S Hemminger
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Charles Hemminger Assoc.
- Based in
- Sausaulito
- On San Francisco permits
- Aug 2001 to Jun 2026
150 permits since 2000 (architect on 147 permits, engineer on 2 permits, authorized agent-others on 1 permit): 91 completed, 8 in progress, 27 never finaled, 24 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 150.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 101 Oak St | install retail to go window to (e) restaurant window.Details
install retail to go window to (e) restaurant window. | $20,000 | |
| May 15, 2026 | In progress issued Jun 2026 | 460 Larkin St | Roman Hunt | existing restaurant remodel: change kitchen hood and add ada compliant restroom. electrical deferred. electrical work requires plans reviewed under a separate building permit.Details
existing restaurant remodel: change kitchen hood and add ada compliant restroom. electrical deferred. electrical work requires plans reviewed under a separate building permit. | $117,000 |
| Jan 21, 2026 | In progress issued Apr 2026 | 448 Brannan St | R 3 Builders Inc. | tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations.Details
tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations. | $600,000 |
| Mar 4, 2025 | Completed final sign-off Feb 2026 | 205 Oak St | Sweitzer Inc. | change of operator- interior remodel of (e) restaurant work to include: accessibility improvements @ entry/path of travel, remodel (e) bathroom replacement of (e) kitchen equipment finishes & lighting in the dining room; deferred mechanical & electricalDetails
change of operator- interior remodel of (e) restaurant work to include: accessibility improvements @ entry/path of travel, remodel (e) bathroom replacement of (e) kitchen equipment finishes & lighting in the dining room; deferred mechanical & electrical | $137,000 |
| Feb 18, 2025 | In progress issued Jul 2025 | 2900 18th St | Cookline Construction Inc | new operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463.Details
new operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463. | $40,000 |
| Apr 18, 2024 | Completed final sign-off Jul 2024 | 3500 22nd St | Bernhardt Remodeling | convert a portion of retail space into food prep and service area.Details
convert a portion of retail space into food prep and service area. | $20,000 |
| Nov 3, 2023 | Completed final sign-off Nov 2024 | 3485 Cesar Chavez St | Benburb Construction | exterior work only part of n ew driveway take place on this property (3485 cesar chavez). majority of work takes place on 3435 cesar chavez ref 2021009249109.Details
exterior work only part of n ew driveway take place on this property (3485 cesar chavez). majority of work takes place on 3435 cesar chavez ref 2021009249109. | $25,000 |
| Oct 31, 2023 | Completed final sign-off Jun 2024 | 4042 24th St | Westport Construction | new operator taking over existing restaurant work to include: remodel kitchen & dining area; new type 1 hood/hotline, new pizza oven. no alteration to (e) egress; entry path of travel; ada unise bathrooms contracted under pa 2010-0915-0928Details
new operator taking over existing restaurant work to include: remodel kitchen & dining area; new type 1 hood/hotline, new pizza oven. no alteration to (e) egress; entry path of travel; ada unise bathrooms contracted under pa 2010-0915-0928 | $340,000 |
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 372 Hayes St | abe business entry improvement - post new accessible directional signage and entry (372 hayes) comply with abe: 202210135025Details
abe business entry improvement - post new accessible directional signage and entry (372 hayes) comply with abe: 202210135025 | $100 | |
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 384 Hayes St | to comply with abe 202210135026. replace (e) single pad power assist door activation with hi/lo door activation device.Details
to comply with abe 202210135026. replace (e) single pad power assist door activation with hi/lo door activation device. | $1,000 | |
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 370 Hayes St | to comply with abe program per ordinance 51-16, replace existing single pad power assist door activation with hi/low door activation device. abe# 202210135024Details
to comply with abe program per ordinance 51-16, replace existing single pad power assist door activation with hi/low door activation device. abe# 202210135024 | $1,000 | |
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 388 Hayes St | to comply with accessible business entrance program per orfinance 51-16. replace (e) single pad power assist door activation with hi/lo door acrivation decice. abe# 202210135027.Details
to comply with accessible business entrance program per orfinance 51-16. replace (e) single pad power assist door activation with hi/lo door acrivation decice. abe# 202210135027. | $1,000 | |
| Jul 21, 2023 | Never finaled filed Jul 2023, never issued | 2551 Mission St | t.i. on 2/f: empty floor to be divided into individual work spaces. work to include partition walls & common accessible bathroom facilities.g/f lobby to be reconstructed. all base bldg.accessibility works, mep, sprinklers, fire l/s under pa 200106131442 s-4.Details
t.i. on 2/f: empty floor to be divided into individual work spaces. work to include partition walls & common accessible bathroom facilities.g/f lobby to be reconstructed. all base bldg.accessibility works, mep, sprinklers, fire l/s under pa 200106131442 s-4. | $220,000 | |
| May 19, 2023 | Completed final sign-off Mar 2024 | 2636 San Bruno Av | change of use: establish a full-service restaurant a-2 from brewery/tasting room.Details
change of use: establish a full-service restaurant a-2 from brewery/tasting room. | $5,000 | |
| Feb 9, 2023 | Completed final sign-off Jul 2024 | 375 Alabama St | Benburb Construction | to comply with nov 202200179: interior renovation at ground floor lobby. work to include expansion of (e) lobby to enlarge tenant mailing area & provide new secure package room.Details
