William Walters
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Walters Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Jul 2026
234 permits since 2000 (architect on 217 permits, authorized agent-others on 12 permits, engineer on 5 permits, designer on 2 permits, pmt consultant/expediter on 1 permit): 147 completed, 1 in progress, 27 never finaled, 59 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 234.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | Expired or cancelled cancelled Sep 2026 | 1038 Capitol Av | Carter's Devco Llc | rev 202509296283: additiion of full bath on g/f. add new lighting, powerl and plumbing. replce (e) footing and partition between new bath and flex room on g/f due to inadequate foundation and framing dry rot discovery.Details
rev 202509296283: additiion of full bath on g/f. add new lighting, powerl and plumbing. replce (e) footing and partition between new bath and flex room on g/f due to inadequate foundation and framing dry rot discovery. | $22,500 |
| Aug 8, 2025 | Completed final sign-off Jun 2026 | 1527 Sanchez St | Edri Construction Inc *See Notes* | replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location.Details
replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location. | $60,000 |
| Feb 3, 2025 | In progress issued Jul 2025 | 3723 Anza St | Golden Gate Construction Llc | repair and replace existing exterior deck and staircase in the rear. demo existing stair and landing and replace with new stair and landing shown on plans.Details
repair and replace existing exterior deck and staircase in the rear. demo existing stair and landing and replace with new stair and landing shown on plans. | $1,000 |
| Aug 22, 2023 | Completed final sign-off May 2025 | 1905 Union St | to comply with nov 202286294 & 202286803. existing roof deck expansion. comply with 2022-000732enf (newly construction deck exceeds that allowed under pa 202201206346 & 201404163371).Details
to comply with nov 202286294 & 202286803. existing roof deck expansion. comply with 2022-000732enf (newly construction deck exceeds that allowed under pa 202201206346 & 201404163371). | $12,000 | |
| Jan 6, 2023 | Never finaled filed Jan 2023, never issued | 704 Geary St | Apex America Gc Inc | revision of extg bldg pa#201911278358. remove portion of the front door to make more space and install double glass door.Details
revision of extg bldg pa#201911278358. remove portion of the front door to make more space and install double glass door. | $3,000 |
| Nov 27, 2019 | Expired or cancelled expired Jan 2026 | 704 Geary St | Apex America Gc Inc | tenant improvement 327 sq ft. accessory use for 700 geary cafe. service counter w/ kitchen equip for juices/coffee. (n) sheetrock all demising walls & ceiling. (n) soffit/equip platform. plubming & elect work. (n) opening to 700 geary cafe.Details
tenant improvement 327 sq ft. accessory use for 700 geary cafe. service counter w/ kitchen equip for juices/coffee. (n) sheetrock all demising walls & ceiling. (n) soffit/equip platform. plubming & elect work. (n) opening to 700 geary cafe. | $40,000 |
| May 23, 2019 | Never finaled issued Jun 2019, no final | 233 Sansome St | Rudolph Commercial Interiors Inc, Rci | ti-demo (e) offices & conf rm. construct new offices, install new ceiling and light fixtures, modify (e) hvac as reqd, upgrade (e) 2nd flr mens toilet to all gender. install sprinkler/fire/life safety under sep permitDetails
ti-demo (e) offices & conf rm. construct new offices, install new ceiling and light fixtures, modify (e) hvac as reqd, upgrade (e) 2nd flr mens toilet to all gender. install sprinkler/fire/life safety under sep permit | $145,000 |
| Jan 24, 2019 | Completed final sign-off Nov 2019 | 550 Battery St | C B 2 Builders Incorporated | maintenance repair - replace (e)trash chute with new discharge door and chute from 1st thru 22nd fls. remove (e) non-structural partitions as reqiured, construct new partition, replace in kind. maher n/a.Details
