Block 0809, lot 021
388 Hayes St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 3
- Building
- 20,655 sq ft
- Lot
- 9,445 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
46 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 388 Hayes St | to comply with accessible business entrance program per orfinance 51-16. replace (e) single pad power assist door activation with hi/lo door acrivation decice. abe# 202210135027.Details
to comply with accessible business entrance program per orfinance 51-16. replace (e) single pad power assist door activation with hi/lo door acrivation decice. abe# 202210135027. | $1,000 | |
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 384 Hayes St | to comply with abe 202210135026. replace (e) single pad power assist door activation with hi/lo door activation device.Details
to comply with abe 202210135026. replace (e) single pad power assist door activation with hi/lo door activation device. | $1,000 | |
| Oct 24, 2023 | In progress filed Oct 2023, not yet issued | 372 Hayes St | abe business entry improvement - post new accessible directional signage and entry (372 hayes) comply with abe: 202210135025Details
abe business entry improvement - post new accessible directional signage and entry (372 hayes) comply with abe: 202210135025 | $100 | |
| Jul 14, 2023 | Never finaled issued Aug 2023, no final | 398 Hayes St | to comply with sffd nov for place of assembly permit for shared outdoor garden space. shared space includes (1) ada compliant exit to ivy street, occupant load is 48. no construction required.Details
to comply with sffd nov for place of assembly permit for shared outdoor garden space. shared space includes (1) ada compliant exit to ivy street, occupant load is 48. no construction required. | ||
| Jan 8, 2020 | Never finaled issued Jan 2020, no final | 384 Hayes St | Edison Fire Extinguisher Company Inc | install ul300 fire suppressionDetails
install ul300 fire suppression | $1,400 |
| Aug 15, 2019 | Completed final sign-off Jan 2020 | 384 Hayes St | Alsterlind Construction Inc. | int. remodel of an extg restaurant including demo of extg finishes, fixtures, non load bearing int. partition walls, new non load bearing partition walls, flooring , wall paneling, paint & tile, wd dining counter, lighting, dishwashing, & cooking equip, fixed & unfixed furnitions &Details
int. remodel of an extg restaurant including demo of extg finishes, fixtures, non load bearing int. partition walls, new non load bearing partition walls, flooring , wall paneling, paint & tile, wd dining counter, lighting, dishwashing, & cooking equip, fixed & unfixed furnitions & | $220,000 |
| Aug 9, 2017 | Never finaled issued Aug 2017, no final | 398 Hayes St | street spaceDetails
street space | ||
| Feb 9, 2017 | Completed final sign-off Jul 2017 | 398 Hayes St | Johnson Controls Security Solutions Llc | replace fire sprinkler monitor system.Details
replace fire sprinkler monitor system. | $6,000 |
| Jun 10, 2013 | Completed final sign-off Jun 2013 | 384 Hayes St | Batey Company | to obtain final inspection for work appro ved under pa#201102220717 all work is complete: replace 3 sections steel railing to comply with nov#201197666Details
to obtain final inspection for work appro ved under pa#201102220717 all work is complete: replace 3 sections steel railing to comply with nov#201197666 | |
| Feb 22, 2011 | Expired or cancelled expired Mar 2013 | 384 Hayes St | Batey Company | replace 3 pc steel rail insert, max 4" opening, 3 8' pc to comply nov#201197666. rail is wood 2x12 bottom with steele ballusters. repair to be less than 50% of structure to comply with title 24 20% provide signage @ restrooms entry door. vif by field inspector.Details
replace 3 pc steel rail insert, max 4" opening, 3 8' pc to comply nov#201197666. rail is wood 2x12 bottom with steele ballusters. repair to be less than 50% of structure to comply with title 24 20% provide signage @ restrooms entry door. vif by field inspector. | $800 |
| Apr 21, 2010 | Never finaled issued Apr 2010, no final | 398 Hayes St | street spaceDetails
street space | ||
| Mar 18, 2010 | Never finaled issued Mar 2010, no final | 398 Hayes St | street spaceDetails
street space | ||