to comply with nov 202200179: interior renovation at ground floor lobby. work to include expansion of (e) lobby to enlarge tenant mailing area & provide new secure package room. | $60,000 |
| Dec 22, 2022 | Never finaled filed Dec 2022, never issued | 1238 09th Av | accessible business entrance program 202209134240 per ordinance 51-16 - upgrades to entry door, install hihg/low door assist device, provide new ada level hardware, provide closer at door.provide 10" kickplate.Details
accessible business entrance program 202209134240 per ordinance 51-16 - upgrades to entry door, install hihg/low door assist device, provide new ada level hardware, provide closer at door.provide 10" kickplate. | $5,000 | |
| Dec 22, 2022 | Never finaled issued Jun 2023, no final | 2551 Mission St | required "deferred elevator" permit submission. ref pa 2001-0613-1442-s4)Details
required "deferred elevator" permit submission. ref pa 2001-0613-1442-s4) | ||
| Oct 26, 2022 | Completed final sign-off Jun 2024 | 2551 Mission St | required deferred spray on fireproofing permit submittal. ref pa 2001-0613-1442 s4Details
required deferred spray on fireproofing permit submittal. ref pa 2001-0613-1442 s4 | ||
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 2639 Mission St | Pineda Construction Inc | minor t.i. to (e) g/f spaces. work to include 2 offices, community room & small kitchenette. (e) ada entries, ada bathrooms, hvac, f/s approved under pa202012261737.Details
minor t.i. to (e) g/f spaces. work to include 2 offices, community room & small kitchenette. (e) ada entries, ada bathrooms, hvac, f/s approved under pa202012261737. | $25,000 |
| Sep 24, 2021 | Completed final sign-off Nov 2024 | 3435 Cesar Chavez St | Benburb Construction | exterior work only: 3 exterior ada entry gates, auto gate access and fence. new curb cut. majority of work takes place on 3435 cesar chavez property. part of new driveway takes place on 3485 cesar chavez property. ref pa# 202311030163 and pa# 5 assigned.Details
exterior work only: 3 exterior ada entry gates, auto gate access and fence. new curb cut. majority of work takes place on 3435 cesar chavez property. part of new driveway takes place on 3485 cesar chavez property. ref pa# 202311030163 and pa# 5 assigned. | $65,000 |
| Dec 26, 2020 | Completed final sign-off Jan 2024 | 2637 Mission St | Pineda Construction Inc | convert part of (3)(e) ground fl commercial spaces into (3)(n) residential units. proposed conversion takes place within the (e) building envlope - no expansion of (e) envelope.Details
convert part of (3)(e) ground fl commercial spaces into (3)(n) residential units. proposed conversion takes place within the (e) building envlope - no expansion of (e) envelope. | $180,000 |
| Aug 21, 2020 | Completed final sign-off Aug 2021 | 2170 Bryant St | Northern Sun Associates | new operator taking over (e) restaurant. work to include remodeled kitchen and prep areas; remodel ada bathrooms, new mep (hvac, electrical/lighting and plumbing) work. restaurant will change from b to a-2 occupancyDetails
new operator taking over (e) restaurant. work to include remodeled kitchen and prep areas; remodel ada bathrooms, new mep (hvac, electrical/lighting and plumbing) work. restaurant will change from b to a-2 occupancy | $340,000 |
| Mar 10, 2020 | Completed final sign-off Aug 2021 | 1238 09th Av | Melo Willard Tabudlo Dba Dreamt Design | change of ownership of (e) restaurant. ti to include: remodel kitchen & bar, equipment replacement, ada improvements to (e) bathrooms. building is fully sprinklered. no change of occupancy. (requesting deferred mech, hood,Details
change of ownership of (e) restaurant. ti to include: remodel kitchen & bar, equipment replacement, ada improvements to (e) bathrooms. building is fully sprinklered. no change of occupancy. (requesting deferred mech, hood, | $220,000 |
| Jan 24, 2020 | Completed final sign-off Feb 2020 | 498 Alabama St | Ashot Baghdiyan | ref 2018-0720-5110 added mechanical plan and shifted ada doorDetails
ref 2018-0720-5110 added mechanical plan and shifted ada door | |
| Jan 13, 2020 | Never finaled issued May 2020, no final | 550 Florida St | interior t.i. improvement to approx 1450 sq 2nd fl. space withing (e) production factory, work to include new ada bathroom, w/shower, kitchenete, partition walls and minor structural framing reinforcement associate w/new accostical separation floor no change in use. n/a maherDetails
interior t.i. improvement to approx 1450 sq 2nd fl. space withing (e) production factory, work to include new ada bathroom, w/shower, kitchenete, partition walls and minor structural framing reinforcement associate w/new accostical separation floor no change in use. n/a maher | $34,000 | |
| Dec 18, 2019 | Completed final sign-off Aug 2021 | 2170 Bryant St | Northern Sun Associates | non structural soft demo of interior of existing restaurant space in preparation for new restaurant per ab017Details
non structural soft demo of interior of existing restaurant space in preparation for new restaurant per ab017 | $10,000 |
| Nov 5, 2019 | Expired or cancelled cancelled Jan 2026 | 1450 Armstrong Av | tenant improvement for food delivery business: work to include retherm area, skullery & walk-in refirgeration unit, ada entry/exits upgradesDetails
tenant improvement for food delivery business: work to include retherm area, skullery & walk-in refirgeration unit, ada entry/exits upgrades | $80,000 | |
| Nov 1, 2019 | Expired or cancelled withdrawn Nov 2019 | 724 Lake St | Melo Willard Tabudlo Dba Dreamt Design | revision to pa 2018-0720-5117 added utility counter with sinkDetails
revision to pa 2018-0720-5117 added utility counter with sink | $5,000 |
| Sep 19, 2019 | Completed final sign-off Aug 2020 | 1890 Bryant St | Cookline Construction Inc | exterior entry court scope of work only - include repair/replace existing exterior fence & entry gate. maher naDetails