maintenance repair - replace (e)trash chute with new discharge door and chute from 1st thru 22nd fls. remove (e) non-structural partitions as reqiured, construct new partition, replace in kind. maher n/a. | $65,000 |
| Sep 13, 2018 | Completed final sign-off Dec 2018 | 233 Sansome St | Rudolph Commercial Interiors Inc, Rci | 3/f: suite 300: t.i. interior work only. demo of (e) non-structural partitions. construct (n) partitions as indicated; relocate (e) light fixtures, convert (e) womens toilet to accessible all gender toilet room. separate to let entrance from stairwell. sprinkler & l/s under sep permit. maher n/a.Details
3/f: suite 300: t.i. interior work only. demo of (e) non-structural partitions. construct (n) partitions as indicated; relocate (e) light fixtures, convert (e) womens toilet to accessible all gender toilet room. separate to let entrance from stairwell. sprinkler & l/s under sep permit. maher n/a. | $82,000 |
| Aug 13, 2018 | Completed final sign-off Feb 2019 | 95 Jefferson St | P M Construction | tenant improvement. new partition for stockroom, new lighting, suspended ceiling. interior paint throught. no plumbing work.**maher n/a**Details
tenant improvement. new partition for stockroom, new lighting, suspended ceiling. interior paint throught. no plumbing work.**maher n/a** | $50,000 |
| Jul 30, 2018 | Completed final sign-off May 2019 | 2350 Market St | Ivan Alberto Rivera Rivas | reconfiguration of building exit stairways, new stairway to exist mezzanine, reconsturction of street facade, new roof deckDetails
reconfiguration of building exit stairways, new stairway to exist mezzanine, reconsturction of street facade, new roof deck | $30,000 |
| Jun 11, 2018 | Completed final sign-off Jul 2018 | 233 Sansome St | Rudolph Commercial Interiors Inc, Rci | 9th fl: revision to app #201803274687, construct three new offices and one conference room, adhust lighting per new layout. sprinkker & life saftey under sep. permit.Details
9th fl: revision to app #201803274687, construct three new offices and one conference room, adhust lighting per new layout. sprinkker & life saftey under sep. permit. | $30,000 |
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 155 Jackson St | C B 2 Builders Incorporated | apt 2504: to comply with complaint 201833171: remove (e) door between bed 2 & living room,in-fill door opening with gyp board partition,construct new partition in bedroom 2 to create 3rd bedroom.replace (e) toilets with h.e, new shower finishes & water proofing. maher n/a.Details
apt 2504: to comply with complaint 201833171: remove (e) door between bed 2 & living room,in-fill door opening with gyp board partition,construct new partition in bedroom 2 to create 3rd bedroom.replace (e) toilets with h.e, new shower finishes & water proofing. maher n/a. | $10,000 |
| Nov 16, 2017 | Completed final sign-off Jul 2018 | 1025 Masonic Av | Rudolph Commercial Interiors Inc, Rci | voluntary accessibility upgrade: construct concrete ramp to provide access from courtyard of 1025 masonic to 1611 oak st.Details
voluntary accessibility upgrade: construct concrete ramp to provide access from courtyard of 1025 masonic to 1611 oak st. | $40,000 |
| Nov 16, 2017 | Completed final sign-off Jul 2018 | 1611 Oak St | Rudolph Commercial Interiors Inc, Rci | voluntary accessibility upgrade: construct concrete ramp to provide access from 1611 oak street to courtyard of 1025 masonic ave.Details
voluntary accessibility upgrade: construct concrete ramp to provide access from 1611 oak street to courtyard of 1025 masonic ave. | $25,000 |
| Oct 27, 2017 | Never finaled issued Sep 2020, no final | 743 Vermont St | to comply w/ nov #201928061, demo rear portion of (e)house on 3rd fl and portions of 2nd fl. extension to rear (east) and north for addition of 136 sf to bldb footprint. relocation of interior stairway and remodel kitchen, master bedrm, baths, closet areasDetails
to comply w/ nov #201928061, demo rear portion of (e)house on 3rd fl and portions of 2nd fl. extension to rear (east) and north for addition of 136 sf to bldb footprint. relocation of interior stairway and remodel kitchen, master bedrm, baths, closet areas | $200,000 | |