| Jan 25, 2010 | Completed final sign-off Jul 2010 | 396 Hayes St | Flynn Glass & Sash | install 52 sash like size,kind with insulated low e glass. marvin sash kits to match existingDetails
install 52 sash like size,kind with insulated low e glass. marvin sash kits to match existing | $50,000 |
| Aug 20, 2008 | Never finaled issued Aug 2008, no final | 398 Hayes St | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| Sep 6, 2007 | Completed final sign-off Nov 2007 | 384 Hayes St | Bernardini Construction | revision to appl.# 200705232110. & appl.# 200707267791. revision includ demo (e) stair tread extension to provide clearance dimension for means of egress at rear ramp. remove seating shown at cash register counter.Details
revision to appl.# 200705232110. & appl.# 200707267791. revision includ demo (e) stair tread extension to provide clearance dimension for means of egress at rear ramp. remove seating shown at cash register counter. | $100 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 388 Hayes St | street spaceDetails
street space | ||
| Aug 21, 2007 | Completed final sign-off Nov 2007 | 384 Hayes St | Bernardini Construction | revisions to pa#s 2007.05.23.2110 and 2007.07.26.7791 to clearances at the lavatory for the accessible bathroom and to the walk and handrails at stair and ramp.Details
revisions to pa#s 2007.05.23.2110 and 2007.07.26.7791 to clearances at the lavatory for the accessible bathroom and to the walk and handrails at stair and ramp. | |
| Aug 10, 2007 | Completed final sign-off Nov 2007 | 384 Hayes St | alternate seating plan,revised second means of egress,alternate bathroom floor plan per app #200707267791.Details
alternate seating plan,revised second means of egress,alternate bathroom floor plan per app #200707267791. | $10,000 | |
| Jul 30, 2007 | Completed final sign-off Nov 2007 | 372 Hayes St | International Fire Equip | ground floor-lower the fire sprinkler heads, relocates 3, all (e) on ground floorDetails
ground floor-lower the fire sprinkler heads, relocates 3, all (e) on ground floor | $1,500 |
| Jul 26, 2007 | Completed final sign-off Nov 2007 | 384 Hayes St | revison to the proposed accessible ramp that servises as the second means of egress for pa # 2007-0523-2110Details
revison to the proposed accessible ramp that servises as the second means of egress for pa # 2007-0523-2110 | ||
| Jul 26, 2007 | Completed final sign-off Nov 2007 | 384 Hayes St | revision to pa# 200705232110. lighting work onlyDetails
revision to pa# 200705232110. lighting work only | $10,000 | |
| Jun 18, 2007 | Never finaled issued Jun 2007, no final | 384 Hayes St | street space permitDetails
street space permit | ||
| May 23, 2007 | Completed final sign-off Nov 2007 | 384 Hayes St | g/f: relocate (e) wine store into adjacent space and expand the dining area for the (e) cafe. combine cafe and wine store into one tenancy. work includes (n) walls, (n) finishes, (n) fixtures and improvements to accessible bathrooms. mechanical and lighting under separate permit.Details
g/f: relocate (e) wine store into adjacent space and expand the dining area for the (e) cafe. combine cafe and wine store into one tenancy. work includes (n) walls, (n) finishes, (n) fixtures and improvements to accessible bathrooms. mechanical and lighting under separate permit. | $100,000 | |
| Aug 9, 2006 | Expired or cancelled cancelled Mar 2010 | 372 Hayes St | expand (e) cafe into adjacent wine store. relocate (e0 wine store into adjacent vacant space. combine cafe and wine store into one tenancy under single ownership. work includes soft demo, (n) walls, (n) fixtures & furniture, (n) finishesDetails
expand (e) cafe into adjacent wine store. relocate (e0 wine store into adjacent vacant space. combine cafe and wine store into one tenancy under single ownership. work includes soft demo, (n) walls, (n) fixtures & furniture, (n) finishes | $98,500 | |
| Nov 10, 2005 | Completed final sign-off Nov 2005 | 398 Hayes St | Bernardini Construction | revision to 200507016640: changes from x5'4"x5'1/4 pslcolumn to 3' 1/2" parallam pls column 1-8dDetails
revision to 200507016640: changes from x5'4"x5'1/4 pslcolumn to 3' 1/2" parallam pls column 1-8d | |