exterior entry court scope of work only - include repair/replace existing exterior fence & entry gate. maher na | $18,000 |
| Sep 18, 2019 | Completed final sign-off Aug 2020 | 1890 Bryant St | Cookline Construction Inc | ti to (e) a-2 restaurant. new operator taking over (e) restaurant, work to include - remodel kitchen & bar, new hvac and ele/lighting. no change of occupancy bld is fully sprinklered.Details
ti to (e) a-2 restaurant. new operator taking over (e) restaurant, work to include - remodel kitchen & bar, new hvac and ele/lighting. no change of occupancy bld is fully sprinklered. | $220,000 |
| Sep 5, 2019 | Expired or cancelled withdrawn Aug 2022 | 799 Haight St | change of occupancy from retail to new restaurant & t.i. work to include new kitchen, bar and dining. minor exterior work include remodel entry. 3 new windows.Details
change of occupancy from retail to new restaurant & t.i. work to include new kitchen, bar and dining. minor exterior work include remodel entry. 3 new windows. | $250,000 | |
| Apr 16, 2019 | Expired or cancelled withdrawn Sep 2020 | 2551 Mission St | per sf planning 3.11.19 notice of enforcement-applt is submit new permit to complete mission st fcade &est a health fitness facility. shell wk:exterior weather proofing,complete facades,shell bldg,elec&mech.interior tenant wk:interior partitions,lockerrooms,bathrooms exercise rms&assoc elec/mechDetails
per sf planning 3.11.19 notice of enforcement-applt is submit new permit to complete mission st fcade &est a health fitness facility. shell wk:exterior weather proofing,complete facades,shell bldg,elec&mech.interior tenant wk:interior partitions,lockerrooms,bathrooms exercise rms&assoc elec/mech | $2,000,000 | |
| Jan 17, 2019 | Completed final sign-off Feb 2020 | 498 Alabama St | Ashot Baghdiyan | administrative permit to adjust job value for deferred lighting/elec/t-24 to 20,000. permit to pa 2018-0720-5110Details
administrative permit to adjust job value for deferred lighting/elec/t-24 to 20,000. permit to pa 2018-0720-5110 | $20,000 |
| Sep 28, 2018 | Expired or cancelled expired Apr 2022 | 2170 Folsom St | Nelson Jameson Construction Inc | legalize (e) light mfg. & arts use for ground fl & 2nd fl. to comply w/ planning enf 2016-0097. work to include improvement to exit/egress @ ground fl. (n) ada bathroom @ ground fl & the permitting of a pedestrian walkway bridge connecting 2150 to 2170 folsom st.Details
legalize (e) light mfg. & arts use for ground fl & 2nd fl. to comply w/ planning enf 2016-0097. work to include improvement to exit/egress @ ground fl. (n) ada bathroom @ ground fl & the permitting of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. | $30,000 |
| Sep 28, 2018 | Never finaled issued Jul 2019, no final | 2150 Folsom St | Nelson Jameson Construction Inc | legalize (e) light mfg./production @ 2nd fl. to comply w/ planning dept enf 2016-0097. work to include permittng of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. legalize (e) breakroom counters built without permit.Details
legalize (e) light mfg./production @ 2nd fl. to comply w/ planning dept enf 2016-0097. work to include permittng of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. legalize (e) breakroom counters built without permit. | $38,000 |
| Aug 28, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | Edgewood Builders Inc | revision to 201802272389 & 201807023573. new work to include apprx 1333 sf mezzanine, stair & ada lift. relocation of ada bathroom & structural upgrades of bld a. no exterior changes under this permit.Details
revision to 201802272389 & 201807023573. new work to include apprx 1333 sf mezzanine, stair & ada lift. relocation of ada bathroom & structural upgrades of bld a. no exterior changes under this permit. | $200,000 |
| Jul 20, 2018 | Completed final sign-off Feb 2020 | 724 Lake St | Melo Willard Tabudlo Dba Dreamt Design | minor interior remodel to existing 2 level condo unit @ 724 lake st (lower unit), construction of new interior open communicating stair within existing 2 level unit, remodel existing bathroom, conversion of existing storage space to habitable spaceDetails
minor interior remodel to existing 2 level condo unit @ 724 lake st (lower unit), construction of new interior open communicating stair within existing 2 level unit, remodel existing bathroom, conversion of existing storage space to habitable space | $30,000 |
| Jul 20, 2018 | Completed final sign-off Feb 2020 | 498 Alabama St | Ashot Baghdiyan | tenant improvement to include coffee roastery and cafe/coffee bar associated with production coffee roastery, ada path of travel improvements, ada bathroom upgrade, improvment to existing commercial kitchen. add b occupancy to coffee factory.Details
tenant improvement to include coffee roastery and cafe/coffee bar associated with production coffee roastery, ada path of travel improvements, ada bathroom upgrade, improvment to existing commercial kitchen. add b occupancy to coffee factory. | $74,000 |
| Jun 14, 2018 | Completed final sign-off Nov 2018 | 1148 Mission St | Alsterlind Construction Inc. | minor tenant improvement to existing full service restaurant. work to include minor framing & finish alteration, installation of additional refrigeration equipment, kitchen to remain as is - no change of occupancy. maher naDetails
minor tenant improvement to existing full service restaurant. work to include minor framing & finish alteration, installation of additional refrigeration equipment, kitchen to remain as is - no change of occupancy. maher na | $30,000 |
| Jun 7, 2018 | Never finaled issued Jun 2018, no final | 1148 Mission St | Alsterlind Construction Inc. | minor demolition permit.Details
minor demolition permit. | $3,000 |
| Feb 27, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | Edgewood Builders Inc | t.i. to extg production space. work to include ada upgrade and construction of new egress stair. no change of use(deffered mep permits) n/a for maherDetails