| Oct 19, 2017 | Completed final sign-off Jun 2021 | 1177 California St | Sf Contractor | unit 630: remodel to include water isolation valves, bath/kitchen cabinets, countertops, fixtures, appliances, replace but with shower pan, update plubming/electrical, install led lighting, new floor finishes, no structural work.Details
unit 630: remodel to include water isolation valves, bath/kitchen cabinets, countertops, fixtures, appliances, replace but with shower pan, update plubming/electrical, install led lighting, new floor finishes, no structural work. | $43,000 |
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 1177 California St | Sf Contractor | revision to previously issued pa #201706270483. new lighting fixtures, washer/dryer, connections to building mechanical systems. new int. doors, new finishes. no structural.Details
revision to previously issued pa #201706270483. new lighting fixtures, washer/dryer, connections to building mechanical systems. new int. doors, new finishes. no structural. | |
| Sep 29, 2017 | Completed final sign-off Nov 2017 | 233 Sansome St | Rudolph Commercial Interiors Inc, Rci | #508:interior work only soft demo to remove extg non-structural partitions. t.i. to be performed under seperate app#2017-0815-4800 in pre-application review. n/a for maher. ab-017. alarm/sprinkler deferred.Details
#508:interior work only soft demo to remove extg non-structural partitions. t.i. to be performed under seperate app#2017-0815-4800 in pre-application review. n/a for maher. ab-017. alarm/sprinkler deferred. | $15,000 |
| Aug 15, 2017 | Completed final sign-off Feb 2018 | 233 Sansome St | Rudolph Commercial Interiors Inc, Rci | suite 508, 5th fl: ti interior remodel, demo (e) office & conference rooms - construct new offices, install new ceiling & lights. convert (e) women's toilet room to accessible all gender toilet room. install sprinkler on entire fl, sprinker & fire life safety under seperate permit. maher naDetails
suite 508, 5th fl: ti interior remodel, demo (e) office & conference rooms - construct new offices, install new ceiling & lights. convert (e) women's toilet room to accessible all gender toilet room. install sprinkler on entire fl, sprinker & fire life safety under seperate permit. maher na | $180,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2017 | 550 Battery St | C B 2 Builders Incorporated | maintenance & repair, responding to nov #201780471, item #4. remove (e) non-structural partition for maintenance & repair of trash chute, construct new partitions, replace in kind.Details
maintenance & repair, responding to nov #201780471, item #4. remove (e) non-structural partition for maintenance & repair of trash chute, construct new partitions, replace in kind. | $8,500 |
| Nov 16, 2016 | Completed final sign-off Feb 2017 | 2188 15th St | Cornerstone Dba Ag Construction | remodel of extg bathroom and washer and dryer. extension of extg wall to property line in lightwell. addition of new plumbing fixtures and finishes. structural work. replace an overhead (dryrot) beam between (e) kitchen & dining room in kind. revision to pa#201609289093Details
remodel of extg bathroom and washer and dryer. extension of extg wall to property line in lightwell. addition of new plumbing fixtures and finishes. structural work. replace an overhead (dryrot) beam between (e) kitchen & dining room in kind. revision to pa#201609289093 | $20,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 495 Geary St | Rudolph Commercial Interiors Inc, Rci | mezzanine - ti- remove 30" wide door, modify (e) partition, install new 36" wide door. remove portions (e) gyp board ceiling, patch/repairs required - all work in mechanical room. ref pa 2016-0809-4518. maher naDetails
mezzanine - ti- remove 30" wide door, modify (e) partition, install new 36" wide door. remove portions (e) gyp board ceiling, patch/repairs required - all work in mechanical room. ref pa 2016-0809-4518. maher na | $8,000 |
