Expired or cancelled cancelled Jan 2026 | 600 California St | 4th & 5th level t.i office space. demo (e) non-load bearing partitions, flooring, ceiling & light fixtures and replace with new. install (n) millwork, plumb fixtures & finishes. no change of use, area or occupancy. revision at 4th level-lounge & open office are switched, 3 gender neutral baths inDetails
4th & 5th level t.i office space. demo (e) non-load bearing partitions, flooring, ceiling & light fixtures and replace with new. install (n) millwork, plumb fixtures & finishes. no change of use, area or occupancy. revision at 4th level-lounge & open office are switched, 3 gender neutral baths in | $1,821,609 | |
| Sep 21, 2020 | Completed final sign-off Jun 2021 | 600 California St | M C S Construction Services | tenant improvement of office space. scope includes: demolition of existing ceilings & lighting fixtures. installtion of new non-load bearing partitions, millwork, ceilings, lighting & finishes. no change of use, area, or occupancy.Details
tenant improvement of office space. scope includes: demolition of existing ceilings & lighting fixtures. installtion of new non-load bearing partitions, millwork, ceilings, lighting & finishes. no change of use, area, or occupancy. | $141,280 |
| Sep 19, 2020 | Completed final sign-off Apr 2021 | 456 Montgomery St | Source Planning And Construction Inc | suite gt-3, level 4: demo a couple of (e) partitions, a sink and ceiling tiles. new owrk includes new partitions, millwork and reception desk, ceiling tiles and floor finish and bathroom ada upgrades.Details
suite gt-3, level 4: demo a couple of (e) partitions, a sink and ceiling tiles. new owrk includes new partitions, millwork and reception desk, ceiling tiles and floor finish and bathroom ada upgrades. | $103,750 |
| Sep 18, 2020 | Completed final sign-off Dec 2020 | 4 Embarcadero Center | 20th fl: revision to pa# 201908158941. electrical drawings.Details
20th fl: revision to pa# 201908158941. electrical drawings. | $25,000 | |
| Mar 6, 2020 | Completed final sign-off Mar 2024 | 2525 Van Ness Av | alter site. revision to approved site pa# 201712277456-s. see detail of summary changes on the plans. no change in building envelope. ** maher: n/a **Details
alter site. revision to approved site pa# 201712277456-s. see detail of summary changes on the plans. no change in building envelope. ** maher: n/a ** | ||
| Feb 7, 2020 | Never finaled issued Mar 2020, no final | 600 California St | M C S Construction Services | level 4 and 5: t.i. of office space: demolition of extg ceilings and lighting fixtures, installation of new non load bearing partitions,millwork, ceilings, lighting, plmg fixtures, and finishes. no change of use, area, or occupancy. mep scope under seperate permit.Details
level 4 and 5: t.i. of office space: demolition of extg ceilings and lighting fixtures, installation of new non load bearing partitions,millwork, ceilings, lighting, plmg fixtures, and finishes. no change of use, area, or occupancy. mep scope under seperate permit. | $1,516,000 |
| Feb 5, 2020 | Completed final sign-off Nov 2020 | 425 Market St | Team Commercial Construction Inc. | 15th floor. update to breakroom area and adjacent lounge, largely millwork, finish related items. removal of 3 glass doors. card readers at 3 locations throughout floor thereby opening up access to entire floor maher not reqDetails
15th floor. update to breakroom area and adjacent lounge, largely millwork, finish related items. removal of 3 glass doors. card readers at 3 locations throughout floor thereby opening up access to entire floor maher not req | $131,065 |
| Jan 14, 2020 | Expired or cancelled cancelled Jan 2026 | 456 Montgomery St | suite gc-1 on level -3. demo a couple of (e) partitions, a sink & ceiling tiles. new work includes new partitions, millwork & reception desk, ceiling tiles & floor finishe.Details
suite gc-1 on level -3. demo a couple of (e) partitions, a sink & ceiling tiles. new work includes new partitions, millwork & reception desk, ceiling tiles & floor finishe. | $51,200 | |