t.i. to extg production space. work to include ada upgrade and construction of new egress stair. no change of use(deffered mep permits) n/a for maher | $200,000 |
| Jan 17, 2018 | Never finaled filed Jan 2018, never issued | 334 South Van Ness Av | to comply n.o.v. #201781110: change extg 2nd floor to residential. improving extg bathroom. adding sink on mezzanine. improving shower at 1st and 2nd floors. change of occupancy at 2nd floor only. n/a for maherDetails
to comply n.o.v. #201781110: change extg 2nd floor to residential. improving extg bathroom. adding sink on mezzanine. improving shower at 1st and 2nd floors. change of occupancy at 2nd floor only. n/a for maher | $20,000 | |
| Dec 8, 2017 | Completed final sign-off May 2018 | 2150 Folsom St | ti to (e) 2nd fl tenant space. work to include dbi field inspector request to correct issued 2017-0922-9385 (demo only permit) to correct inaccurately shown (e) partition wall location and construction of new partition walls as shown to create open work spaceDetails
ti to (e) 2nd fl tenant space. work to include dbi field inspector request to correct issued 2017-0922-9385 (demo only permit) to correct inaccurately shown (e) partition wall location and construction of new partition walls as shown to create open work space | $25,000 | |
| Dec 8, 2017 | Completed final sign-off May 2018 | 461 Valencia St | Alsterlind Construction Inc. | as built permit for final inspection to previously approved ti pa 2017-0419-4397 and 2017-0915-8748. work to include minor partition walls & storage basement. revision to storefront glazing, submittal deferred electrical. n/a maherDetails
as built permit for final inspection to previously approved ti pa 2017-0419-4397 and 2017-0915-8748. work to include minor partition walls & storage basement. revision to storefront glazing, submittal deferred electrical. n/a maher | $5,000 |
| Sep 25, 2017 | Completed final sign-off May 2018 | 1890 Bryant St | comply with nov 201788282, close up open holes to previous shaftDetails
comply with nov 201788282, close up open holes to previous shaft | $10,000 | |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 461 Valencia St | under construction revision to app#201704194397. request to sf planning to keep extg curb cut loading area. n/a for maherDetails
under construction revision to app#201704194397. request to sf planning to keep extg curb cut loading area. n/a for maher | ||
| Sep 15, 2017 | Completed final sign-off Jan 2019 | 10 06th St | remodel (e) ada bathroom, upgrade plumbing/electricalDetails
remodel (e) ada bathroom, upgrade plumbing/electrical | $7,000 | |
| Sep 15, 2017 | Completed final sign-off May 2018 | 461 Valencia St | Alsterlind Construction Inc. | under construction revision to app#201704194397 corrcting non ada compliance slope at extg sidewalk. requesting ad-04 push activated door assist at inlieu at non level landing. n/a for maherDetails
under construction revision to app#201704194397 corrcting non ada compliance slope at extg sidewalk. requesting ad-04 push activated door assist at inlieu at non level landing. n/a for maher | $10,000 |
| Apr 26, 2017 | Completed final sign-off Nov 2017 | 3108 Fillmore St | Alsterlind Construction Inc. | ground floor t.i. to (e) (approx 970 sq ft) retail space. space to be used as retail chocolate sales w/accessory coffee counter. work include: retail counters, millwork, new lighting, hvac & prep storage room, all ada work associated w.entry, path of travel, ada bath. ref #201701137143.n/a maher ordDetails
ground floor t.i. to (e) (approx 970 sq ft) retail space. space to be used as retail chocolate sales w/accessory coffee counter. work include: retail counters, millwork, new lighting, hvac & prep storage room, all ada work associated w.entry, path of travel, ada bath. ref #201701137143.n/a maher ord | $170,000 |
| Apr 19, 2017 | Completed final sign-off May 2018 | 461 Valencia St | Alsterlind Construction Inc. | tenant improvement to remodel existing gr fl space approx 3110 to retail clothing store. work to include ada bath, dressing rooms, relocate existing stair to storage basement. installation of new store front and skylights at roof. existing basement to remain storage . maher not reqDetails
tenant improvement to remodel existing gr fl space approx 3110 to retail clothing store. work to include ada bath, dressing rooms, relocate existing stair to storage basement. installation of new store front and skylights at roof. existing basement to remain storage . maher not req | $320,000 |
| Mar 9, 2017 | Completed final sign-off Mar 2017 | 2900 18th St | change of retail business from (e) coffee retail to newstand retail. work to include replacement of millwork. no change use (area of work 250sf) maher naDetails
change of retail business from (e) coffee retail to newstand retail. work to include replacement of millwork. no change use (area of work 250sf) maher na | $22,000 | |
| Dec 20, 2016 | Completed final sign-off Apr 2017 | 550 Florida St | minor tenant improvement to existing production space work to include interior partition walls. separate plumbing & elec. permits/building fully sprinklered; maher n/aDetails
minor tenant improvement to existing production space work to include interior partition walls. separate plumbing & elec. permits/building fully sprinklered; maher n/a | $15,000 | |
| Dec 19, 2016 | Completed final sign-off Dec 2017 | 2637 Mission St | J H Mejia Construction And Remodeling | #4- minor interior remodel to include bathroom & kitchen remodel, addition of 1/2 bathroom & new bedroom.Details
#4- minor interior remodel to include bathroom & kitchen remodel, addition of 1/2 bathroom & new bedroom. | $40,000 |
| Nov 3, 2016 | Completed final sign-off Nov 2017 | 2637 Mission St | J H Mejia Construction And Remodeling | unit #204 (aka unit 5) minor interior remodel to (e). work to include bathroom/kitchen remodel, addition of new 1/2 bathroomDetails
unit #204 (aka unit 5) minor interior remodel to (e). work to include bathroom/kitchen remodel, addition of new 1/2 bathroom | $30,000 |