| Nov 8, 2016 | Completed final sign-off May 2017 | 303 02nd St | 7/f #750- commercial t.i. to unoccupied suite, demo finishes & millwork, new non structural partitions, glazing, millwork & finishes includes accessibility upgrades to restrooms. n/a ordinance #155-13Details
7/f #750- commercial t.i. to unoccupied suite, demo finishes & millwork, new non structural partitions, glazing, millwork & finishes includes accessibility upgrades to restrooms. n/a ordinance #155-13 | $38,400 | |
| Sep 16, 2016 | Never finaled issued Oct 2016, no final | 1 Daniel Burnham Ct | Rossi Builders Inc. | arch/mep ti on 3rd floor - expand (e) dr. office (350c) into adjacent suite (345c). new space will add 5 exam rooms, new office, sterilizating room and open consulting area. no structural work maher na, 3 new duct smoke detectors, fire under separate permitDetails
arch/mep ti on 3rd floor - expand (e) dr. office (350c) into adjacent suite (345c). new space will add 5 exam rooms, new office, sterilizating room and open consulting area. no structural work maher na, 3 new duct smoke detectors, fire under separate permit | $180,000 |
| Jul 14, 2016 | Completed final sign-off Jul 2017 | 758 Natoma St | to change dormitory changed per app #8511648 back to a warehouse. no construction under this permit. reference no.8511648 ** maher: n/a **Details
to change dormitory changed per app #8511648 back to a warehouse. no construction under this permit. reference no.8511648 ** maher: n/a ** | ||
| Jan 28, 2016 | Completed final sign-off Apr 2018 | 2180 Harrison St | Skyline Construction | 2nd flr: t.i. remove (e) non-structural partitions, construct new gyp board, partitions as shown on plan, modify existing acoustical ceiling,separate permit sprinkler, life safety, mechanical & electrical; maher n/aDetails
2nd flr: t.i. remove (e) non-structural partitions, construct new gyp board, partitions as shown on plan, modify existing acoustical ceiling,separate permit sprinkler, life safety, mechanical & electrical; maher n/a | $95,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 7 Lee Av | Darc Ventures Inc Dba Spl Construction S | revision to pa 2015 0312 0616 - add 1/2 bathDetails
revision to pa 2015 0312 0616 - add 1/2 bath | $5,000 |
| Jul 31, 2015 | Completed final sign-off Dec 2015 | 460 Ellis St | Cornerstone Dba Ag Construction | additional plans for title 24 for lighting for 201505196703. n/a maher ord. # 155-13Details
additional plans for title 24 for lighting for 201505196703. n/a maher ord. # 155-13 | $250 |
| May 19, 2015 | Completed final sign-off Dec 2015 | 460 Ellis St | Cornerstone Dba Ag Construction | demo of ground floor office partitions and restroom construction of new walls and new accessible restroom. n/a for the maher.Details
demo of ground floor office partitions and restroom construction of new walls and new accessible restroom. n/a for the maher. | $40,000 |
| Mar 17, 2015 | Completed final sign-off Aug 2016 | 1312 Jackson St | Patrick Uniacke | soft story structural upgrade. install bolting and shear walls per soft story ordinance sfbc chapter 34b.Details
soft story structural upgrade. install bolting and shear walls per soft story ordinance sfbc chapter 34b. | $18,000 |
| Mar 12, 2015 | Completed final sign-off Oct 2015 | 7 Lee Av | Darc Ventures Inc Dba Spl Construction S | removal of portions of ground floor conc slab. repouring of slab & new footings. ocnstruction of 117 sq ft of new ocnditioned area below (e) extension. addition of new inteiror stair to connect floors. const. of new utility closet & master bedroom & full bath (suite) on ground floor.Details
removal of portions of ground floor conc slab. repouring of slab & new footings. ocnstruction of 117 sq ft of new ocnditioned area below (e) extension. addition of new inteiror stair to connect floors. const. of new utility closet & master bedroom & full bath (suite) on ground floor. | $50,000 |
| Mar 12, 2015 | Completed final sign-off Oct 2015 | 2642 40th Av | Cornerstone Dba Ag Construction | demo of ground floor walls + slab portions. construction of ground floor bedroom, full bath & rec. room, construction of 215 sq ft of new ground flr area under exist extension as a fam room. ground floor apppliance & fixture upgrades.Details
