Cass Calder Smith
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Ccs Architecture
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Jun 2026
76 permits since 2000 (architect on 70 permits, authorized agent-others on 6 permits, engineer on 1 permit): 45 completed, 11 in progress, 9 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 1631 North Point St | revision to pa#202211015684. reduction in demo scope and structural framing scope at level 2 & 3 living, dining and kitchen area. addition of sauna at level 1.Details
revision to pa#202211015684. reduction in demo scope and structural framing scope at level 2 & 3 living, dining and kitchen area. addition of sauna at level 1. | $200,000 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public rowDetails
exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public row | $125,000 |
| Dec 4, 2025 | In progress filed Dec 2025, not yet issued | 850 California St | to demolish 1 story, no basement 2 units residential building.Details
to demolish 1 story, no basement 2 units residential building. | $12,000 | |
| Dec 4, 2025 | In progress filed Dec 2025, not yet issued | 860 California St | to demolish 1 story, no basement retail building.Details
to demolish 1 story, no basement retail building. | $21,000 | |
| Dec 4, 2025 | In progress filed Dec 2025, not yet issued | 854 California St | to demolish 1 story, 1 basement, single family building.Details
to demolish 1 story, 1 basement, single family building. | $24,500 | |
| Dec 4, 2025 | In progress filed Dec 2025, not yet issued | 842 California St | to erect 9 stories, 1 basement, type i-b, 33 multi-family rsidential codominiums building.Details
to erect 9 stories, 1 basement, type i-b, 33 multi-family rsidential codominiums building. | $15,000,000 | |
| Dec 4, 2025 | In progress filed Dec 2025, not yet issued | 842 California St | to demolish 3 stories 1 basement 2 units residential / retail building.Details
to demolish 3 stories 1 basement 2 units residential / retail building. | $49,500 | |
| Nov 6, 2025 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way.Details
revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way. | $250,000 |
| Oct 27, 2025 | In progress issued Jan 2026 | 1631 North Point St | rear yard improvements including new 12" tall deck, new fences, new paving, new planters, hot tub, gas firepit, bbq and shade structure.Details
rear yard improvements including new 12" tall deck, new fences, new paving, new planters, hot tub, gas firepit, bbq and shade structure. | $75,000 | |
| Apr 15, 2025 | In progress issued Aug 2025 | 185 Berry St | Hathaway Dinwiddie Co. | converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.Details
converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades. | $15,000,000 |
| Feb 7, 2023 | Completed final sign-off Feb 2025 | 155 12th St | Eric F Anderson Incorporated | 1/f interior tenant improvment in (e) back of house restaurant space. new partitions & finishes. mep deferred.Details
1/f interior tenant improvment in (e) back of house restaurant space. new partitions & finishes. mep deferred. | $330,000 |
| Nov 1, 2022 | In progress issued Apr 2025 | 1631 North Point St | complete interior remodel on all floors with exterior work to include window replacement, new entry stair finishes, an alteration to the roof at both light wells, installation of solar panels and installation of skylights.Details
complete interior remodel on all floors with exterior work to include window replacement, new entry stair finishes, an alteration to the roof at both light wells, installation of solar panels and installation of skylights. | $500,000 | |
| Jun 3, 2022 | Completed final sign-off Sep 2025 | 226 Palo Alto Av | Urbnbuild Inc | 19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred.Details
19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred. | $350,000 |
| Oct 12, 2021 | Completed final sign-off Sep 2025 | 226 Palo Alto Av | Urbnbuild Inc | add a horizontal addition to the rear yard which will be within the current foot print of the existing deck. the proposal will be 15" from the rear property line-same distance as teh existing deckDetails