| Oct 11, 2019 | Completed final sign-off Jun 2021 | 600 California St | M C S Construction Services | 2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes.Details
2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes. | $1,797,500 |
| Sep 24, 2019 | Expired or cancelled cancelled Jan 2026 | 600 California St | demolition of extg non load bearing partitions,millwork, ceilings, lighting, fixtures and finishes. all extg sprinklers, life safety speakers and systems. strobe lights, smoke detectors and related control equipment to remain in place and in operation. n/a for maher. per ab-017.Details
demolition of extg non load bearing partitions,millwork, ceilings, lighting, fixtures and finishes. all extg sprinklers, life safety speakers and systems. strobe lights, smoke detectors and related control equipment to remain in place and in operation. n/a for maher. per ab-017. | $179,000 | |
| Oct 18, 2018 | Expired or cancelled cancelled Jan 2024 | 22 04th St | remove & replace (e) (2) pairs of frameless glass swing doors. install (n) pair of sliding alum glass doors w/ full breakaway panels & features @ ground levelDetails
remove & replace (e) (2) pairs of frameless glass swing doors. install (n) pair of sliding alum glass doors w/ full breakaway panels & features @ ground level | $84,000 | |
| Mar 1, 2018 | Completed final sign-off Sep 2018 | 1625 Post St | Midway Enterprises, Inc. | revision to pa 2017-1206-5644, revision to electrical drawings. reduction in scope - elimination of all new electrical receptacles.Details
revision to pa 2017-1206-5644, revision to electrical drawings. reduction in scope - elimination of all new electrical receptacles. | |
| Dec 6, 2017 | Completed final sign-off Sep 2018 | 1625 Post St | Midway Enterprises, Inc. | revision to electrical reduction in scope to corridor lights. revision to pa 2016-0308-1496Details
revision to electrical reduction in scope to corridor lights. revision to pa 2016-0308-1496 | |
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 456 Montgomery St | Peacock Construction | revision to pa #201612225764 and #201705227281. demo partition at huddle room 2 to create huddle room 2 open area. maher naDetails
revision to pa #201612225764 and #201705227281. demo partition at huddle room 2 to create huddle room 2 open area. maher na | |
| Jul 11, 2017 | Completed final sign-off Jun 2019 | 1390 Market St | Plant Construction Co, Lp | voluntary seismic upgrade. new micropiles in 2nd sub floor, new concrete beam encasements on 1st sub floor, new seismic dampers & column reinforcement on floors 1-7. new knife plate connections to columns on floors 17-21. ** maher: n/a **Details
voluntary seismic upgrade. new micropiles in 2nd sub floor, new concrete beam encasements on 1st sub floor, new seismic dampers & column reinforcement on floors 1-7. new knife plate connections to columns on floors 17-21. ** maher: n/a ** | $5,000,000 |
| Jun 30, 2017 | Completed final sign-off Apr 2022 | 975 Bryant St | Maple Construction Norcal Lp | to erect 5 stories, 1 basement, type iii-a / i-a, 185 unit multi-family residential & retail mixed use building. (r-2,m,b,s-2) ** maher: n/a **Details
to erect 5 stories, 1 basement, type iii-a / i-a, 185 unit multi-family residential & retail mixed use building. (r-2,m,b,s-2) ** maher: n/a ** | $35,000,000 |
| Feb 10, 2017 | Completed final sign-off Mar 2018 | 456 Montgomery St | Peacock Construction | revision to pa 2016-1007-9784 for removal of officeDetails
revision to pa 2016-1007-9784 for removal of office | |
| Jan 19, 2017 | Completed final sign-off Mar 2018 | 456 Montgomery St | Peacock Construction | 11/f: revision to pa#201610079784 to add card readers to door #18.Details
11/f: revision to pa#201610079784 to add card readers to door #18. | |
| Oct 27, 2016 | Never finaled issued Dec 2016, no final | 1625 Post St | Midway Enterprises, Inc. | replacement and updated signs to be installed as required per code.Details
replacement and updated signs to be installed as required per code. | $16,875 |