demo of ground floor walls + slab portions. construction of ground floor bedroom, full bath & rec. room, construction of 215 sq ft of new ground flr area under exist extension as a fam room. ground floor apppliance & fixture upgrades. | $90,000 |
| Mar 9, 2015 | Completed final sign-off Jul 2015 | 235 Oak St | soft story structural upgrading. install shearwalls and grade beams per soft story ordinance sfbc ch 34 bDetails
soft story structural upgrading. install shearwalls and grade beams per soft story ordinance sfbc ch 34 b | $37,000 | |
| Feb 20, 2015 | Completed final sign-off May 2015 | 205 Bonview St | new kitchen appliances, fixtures & counters, patch sheetrock gyp. board, ceiling - damaged areas. no structural work.Details
new kitchen appliances, fixtures & counters, patch sheetrock gyp. board, ceiling - damaged areas. no structural work. | $11,000 | |
| Jan 26, 2015 | Completed final sign-off Mar 2015 | 353 03rd Av | Darc Ventures Inc Dba Spl Construction S | comply with cc 7747 excluding item 2, and add 6 skylights to 353 3rd ave.; item 1 front stair repair less than 50%; (a separate permit will be submitted for item 2 for ground floor walls & second mean of egress removal).Details
comply with cc 7747 excluding item 2, and add 6 skylights to 353 3rd ave.; item 1 front stair repair less than 50%; (a separate permit will be submitted for item 2 for ground floor walls & second mean of egress removal). | $12,500 |
| Jan 22, 2015 | Expired or cancelled cancelled Mar 2020 | 318 Spear St | t.i new cafe & h.c toilet. non bearing partitions, mech. elec. & plumbing work food service equipment. interior finishes. maher ordinance n/a.Details
t.i new cafe & h.c toilet. non bearing partitions, mech. elec. & plumbing work food service equipment. interior finishes. maher ordinance n/a. | $65,000 | |
| Jan 20, 2015 | Completed final sign-off Jan 2017 | 50 Shrader St | R D Sherrill Inc | demo and replace defective retaining wall in order to replace rear exterior stair. original stair to be demolished after replacement stair is constructed. maher not reqDetails
demo and replace defective retaining wall in order to replace rear exterior stair. original stair to be demolished after replacement stair is constructed. maher not req | $238,000 |
| Dec 23, 2014 | Expired or cancelled cancelled Aug 2016 | 2180 Harrison St | Paradigm General Contractors | voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a.Details
voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a. | $30,000 |
| Sep 24, 2014 | Completed final sign-off Mar 2016 | 3609 Sacramento St | Patrick Uniacke | 3/f only -revision to on going work for pa#201404304545 fire damaged bldg. additional work on 3/f wall changes, ceiling work & accessibility upgrade.Details
3/f only -revision to on going work for pa#201404304545 fire damaged bldg. additional work on 3/f wall changes, ceiling work & accessibility upgrade. | $12,500 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 490 Post St | Sf Contractor | suite 900 - light demolition of extg walls and counters. construction of 2 new assistants offices, relocation of interior doors. accessible upgrades to extg h.c. restroom. breakroom and hallways and to one exam room.Details
suite 900 - light demolition of extg walls and counters. construction of 2 new assistants offices, relocation of interior doors. accessible upgrades to extg h.c. restroom. breakroom and hallways and to one exam room. | $45,000 |
| Sep 17, 2014 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkler and life safety under separate permits; maher n/aDetails
grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkler and life safety under separate permits; maher n/a | $23,000 |
| Aug 26, 2014 | Expired or cancelled cancelled Dec 2017 | 3611 Sacramento St | change of hours of outdoor operation for rear yard use by ground floor cafe. existing approved hours from 8:00 pm to 10:00 pm.Details
change of hours of outdoor operation for rear yard use by ground floor cafe. existing approved hours from 8:00 pm to 10:00 pm. | ||