| Oct 21, 2016 | Completed final sign-off Apr 2017 | 550 Florida St | addition of 4 individual unisex toilet rooms and group sink to existing factory/storage. all existing work to facility including ada access to area of work approved pa 2011-0926-5463. life safety deferred. maher ord 155-13 not required.Details
addition of 4 individual unisex toilet rooms and group sink to existing factory/storage. all existing work to facility including ada access to area of work approved pa 2011-0926-5463. life safety deferred. maher ord 155-13 not required. | $25,000 | |
| Oct 4, 2016 | Expired or cancelled withdrawn Dec 2016 | 2551 Mission St | Hai's Roofing Company | under construction revision to app#200106131442 s3/r5. addition of exterior wall and roof at penthouses to provide protection from weather at elevator and stair doors. addition of approx 18"-24" to extg parapet wall to provide code compliant min 44" at occupied roof.Details
under construction revision to app#200106131442 s3/r5. addition of exterior wall and roof at penthouses to provide protection from weather at elevator and stair doors. addition of approx 18"-24" to extg parapet wall to provide code compliant min 44" at occupied roof. | $25,000 |
| Sep 29, 2016 | Completed final sign-off Feb 2017 | 632 20th St | Hive Builds Inc. | g/f -remodel of (e)restaurant,no change in occupancy,ada upgrades made, basement kitchen to be updated with new plumbing, electrical, storage, fixtures & equipment. interior only, no exterior changes; maher n/aDetails
g/f -remodel of (e)restaurant,no change in occupancy,ada upgrades made, basement kitchen to be updated with new plumbing, electrical, storage, fixtures & equipment. interior only, no exterior changes; maher n/a | $50,000 |
| Sep 28, 2016 | Completed final sign-off Apr 2017 | 1890 Bryant St | minor tenant improvement to existing production space. work to include approx 12 ft of new partiton wall, new exist door at hallway, replace existing non compliant stair (7 risers) with new code compliant stair.use ot be storage/warehouse/light mfgDetails
minor tenant improvement to existing production space. work to include approx 12 ft of new partiton wall, new exist door at hallway, replace existing non compliant stair (7 risers) with new code compliant stair.use ot be storage/warehouse/light mfg | $18,000 | |
| Sep 28, 2016 | Expired or cancelled withdrawn Jun 2017 | 2637 Mission St | legalize (2) (e) residential units (units built without benefit of permit) @ 2nd fl. no expansion of (e) building envelope.Details
legalize (2) (e) residential units (units built without benefit of permit) @ 2nd fl. no expansion of (e) building envelope. | $85,000 | |
| Sep 9, 2016 | Completed final sign-off Dec 2016 | 1525 Cortland Av | per sffd inspector request for revision to app#201510018618 for revised occupancy count for a-2 brewery tasting room occupancy. n/a for maherDetails
per sffd inspector request for revision to app#201510018618 for revised occupancy count for a-2 brewery tasting room occupancy. n/a for maher | $1,000 | |
| Jul 14, 2016 | Completed final sign-off Aug 2016 | 595 Alabama St | revision to occupant load only. no work proposed per s.f. fire, under construction rev. to pa 201502097862; maher n/aDetails
revision to occupant load only. no work proposed per s.f. fire, under construction rev. to pa 201502097862; maher n/a | ||
| Jun 10, 2016 | Completed final sign-off Nov 2018 | 1 Franklin St | change of use. tenant improvement to (e) ground floor retail space approx 1065 sq ft, to remodel to full service restaurant. (e) bldg fully sprinkled. separate mep.Details
change of use. tenant improvement to (e) ground floor retail space approx 1065 sq ft, to remodel to full service restaurant. (e) bldg fully sprinkled. separate mep. | $140,000 | |
| Apr 18, 2016 | Completed final sign-off Aug 2016 | 595 Alabama St | new address for pa 2015-0209-7862 for new commercial unit under m623967, revision to 2015-0209-7862 to include: coffee service, service counter, food prep, wine storage area, reconfigure exit stairs. separate plumbing & electrical permits. bldg fully sprinklered, fire under separate permit. maher naDetails
new address for pa 2015-0209-7862 for new commercial unit under m623967, revision to 2015-0209-7862 to include: coffee service, service counter, food prep, wine storage area, reconfigure exit stairs. separate plumbing & electrical permits. bldg fully sprinklered, fire under separate permit. maher na | $40,000 | |
| Apr 4, 2016 | Never finaled issued Apr 2016, no final | 498 Alabama St | permit to abate nov#201600742 work done without permit, install plumbing and electrical work associated with installation of accessory kitchen. seperate electrical & plumbing permits will be applied for. n/a ordinance #155-13Details
permit to abate nov#201600742 work done without permit, install plumbing and electrical work associated with installation of accessory kitchen. seperate electrical & plumbing permits will be applied for. n/a ordinance #155-13 | $7,000 | |
| Mar 16, 2016 | Completed final sign-off Sep 2016 | 2501 Mariposa St | Jeff Alsterlind | minor ti to (e) restaurant: work to include - equip replacement. mateial, re-finishing, rebuild (e) bar to include new ada seating section, new wine storage & support prep space. n/a ordinance #155-13Details
minor ti to (e) restaurant: work to include - equip replacement. mateial, re-finishing, rebuild (e) bar to include new ada seating section, new wine storage & support prep space. n/a ordinance #155-13 | $72,000 |
| Feb 8, 2016 | Completed final sign-off Jul 2018 | 2193 Fillmore St | M-Projects | t.i. to extg 2nd floor office. appox 2900 sq ft. demo extg office walls, reframe with new post and beam, construct new office partitions, replace extg bathroom with new. replace extg lighting.Details
t.i. to extg 2nd floor office. appox 2900 sq ft. demo extg office walls, reframe with new post and beam, construct new office partitions, replace extg bathroom with new. replace extg lighting. | $95,000 |
