David G. Kallmeyer
- Listed as
- architect, engineer
- Firm
- Gfds Engineers
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Sep 2026
75 permits since 2000 (engineer on 69 permits, architect on 6 permits): 41 completed, 11 in progress, 11 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 3444 Washington St | Van Acker Const Assoc Inc | replacement of (e) doors/wdws and ext'r material in-kind where req'd.excavation for addtional basement sf, enclosure of (e) rear deck to create a new 2-story additonal with access to the rear yard,(n) mechanical and electrical systems. various landscape improvements including new planting, terracesDetails
replacement of (e) doors/wdws and ext'r material in-kind where req'd.excavation for addtional basement sf, enclosure of (e) rear deck to create a new 2-story additonal with access to the rear yard,(n) mechanical and electrical systems. various landscape improvements including new planting, terraces | $3,000,000 |
| Jul 27, 2026 | In progress issued Aug 2026 | 838 Divisadero St | Cookline Construction Inc | fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures.Details
fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures. | $250,000 |
| Jul 21, 2026 | In progress issued Aug 2026 | 2100 Pacific Av | Van Acker Const Assoc Inc | 10th fl: full interior remodel and reconfiguration of existing residential in high rise. includes non structural interior partitoins with updated finishes.Details
10th fl: full interior remodel and reconfiguration of existing residential in high rise. includes non structural interior partitoins with updated finishes. | $196,000 |
| May 15, 2026 | In progress issued Jun 2026 | 101 Walnut St | Add A Garage Inc. | revision to 202511139490. minor floor plan adjustments, revised elevator door configuration, and resulting structural updates.Details
revision to 202511139490. minor floor plan adjustments, revised elevator door configuration, and resulting structural updates. | $12,000 |
| May 12, 2026 | In progress issued Sep 2026 | 21 05th Av | Saturn Construction Co | horizontal addition and renovation of (e) residence. excavate 1/f and replace foundations as required.Details
horizontal addition and renovation of (e) residence. excavate 1/f and replace foundations as required. | $997,681 |
| Mar 15, 2026 | In progress issued Sep 2026 | 51 Lopez Av | Carroll Construction | construct new exterior rear yard 2nd and 3rd floor balcony decks.Details
construct new exterior rear yard 2nd and 3rd floor balcony decks. | $35,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair.Details
basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair. | $127,000 |
| Dec 19, 2025 | Completed final sign-off Jun 2026 | 39 06th Av | Sidney Builders, Inc | voluntary structural strengthening at attic and roof framing. adding window change to the front facade.Details
voluntary structural strengthening at attic and roof framing. adding window change to the front facade. | $25,000 |
| Sep 24, 2025 | In progress issued Sep 2026 | 655 Alvarado St | to document as built foundation & retaining walls,consistent with the scope of work shown under previously approved & issued (later canceled) plans including bpa#201711033047.Details
to document as built foundation & retaining walls,consistent with the scope of work shown under previously approved & issued (later canceled) plans including bpa#201711033047. | ||
| Aug 20, 2025 | In progress filed Aug 2025, not yet issued | 2500 Pacific Av | voluntary structural strenghthening of (e) building foundation, including new hand dug piers and grade beams.Details
voluntary structural strenghthening of (e) building foundation, including new hand dug piers and grade beams. | $100,000 | |
| Aug 18, 2025 | In progress issued Jan 2026 | 16 Presidio Tr | Cairn Construction | int: reno at each floor, lowering slab on grade -1' at level 0. (e) & (n) stair revisions and (n) elevator struct revisions, along w/seismic upgrade as needed throughout. ext: new window openings at side and rear. no change to front. (n) deck @ rear. sliding doors and trim details replaced.Details
int: reno at each floor, lowering slab on grade -1' at level 0. (e) & (n) stair revisions and (n) elevator struct revisions, along w/seismic upgrade as needed throughout. ext: new window openings at side and rear. no change to front. (n) deck @ rear. sliding doors and trim details replaced. | $2,500,000 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | Bradford Construction | revision to 202502281303: modify shear wall layout on lower level and main levelDetails
