David L Mccormick
- Listed as
- designer, engineer
- Firm
- Simpson Gumpertz & Heger
- Based in
- Oakland
- On San Francisco permits
- Jul 2014 to Feb 2023
25 permits since 2000 (engineer on 24 permits, designer on 1 permit): 20 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 22, 2023 | Completed final sign-off Aug 2023 | 721 Geary St | Bay Area Activo Inc. | repair of cracked slab on grade and installation of new concrete curb. maintain fire-rating at wall and maintain means of egress.Details
repair of cracked slab on grade and installation of new concrete curb. maintain fire-rating at wall and maintain means of egress. | $20,000 |
| Jan 23, 2023 | Completed final sign-off Jul 2023 | 57 Taylor St | Bay Area Activo Inc. | repair parapet wall at roof level, not visible from streetDetails
repair parapet wall at roof level, not visible from street | $20,000 |
| Oct 24, 2022 | Completed final sign-off Oct 2023 | 88 Kearny St | Hitt Contracting Inc. | 19th fl: tenant improvement of an existin building. limited to the installation and anchoring of (6) new prefabricated pramery phone booths.Details
19th fl: tenant improvement of an existin building. limited to the installation and anchoring of (6) new prefabricated pramery phone booths. | $15,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 1424 Polk St | Rain Defense | additional structural engineering needed for original window permit, ref bpa#202203089456.Details
additional structural engineering needed for original window permit, ref bpa#202203089456. | $40,000 |
| Jun 22, 2022 | Completed final sign-off Oct 2022 | 947 Bush St | Hon's Construction Inc. | san francisco fire dept review for previously approved pa 202206106071, "repair and replacement of deteriorated concrete parapet and improvement to west wall anchors at locations where parapet is replaced". the same plan has been approved by city planning and building depts. under pa 202206106071.Details
san francisco fire dept review for previously approved pa 202206106071, "repair and replacement of deteriorated concrete parapet and improvement to west wall anchors at locations where parapet is replaced". the same plan has been approved by city planning and building depts. under pa 202206106071. | |
| Jun 10, 2022 | Completed final sign-off Nov 2022 | 947 Bush St | Hon's Construction Inc. | repair and replacement of deteriorated concrete parapet and improvement to (west) wall anchors at locations where parapet is replaced.Details
repair and replacement of deteriorated concrete parapet and improvement to (west) wall anchors at locations where parapet is replaced. | $20,000 |
| May 18, 2022 | Completed final sign-off Aug 2022 | 686 Post St | Hon's Construction Inc. | repair discovered damaged front facade per plans.Details
repair discovered damaged front facade per plans. | $10,000 |
| Feb 25, 2022 | Completed final sign-off Jun 2022 | 2430 Fillmore St | Sft Construction Corp | repair deteriorated concrete & wood stair framing @ rear stair. stair not visible from street. repair less than 50% replacement like for likeDetails
repair deteriorated concrete & wood stair framing @ rear stair. stair not visible from street. repair less than 50% replacement like for like | $20,000 |
| Feb 3, 2021 | Completed final sign-off Apr 2022 | 845 Pine St | Rain Defense | concrete wall spalling repaires. remove visiby spalling concrete + parge with new.Details
concrete wall spalling repaires. remove visiby spalling concrete + parge with new. | $115,000 |
| Jan 13, 2021 | Completed final sign-off May 2022 | 1035 Sutter St | Rain Defense, Wickman Development And Construction | parapet and roof bracing/anchorage.Details
parapet and roof bracing/anchorage. | $125,000 |
| Oct 29, 2019 | Completed final sign-off Apr 2021 | 850 Powell St | Nob Hill Construction | remedeate concrete damage. infill extg roof openings as per structural engineer drawings and calculations.Details
remedeate concrete damage. infill extg roof openings as per structural engineer drawings and calculations. | $65,000 |
| Apr 24, 2019 | Never finaled issued May 2019, no final | 2255 Vallejo St | D Kelly Construction Inc. | revision to pa 2018-0816-7498 (soft story) revised structural detailsDetails
revision to pa 2018-0816-7498 (soft story) revised structural details | |