| Oct 30, 2015 | Never finaled issued Mar 2016, no final | 206 Valencia St | Melo Willard Tabudlo Dba Dreamt Design | tenant improvement for full service restaurant. work to include (n) kitchen/bar. dining area & prep area at basement.Details
tenant improvement for full service restaurant. work to include (n) kitchen/bar. dining area & prep area at basement. | $200,000 |
| Jul 30, 2015 | Completed final sign-off Dec 2017 | 2961 Mission St | Angotti & Reilly Inc. | change of use. ti to convert grd floor retail space to cooking school and full service restaurant, work include; new entry/exits, new ada bathrooms, installation of cooking school equipment, install cooking school equipment, replacement of storefront glazing, reveal concealed storefront clerestory.Details
change of use. ti to convert grd floor retail space to cooking school and full service restaurant, work include; new entry/exits, new ada bathrooms, installation of cooking school equipment, install cooking school equipment, replacement of storefront glazing, reveal concealed storefront clerestory. | $250,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2015 | 1890 Bryant St | renew pa# 200608189924s2 for final inspection.Details
renew pa# 200608189924s2 for final inspection. | ||
| Mar 19, 2015 | Completed final sign-off Apr 2015 | 2601 Mission St | Mc Gibbon Construction | suite 501: minor ti to consist of (2) offices within open office. work consists of 2 partition walls & (4) new doors iDetails
suite 501: minor ti to consist of (2) offices within open office. work consists of 2 partition walls & (4) new doors i | $6,000 |
| Feb 9, 2015 | Completed final sign-off Aug 2016 | 550 Florida St | t.i. of approx 5090 sq. ft. to include: bread baking facility, commissary kitchen & full service restaurant. (all ada work (bathrooms, path of travel to space under ref pa# 2011/09/20/5060) separate plumbing, electrical & sprinkler permits. building is fully sprinklered. ** maher: yes **Details
t.i. of approx 5090 sq. ft. to include: bread baking facility, commissary kitchen & full service restaurant. (all ada work (bathrooms, path of travel to space under ref pa# 2011/09/20/5060) separate plumbing, electrical & sprinkler permits. building is fully sprinklered. ** maher: yes ** | $800,000 | |
| Oct 16, 2014 | Never finaled issued Oct 2014, no final | 301 Divisadero St | Narrowback Construction Co. | revision to pa #201404183645. replace e brick foundation at northwall, replace e floor joists with concrete slab on grade, all plumbing, elec under orig permit. the building will remain vacant, full accessibility compliance will be provided under future tenant improvement permit per sfbc ab-017.Details
revision to pa #201404183645. replace e brick foundation at northwall, replace e floor joists with concrete slab on grade, all plumbing, elec under orig permit. the building will remain vacant, full accessibility compliance will be provided under future tenant improvement permit per sfbc ab-017. | $5,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2016 | 149 Fell St | Melo Willard Tabudlo Dba Dreamt Design | change of use to a-2. tenant improvement for full service restaurant. work to include ada bathrooms, ada entries, new storefront windows, kitchen, bar seating area at ground floor and construction of apprx 525 sf storage mezzanine.n/a for maher ordinance.Details
change of use to a-2. tenant improvement for full service restaurant. work to include ada bathrooms, ada entries, new storefront windows, kitchen, bar seating area at ground floor and construction of apprx 525 sf storage mezzanine.n/a for maher ordinance. | $550,000 |
| Sep 29, 2014 | Completed final sign-off Oct 2016 | 3130 20th St | per sf planning official legitimization process - legitimization of approx 32,081 sq ft to office designation: area to include entire 2nd floor (approx 18,274 sq. ft) and portion of 3rd floor (approx 12,758 sq. ft) work to include new 'hi/lo' drinking fountain @ 3rd floor. change of use. maher: n/a.Details
per sf planning official legitimization process - legitimization of approx 32,081 sq ft to office designation: area to include entire 2nd floor (approx 18,274 sq. ft) and portion of 3rd floor (approx 12,758 sq. ft) work to include new 'hi/lo' drinking fountain @ 3rd floor. change of use. maher: n/a. | $3,000 | |
| May 16, 2014 | Completed final sign-off Sep 2017 | 1426 Fillmore St | minor under construction revision to approved app#201208298523. reconfigure extg exit and revisions to storefront mullion configuration. bldg fully sprinkler head. n/a for the maher ordinance #155-13Details
minor under construction revision to approved app#201208298523. reconfigure extg exit and revisions to storefront mullion configuration. bldg fully sprinkler head. n/a for the maher ordinance #155-13 | ||
| Apr 18, 2014 | Completed final sign-off Jul 2017 | 301 Divisadero St | Narrowback Construction Co. | voluntary structural upgrade to ground floor only. new ada entry, new concrete slab at rear storage approx. 300 sq ft. no change of use under this permit. existing storefront to remain, new wood door entry, work in low rise "m" only.Details
voluntary structural upgrade to ground floor only. new ada entry, new concrete slab at rear storage approx. 300 sq ft. no change of use under this permit. existing storefront to remain, new wood door entry, work in low rise "m" only. | $130,000 |
| Apr 11, 2014 | Expired or cancelled expired Apr 2022 | 4001 Judah St | revision to app#201210010977s/1. bldg inspector under construction. revision to storage mezzanine structure.Details
revision to app#201210010977s/1. bldg inspector under construction. revision to storage mezzanine structure. | $7,000 | |
| Mar 24, 2014 | Completed final sign-off Jul 2014 | 132 The Embarcadero | Bernardini Construction | field inspection requested as built revision to 201401166459 to clarify ada employee access to remodeled service bar. maher 155-13 not required.Details