revision to 202502281303: modify shear wall layout on lower level and main level | |
| Jan 27, 2025 | In progress issued Feb 2025 | 3828 Jackson St | interior modifications including kitchen, bathroom, and basement remodel, exterior modifications to extend lightwell and enlarge window openings at rear elevation and basement level, and replacement of existing skylight. inc. structural, electrical, mechanical, and plumbing.Details
interior modifications including kitchen, bathroom, and basement remodel, exterior modifications to extend lightwell and enlarge window openings at rear elevation and basement level, and replacement of existing skylight. inc. structural, electrical, mechanical, and plumbing. | $480,000 | |
| Oct 28, 2024 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | rev202102245264-(s1 r1) structural foundation updateDetails
rev202102245264-(s1 r1) structural foundation update | |
| Jul 26, 2024 | Completed final sign-off May 2025 | 3091 California St | Urrutia's Construction, S L M Development Inc. | unit 3-add in unit laundry. (1) bathrrom remodel. add (1) bathroom. (1) kitchen remodel. no new floor area or new conditioned spaceDetails
unit 3-add in unit laundry. (1) bathrrom remodel. add (1) bathroom. (1) kitchen remodel. no new floor area or new conditioned space | $5,000 |
| Jun 13, 2024 | Completed final sign-off Aug 2024 | 26 Commonwealth Av | Upscale Construction Inc. | dry rot repair in kitchen and kitchen nook.Details
dry rot repair in kitchen and kitchen nook. | $35,000 |
| Mar 8, 2024 | Expired or cancelled expired Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | revise pa#'s 202307061612 and 202312192794: to repair east property line windows, replace 3rd floor exterior door, add mechanical well at front yard and replace exterior service stair.Details
revise pa#'s 202307061612 and 202312192794: to repair east property line windows, replace 3rd floor exterior door, add mechanical well at front yard and replace exterior service stair. | $80,000 |
| Feb 14, 2024 | Completed final sign-off Jun 2024 | 220 Montgomery St | San Francisco Commercial Builders Inc | revision to permit 202312212965. addition of side plate to base plate for detail 5/s4.2. corrected callouts on s2.1Details
revision to permit 202312212965. addition of side plate to base plate for detail 5/s4.2. corrected callouts on s2.1 | $1,000 |
| Dec 21, 2023 | Completed final sign-off Jun 2024 | 220 Montgomery St | San Francisco Commercial Builders Inc | repair of corrosion damage to 2 existing steel columns at basement.Details
repair of corrosion damage to 2 existing steel columns at basement. | $10,000 |
| Oct 5, 2023 | In progress issued Dec 2024 | 24 Orben Pl | revision to 202212218915: add 200 sq ft heated space and 53 sq ft unheated to e basement at rear of property below grade. new conc stair at rear yardDetails
revision to 202212218915: add 200 sq ft heated space and 53 sq ft unheated to e basement at rear of property below grade. new conc stair at rear yard | $75,232 | |
| Feb 16, 2022 | Never finaled issued Apr 2022, no final | 25 06th Av | Jeff King And Company Inc | revise grading, utility, erosion control plans and foundation and 2nd floor framing plans for pa#201906274559 (s1)Details
revise grading, utility, erosion control plans and foundation and 2nd floor framing plans for pa#201906274559 (s1) | |
| Aug 9, 2021 | Completed final sign-off Jan 2022 | 3838 Clay St | Cairn Construction | replacement of (e) failing retaining wall with new retaining wall.Details
replacement of (e) failing retaining wall with new retaining wall. | $35,000 |
| Aug 4, 2021 | Never finaled issued Aug 2021, no final | 3501 Clay St | Thompson Suskind L P | interior remodel, no exterior work. g/f: kitchen remodel and appliance relocations, wall between kitchen and living to be removed to make 1 combined family room area.Details
interior remodel, no exterior work. g/f: kitchen remodel and appliance relocations, wall between kitchen and living to be removed to make 1 combined family room area. | $112,500 |
| Jun 10, 2021 | Completed final sign-off Oct 2022 | 115 Jordan Av | Carroll Construction | remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/fDetails
remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/f | $42,000 |
| Jun 2, 2021 | Expired or cancelled cancelled Jan 2026 | 17 Landers St | seismic strengthening of an (e) building. new wood shearwalls & steel moment frames at basement level.Details
seismic strengthening of an (e) building. new wood shearwalls & steel moment frames at basement level. | $5,000 | |