add a horizontal addition to the rear yard which will be within the current foot print of the existing deck. the proposal will be 15" from the rear property line-same distance as teh existing deck | $450,000 |
| Sep 17, 2020 | Completed final sign-off Jun 2023 | 2108 Washington St | Mueller Nicholls Inc | replace (e) wood/steel windows/doors w/steel windows/doors. garage level: infaill of area below (e) bay window tower at north facade to increase coditionied floor area. remodel interior spaces to spa area w/bathroom, sauna, hot tub, cold plumbe. structural includes reconfiguration of rear exteriorDetails
replace (e) wood/steel windows/doors w/steel windows/doors. garage level: infaill of area below (e) bay window tower at north facade to increase coditionied floor area. remodel interior spaces to spa area w/bathroom, sauna, hot tub, cold plumbe. structural includes reconfiguration of rear exterior | $700,000 |
| May 12, 2020 | Completed final sign-off Dec 2020 | 888 Ofarrell St | Build Group Inc. | floor 2,3,13: elevator lobby remodel project including remodel of existing elevator lobbies on 2nd, 3rd, & 13th floor at east and west towers.Details
floor 2,3,13: elevator lobby remodel project including remodel of existing elevator lobbies on 2nd, 3rd, & 13th floor at east and west towers. | $50,000 |
| Dec 24, 2019 | Never finaled filed Dec 2019, never issued | 425 Mission St | tjpa ti suite# 103. project#-19-0300. interior t.i. remodel to (e) tenant space on 1st flr(suite 103), for new restanrant tenant. scope to include non-strucral partions millwork and finishes and lighting, equipment, and mep.**maher n/a**Details
tjpa ti suite# 103. project#-19-0300. interior t.i. remodel to (e) tenant space on 1st flr(suite 103), for new restanrant tenant. scope to include non-strucral partions millwork and finishes and lighting, equipment, and mep.**maher n/a** | $290,000 | |
| Dec 24, 2019 | Expired or cancelled withdrawn Nov 2022 | 969 Market St | interior improvement. (n) interiors kitchen equipment, fixtures, extension of staircase. (n) mep. kitchen hood. fully sprinklered. alarm under separate permitDetails
interior improvement. (n) interiors kitchen equipment, fixtures, extension of staircase. (n) mep. kitchen hood. fully sprinklered. alarm under separate permit | $1,500,000 | |
| Sep 5, 2019 | Expired or cancelled cancelled Apr 2023 | 240 Dolores St | exterior renovation of building, complete upgrade to exterior finishes, repaving of all common areas 3 walkways, new doors & windows, new roofing and waterproofing throughoutDetails
exterior renovation of building, complete upgrade to exterior finishes, repaving of all common areas 3 walkways, new doors & windows, new roofing and waterproofing throughout | $3,000,000 | |
| Sep 5, 2019 | Expired or cancelled cancelled Apr 2023 | 230 Dolores St | exterior renovaton of the entire building, including complete upgrade to exterior finishes, re-paving of all common areas and walkways, new doors, windows and new roofing & water protecting througoutDetails
exterior renovaton of the entire building, including complete upgrade to exterior finishes, re-paving of all common areas and walkways, new doors, windows and new roofing & water protecting througout | $1,500,000 | |
| May 20, 2019 | Completed final sign-off Aug 2020 | 225 Clement St | Bradford Construction | install non electric projecting double faced sign (shu lin) 3'-0" x 2'-6"x x 5 x 2'-6"Details
install non electric projecting double faced sign (shu lin) 3'-0" x 2'-6"x x 5 x 2'-6" | $2,000 |
| Apr 26, 2019 | Completed final sign-off Oct 2020 | 901 Bay Shore Bl | Bay Area Builders Inc. | revision to approved ti permit #201807255538, to allow electromagnetic lock equivalency for panic hardware at doors 101, 102, 103.Details
revision to approved ti permit #201807255538, to allow electromagnetic lock equivalency for panic hardware at doors 101, 102, 103. | |