field inspection requested as built revision to 201401166459 to clarify ada employee access to remodeled service bar. maher 155-13 not required. | |
| Feb 20, 2014 | Completed final sign-off Apr 2014 | 2289 03rd St | Harrison Woodworking + Design | sheet rock over extg lath and plaster for smooth wall for wall paper. new lighting, elocate extg electrical. entry door with ada code door, gyp board ceiling.n/a for the maher ordinance #155-13Details
sheet rock over extg lath and plaster for smooth wall for wall paper. new lighting, elocate extg electrical. entry door with ada code door, gyp board ceiling.n/a for the maher ordinance #155-13 | $12,000 |
| Jan 16, 2014 | Completed final sign-off Jul 2014 | 132 The Embarcadero | Bernardini Construction | remodel existing service bar in existing restaurant, area of work approx. 20 sq.ft., seperate electrical & plumbing trade permit will be applied for. no change of use, building is fully sprinklered. compliance with ordinance #155-13 not required.Details
remodel existing service bar in existing restaurant, area of work approx. 20 sq.ft., seperate electrical & plumbing trade permit will be applied for. no change of use, building is fully sprinklered. compliance with ordinance #155-13 not required. | $30,000 |
| Nov 12, 2013 | Completed final sign-off May 2014 | 580 York St | Theodore Design & Constr | alter existing entry to ada etnry and rebuild existing rear stair and exit. for sf planning dept 'office legitimization process'. ** maher: compliance with ordinance no# 155-13 not required **Details
alter existing entry to ada etnry and rebuild existing rear stair and exit. for sf planning dept 'office legitimization process'. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Sep 30, 2013 | Never finaled issued Oct 2013, no final | 644 Polk St | Martinelli Environmental Graph | erect a non-electric single faced attached to (e) spardiel.Details
erect a non-electric single faced attached to (e) spardiel. | $2,000 |
| Aug 22, 2013 | Completed final sign-off Sep 2015 | 550 Florida St | remodel of alabama st wing of 550 florida property to include: new partition walls, stairs at (e) production space & change of use for space 'a' from production to restaurant shell. all structural work completed under pa#201109265463. bldg. fully sprinklers, all ada work, seperate plumbing & electriDetails
remodel of alabama st wing of 550 florida property to include: new partition walls, stairs at (e) production space & change of use for space 'a' from production to restaurant shell. all structural work completed under pa#201109265463. bldg. fully sprinklers, all ada work, seperate plumbing & electri | $200,000 | |
| Aug 21, 2013 | Completed final sign-off Nov 2013 | 486 Ellis St | M-Projects | interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safetyDetails
interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safety | $120,000 |
| Apr 3, 2013 | Completed final sign-off Apr 2013 | 500 Hampshire St | permit to comply with dbi physical inspection report #5171 to consolidate the following permits under 1 single permit for which cfc will be issued. pa#201001084412, 201210091629, 200906110301, 201106279033, 200809192132, 200812118337, 200904166412. no work required. for final inspection only.Details
permit to comply with dbi physical inspection report #5171 to consolidate the following permits under 1 single permit for which cfc will be issued. pa#201001084412, 201210091629, 200906110301, 201106279033, 200809192132, 200812118337, 200904166412. no work required. for final inspection only. | ||
| Dec 21, 2012 | Expired or cancelled cancelled May 2015 | 1406 Fillmore St | R & R Construction | t.i permit to combine 2 (e) storefront retail business(restaurant) into 1 full service restaurant (aprox 2870 sf) work to include interior remodel of (e) kitchen & eating area. (e) bldg is fully sprinklered. elec & plumbing to be on separate permitsDetails
t.i permit to combine 2 (e) storefront retail business(restaurant) into 1 full service restaurant (aprox 2870 sf) work to include interior remodel of (e) kitchen & eating area. (e) bldg is fully sprinklered. elec & plumbing to be on separate permits | $150,000 |
| Nov 27, 2012 | Completed final sign-off Jun 2013 | 2066 Chestnut St | One Inch To The Left, Inc. Dba Rarefield | interior t.i. - (e) ice cream store to retail bakery - remodel of (e) approx 1025 sf ground flr work to include new retail counter, new equipment including hvac, new elec/lighting. plbg & elec permit will be applied separately.Details
interior t.i. - (e) ice cream store to retail bakery - remodel of (e) approx 1025 sf ground flr work to include new retail counter, new equipment including hvac, new elec/lighting. plbg & elec permit will be applied separately. | $120,000 |
| Oct 19, 2012 | Completed final sign-off Apr 2014 | 550 Florida St | tenant improvement approx 5830af production space @2nd floor - minor interior alteration , new partition walls, (2) ada bathrooms, all ada accessibility to space provided under ref pa #2011.0926.5463/s3. separate elec & plbg & sprinkler permit will be applied.Details
tenant improvement approx 5830af production space @2nd floor - minor interior alteration , new partition walls, (2) ada bathrooms, all ada accessibility to space provided under ref pa #2011.0926.5463/s3. separate elec & plbg & sprinkler permit will be applied. | $125,000 | |
| Oct 1, 2012 | Expired or cancelled expired Apr 2022 | 4001 Judah St | Roman Hunt | t.i. permit to expand existing restaurant @4001 judah st into adjacent space @4005 judah st. work to incl interior remodel, expansion of eating area & service&prep areas. area of expansion approx 980 sf.sep plumbing, elec permits will be applied for as required.Details
t.i. permit to expand existing restaurant @4001 judah st into adjacent space @4005 judah st. work to incl interior remodel, expansion of eating area & service&prep areas. area of expansion approx 980 sf.sep plumbing, elec permits will be applied for as required. | $125,000 |