| May 25, 2016 | Never finaled issued Jan 2017, no final | 933 Stockton St | Tutor Perini Corporation | revision to pa #201204037405, addition of plaza level on top of existing (currently under construction) transit station. ref pa 201204037405Details
revision to pa #201204037405, addition of plaza level on top of existing (currently under construction) transit station. ref pa 201204037405 | $3,500,000 |
| May 4, 2016 | Completed final sign-off Feb 2017 | 315 Bay St | Z Construction Company Inc | office build out, add three offices, conference rom, management office with private bathroom and open office area. n/a ordinance #155-13Details
office build out, add three offices, conference rom, management office with private bathroom and open office area. n/a ordinance #155-13 | $70,000 |
| Mar 25, 2016 | Completed final sign-off Aug 2018 | 1625 Post St | Midway Enterprises, Inc. | the lobby & garden levels involves adding a pantry, a bar & two unisex restrooms. it will also demolish the existing stairs by the entry.Details
the lobby & garden levels involves adding a pantry, a bar & two unisex restrooms. it will also demolish the existing stairs by the entry. | $200,000 |
| Mar 8, 2016 | Completed final sign-off Sep 2018 | 1625 Post St | Midway Enterprises, Inc. | the scope of work for the annex building involves renovation of existing guestrooms & common areas. there will be 7 new rooms added to the existing structure but no square footage will be added or alterated.Details
the scope of work for the annex building involves renovation of existing guestrooms & common areas. there will be 7 new rooms added to the existing structure but no square footage will be added or alterated. | $200,000 |
| Feb 19, 2016 | Completed final sign-off Aug 2018 | 1625 Post St | Midway Enterprises, Inc. | renovation 156 extg guest rooms and common space such as corridors from level 4 to 16 in the tower only. no square footage is added. total proposed work is 70,368 sq ft occupant load is unchanged. separte mep permitDetails
renovation 156 extg guest rooms and common space such as corridors from level 4 to 16 in the tower only. no square footage is added. total proposed work is 70,368 sq ft occupant load is unchanged. separte mep permit | $200,000 |
| Jan 12, 2016 | Completed final sign-off May 2016 | 291 Connecticut St | John Woo Constructionllc | remove (e) non-structural partitions & (e) bathroom, install 3 (n) treatment rooms and bathroom, no massage.Details
remove (e) non-structural partitions & (e) bathroom, install 3 (n) treatment rooms and bathroom, no massage. | $25,000 |
| Dec 2, 2015 | Completed final sign-off May 2016 | 1321 Mission St | Yerba Buena Builders Inc | ground fl: panoramic interests office building & unit mock up for sales purposes. modulab unit mock up in temporary sales office.Details
ground fl: panoramic interests office building & unit mock up for sales purposes. modulab unit mock up in temporary sales office. | $35,000 |
| Nov 30, 2015 | Never finaled issued Oct 2016, no final | 1625 Post St | Midway Enterprises, Inc. | demolish mezzanine level above lobby, decrease sq. footage and occupant load. total is 1,206 sq ft 121 occupant load is reduced. mep, life safety deferred.Details
demolish mezzanine level above lobby, decrease sq. footage and occupant load. total is 1,206 sq ft 121 occupant load is reduced. mep, life safety deferred. | $90,000 |
| Nov 23, 2015 | Completed final sign-off Sep 2016 | 1688 Pine St | Build Group Inc. | revision to approved appln #201312184508-s. combine 2 units into 1 unit & retaining the same number of affordable units per the commission's approve of 31 bmr units. ** maher: n/a **Details
revision to approved appln #201312184508-s. combine 2 units into 1 unit & retaining the same number of affordable units per the commission's approve of 31 bmr units. ** maher: n/a ** | $1,000 |
| Oct 26, 2015 | Never finaled filed Oct 2015, never issued | 1208 Junipero Serra Bl | to erect 17 stories, 3 basements, type i-a, 299 residential units building.Details
to erect 17 stories, 3 basements, type i-a, 299 residential units building. | $61,748,161 | |
| Feb 25, 2015 | Never finaled issued Apr 2015, no final | 151 Powell St | Build Group Inc. | erect non electric, double faced sign. n/a for maher ordinance.Details