| Jul 25, 2018 | Completed final sign-off Oct 2020 | 901 Bay Shore Bl | Bay Area Builders Inc. | 1st flr. interior tenant improvement of (e) commercial space for day care center. includes demo of non-structural partitions, new framing, mep w/ fixtures, and finishes, no structural or exterior work. change of occupancy from m to e. no otc approvalsDetails
1st flr. interior tenant improvement of (e) commercial space for day care center. includes demo of non-structural partitions, new framing, mep w/ fixtures, and finishes, no structural or exterior work. change of occupancy from m to e. no otc approvals | $115,000 |
| Jul 13, 2018 | Completed final sign-off Dec 2018 | 845 Market St | Pacific Wide Builders Inc. | ste 199 interior remodel of (e) restaurant "executive order" scope to include floor, wall, ceiling finishes, lighting and limited electrical and plumbing. mezzanine level storage converted to service bar with limited demo and (n) partitionsDetails
ste 199 interior remodel of (e) restaurant "executive order" scope to include floor, wall, ceiling finishes, lighting and limited electrical and plumbing. mezzanine level storage converted to service bar with limited demo and (n) partitions | $120,000 |
| Mar 27, 2018 | Completed final sign-off Dec 2020 | 155 12th St | Build Group Inc. | whole building tenant improvement & change of use to (e) bldg from a b and s1 occpancy to an a2, a3 & b occupancy, full service restaurant, art gallery & outdoor patio.Details
whole building tenant improvement & change of use to (e) bldg from a b and s1 occpancy to an a2, a3 & b occupancy, full service restaurant, art gallery & outdoor patio. | $750,000 |
| Mar 19, 2018 | Completed final sign-off Aug 2018 | 210 Grant Av | Arrow Sign Company | non electric projecting signDetails
non electric projecting sign | $3,000 |
| Mar 19, 2018 | Completed final sign-off Aug 2018 | 210 Grant Av | Arrow Sign Company | non-electrick wall signDetails
non-electrick wall sign | $2,000 |
| Mar 15, 2018 | Completed final sign-off Aug 2018 | 210 Grant Av | K Bali Construction | ti - finishes, ele & lighting fixtures, da-05 compliance, no structural, plm or mechDetails
ti - finishes, ele & lighting fixtures, da-05 compliance, no structural, plm or mech | $95,000 |
| Jan 11, 2018 | Completed final sign-off Apr 2022 | 4230 18th St | Adamas Builders Inc | to erect 4 stories, no basement, 12 resential hotel & restaurant building.Details
to erect 4 stories, no basement, 12 resential hotel & restaurant building. | $1,687,500 |
| Dec 19, 2017 | Expired or cancelled withdrawn Nov 2023 | 3300 Mission St | to comply w/nov 201623526.remodel(e)a-2 occupancies on 1/fl&bsmt&r-2 occupancies on 2nd,3rd&roof.proj incl struc seismic,new exit stairs& elevator,new mep&fixtures&finishes.roof penthouse&mech,&1/fl commercial storefrt under sep #201712156602. priority permit processing.Details
to comply w/nov 201623526.remodel(e)a-2 occupancies on 1/fl&bsmt&r-2 occupancies on 2nd,3rd&roof.proj incl struc seismic,new exit stairs& elevator,new mep&fixtures&finishes.roof penthouse&mech,&1/fl commercial storefrt under sep #201712156602. priority permit processing. | $1,300,000 | |
| Dec 15, 2017 | Expired or cancelled withdrawn Nov 2023 | 3300 Mission St | remodel to (e) a-2 occupancies on 1st fl & basement, and r-2 occupancies on 2nd, 3rd and roof. project includes structural seismic, new exit stairs and elevator, new mep and fixtures and finishes. roof penthouse and mechanical, and 1st fl commercial storefront. to comply with nov 201623526Details
remodel to (e) a-2 occupancies on 1st fl & basement, and r-2 occupancies on 2nd, 3rd and roof. project includes structural seismic, new exit stairs and elevator, new mep and fixtures and finishes. roof penthouse and mechanical, and 1st fl commercial storefront. to comply with nov 201623526 | $300,000 | |
| Aug 30, 2017 | Never finaled issued Nov 2017, no final | 1170 Sacramento St | Nob Hill Construction | #2b - interior remodel to (e) condo space. replace fixtures & finishes in kitchen & bathrooms. new finish floor, cabinets & light fixtures. relocation of non-load bearing walls. no work to structure or exterior of bldg.Details
