Permit GraphShortlistSan Francisco building permits since 2000

Block 3640, lot 059

3035 23rd St

City’s use
Single Family Residential
Built
1904
Stories
1
Units
1
Rooms
1 bathroom
Building
1,022 sq ft
Lot
2,000 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

8 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 20, 2025Completed
final sign-off Nov 2025
3035 23rd StLuminalt Energy Corporationsolar permit: ballasted: n, including 1 energy storage unit, of 240 vdc, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) tesla powerwall 3 (1707000-xx-y) (1) tesla backup switch (1624171-xx-y)
Details
Permit
S20250819018
Status
complete
Filed
Aug 20, 2025
Permit issued
Sep 10, 2025
Final sign-off
Nov 19, 2025
Address
3035 23rd St

solar permit: ballasted: n, including 1 energy storage unit, of 240 vdc, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) tesla powerwall 3 (1707000-xx-y) (1) tesla backup switch (1624171-xx-y)

Open the permit page

Jul 11, 2023Completed
final sign-off Jun 2024
3035 23rd StCompetente Construction Increvision to 202202228375. repair and strengthen e ceiling framing due to prior damage. e ceiling joists support e roofloads. new larger ceiling joists will be added to support these loads
Details
Permit
202307111836
Status
complete
Filed
Jul 11, 2023
Permit issued
Jul 11, 2023
Final sign-off
Jun 3, 2024
Declared cost
$2,300
Address
3035 23rd St

revision to 202202228375. repair and strengthen e ceiling framing due to prior damage. e ceiling joists support e roofloads. new larger ceiling joists will be added to support these loads

Open the permit page

$2,300
Oct 21, 2022Completed
final sign-off Jun 2024
3035 23rd StCompetente Construction Increvision 202202228375, 1st fl shift interior towards west property line to enlarge family room, add window at family room, reconfigure rear yard stairs, 2nd fl add window at master bath
Details
Permit
202210214842
Status
complete
Filed
Oct 21, 2022
Permit issued
Oct 21, 2022
Final sign-off
Jun 3, 2024
Declared cost
$1,000
Address
3035 23rd St

revision 202202228375, 1st fl shift interior towards west property line to enlarge family room, add window at family room, reconfigure rear yard stairs, 2nd fl add window at master bath

Open the permit page

$1,000
Feb 22, 2022Completed
final sign-off Jun 2024
3035 23rd StCompetente Construction Inc1/f: fill in area under (e) 2/f sunroom & convert portion of storage room to create family room, fulll bathroom & laundry. lower slab for finished ceiling ht 8-0. 2/f: remodel (e) kitchen & bathroom, new interior stairs.
Details
Permit
202202228375
Status
complete
Filed
Feb 22, 2022
Permit issued
May 4, 2022
Final sign-off
Jun 3, 2024
Declared cost
$191,135
Address
3035 23rd St

1/f: fill in area under (e) 2/f sunroom & convert portion of storage room to create family room, fulll bathroom & laundry. lower slab for finished ceiling ht 8-0. 2/f: remodel (e) kitchen & bathroom, new interior stairs.

Open the permit page

$191,135
Feb 12, 2021Expired or cancelled
withdrawn Jun 2021
3035 23rd Streplace existing 8' high fence at east property line. replace existing 10' fence at south property line.
Details
Permit
202102124559
Status
withdrawn
Filed
Feb 12, 2021
Declared cost
$2,000
Address
3035 23rd St

replace existing 8' high fence at east property line. replace existing 10' fence at south property line.

Open the permit page

$2,000
Sep 22, 2006Completed
final sign-off Nov 2006
3035 23rd StKoefoed Const Copartiac coluntary sseismic improvements in basement only with engineers plan.
Details
Permit
200609223107
Status
complete
Filed
Sep 22, 2006
Permit issued
Sep 22, 2006
Final sign-off
Nov 22, 2006
Declared cost
$22,000
Address
3035 23rd St

partiac coluntary sseismic improvements in basement only with engineers plan.

Open the permit page

$22,000
Dec 31, 2002Completed
final sign-off Mar 2003
3035 23rd StS P G Solar Inc.installation of a 1.4 kw photovoltaic solar energy system
Details
Permit
200212314361
Status
complete
Filed
Dec 31, 2002
Permit issued
Dec 31, 2002
Final sign-off
Mar 12, 2003
Declared cost
$14,000
Address
3035 23rd St

installation of a 1.4 kw photovoltaic solar energy system

Open the permit page

$14,000
Jun 26, 2000Completed
final sign-off Sep 2000
3035 23rd Stnew waste line & drive drain.
Details
Permit
200006263660
Status
complete
Filed
Jun 26, 2000
Permit issued
Jun 26, 2000
Final sign-off
Sep 29, 2000
Declared cost
$5,000
Address
3035 23rd St

new waste line & drive drain.

Open the permit page

$5,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Competente Construction Inc (3), Koefoed Const Co, Luminalt Energy Corporation, S P G Solar Inc.
Architects
Cassandra Mettling-Davis (2)
Engineers
Sarah Leong (2)
Authorized agent-otherss
Cassandra Mettling-Davis

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.