erect non electric, double faced sign. n/a for maher ordinance. | $1,000 |
| Feb 25, 2015 | Never finaled issued Apr 2015, no final | 151 Powell St | Build Group Inc. | erect non electric, single faced sign. n/a for maher ordinance.Details
erect non electric, single faced sign. n/a for maher ordinance. | $4,000 |
| Feb 25, 2015 | Never finaled issued Apr 2015, no final | 151 Powell St | Build Group Inc. | erect electric, single faced sign. n/a for maher ordinance. on a canopy. canopy on separate permit.Details
erect electric, single faced sign. n/a for maher ordinance. on a canopy. canopy on separate permit. | $7,000 |
| Feb 25, 2015 | Never finaled issued Apr 2015, no final | 151 Powell St | Build Group Inc. | erect non structural signDetails
erect non structural sign | $800 |
| Feb 25, 2015 | Never finaled issued Apr 2015, no final | 151 Powell St | Build Group Inc. | erect non electric, double faced signe. n/a for maher ordinance.Details
erect non electric, double faced signe. n/a for maher ordinance. | $4,000 |
| Feb 10, 2015 | Never finaled issued Apr 2015, no final | 1625 Post St | Newland Interiors | unit#1511 - t.i.(e) hotel rooms & partial corridor ceiling finishes & fixtures. demo includes removal of (e) finsihes (carpet,tile,wallbase, wallpaper) fixtures (tub,toilet vanity). construction includes non-struct tub enclosure, millwork, finishes & fixtures, relocating/capping plbg & elect outletsDetails
unit#1511 - t.i.(e) hotel rooms & partial corridor ceiling finishes & fixtures. demo includes removal of (e) finsihes (carpet,tile,wallbase, wallpaper) fixtures (tub,toilet vanity). construction includes non-struct tub enclosure, millwork, finishes & fixtures, relocating/capping plbg & elect outlets | $18,000 |
| Dec 9, 2014 | Expired or cancelled expired Nov 2023 | 1649 Polk St | Build Group Inc. | remove e non structural partition, doors, millwork, fixtures, add new partitons, doors, remodel bath and kitchen fixtures, appliances only, no plumbing. non functional purposes. replace e with new plumbing fixtures. mech/elec under sep permit. maher not reqDetails
remove e non structural partition, doors, millwork, fixtures, add new partitons, doors, remodel bath and kitchen fixtures, appliances only, no plumbing. non functional purposes. replace e with new plumbing fixtures. mech/elec under sep permit. maher not req | $80,000 |
| Oct 30, 2014 | Never finaled issued Oct 2014, no final | 1321 Mission St | Charles Pankow Builders Ltd | addendum 3 revision appl. 2013.0131.9232 s3. add smoke control system to addendum s3. (a.k.a. 104 9th street)Details
addendum 3 revision appl. 2013.0131.9232 s3. add smoke control system to addendum s3. (a.k.a. 104 9th street) | |
| Sep 23, 2014 | Completed final sign-off Sep 2017 | 1656 Post St | Source Planning And Construction Inc | change of use: converting (e) 2nd floor retail space (3,475 sf) to four residential apartment units. 2 x (one bedrm),2 x (one bedrm + den).Details
change of use: converting (e) 2nd floor retail space (3,475 sf) to four residential apartment units. 2 x (one bedrm),2 x (one bedrm + den). | $400,000 |
| Sep 4, 2014 | Never finaled issued Sep 2014, no final | 1625 Post St | Newland Interiors | work for #1510 only- remodel (e) hotel rm, demo scope includes removal of (e) finishes- carpet, tile, wall base, wall paper. fixtures- tub, toilet, vanity. construction scope includes non structural interior walls, millwork & finishes. fixtures include relocate & capping of plumbing & elec. outletsDetails
work for #1510 only- remodel (e) hotel rm, demo scope includes removal of (e) finishes- carpet, tile, wall base, wall paper. fixtures- tub, toilet, vanity. construction scope includes non structural interior walls, millwork & finishes. fixtures include relocate & capping of plumbing & elec. outlets | $12,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2015 | 151 Powell St | Build Group Inc. | tenant improvement on ground fl & basement. scope includes interior walls, millworks, finishes, relocated restrooms, dumbwater, elevator call buttons, signage upgrades & envelope modifications. t-24 calculations , storefront alt mech, electrical, plumbing, fire alarm & sprinkler under sep permit.Details