#2b - interior remodel to (e) condo space. replace fixtures & finishes in kitchen & bathrooms. new finish floor, cabinets & light fixtures. relocation of non-load bearing walls. no work to structure or exterior of bldg. | $275,000 |
| Jul 20, 2017 | Never finaled issued Jul 2017, no final | 18 Geary St | Northern Sun Associates | 2nd floor - revision to pa #201703201895 - minor revision to lighting & corresponding revision to t-24 energy calcs. n/a maher ordinanceDetails
2nd floor - revision to pa #201703201895 - minor revision to lighting & corresponding revision to t-24 energy calcs. n/a maher ordinance | |
| Apr 13, 2017 | Completed final sign-off Jan 2020 | 520 El Camino Del Mar | Moroso Construction Inc | revision to 201602260616. additon of precast concrete to match existing cornice, entry and bay window. addition of skylight, removal of 2. relocation of bbq area. removal of stairs west facade. modify existing street wall, layout and finish of alley facadeDetails
revision to 201602260616. additon of precast concrete to match existing cornice, entry and bay window. addition of skylight, removal of 2. relocation of bbq area. removal of stairs west facade. modify existing street wall, layout and finish of alley facade | $20,000 |
| Mar 20, 2017 | Completed final sign-off Aug 2017 | 18 Geary St | Northern Sun Associates | 2nd floor - interior improvements at 2nd floor space (only) to include new unisex restroom and new kitchenette. selective demo at (e) interior partitions, new entry door adjacent stair, interior doors, mep work included. n/a maherDetails
2nd floor - interior improvements at 2nd floor space (only) to include new unisex restroom and new kitchenette. selective demo at (e) interior partitions, new entry door adjacent stair, interior doors, mep work included. n/a maher | $125,000 |
| Oct 27, 2016 | Completed final sign-off Jan 2017 | 2223 Market St | Bradford Construction | ground fl: modify (e) exit door to provide 12" push side clearance, modify door at (e) walk-in cooler (ref. to 2016-0321-2586)Details
ground fl: modify (e) exit door to provide 12" push side clearance, modify door at (e) walk-in cooler (ref. to 2016-0321-2586) | $400 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 18 Geary St | revision to 201501216216, reduction of scope of work for electricalDetails
revision to 201501216216, reduction of scope of work for electrical | ||
| Apr 11, 2016 | Completed final sign-off Mar 2018 | 25 Lusk St | Teutonic Construction Inc | improvements to roof level to extend 1st floor restaurant to proposed roof deck dining area, includes shade structure, lighting and windscreen; maher n/aDetails
improvements to roof level to extend 1st floor restaurant to proposed roof deck dining area, includes shade structure, lighting and windscreen; maher n/a | $200,000 |
| Mar 21, 2016 | Completed final sign-off Aug 2016 | 2223 Market St | Bradford Construction | interior ti, remodel of existing restaurant space. existing restroom and storefront to remain. no work in basement. no mechanical or plumbing.Details
interior ti, remodel of existing restaurant space. existing restroom and storefront to remain. no work in basement. no mechanical or plumbing. | $195,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 18 Geary St | revision to permit #201501216216 to remove interior demising wall & add a new storefront mullion at the easternmost bay. convert 2b into 1 m occupancy and add exit. work reviewed and approved as part of minor permit to alter case 2014-000856. previous revision #2015-1223-5877 to be canceled.na maherDetails
revision to permit #201501216216 to remove interior demising wall & add a new storefront mullion at the easternmost bay. convert 2b into 1 m occupancy and add exit. work reviewed and approved as part of minor permit to alter case 2014-000856. previous revision #2015-1223-5877 to be canceled.na maher | $5,000 | |