| Sep 21, 2012 | Completed final sign-off Jul 2013 | 375 Alabama St | no construction work or alteration is proposed under this permit. this permit is to document the approval by the sf planning dept of the office legitmization process related to 2009 changes to the underlying zoning of property. the bldg is fully sprinklered fully ada accessible. document on attachDetails
no construction work or alteration is proposed under this permit. this permit is to document the approval by the sf planning dept of the office legitmization process related to 2009 changes to the underlying zoning of property. the bldg is fully sprinklered fully ada accessible. document on attach | ||
| Aug 29, 2012 | Never finaled issued Apr 2013, no final | 1426 Fillmore St | expand existing ground floor storefront spaces by 'filling in' exterior ground floor arcade under existing 2nd floor, area of expansion equals approx 1764 s.f. separate sprinker, hvac, application/permit if required.Details
expand existing ground floor storefront spaces by 'filling in' exterior ground floor arcade under existing 2nd floor, area of expansion equals approx 1764 s.f. separate sprinker, hvac, application/permit if required. | $130,000 | |
| Aug 1, 2012 | Expired or cancelled cancelled Jan 2026 | 1525 Fillmore St | replace existing built up roof with new at shed roof section, including replacement of existing water damaged metl deck with new. part of reroofing scope provide voluntary structural strengthening of shed roof diaghram connection to exterior walls. mnor repair replacement of section of water damagedDetails
replace existing built up roof with new at shed roof section, including replacement of existing water damaged metl deck with new. part of reroofing scope provide voluntary structural strengthening of shed roof diaghram connection to exterior walls. mnor repair replacement of section of water damaged | $75,000 | |
| Jun 29, 2012 | Completed final sign-off Aug 2013 | 198 Gough St | Alsterlind Construction Inc. | remodel approx 780 sq. ft. ground floor retail space to full service restaurant. include new kitchen, ada bathroom, eating area. include basement storage.Details
remodel approx 780 sq. ft. ground floor retail space to full service restaurant. include new kitchen, ada bathroom, eating area. include basement storage. | $150,000 |
| Mar 29, 2012 | Completed final sign-off Jul 2014 | 2601 Mission St | per nov# 200853830-providing ada accessible upgrades to incl. ada path of travel from parking lot to street, ada wheelchair lift, re-stripe/re-configure ada parking spaces. upgrade (e) elev at eastlobby. seperate exterior permits will be obtained.remove obsolate generator and any fuel storage tanks.Details
per nov# 200853830-providing ada accessible upgrades to incl. ada path of travel from parking lot to street, ada wheelchair lift, re-stripe/re-configure ada parking spaces. upgrade (e) elev at eastlobby. seperate exterior permits will be obtained.remove obsolate generator and any fuel storage tanks. | $30,000 | |
| Jan 27, 2012 | Completed final sign-off Aug 2026 | 2601 Mission St | per compliant #201281793 dated 1/13/12 work with out permit - construction of (2) partial height - approx 8 ft, partition walls.Details
per compliant #201281793 dated 1/13/12 work with out permit - construction of (2) partial height - approx 8 ft, partition walls. | $1,000 | |
| Jan 25, 2012 | Completed final sign-off May 2012 | 782 Florida St | construct awning structure partially covering an outdoor courtyard ada access shown on ref. set pa 200804108463Details
construct awning structure partially covering an outdoor courtyard ada access shown on ref. set pa 200804108463 | $20,000 | |
| Nov 18, 2011 | Completed final sign-off Feb 2017 | 561 Valencia St | Greentree Design/Build | change of use.expand (e) restaurant to adjacent vacant space from (b) occupancy to (a-2) occupancy. convert (e) vacant space to new specialty bakery from (m) occupancy to (b) occupancy.Details
change of use.expand (e) restaurant to adjacent vacant space from (b) occupancy to (a-2) occupancy. convert (e) vacant space to new specialty bakery from (m) occupancy to (b) occupancy. | $15,000 |
| Sep 26, 2011 | Never finaled issued Oct 2011, no final | 1525 Fillmore St | construct 2 stairs: 1 at fround to 2nd flr 1 basement to 2nd fl at corridor walls. new unisex ada bathrm, elec rm at bsmnt level. pa# 2011.06.21.8599 for ref. 2nd floor office merger between 1527 and 1529 fillmore.Details
construct 2 stairs: 1 at fround to 2nd flr 1 basement to 2nd fl at corridor walls. new unisex ada bathrm, elec rm at bsmnt level. pa# 2011.06.21.8599 for ref. 2nd floor office merger between 1527 and 1529 fillmore. | $35,000 | |
| Sep 26, 2011 | Completed final sign-off Oct 2015 | 550 Florida St | renov of(e)prod facility&accessy office.work to incl new ada entries,ada ramps,adapt(e)freight elev.to ada elevator,ada bathrms.constr an accessory show room for primary production use. int. partition work @ gr/fl&2/flr.plans to incl area for coffee kiosk on 18th st&voluntary seismic stren.Details
renov of(e)prod facility&accessy office.work to incl new ada entries,ada ramps,adapt(e)freight elev.to ada elevator,ada bathrms.constr an accessory show room for primary production use. int. partition work @ gr/fl&2/flr.plans to incl area for coffee kiosk on 18th st&voluntary seismic stren. | $500,000 | |
| Sep 20, 2011 | Completed final sign-off Oct 2015 | 550 Florida St | soft demo in preparation for future permit work. building is vacant and will remain vacant. ab-017. demo to include: demo for future ada work future foundation work demo bathrooms, stairs, topping slab whre needed, plaster ceiling at 2nd floorDetails
soft demo in preparation for future permit work. building is vacant and will remain vacant. ab-017. demo to include: demo for future ada work future foundation work demo bathrooms, stairs, topping slab whre needed, plaster ceiling at 2nd floor | $40,000 |