| Feb 24, 2021 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedrDetails
basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedr | $600,000 |
| Feb 12, 2021 | Never finaled issued May 2021, no final | 2221 Baker St | Clayton Timbrell & Co | limited interior remodel and structural work within existing building.Details
limited interior remodel and structural work within existing building. | $50,000 |
| Nov 13, 2020 | Completed final sign-off Mar 2021 | 469 Vernon St | repair to rear foundation, including shoring and replacement of footings and concreteDetails
repair to rear foundation, including shoring and replacement of footings and concrete | $35,000 | |
| Sep 27, 2020 | Completed final sign-off Feb 2023 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | demo of (e) pedestriant gate and construction of a new pedestrian gate.Details
demo of (e) pedestriant gate and construction of a new pedestrian gate. | $10,000 |
| Sep 17, 2020 | Completed final sign-off Jun 2023 | 2108 Washington St | Mueller Nicholls Inc | replace (e) wood/steel windows/doors w/steel windows/doors. garage level: infaill of area below (e) bay window tower at north facade to increase coditionied floor area. remodel interior spaces to spa area w/bathroom, sauna, hot tub, cold plumbe. structural includes reconfiguration of rear exteriorDetails
replace (e) wood/steel windows/doors w/steel windows/doors. garage level: infaill of area below (e) bay window tower at north facade to increase coditionied floor area. remodel interior spaces to spa area w/bathroom, sauna, hot tub, cold plumbe. structural includes reconfiguration of rear exterior | $700,000 |
| Jun 9, 2020 | Completed final sign-off Jun 2022 | 3746 Jackson St | revision to pa 2019.0820.9378. to level off a ceiling in a room that faces a light well, to lower the floor on the ground floor by one riser, to replace areas of the foundation, various structural strengthening, and a new mechanical system.Details
revision to pa 2019.0820.9378. to level off a ceiling in a room that faces a light well, to lower the floor on the ground floor by one riser, to replace areas of the foundation, various structural strengthening, and a new mechanical system. | $15,000 | |
| Oct 30, 2019 | Completed final sign-off May 2020 | 56 Presidio Av | Centric Building Inc. | replace area of foundation at front tradesman entranceDetails
replace area of foundation at front tradesman entrance | $7,000 |
| Aug 26, 2019 | Completed final sign-off Aug 2020 | 395 Ewing Tr | revision to original pa #201906244193. adding framing plans at skylights & framing at new wall opening between kitchen and dining room.Details
revision to original pa #201906244193. adding framing plans at skylights & framing at new wall opening between kitchen and dining room. | ||
| Jun 27, 2019 | Never finaled issued Feb 2021, no final | 25 06th Av | Jeff King And Company Inc | add 2nd story to (e) garageDetails
add 2nd story to (e) garage | $400,000 |
| Jun 25, 2019 | Never finaled issued Mar 2021, no final | 25 06th Av | Jeff King And Company Inc | front bldg: renovate (e) house including lowering 1st flr, extend south wall addition at 1st and 2nd flrs. construct a new terrace. legalize deck addition at 1st and 2nd flrs.Details
front bldg: renovate (e) house including lowering 1st flr, extend south wall addition at 1st and 2nd flrs. construct a new terrace. legalize deck addition at 1st and 2nd flrs. | $2,000,000 |
| Jun 25, 2019 | Expired or cancelled cancelled May 2025 | 3756 Jackson St | Lee & Company Contractors Inc | complete structural repairs to compl with previously approved plans on permit #201710100750 - complete shearwall, shear transfer blocking, tie down anchors. no change from original permit.Details
complete structural repairs to compl with previously approved plans on permit #201710100750 - complete shearwall, shear transfer blocking, tie down anchors. no change from original permit. | $15,000 |
| May 20, 2019 | Completed final sign-off Jan 2022 | 34 Maple St | Upscale Construction Inc. | revsiosn to 201811216501 seismic upgrade to all levels. add fire sprinkler to all levels. new electrical, plumbing and hvac systemsDetails
revsiosn to 201811216501 seismic upgrade to all levels. add fire sprinkler to all levels. new electrical, plumbing and hvac systems | $79,000 |
| May 8, 2019 | Completed final sign-off May 2022 | 3673 Jackson St | Cairn Construction | no work on 1st fl. no change in use. remodel of upper level cariage house. (n) mep. demo 47% of (e) poolhouse. infill (e) pool and demo pool deck. (garage structure). full relandscape include, replace (e) concrete driveway.Details