| Feb 26, 2016 | Completed final sign-off Jan 2020 | 520 El Camino Del Mar | Moroso Construction Inc | revision to pa# 2013 0411 4257; one new skylight change to size & location of skylight at sloped w/roof & main flat roof. relocation of window of west facade & south facade @ garden level. revised mullion layout of n facade windows. revisied scoring lines at garage. modify catwalk @ w. facadeDetails
revision to pa# 2013 0411 4257; one new skylight change to size & location of skylight at sloped w/roof & main flat roof. relocation of window of west facade & south facade @ garden level. revised mullion layout of n facade windows. revisied scoring lines at garage. modify catwalk @ w. facade | $10,000 |
| Jun 23, 2015 | Never finaled issued Apr 2016, no final | 147 South Park | Greentree Design/Build | revision to approved permit#201305308179. revised tenant improvements to ground floor & basement plans for change of use from restaurant to office. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to approved permit#201305308179. revised tenant improvements to ground floor & basement plans for change of use from restaurant to office. ** maher: compliance with ordinance no# 155-13 not required ** | |
| Apr 6, 2015 | Completed final sign-off Apr 2016 | 845 Market St | Build Group Inc. | interior tenant improvement @ (n) restaurant tenant in (e) restaurant space. no exterior work, no structural work. construction includes non-structural partitions, a (n) interior stair, (2) (n) unisex restrooms, mep.Details
interior tenant improvement @ (n) restaurant tenant in (e) restaurant space. no exterior work, no structural work. construction includes non-structural partitions, a (n) interior stair, (2) (n) unisex restrooms, mep. | $600,000 |
| Apr 6, 2015 | Completed final sign-off Apr 2016 | 845 Market St | Build Group Inc. | site permit for exterior work. modification of one door & removal of one door.Details
site permit for exterior work. modification of one door & removal of one door. | $50,000 |
| Sep 29, 2014 | Completed final sign-off Jun 2016 | 18 Geary St | demo and replacement of ground floor storefront, windows and doors. demo (e) awnings. new exterior lights. to comply with maher ordinance - extended no.155-13 not required; ref. pmt 201501286216Details
demo and replacement of ground floor storefront, windows and doors. demo (e) awnings. new exterior lights. to comply with maher ordinance - extended no.155-13 not required; ref. pmt 201501286216 | $75,000 | |
| Jul 8, 2014 | Completed final sign-off Jun 2016 | 18 Geary St | Build Group Inc. | interior demo of non-bearing partition walls on 1/f & mezzanine floor, removal of 1/f kitchen and bathrooms, electrical and plumbing to be demo and capped, sprinkler to remain operational. demo as per ab-17 all egress and life safety systems to remain operational. maintain fire escape.Details
interior demo of non-bearing partition walls on 1/f & mezzanine floor, removal of 1/f kitchen and bathrooms, electrical and plumbing to be demo and capped, sprinkler to remain operational. demo as per ab-17 all egress and life safety systems to remain operational. maintain fire escape. | $60,000 |
| Jan 13, 2014 | Completed final sign-off Feb 2016 | 2539 Vallejo St | Goodman Construction & Design Co | rev. to pa# 201010052357, 201308144339 extend roof deck to the east property line over existing roofingDetails
rev. to pa# 201010052357, 201308144339 extend roof deck to the east property line over existing roofing | |
| Oct 19, 2011 | Completed final sign-off Jan 2012 | 525 Market St | Terra Nova Industries | #130 - ti for e take away food cafe, incuding new fixtures finishes, equipment, new mep. no exterior work or change of use. fire protection under separate permitDetails
#130 - ti for e take away food cafe, incuding new fixtures finishes, equipment, new mep. no exterior work or change of use. fire protection under separate permit | $125,000 |