| Jul 22, 2014 | Completed final sign-off Aug 2014 | 116 Divisadero St | Cornerstone Dba Ag Construction | new permit to accompany/revision to 201407070549 for kitchen remodel. new beam at 10' long wall opening at kitchen.Details
new permit to accompany/revision to 201407070549 for kitchen remodel. new beam at 10' long wall opening at kitchen. | $1,500 |
| Jun 9, 2014 | Never finaled issued Sep 2014, no final | 2131 Folsom St | Ardo Construction Co. | tenant improvement for new cannabis nursery/greenhouse. n/a maher ordinance 155-13Details
tenant improvement for new cannabis nursery/greenhouse. n/a maher ordinance 155-13 | $20,000 |
| May 19, 2014 | Completed final sign-off Oct 2016 | 2000 Van Ness Av | Grand Electric & Construction Co. | electrical service upgrade-new transformer vault in aerial bsmt on public right of way sidewalk. 1200 amp 3 phase service. vault enclosure - 3 masonry walls with fire rated door. above ground incidental hatch doors per pg&e specifications.Details
electrical service upgrade-new transformer vault in aerial bsmt on public right of way sidewalk. 1200 amp 3 phase service. vault enclosure - 3 masonry walls with fire rated door. above ground incidental hatch doors per pg&e specifications. | $50,000 |
| Apr 30, 2014 | Completed final sign-off Mar 2016 | 3609 Sacramento St | Patrick Uniacke | vacant 3-story com'l bldg, interior stripped to wall & floor framing, provide g/f shear @ front & structure support @ rear, new g/f accessible entry & new access. restroom, provide new insulation & drywall throughout, provide new windows & doors throughout, provide 1 hr. walls & new ext. siding.Details
vacant 3-story com'l bldg, interior stripped to wall & floor framing, provide g/f shear @ front & structure support @ rear, new g/f accessible entry & new access. restroom, provide new insulation & drywall throughout, provide new windows & doors throughout, provide 1 hr. walls & new ext. siding. | $225,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2014 | 231 Divisadero St | minor demolitoin of interior walls & construction of new walls for the addition of a new bathroom + laundry room. no structural work this permit.Details
minor demolitoin of interior walls & construction of new walls for the addition of a new bathroom + laundry room. no structural work this permit. | $18,000 | |
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 77 Beale St | Siemens Industry, Inc. | 2nd fl. t.i. install electrified lock at existing elevator lobby doors, to comply w/ section 1008.1.4.6 of 2010 sfbc. life safety work under separate permit.Details
2nd fl. t.i. install electrified lock at existing elevator lobby doors, to comply w/ section 1008.1.4.6 of 2010 sfbc. life safety work under separate permit. | $1,200 |
| Nov 12, 2013 | Completed final sign-off Feb 2014 | 411 Greenwich St | Tom Can Construction | disassemble the (e) deck with fence, remove (e) doors (2) replace w/fixed glass windows. replace (2) window with (1) sliding glass doors. add new deck, wood fence, metal rail fence & 42" high rated wall @ property line. (under separate permit replace with new roof).Details
disassemble the (e) deck with fence, remove (e) doors (2) replace w/fixed glass windows. replace (2) window with (1) sliding glass doors. add new deck, wood fence, metal rail fence & 42" high rated wall @ property line. (under separate permit replace with new roof). | $20,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 42 Orben Pl | Clayton Valley Construction, Inc | condo conversion work per physcal insp #7313-install 2 layer of 5/8" drywall to exposed ceiling in breezewy, install new concrete step & handrail @rear stairs, remove window security bars, repair framing @breezway. install battery smoke alarms provided ventilation, comp w/all items for units per ltrDetails
condo conversion work per physcal insp #7313-install 2 layer of 5/8" drywall to exposed ceiling in breezewy, install new concrete step & handrail @rear stairs, remove window security bars, repair framing @breezway. install battery smoke alarms provided ventilation, comp w/all items for units per ltr | $20,000 |