no work on 1st fl. no change in use. remodel of upper level cariage house. (n) mep. demo 47% of (e) poolhouse. infill (e) pool and demo pool deck. (garage structure). full relandscape include, replace (e) concrete driveway. | $120,000 |
| May 7, 2019 | Expired or cancelled expired Aug 2022 | 1188 Lombard St | Period Restoration Dba Condylis Baier | modification of structural trusses (2 total). supporting the existing roof.Details
modification of structural trusses (2 total). supporting the existing roof. | $15,000 |
| Mar 6, 2019 | Expired or cancelled expired Nov 2025 | 1 Embarcadero Center | Acco Engineered Systems Inc. Dba Acco En | replacement of existing boilers,cooling towers, chillers, associated pumps. reconfigure power distribution based on new equipment electrical requirements. *maher n/a**Details
replacement of existing boilers,cooling towers, chillers, associated pumps. reconfigure power distribution based on new equipment electrical requirements. *maher n/a** | $5,000,000 |
| Nov 19, 2018 | Completed final sign-off Apr 2021 | 1641 Grove St | Thompson Suskind L P | extend new footing and stem wall at west property line from gridline 7 to 3' past the southeast corner of the adjacent neighbor's building.Details
extend new footing and stem wall at west property line from gridline 7 to 3' past the southeast corner of the adjacent neighbor's building. | $8,000 |
| Nov 1, 2018 | Completed final sign-off Feb 2020 | 2511 Pacific Av | Cairn Construction | revision to existing permit 2017-1222-7244. add new powder room at basement. remodeling 3rd floor bath.Details
revision to existing permit 2017-1222-7244. add new powder room at basement. remodeling 3rd floor bath. | $10,000 |
| Mar 23, 2018 | Completed final sign-off Oct 2018 | 436 Castenada Av | Cronin Construction & Development Inc. | expand kitchen & 1st floor bathroom. (e) walls will be removed to expand the kitchen. remodel bathroom on the 2nd floor. same footprint just update tile and plm & ele fixturesDetails
expand kitchen & 1st floor bathroom. (e) walls will be removed to expand the kitchen. remodel bathroom on the 2nd floor. same footprint just update tile and plm & ele fixtures | $125,000 |
| Mar 2, 2018 | Completed final sign-off Dec 2019 | 135 Parker Av | Thompson Suskind L P | add habitable space (rooms & bathroom) down at ground fl, renovate both units, lightwell infill-partial- on both sides of building. add roof deck, replace windows. remove wood burning fire places & add gas fireplace.Details
add habitable space (rooms & bathroom) down at ground fl, renovate both units, lightwell infill-partial- on both sides of building. add roof deck, replace windows. remove wood burning fire places & add gas fireplace. | $700,000 |
| Aug 4, 2017 | Expired or cancelled cancelled Apr 2025 | 655 Alvarado St | Thompson Brooks Inc. | revision to pa #201703161580 (orig pa #200912113061) -adding landscaping retaining walls @ rear yard.Details
revision to pa #201703161580 (orig pa #200912113061) -adding landscaping retaining walls @ rear yard. | $100,000 |
| Aug 3, 2017 | Completed final sign-off Oct 2017 | 2585 Pacific Av | Matarozzi/Pelsinger Builders Inc. | submit structural as-built set to app#2014-1203-2933 s1. changes include updates to details only. original scope unchanged.Details
submit structural as-built set to app#2014-1203-2933 s1. changes include updates to details only. original scope unchanged. | |
| Jul 26, 2017 | Never finaled issued Dec 2017, no final | 2255 Octavia St | Jeff King And Company Inc | revision to pa #201704184231 incl 2 new lightwells & 2 new windows. add't int improvements to basement inc: wine cellar, entertainmt rm,2 bedrm,2 baths,powder,mech, laundry. 1st flr includes removal of wall bet porch & entry, removal of int stair to be replaced by bar @ 1st flr & storage @ 2nd flr.Details
revision to pa #201704184231 incl 2 new lightwells & 2 new windows. add't int improvements to basement inc: wine cellar, entertainmt rm,2 bedrm,2 baths,powder,mech, laundry. 1st flr includes removal of wall bet porch & entry, removal of int stair to be replaced by bar @ 1st flr & storage @ 2nd flr. | $500,000 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 3637 Washington St | revision to pa #201612064212 - add window in lightwell @ 2nd floor(ground floor above garage). n/a maher ordinanceDetails
revision to pa #201612064212 - add window in lightwell @ 2nd floor(ground floor above garage). n/a maher ordinance | $500 | |