| May 4, 2011 | Never finaled issued Dec 2012, no final | 611 Buena Vista West Av | Devlin/Mcnally Construction | one story vertical addition to the existing 2 story residence. the roof of the 3rd story addition will include a green roof. the project will have a basement addition.Details
one story vertical addition to the existing 2 story residence. the roof of the 3rd story addition will include a green roof. the project will have a basement addition. | $300,000 |
| Jan 14, 2011 | Completed final sign-off Nov 2012 | 650 02nd St | Van Der Sterre Construction | work @ unit# 401 only. to comply with nov# 201076086 to merge units# 401 & unit# 402 into one unit.for documentation only.no construction under this permit. all work approved under pa#201002226890.Details
work @ unit# 401 only. to comply with nov# 201076086 to merge units# 401 & unit# 402 into one unit.for documentation only.no construction under this permit. all work approved under pa#201002226890. | $10,000 |
| Jan 14, 2011 | Completed final sign-off Nov 2012 | 650 02nd St | Van Der Sterre Construction | work @ unit# 402. this application is in response to nov# 201074406. it is also to merge units# 401 & unit# 402 into one unit. for documentation only. no construction under this permit. all work approved under p/a#201002226890.Details
work @ unit# 402. this application is in response to nov# 201074406. it is also to merge units# 401 & unit# 402 into one unit. for documentation only. no construction under this permit. all work approved under p/a#201002226890. | $10,000 |
| Dec 13, 2010 | Never finaled issued Dec 2010, no final | 555 North Point St | Northern Sun Associates | new unconditioned entry vestibule under (e) entry canopyDetails
new unconditioned entry vestibule under (e) entry canopy | $140,000 |
| Apr 21, 2010 | Completed final sign-off Mar 2011 | 25 Lusk St | Teutonic Construction Inc | tenant improvement to 2nd floor office, storage, and bathroom to support the restaurant operation on basement and 1st floor and future tenant on 2nd floor. basement and 1st floor improvment work under 200806184781Details
tenant improvement to 2nd floor office, storage, and bathroom to support the restaurant operation on basement and 1st floor and future tenant on 2nd floor. basement and 1st floor improvment work under 200806184781 | $75,000 |
| Feb 22, 2010 | Completed final sign-off Jun 2012 | 650 02nd St | Van Der Sterre Construction | demloition of existing non-structural partition walls, replacing hardwood flr with new hardwood flr, painting, modification of (e) hvac, revising power/data locations, updating & renovation of lighting in kind, relocation of exisiing kitchen. residential olny,no exteriorDetails
demloition of existing non-structural partition walls, replacing hardwood flr with new hardwood flr, painting, modification of (e) hvac, revising power/data locations, updating & renovation of lighting in kind, relocation of exisiing kitchen. residential olny,no exterior | $200,000 |
| Feb 4, 2010 | Completed final sign-off Jun 2011 | 3550 Baker St | A M G Construction | build a two-story rear yard addition to an existing three-story, single family dewlling including studio and sunroom addition.Details
build a two-story rear yard addition to an existing three-story, single family dewlling including studio and sunroom addition. | $225,000 |
| Jun 4, 2009 | Never finaled issued Aug 2009, no final | 230 California St | J M E Construction Services Inc | (e) restaurant tenant improvement remodel of "rado's deli" for new restaurant tenant barbacco. fire alarm & sprinkler under deferred submittalDetails
(e) restaurant tenant improvement remodel of "rado's deli" for new restaurant tenant barbacco. fire alarm & sprinkler under deferred submittal | $575,000 |
| May 28, 2009 | Completed final sign-off Oct 2009 | 230 California St | J M E Construction Services Inc | demolition of (e) restaurant "rado's deli" for new restaurant tenant "barbacco" per ab-017Details
demolition of (e) restaurant "rado's deli" for new restaurant tenant "barbacco" per ab-017 | $10,000 |