tenant improvement on ground fl & basement. scope includes interior walls, millworks, finishes, relocated restrooms, dumbwater, elevator call buttons, signage upgrades & envelope modifications. t-24 calculations , storefront alt mech, electrical, plumbing, fire alarm & sprinkler under sep permit. | $350,000 |
| Jun 17, 2014 | Completed final sign-off Sep 2016 | 1634 Pine St | Build Group Inc. | demolish 1 story, type 5, office/auto repair.Details
demolish 1 story, type 5, office/auto repair. | $75,000 |
| Jun 17, 2014 | Never finaled issued Oct 2014, no final | 1650 Pine St | Build Group Inc. | demolish 1 story, type 5, warehouse building.Details
demolish 1 story, type 5, warehouse building. | $75,000 |
| Jun 17, 2014 | Never finaled issued Oct 2014, no final | 1656 Pine St | Build Group Inc. | demolish 1 story, type 5, office bldg.Details
demolish 1 story, type 5, office bldg. | $75,000 |
| Jun 4, 2014 | Completed final sign-off May 2021 | 2558 Mission St | Build Group Inc. | new property line opening in unit 807. ab-009 compliant.Details
new property line opening in unit 807. ab-009 compliant. | $6,000 |
| Jan 28, 2014 | Completed final sign-off Sep 2017 | 1656 Post St | Source Planning And Construction Inc | remove existing partitions, doors and some shelving, add new elevator, main electrical, phone room for new ground transformer in sidewalk, scope includes new partition, doors and stair as well as replacing some rotted beams & plywood decking.Details
remove existing partitions, doors and some shelving, add new elevator, main electrical, phone room for new ground transformer in sidewalk, scope includes new partition, doors and stair as well as replacing some rotted beams & plywood decking. | $350,000 |
| Dec 18, 2013 | Completed final sign-off Sep 2016 | 1634 Pine St | Build Group Inc. | complete removal of 3 structures w/facade retention only @ 1660 &1670 pine st. (n) const of 2 residential high rise towers, both over single g/f podium w/common area & commercial over basement parking, 6 lots to formally merged into 1 fl to the issuance of a permit of occupancy. demo sep permitDetails
complete removal of 3 structures w/facade retention only @ 1660 &1670 pine st. (n) const of 2 residential high rise towers, both over single g/f podium w/common area & commercial over basement parking, 6 lots to formally merged into 1 fl to the issuance of a permit of occupancy. demo sep permit | $105,000,000 |
| Nov 19, 2013 | Completed final sign-off Mar 2014 | 2540 Mission St | remove (e) non-structural partitions, doors & millwrok. add new prtitions, doors, new model bathroom & kitchen w/no plumbing (non-functional), upgrade (e) bathroom to fully accessible.Details
remove (e) non-structural partitions, doors & millwrok. add new prtitions, doors, new model bathroom & kitchen w/no plumbing (non-functional), upgrade (e) bathroom to fully accessible. | $110,000 | |
| Oct 9, 2013 | Never finaled issued Dec 2013, no final | 116 09th St | Charles Pankow Builders Ltd | underpin for excavation of adjacent property under pa#201309166891. not more than 50 cube yards excavation.Details
underpin for excavation of adjacent property under pa#201309166891. not more than 50 cube yards excavation. | $12,000 |
| Sep 16, 2013 | Never finaled issued Nov 2013, no final | 1321 Mission St | Charles Pankow Builders Ltd | to demolish retail - commercial buildingDetails
to demolish retail - commercial building | $150,000 |
| Aug 27, 2013 | Completed final sign-off Jan 2015 | 2558 Mission St | Build Group Inc. | erect temporary crane for new building construction authorized under pa# 2013/01/16/8124.Details
erect temporary crane for new building construction authorized under pa# 2013/01/16/8124. | $30,000 |
| Jul 12, 2013 | Completed final sign-off Sep 2014 | 1771 Washington St | Build Group Inc. | work @ unit# th3. alter to pa# 2012/03/07/5572. modifies unit# th3 to include addition of a roof deck. enclose parapet & guardrail; addition of a new spiral staircase. enclose (e) walls & windows & a penthouse to provide access to roof deck. addition of a bifold style door where storefront glazingDetails