| Mar 1, 2017 | Completed final sign-off Mar 2018 | 3660 Jackson St | Van Acker Const Assoc Inc | new vehicle and pedestrian gates at front of property. scope includes partial removal of brick garden wall.Details
new vehicle and pedestrian gates at front of property. scope includes partial removal of brick garden wall. | $10,000 |
| Aug 13, 2015 | Completed final sign-off Dec 2015 | 1904 Baker St | Pacific Green Construction | interior renovation of master bath, powder room, & eat-in area in kitchen.Details
interior renovation of master bath, powder room, & eat-in area in kitchen. | $50,000 |
| Jul 27, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Plant Construction Co, Lp | retail t-i construction of a full service restaurant on ground floor of an (e) museum. new interior wall portitions, interior mechanical, electrical, plumbing, lighting. food service equipment and interior finisher. type 1 hood/duct fire supression, l/s under sep. permit. n/a for maher ordinance.Details
retail t-i construction of a full service restaurant on ground floor of an (e) museum. new interior wall portitions, interior mechanical, electrical, plumbing, lighting. food service equipment and interior finisher. type 1 hood/duct fire supression, l/s under sep. permit. n/a for maher ordinance. | $3,000,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2017 | 2585 Pacific Av | Matarozzi/Pelsinger Builders Inc. | renovate the (e) single fam residence, add a 2 story addition towards the rear yard, extend the (e) third floor area towards the rear yard, enlarge the basement area, structural upgrades as required to meet current seismic code. (1) new bedroom and (1) new bath on third floorDetails
renovate the (e) single fam residence, add a 2 story addition towards the rear yard, extend the (e) third floor area towards the rear yard, enlarge the basement area, structural upgrades as required to meet current seismic code. (1) new bedroom and (1) new bath on third floor | $1,000,000 |
| Nov 12, 2014 | Completed final sign-off Oct 2015 | 3230 Jackson St | Van Acker Const Assoc Inc | replace rotted 2nd fl terrace framing in kind at front of houseDetails
replace rotted 2nd fl terrace framing in kind at front of house | $20,000 |
| Aug 28, 2014 | Completed final sign-off Dec 2015 | 15 Arguello Bl | Van Acker Const Assoc Inc | revision to 201404244110 full seismic upgrade to entire building (voluntary)Details
revision to 201404244110 full seismic upgrade to entire building (voluntary) | $234,000 |
| Aug 27, 2014 | Completed final sign-off Sep 2015 | 615 Broderick St | Rosil Construction | remove wall, add wall, remodel 2 bathrooms, remodel one kitchen, and replace carpet with wood.Details
remove wall, add wall, remodel 2 bathrooms, remodel one kitchen, and replace carpet with wood. | $52,257 |
| Jul 23, 2014 | Completed final sign-off Apr 2016 | 1532 Cole St | Scott & Warner Builders Inc | revision to pa 201304265579; change in shoring methodsDetails
revision to pa 201304265579; change in shoring methods | |
| Jul 18, 2014 | Completed final sign-off Oct 2014 | 2750 Vallejo St | Van Acker Const Assoc Inc | remodel interior stairs.Details
remodel interior stairs. | $15,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 75 Raycliff Tr | Cahill Contractors Inc | voluntary crawl space strengtheningDetails
voluntary crawl space strengthening | $15,000 |
| Feb 4, 2014 | Completed final sign-off Sep 2014 | 115 Spruce St | Upscale Construction Inc. | structural revision to pa#201303212764 in garage.Details
structural revision to pa#201303212764 in garage. | |
| Nov 7, 2013 | Expired or cancelled cancelled Jan 2026 | 60 Normandie Tr | removal of an (e) bearing wall in garage & replace with steel beam & postsDetails
removal of an (e) bearing wall in garage & replace with steel beam & posts | $15,000 | |
| Sep 5, 2013 | Never finaled issued Sep 2013, no final | 819 Anza St | Kalix Inc Dbalara Construction | voluntary seismic retrofit of 3-story residential building. no change to existing exterior elevations, roof height, or square footage of building.Details
voluntary seismic retrofit of 3-story residential building. no change to existing exterior elevations, roof height, or square footage of building. | $250,000 |
| Aug 30, 2013 | Expired or cancelled cancelled Jan 2026 | 819 Anza St | Kalix Inc Dbalara Construction | voluntary seismic retrofit of 3 story resodemtoa; nio;domg, reframing of 3rd floor cieling joists.Details
voluntary seismic retrofit of 3 story resodemtoa; nio;domg, reframing of 3rd floor cieling joists. | $90,000 |
