Block 4016, lot 002
580 York St
- City’s use
- Commercial Retail
- Built
- 1918
- Stories
- 2
- Rooms
- 5 bathrooms
- Lot
- 8,938 sq ft
- Zoning
- M1
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2022 | Completed final sign-off Oct 2022 | 580 York St | Alpha Construction Co *Stop Issusing* | interior remodel: 1/f: install 3 new doors and glass. 2/f: demo of (e) partition wall about 14lf.Details
interior remodel: 1/f: install 3 new doors and glass. 2/f: demo of (e) partition wall about 14lf. | $16,000 |
| Jun 13, 2016 | Completed final sign-off Jun 2016 | 590 York St | Johnstone - Mc Auliffe Const. Inc. | revision to ref pa 2015 0715 1557: clarification of (e) entrance and site conditions, addition of disables access signage. maher naDetails
revision to ref pa 2015 0715 1557: clarification of (e) entrance and site conditions, addition of disables access signage. maher na | |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 590 York St | Johnstone - Mc Auliffe Const. Inc. | minor revision to interior non structural partitions, revision to reflect ceiling plans & t-24 to align with revised lighting fixture selections. t.i. pa#201507151557 n/a ordinance #155-13Details
minor revision to interior non structural partitions, revision to reflect ceiling plans & t-24 to align with revised lighting fixture selections. t.i. pa#201507151557 n/a ordinance #155-13 | |
| Sep 8, 2015 | Completed final sign-off Feb 2016 | 590 York St | Johnstone - Mc Auliffe Const. Inc. | soft demo in advance of tenant improvement. n/a ordinance #155-13Details
soft demo in advance of tenant improvement. n/a ordinance #155-13 | $10,000 |
| Jul 15, 2015 | Completed final sign-off Aug 2016 | 590 York St | Johnstone - Mc Auliffe Const. Inc. | ti for partial renovation on 2nd fl office/factory. work includes mech. fire protection under separate permit.Details
ti for partial renovation on 2nd fl office/factory. work includes mech. fire protection under separate permit. | $797,000 |
| Apr 7, 2015 | Completed final sign-off Oct 2015 | 590 York St | Theodore Design & Constr | add blocking omitted from original permit 9801520; add conventional blocking 2x between floor joists.Details
add blocking omitted from original permit 9801520; add conventional blocking 2x between floor joists. | $1,000 |
| Nov 18, 2014 | Expired or cancelled withdrawn Apr 2015 | 580 York St | replace (e) 2nd flr alum windows (31) with (n) painted-wood single hung windows with clear insulated low-e glazing, matching historic wooden windows @ 1st flr, no change to (e) openings, maher n/aDetails
replace (e) 2nd flr alum windows (31) with (n) painted-wood single hung windows with clear insulated low-e glazing, matching historic wooden windows @ 1st flr, no change to (e) openings, maher n/a | $62,000 | |
| Jun 24, 2014 | Expired or cancelled withdrawn Apr 2015 | 580 York St | ti for 2nd fl including ada bathroom, partitions, mep. e kitchen to be renovated. no exterior work. fire protection under separate permitDetails
ti for 2nd fl including ada bathroom, partitions, mep. e kitchen to be renovated. no exterior work. fire protection under separate permit | $50,000 | |
| Jun 24, 2014 | Expired or cancelled withdrawn Apr 2015 | 580 York St | partial gr fl renovation including ada bathroom, partitions, mep. no exterior work. fire protection under sep permitDetails
partial gr fl renovation including ada bathroom, partitions, mep. no exterior work. fire protection under sep permit | $30,000 | |
| Apr 21, 2014 | Never finaled issued Apr 2014, no final | 580 York St | street spaceDetails
street space | ||
| Nov 12, 2013 | Completed final sign-off May 2014 | 580 York St | Theodore Design & Constr | alter existing entry to ada etnry and rebuild existing rear stair and exit. for sf planning dept 'office legitimization process'. ** maher: compliance with ordinance no# 155-13 not required **Details
alter existing entry to ada etnry and rebuild existing rear stair and exit. for sf planning dept 'office legitimization process'. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Aug 17, 2006 | Never finaled issued Aug 2006, no final | 580 York St | street space permit only.Details
street space permit only. | ||
| Aug 15, 2006 | Never finaled issued Aug 2006, no final | 580 York St | street space permit and sidewalk repairDetails
street space permit and sidewalk repair | ||
| Apr 21, 2006 | Never finaled issued Apr 2006, no final | 590 York St | S P G Solar Inc. | roof-mounted photovoltaic array with electrical tie-inDetails
roof-mounted photovoltaic array with electrical tie-in | $54,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.