Permit GraphShortlistSan Francisco building permits since 2000

S P G Solar Inc.

Contractor license
759086
State license record
Based in
San Rafael
On San Francisco permits
Nov 2001 to Apr 2006
Last 24 months
0 permits filed

20 permits since 2000: 14 completed, 3 never finaled, 3 expired or cancelled.

Of the 3 never-finaled permits, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 21, 2006Expired or cancelled
withdrawn Jul 2007
48 Gold Stroof mounted photovoltaic array w/electrical tie in
Details
Permit
200604219609

roof mounted photovoltaic array w/electrical tie in

Open the permit page

$61,000
Apr 21, 2006Never finaled
issued Apr 2006, no final
590 York Stroof-mounted photovoltaic array with electrical tie-in
Details
Permit
200604219604
Permit issued
Apr 21, 2006

roof-mounted photovoltaic array with electrical tie-in

Open the permit page

$54,000
Apr 13, 2005Never finaled
issued May 2005, no final
1563 Page Stadd solar (pv)modules to (e) structure.pg&e grid tie,raised racks on flat roof(10.34kw)22 tilt/15 ti
Details
Permit
200504139888
Permit issued
May 18, 2005

add solar (pv)modules to (e) structure.pg&e grid tie,raised racks on flat roof(10.34kw)22 tilt/15 ti

Open the permit page

$85,000
Apr 26, 2004Completed
final sign-off May 2004
3361 Market Stinstalling solar elctric system (roof mount)
Details
Permit
200404262222
Permit issued
Apr 26, 2004
Final sign-off
May 25, 2004

installing solar elctric system (roof mount)

Open the permit page

$32,000
Mar 12, 2004Completed
final sign-off Apr 2004
1242 08th Avinstallation of solar electric flush roof mount system
Details
Permit
200403128462
Permit issued
Mar 12, 2004
Final sign-off
Apr 1, 2004

installation of solar electric flush roof mount system

Open the permit page

$10,000
Feb 18, 2004Completed
final sign-off Apr 2004
469 Church Stinstallation of solar electric system
Details
Permit
200402186593
Permit issued
Feb 18, 2004
Final sign-off
Apr 27, 2004

installation of solar electric system

Open the permit page

$25,000
Nov 26, 2003Completed
final sign-off Sep 2018
580 Douglass Stinstall 40 sharp 185 watt solar panels on roof of residence. also 4 power inverters also to be insta
Details
Permit
200311261170
Permit issued
Dec 12, 2003
Final sign-off
Sep 27, 2018

install 40 sharp 185 watt solar panels on roof of residence. also 4 power inverters also to be insta

Open the permit page

$62,803
Nov 18, 2003Completed
final sign-off Dec 2003
60 Belgrave Avinstallation of a 2.5 kw roof mount, grid interactive solar photovoltaic system
Details
Permit
200311180456
Permit issued
Nov 18, 2003
Final sign-off
Dec 12, 2003

installation of a 2.5 kw roof mount, grid interactive solar photovoltaic system

Open the permit page

$15,000
May 7, 2003Completed
final sign-off Jun 2003
945 Larkin St3.6 kw photovoltaic grid interactive battery back up, roof mount.
Details
Permit
200305073956
Permit issued
May 19, 2003
Final sign-off
Jun 10, 2003

3.6 kw photovoltaic grid interactive battery back up, roof mount.

Open the permit page

$27,232
May 7, 2003Completed
final sign-off May 2003
1360 04th Avinstallation of 1.4 kw (14 module) roof-mount, grid-interactive solar electric system on flat roof.
Details
Permit
200305073975
Permit issued
May 7, 2003
Final sign-off
May 30, 2003

installation of 1.4 kw (14 module) roof-mount, grid-interactive solar electric system on flat roof.

Open the permit page

$7,000
Mar 5, 2003Completed
final sign-off Apr 2003
25 Rico Wyrenewal of pa#2002/06/28/0290 for final inspection
Details
Permit
200303058858
Permit issued
Mar 5, 2003
Final sign-off
Apr 7, 2003

renewal of pa#2002/06/28/0290 for final inspection

Open the permit page

Dec 31, 2002Completed
final sign-off Mar 2003
3035 23rd Stinstallation of a 1.4 kw photovoltaic solar energy system
Details
Permit
200212314361
Permit issued
Dec 31, 2002
Final sign-off
Mar 12, 2003

installation of a 1.4 kw photovoltaic solar energy system

Open the permit page

$14,000
Sep 10, 2002Completed
final sign-off Nov 2002
233 27th Stinstall 2.4 kw photovoltaic system
Details
Permit
200209106137
Permit issued
Sep 10, 2002
Final sign-off
Nov 27, 2002

install 2.4 kw photovoltaic system

Open the permit page

$20,000
Jul 11, 2002Completed
final sign-off Oct 2002
397 Arlington Stinstall grid-interactive with battery backup photovoltoic system
Details
Permit
200207111194
Permit issued
Jul 11, 2002
Final sign-off
Oct 4, 2002

install grid-interactive with battery backup photovoltoic system

Open the permit page

$20,000
Jul 2, 2002Completed
final sign-off Aug 2002
345 Liberty Stinstallation of 4.o kw utility tied photovoltaic system.
Details
Permit
200207020544
Permit issued
Jul 2, 2002
Final sign-off
Aug 12, 2002

installation of 4.o kw utility tied photovoltaic system.

Open the permit page

$40,000
Jun 28, 2002Expired or cancelled
expired Apr 2003
25 Rico Wyinstall 91) 204 kw solar system
Details
Permit
200206280290
Permit issued
Jun 28, 2002

install 91) 204 kw solar system

Open the permit page

$16,000
Mar 15, 2002Expired or cancelled
expired Sep 2002
50 Alma Stinstall solar system not visible from street or neighbors
Details
Permit
200203151528
Permit issued
Mar 15, 2002
Final sign-off
Mar 19, 2002

install solar system not visible from street or neighbors

Open the permit page

Feb 19, 2002Completed
final sign-off Feb 2003
1040 Fulton St3-4 kw photovoltaic solar system w/battery back up
Details
Permit
200202199501
Permit issued
May 23, 2002
Final sign-off
Feb 27, 2003

3-4 kw photovoltaic solar system w/battery back up

Open the permit page

$22,000
Jan 11, 2002Never finaled
issued Jan 2002, no final
50 Alma Stinstall solar system. not visible from street.
Details
Permit
200201116794
Permit issued
Jan 11, 2002
Final sign-off
Mar 19, 2002

install solar system. not visible from street.

Open the permit page

$27,000
Nov 28, 2001Completed
final sign-off Apr 2002
443 Fair Oaks St3.4 kw solar sytem on roof
Details
Permit
200111284051
Permit issued
Nov 28, 2001
Final sign-off
Apr 11, 2002

3.4 kw solar sytem on roof

Open the permit page

$22,000