| Apr 16, 2009 | Never finaled issued Apr 2009, no final | 3318 Steiner St | Davies Construction | erect a electronic, single faced, door/window indirect new sign.Details
erect a electronic, single faced, door/window indirect new sign. | $5,000 |
| Mar 27, 2009 | Never finaled issued Jan 2010, no final | 988 Market St | Premier Structures Inc | renovation to e 8th fl offices, restrooms. renovation to elevator lobby finishes, stairs 1 and 2. extending stair 2 to taylor st, new exit. mech shaft for future tenant spaceDetails
renovation to e 8th fl offices, restrooms. renovation to elevator lobby finishes, stairs 1 and 2. extending stair 2 to taylor st, new exit. mech shaft for future tenant space | $300,000 |
| Mar 26, 2009 | Completed final sign-off Dec 2009 | 101 California St | Fine Line Group Inc | t.i. to (e) space, on a-2 occupancy restaurant. renovation of dining area, kitchen & storage areas, addition of 2 ada restrooms. new awnings. to be fully sprinklered under separate permit. see a0.01 for deferred submittals. signage under separate permit.Details
t.i. to (e) space, on a-2 occupancy restaurant. renovation of dining area, kitchen & storage areas, addition of 2 ada restrooms. new awnings. to be fully sprinklered under separate permit. see a0.01 for deferred submittals. signage under separate permit. | $480,000 |
| Dec 17, 2008 | Completed final sign-off Apr 2009 | 3401 California St | tenant improvement of (e) a-2 occupancy restaurant to smaller "b" restaurant. (n) int. finishes, replace (e) storefront w/(n) wood storefront glazing. (n) lighting (n) electrical,mech, plmg equipment, casework. (n) finishes & equip at (e) mezzanine. repair (e) front canopy and (n) rear canopy.Details
tenant improvement of (e) a-2 occupancy restaurant to smaller "b" restaurant. (n) int. finishes, replace (e) storefront w/(n) wood storefront glazing. (n) lighting (n) electrical,mech, plmg equipment, casework. (n) finishes & equip at (e) mezzanine. repair (e) front canopy and (n) rear canopy. | $130,000 | |
| Aug 28, 2008 | Completed final sign-off Nov 2008 | 181 03rd St | bring (e) accessible shower room @ men's & women's locker rooms to 2007 sfbc accessibility req's. add grab bars, bench, relocate controls as nec, modify threshold, 2 showers work in spa only on 4th floor.Details
bring (e) accessible shower room @ men's & women's locker rooms to 2007 sfbc accessibility req's. add grab bars, bench, relocate controls as nec, modify threshold, 2 showers work in spa only on 4th floor. | $4,000 | |
| Mar 26, 2008 | Expired or cancelled withdrawn Feb 2009 | 44 Mclea Ct | vertical addition of 3rd floor office space and mezzanine and interior renovation to include restroom upgrade to meet accessibility reqmt, addition of 2 new ada restrooms, 1 new elevator, rear 2nd egress stairs with roof access and installation of solar panels on the roof.Details
vertical addition of 3rd floor office space and mezzanine and interior renovation to include restroom upgrade to meet accessibility reqmt, addition of 2 new ada restrooms, 1 new elevator, rear 2nd egress stairs with roof access and installation of solar panels on the roof. | $500,000 | |
| Feb 21, 2008 | Expired or cancelled withdrawn May 2008 | 3785 21st St | add 3rd story & renovate 2nd story & front facade. 2nd floor: remove existing walls load-bearing & replace with new structural beams. 3rd floor: 3 new bedrooms, 2 baths & stair.Details
add 3rd story & renovate 2nd story & front facade. 2nd floor: remove existing walls load-bearing & replace with new structural beams. 3rd floor: 3 new bedrooms, 2 baths & stair. | $400,000 | |
| Dec 18, 2007 | Completed final sign-off Jul 2008 | 1 South Park | Davies Construction | interior remodel and merging of two unoccupied condo units 306 & 307. 2 unoccupied units were converted from warehouse use to res. use under appl#200405194312 themerger has been approved for admin. revision without dr or cu hearing by larry badiner, zoning administor.Details