| Jun 18, 2013 | Completed final sign-off Jun 2015 | 2700 Lyon St | Matarozzi/Pelsinger Builders Inc. | interior remodel, replace existing windows, seismic upgrade new skylightDetails
interior remodel, replace existing windows, seismic upgrade new skylight | $575,000 |
| Apr 26, 2013 | Completed final sign-off Apr 2016 | 1532 Cole St | Scott & Warner Builders Inc | addition of new office space in rear yard below associated patio at natural grade (demo exterior rear wall)Details
addition of new office space in rear yard below associated patio at natural grade (demo exterior rear wall) | $300,000 |
| Aug 21, 2012 | Completed final sign-off Sep 2014 | 26 Commonwealth Av | Upscale Construction Inc. | rear addition. interior & exterior remodel. (n) garage @ (e) basement.Details
rear addition. interior & exterior remodel. (n) garage @ (e) basement. | $350,000 |
| Aug 16, 2012 | Completed final sign-off Nov 2013 | 166 12th Av | Versaggi Construction | removal of previous addition under bay window. remove approx. 200 square foot of existing slab on grade at south portion of garage. rebuild front stair & planters.Details
removal of previous addition under bay window. remove approx. 200 square foot of existing slab on grade at south portion of garage. rebuild front stair & planters. | $25,000 |
| May 13, 2011 | Expired or cancelled cancelled Jan 2026 | 451 Pacific Av | Moroso Construction Inc | repairs to exisitng roof truss, repair 4 replace corroded steel portions of deck; replace steel guardrail to meet current code requirements.Details
repairs to exisitng roof truss, repair 4 replace corroded steel portions of deck; replace steel guardrail to meet current code requirements. | $15,000 |
| Apr 7, 2011 | Expired or cancelled cancelled Mar 2020 | 438 Laurel St | soft story voluntary seismic retrofit per ab094.Details
soft story voluntary seismic retrofit per ab094. | $20,000 | |
| Feb 14, 2011 | Completed final sign-off Apr 2012 | 245 Chattanooga St | Hadley General Contractors Inc | remodel of kitchen and office, associated plmg and kichen & bathrooms associated elctrical work. relocate windows at main floor rear elevation,demo wall and bathrroom at ground floor, demo inerior stair from main floor to second floor,fill in stair well openings.Details
remodel of kitchen and office, associated plmg and kichen & bathrooms associated elctrical work. relocate windows at main floor rear elevation,demo wall and bathrroom at ground floor, demo inerior stair from main floor to second floor,fill in stair well openings. | $80,000 |
| Oct 19, 2010 | Completed final sign-off Mar 2011 | 6 Presidio Tr | R E West Builders Inc | revision to pa# 2010-0730-7805-install interior cribbing walls & beams, exterior steel posts support for staircase at rear, not visible from streetDetails
revision to pa# 2010-0730-7805-install interior cribbing walls & beams, exterior steel posts support for staircase at rear, not visible from street | $5,000 |
| Jul 30, 2010 | Completed final sign-off Mar 2011 | 6 Presidio Tr | R E West Builders Inc | temporary shoring in basement for new foundation under pa# 2010.07.09.6283Details
temporary shoring in basement for new foundation under pa# 2010.07.09.6283 | $2,000 |
| May 27, 2010 | Never finaled issued May 2010, no final | 100 Yerba Buena Av | Siteworks Landscape Inc. | already approved retaining wall (landscaping to be raised by 1'-0" along side of yerba buena. revision to appl. 2009/1219/3378.Details
already approved retaining wall (landscaping to be raised by 1'-0" along side of yerba buena. revision to appl. 2009/1219/3378. | $3,000 |
| Dec 17, 2009 | Never finaled issued Dec 2009, no final | 100 Yerba Buena Av | Siteworks Landscape Inc. | a site retaining wall & stairs on grade to create new terrace, max retained height is 5'-0". privacy wall to match existing , maxd height 6'-0". new wood framed arbor.Details
a site retaining wall & stairs on grade to create new terrace, max retained height is 5'-0". privacy wall to match existing , maxd height 6'-0". new wood framed arbor. | $70,000 |
| Apr 9, 2008 | Never finaled issued Apr 2008, no final | 230 08th St | Gaetani Construction Inc. | repair of (e) window headers by replacing (e) steel headers with new steel headers. replace brick and stucco siding in kindDetails
repair of (e) window headers by replacing (e) steel headers with new steel headers. replace brick and stucco siding in kind | $10,000 |
| Mar 25, 2005 | Never finaled issued Apr 2005, no final | 150 De Haro St | install showroom display structureDetails
install showroom display structure | $3,000 |