| Jul 3, 2018 | Never finaled issued Aug 2019, no final | 840 Powell St | Narrowback Construction Co. | voluntary seismic improvements to existing parking garage. (common area)Details
voluntary seismic improvements to existing parking garage. (common area) | $792,000 |
| Feb 27, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | Edgewood Builders Inc | t.i. to extg production space. work to include ada upgrade and construction of new egress stair. no change of use(deffered mep permits) n/a for maherDetails
t.i. to extg production space. work to include ada upgrade and construction of new egress stair. no change of use(deffered mep permits) n/a for maher | $200,000 |
| Jan 29, 2018 | Completed final sign-off Dec 2018 | 100 05th Av | Michael Mc Nulty Construction***Ask Id | soft story retrofit per sfebc chapter 4d:asce 41-13Details
soft story retrofit per sfebc chapter 4d:asce 41-13 | $17,000 |
| Jul 5, 2017 | Completed final sign-off Jun 2018 | 1940 Sacramento St | Phoenix Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. retrofit includes plywood shear walls and simpson strong-tie frame system at the first story. some existing concrete foundations are modified at lateral force resisting system locations.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. retrofit includes plywood shear walls and simpson strong-tie frame system at the first story. some existing concrete foundations are modified at lateral force resisting system locations. | $92,950 |
| Feb 1, 2017 | Expired or cancelled cancelled Jan 2026 | 1030 Washington St | revision to pa #201508275463 - revision to seismic upgrade, slab.Details
revision to pa #201508275463 - revision to seismic upgrade, slab. | ||
| Aug 3, 2016 | Completed final sign-off May 2017 | 663 33rd Av | D3 Construction | soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4, seismic work only, no exterior work, no change in unit count.Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4, seismic work only, no exterior work, no change in unit count. | $85,900 |
| Jul 20, 2016 | Completed final sign-off Oct 2018 | 3809 20th St | mandator soft story per sfbc ch 34b iebc a4 methodDetails
mandator soft story per sfbc ch 34b iebc a4 method | $184,600 | |
| May 17, 2016 | Completed final sign-off Dec 2017 | 237 Arguello Bl | Seismic Retrofitters Inc. | mandatory soft story retrofit per 2013 sfbc chapter 34b, asce 41-13. new shear walls, steel moment frame, and foundations. remove and replace front stucco for soft story work (replace in-kind).Details
mandatory soft story retrofit per 2013 sfbc chapter 34b, asce 41-13. new shear walls, steel moment frame, and foundations. remove and replace front stucco for soft story work (replace in-kind). | $175,000 |
| Mar 24, 2016 | Completed final sign-off Apr 2017 | 1146 Taylor St | Theodore Design & Constr | soft storey retrofit per 2013 sfbc ibc chapeter a4Details
soft storey retrofit per 2013 sfbc ibc chapeter a4 | $70,000 |
| Jun 16, 2015 | Completed final sign-off Mar 2016 | 1555 Oak St | Theodore Design & Constr | soft story upgrade per code 2012 iebc appendix a-4.Details
soft story upgrade per code 2012 iebc appendix a-4. | $80,000 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 225 Valencia St | I E General Const Inc | revise 201406047451, remove 2 small offices and one conference room at 2nd flr, make one opening at existing wall at 1st floor. maher n/aDetails
revise 201406047451, remove 2 small offices and one conference room at 2nd flr, make one opening at existing wall at 1st floor. maher n/a | $4,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2016 | 149 Fell St | Melo Willard Tabudlo Dba Dreamt Design | change of use to a-2. tenant improvement for full service restaurant. work to include ada bathrooms, ada entries, new storefront windows, kitchen, bar seating area at ground floor and construction of apprx 525 sf storage mezzanine.n/a for maher ordinance.Details
change of use to a-2. tenant improvement for full service restaurant. work to include ada bathrooms, ada entries, new storefront windows, kitchen, bar seating area at ground floor and construction of apprx 525 sf storage mezzanine.n/a for maher ordinance. | $550,000 |
| Jul 29, 2014 | Completed final sign-off Jan 2015 | 663 33rd Av | Luo's Construction Company **Check Id*** | replace extg deck with smaller new deck, comply notice of violation #201482892Details
replace extg deck with smaller new deck, comply notice of violation #201482892 | $8,000 |