work @ unit# th3. alter to pa# 2012/03/07/5572. modifies unit# th3 to include addition of a roof deck. enclose parapet & guardrail; addition of a new spiral staircase. enclose (e) walls & windows & a penthouse to provide access to roof deck. addition of a bifold style door where storefront glazing | $50,000 |
| Apr 1, 2013 | Completed final sign-off Jul 2013 | 343 Sansome St | Mc Carthy Building Companies Inc | 14th floor:tenant improvement in an extg office. new partition walls.Details
14th floor:tenant improvement in an extg office. new partition walls. | $5,000 |
| Jan 31, 2013 | Completed final sign-off Sep 2016 | 104 09th St | Oliver & Company Inc. | to erect 160 units, 11 stories with basement mix use building.Details
to erect 160 units, 11 stories with basement mix use building. | $20,000,000 |
| Oct 4, 2012 | Completed final sign-off Oct 2025 | 933 Stockton St | Tutor Perini Corporation | demolition of one commercial building for central sub-way.Details
demolition of one commercial building for central sub-way. | $238,091 |
| Sep 19, 2012 | Completed final sign-off Jun 2025 | 266 04th St | Tutor Perini Corporation | erect central transit subway station.Details
erect central transit subway station. | $38,314,494 |
| Jun 22, 2012 | Completed final sign-off Apr 2013 | 315 Bay St | Z Construction Company Inc | extend stair 2 to roof and add deck off e penthouseDetails
extend stair 2 to roof and add deck off e penthouse | $12,000 |
| Apr 3, 2012 | Never finaled issued Jul 2013, no final | 933 Stockton St | Tutor Perini Corporation | erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton streetDetails
erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton street | $69,970,683 |
| Feb 21, 2012 | Completed final sign-off Oct 2012 | 1800 Van Ness Av | Build Group Inc. | demolish 2 stories, type 5, retail/office building.Details
demolish 2 stories, type 5, retail/office building. | $156,108 |
| Feb 21, 2012 | Completed final sign-off Nov 2014 | 1800 Van Ness Av | Build Group Inc. | erect 8 stories, 98 dwelling units, 2 basements, type 1 new building.Details
erect 8 stories, 98 dwelling units, 2 basements, type 1 new building. | $33,972,170 |
| Feb 16, 2010 | Completed final sign-off May 2010 | 1160 Mission St | an opening to be constructed to merge condo unit# 2110 into unit 2108. unit 2110 has never been occupied. this work/application is for unit 2110. compliance with ab-005 required final sign-off by fire inspector. sprinklers and fire alarm on separate permit per ab-005.Details
an opening to be constructed to merge condo unit# 2110 into unit 2108. unit 2110 has never been occupied. this work/application is for unit 2110. compliance with ab-005 required final sign-off by fire inspector. sprinklers and fire alarm on separate permit per ab-005. | $2,000 | |
| Feb 16, 2010 | Completed final sign-off May 2010 | 1160 Mission St | an opening to be constructed to merge condo unit# 2108 into unit 2110. unit 2110 has never been occupied. this work/application is for unit 2108. compliance with ab-005 required final sign-off by fire inspector. sprinklers and fire alarm on separate permit per ab-005.Details
an opening to be constructed to merge condo unit# 2108 into unit 2110. unit 2110 has never been occupied. this work/application is for unit 2108. compliance with ab-005 required final sign-off by fire inspector. sprinklers and fire alarm on separate permit per ab-005. | $1,000 | |
| Aug 10, 2009 | Completed final sign-off Oct 2009 | 1746 Post St | Oliver & Company Inc. | revision to appl #200707166813-s3/r1 - clarification: 2 hr glass floor infill panel @ 2nd floor, not 1 hr due to 2 hr lobby.Details
revision to appl #200707166813-s3/r1 - clarification: 2 hr glass floor infill panel @ 2nd floor, not 1 hr due to 2 hr lobby. | |
| Feb 5, 2009 | Completed final sign-off Feb 2010 | 1751 Fulton St | determine occupant load of 154, demo existing bollards in egress path, install bollards for egress path, ref. pa #200602094220.Details