interior remodel and merging of two unoccupied condo units 306 & 307. 2 unoccupied units were converted from warehouse use to res. use under appl#200405194312 themerger has been approved for admin. revision without dr or cu hearing by larry badiner, zoning administor. | $40,000 |
| Oct 26, 2007 | Completed final sign-off Dec 2008 | 134 Golden Gate Av | Behnam And Associates | modifications to (e) building to bring exiting and (e) non-compliant multi-use spaces into compliance. the conversion of "b" occupancy to "e-3" under permit appl #2006.02.08.4100 has been withdrawn. the correct occupancy clasification is "b"-office for mental health.Details
modifications to (e) building to bring exiting and (e) non-compliant multi-use spaces into compliance. the conversion of "b" occupancy to "e-3" under permit appl #2006.02.08.4100 has been withdrawn. the correct occupancy clasification is "b"-office for mental health. | $50,000 |
| May 31, 2007 | Completed final sign-off Nov 2007 | 2930 Lake St | Davies Construction | interior remodel of existing finished basement non structural storage closet to be demolished wet bar to be added new lighting to be addedDetails
interior remodel of existing finished basement non structural storage closet to be demolished wet bar to be added new lighting to be added | $80,000 |
| Sep 11, 2006 | Expired or cancelled expired Oct 2009 | 230 California St | permit 1094160 was submitted as type i construction. during the application it was determined that the building is type iii nr. this permit application is to officallly change the building to type iii nr.Details
permit 1094160 was submitted as type i construction. during the application it was determined that the building is type iii nr. this permit application is to officallly change the building to type iii nr. | ||
| Apr 12, 2006 | Expired or cancelled expired Jun 2010 | 230 California St | erect non electrical wall/door sign.Details
erect non electrical wall/door sign. | ||
| Mar 23, 2006 | Completed final sign-off Jun 2006 | 3011 Steiner St | wall mounted awning retractableDetails
wall mounted awning retractable | $750 | |
| Nov 4, 2005 | Completed final sign-off May 2006 | 3011 Steiner St | remodel of (e) grd flr commercial use space for full service wine bar & cafe to replace previous restaurant " pane e vino" note: expansion of (e) commerical use into (e) garage/utility space has been approved under c.u.p application #2004.0905c. fire protection undder separate permit. change ofDetails
remodel of (e) grd flr commercial use space for full service wine bar & cafe to replace previous restaurant " pane e vino" note: expansion of (e) commerical use into (e) garage/utility space has been approved under c.u.p application #2004.0905c. fire protection undder separate permit. change of | $350,000 | |
| Aug 5, 2005 | Expired or cancelled cancelled Jul 2006 | 3011 Steiner St | rear yard jorizontal addition.Details
rear yard jorizontal addition. | $40,000 | |
| Apr 8, 2005 | Completed final sign-off Oct 2006 | 608 02nd Av | Davies Construction | horizontal rear addition of level 1 & lower level occupied space of family dinning/kchn/bthrmDetails
horizontal rear addition of level 1 & lower level occupied space of family dinning/kchn/bthrm | $150,000 |
| Jan 25, 2005 | Expired or cancelled expired Jun 2009 | 2540 Hyde St | Hammerhouse Construction | remove (e)cabinets,install new cabinets,remove (e)sink,install new sink,run new electrical circuits.Details
remove (e)cabinets,install new cabinets,remove (e)sink,install new sink,run new electrical circuits. | $10,000 |
| Jan 11, 2005 | Completed final sign-off Aug 2005 | 726 Lake St | add bathroom to home office/studio on floor 4 within existing space. rev#200407209291.Details
add bathroom to home office/studio on floor 4 within existing space. rev#200407209291. | $10,000 | |
| Nov 16, 2001 | Completed final sign-off Aug 2002 | 405 Chapman St | strenghten structure in garage, 1 & 2/fl., remodel 2/fl kitchen/dining, refinish 3 fl floorDetails
strenghten structure in garage, 1 & 2/fl., remodel 2/fl kitchen/dining, refinish 3 fl floor | $50,000 |