| Sep 30, 2005 | Never finaled issued Sep 2005, no final | 398 Hayes St | International Fire Equip | add 2 dry pendent sprinkler heads to new wall in freezer. tie into (e) sprinkler system.Details
add 2 dry pendent sprinkler heads to new wall in freezer. tie into (e) sprinkler system. | $700 |
| Jul 1, 2005 | Completed final sign-off Nov 2005 | 398 Hayes St | structural deck re frame & foundation modification (ref to#pa 200506205533 to accomadate walk inDetails
structural deck re frame & foundation modification (ref to#pa 200506205533 to accomadate walk in | $8,000 | |
| Jun 20, 2005 | Completed final sign-off Nov 2005 | 398 Hayes St | new walk in coller on slab-on-grade at rear yard.Details
new walk in coller on slab-on-grade at rear yard. | $10,000 | |
| May 24, 2004 | Never finaled issued May 2004, no final | 398 Hayes St | sidewalk repairDetails
sidewalk repair | ||
| Jul 25, 2003 | Completed final sign-off Aug 2003 | 388 Hayes St | Bernardini Construction | renew appl#200210219515 to clarify occupancy load of dining room as part of larger a-3 restaurantDetails
renew appl#200210219515 to clarify occupancy load of dining room as part of larger a-3 restaurant | |
| Jul 24, 2003 | Never finaled issued Jul 2003, no final | 388 Hayes St | street spaceDetails
street space | ||
| May 12, 2003 | Never finaled issued May 2003, no final | 388 Hayes St | street spaceDetails
street space | ||
| Mar 24, 2003 | Never finaled issued Mar 2003, no final | 388 Hayes St | street space permitDetails
street space permit | ||
| Mar 18, 2003 | Completed final sign-off Aug 2003 | 388 Hayes St | International Fire Equip | add (7) fire sprinklers heads in dining area on ground floorDetails
add (7) fire sprinklers heads in dining area on ground floor | $2,200 |
| Dec 27, 2002 | Never finaled issued Dec 2002, no final | 388 Hayes St | street spaceDetails
street space | ||
| Oct 21, 2002 | Completed final sign-off Aug 2003 | 388 Hayes St | Bernardini Construction | soft demolition @ ground flrDetails
soft demolition @ ground flr | $3,000 |
| Oct 21, 2002 | Completed final sign-off Aug 2003 | 388 Hayes St | Bernardini Construction | convert retail space into dining room for restaurant at grnd flr,new pass through from (e)restDetails
convert retail space into dining room for restaurant at grnd flr,new pass through from (e)rest | $100,000 |
| Oct 11, 2002 | Completed final sign-off Aug 2003 | 388 Hayes St | Bernardini Construction | new moment frame - mech. under separate permitDetails
new moment frame - mech. under separate permit | $46,000 |
| Oct 3, 2002 | Completed final sign-off Aug 2003 | 388 Hayes St | Bernardini Construction | hvac ground floor ceiling & roof installationDetails
hvac ground floor ceiling & roof installation | $44,000 |
| Sep 25, 2002 | Never finaled issued Sep 2002, no final | 384 Hayes St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Mar 1, 2002 | Expired or cancelled cancelled Jun 2007 | 384 Hayes St | (n)cafe dining space; el,hvac,plmbg is design build sprinklers; mep under sep permitDetails
(n)cafe dining space; el,hvac,plmbg is design build sprinklers; mep under sep permit | $89,000 | |
| Jan 4, 2002 | Expired or cancelled expired Jul 2002 | 372 Hayes St | street spaceDetails
street space | ||
| Jan 4, 2002 | Completed final sign-off Jun 2002 | 372 Hayes St | Bernardini Construction | rev. to appl#200108287078 add non structural partition, no change of use or occupancyDetails
rev. to appl#200108287078 add non structural partition, no change of use or occupancy | |
| Aug 28, 2001 | Completed final sign-off Jun 2002 | 372 Hayes St | add non structural partitions & h.c. accessible toilet(no change of use or occupancy)Details
add non structural partitions & h.c. accessible toilet(no change of use or occupancy) | $14,000 | |
| Jul 13, 2001 | Expired or cancelled expired Nov 2001 | 384 Hayes St | awning addition over commercial spaceDetails
awning addition over commercial space | $3,150 | |
| Aug 4, 2000 | Completed final sign-off Jan 2001 | 398 Hayes St | Bernardini Construction | revision to (e)hvac work in rest. duct systemDetails
revision to (e)hvac work in rest. duct system | $50,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.