determine occupant load of 154, demo existing bollards in egress path, install bollards for egress path, ref. pa #200602094220. | $800 | |
| Jan 14, 2009 | Completed final sign-off Oct 2009 | 1746 Post St | Oliver & Company Inc. | revision to appl #200707166813s3-r1 - revise cafe layout - adding some kitchen equipments & a dry storage w/mop sink at retail.Details
revision to appl #200707166813s3-r1 - revise cafe layout - adding some kitchen equipments & a dry storage w/mop sink at retail. | $5,000 |
| Dec 5, 2008 | Completed final sign-off Oct 2009 | 1746 Post St | Oliver & Company Inc. | change stair #2 & 3 walls rating from 2 to 1 hour except stair #2 walls @ ground floor to remain 2 hrs. change 1st fl. walls from 2 hrs to 1 hr. from gl c-d change 2nd & 3rd flrs walls from 2 hrs to 1 hr from gl a-d. revision to application 200707166813s-3r-1.Details
change stair #2 & 3 walls rating from 2 to 1 hour except stair #2 walls @ ground floor to remain 2 hrs. change 1st fl. walls from 2 hrs to 1 hr. from gl c-d change 2nd & 3rd flrs walls from 2 hrs to 1 hr from gl a-d. revision to application 200707166813s-3r-1. | |
| Oct 10, 2007 | Completed final sign-off Mar 2008 | 1160 Mission St | Webcor Construction Lp | revision to appl. #2002.12.20.3957. correction under construction. to combing unit #2204 & #2206 on 21st floor into one unit. also to correct the total number of units from 250 to 245 units.Details
revision to appl. #2002.12.20.3957. correction under construction. to combing unit #2204 & #2206 on 21st floor into one unit. also to correct the total number of units from 250 to 245 units. | |
| Jul 16, 2007 | Completed final sign-off May 2009 | 1746 Post St | demolish 2 stories, print shop. complaint #200714936 (bid-insp).Details
demolish 2 stories, print shop. complaint #200714936 (bid-insp). | ||
| Jul 16, 2007 | Completed final sign-off Oct 2009 | 1746 Post St | erect 3 stories, 1 basement, assembly/office/retail building.Details
erect 3 stories, 1 basement, assembly/office/retail building. | $2,000,000 | |
| May 31, 2007 | Never finaled issued May 2007, no final | 871 Turk St | Cahill Contractors Inc | original permit construction documents represented casement wndws for all operable wndws in order to meet mod requirement for 5 pound force to operate and open the wndw, it was necessary to change all wndw to awnings with approval of fred stumpp fire marshallDetails
original permit construction documents represented casement wndws for all operable wndws in order to meet mod requirement for 5 pound force to operate and open the wndw, it was necessary to change all wndw to awnings with approval of fred stumpp fire marshall | |
| May 1, 2007 | Completed final sign-off Mar 2008 | 871 Turk St | Cahill Contractors Inc | new tenant improvements, senior services at the 1/f of 871 turk street, new occupancy.Details
new tenant improvements, senior services at the 1/f of 871 turk street, new occupancy. | $200,000 |
| Jun 15, 2006 | Expired or cancelled expired Sep 2007 | 680 Mission St | add bathroom & storage (approx 170 sq. ft.) 2 ground floor.Details
add bathroom & storage (approx 170 sq. ft.) 2 ground floor. | $12,000 | |
| Sep 27, 2005 | Completed final sign-off Apr 2009 | 300 Berry St | to erect 268 dwelling unit with 16 story new bldgDetails
to erect 268 dwelling unit with 16 story new bldg | $65,000,924 | |
| Sep 19, 2005 | Expired or cancelled expired Feb 2008 | 343 Sansome St | interior tenant improvement of existing space, elec imech under 14th fl.Details
interior tenant improvement of existing space, elec imech under 14th fl. | $250,000 | |
| Aug 31, 2005 | Completed final sign-off Jul 2009 | 7 Vandewater St | Frando Corporation | erect 3 stories of 9 dwelling unitsDetails
erect 3 stories of 9 dwelling units | $1,370,000 |
| Aug 8, 2005 | Expired or cancelled expired May 2009 | 2801 Leavenworth St | electrical/mechanical work for grocery store,architectural/health issued under appl#200507268630Details
electrical/mechanical work for grocery store,architectural/health issued under appl#200507268630 | $50,000 |