| Sep 9, 2013 | Completed final sign-off Oct 2013 | 1042 Grant Av | Novo Construction Inc | t.i.- construct drywall partitions as shown, install new ceiling and lights, mechanical & title 24 under seperate permits.Details
t.i.- construct drywall partitions as shown, install new ceiling and lights, mechanical & title 24 under seperate permits. | $179,334 |
| Jun 14, 2013 | Completed final sign-off Jul 2013 | 2180 Harrison St | Paradigm General Contractors | office t.i. involving demo only. remove 10 lf of drywall partiton. remove door and frame. non structural partitonDetails
office t.i. involving demo only. remove 10 lf of drywall partiton. remove door and frame. non structural partiton | $1,500 |
| Feb 4, 2013 | Completed final sign-off Mar 2015 | 1177 California St | Sf Contractor | finish upgrades to guest room w/new fixtures. extenstion to master bath by 60 sf. also finish upgrades. extension of hallway by 4.5 ft to allow access to bedrooms. no strucutral work or t-24 required.Details
finish upgrades to guest room w/new fixtures. extenstion to master bath by 60 sf. also finish upgrades. extension of hallway by 4.5 ft to allow access to bedrooms. no strucutral work or t-24 required. | $25,000 |
| Dec 21, 2012 | Expired or cancelled cancelled Jan 2016 | 215 Market St | C B 2 Builders Incorporated | (roof level)install new housekeeping pad at roof level for mechanical equipment. extend (e) emergency generator exhaust ducts, install new exhaust fans.Details
(roof level)install new housekeeping pad at roof level for mechanical equipment. extend (e) emergency generator exhaust ducts, install new exhaust fans. | $85,000 |
| Nov 27, 2012 | Completed final sign-off Mar 2013 | 1555 Burke Av | Pacific Green Construction | mechanical only. ref. 201209180035; new residental type exhaust hood, provide exhaust ductwork from hood to existing 10" exhaust stub-upDetails
mechanical only. ref. 201209180035; new residental type exhaust hood, provide exhaust ductwork from hood to existing 10" exhaust stub-up | |
| Oct 29, 2012 | Completed final sign-off Apr 2013 | 1177 California St | Sf Contractor | removal of bathroom door and adjacent closet. expansion of bathroom to include a new bidet. relocation of bathroom pocket foor. relocation of vanity. provide exhaust fan. remodel of existing kitchen.Details
removal of bathroom door and adjacent closet. expansion of bathroom to include a new bidet. relocation of bathroom pocket foor. relocation of vanity. provide exhaust fan. remodel of existing kitchen. | $25,000 |
| Jul 16, 2012 | Expired or cancelled expired Oct 2013 | 77 Beale St | Paradigm General Contractors | 19kth floor minor t.i. - remove (e) drywall partitions & doors, construct new gyp bd partitions & new doors at indicated to enlarge office #1974 & add #1974a. sprinkler & life safety, hvac under separate permits.Details
19kth floor minor t.i. - remove (e) drywall partitions & doors, construct new gyp bd partitions & new doors at indicated to enlarge office #1974 & add #1974a. sprinkler & life safety, hvac under separate permits. | $16,000 |
| May 24, 2012 | Completed final sign-off Nov 2012 | 1177 California St | Sf Contractor | rev. to 2012-0303-5694 - revise new wall construction to delete wall in hallway. replace existing acoustic ceiling tiles with new in existing grid system. new swismic 12 ga supports to existing light fixtures, grid and ceiling fixtures. provide new exit sign emergency lighting.Details
rev. to 2012-0303-5694 - revise new wall construction to delete wall in hallway. replace existing acoustic ceiling tiles with new in existing grid system. new swismic 12 ga supports to existing light fixtures, grid and ceiling fixtures. provide new exit sign emergency lighting. | $6,000 |
| Nov 28, 2011 | Completed final sign-off Dec 2011 | 2398 Pine St | H S Construction And Associates Co | provide 28 lin.ft. of wall 7'-0" a.f.f.. add exit sign. ref pa#201110116432.Details
provide 28 lin.ft. of wall 7'-0" a.f.f.. add exit sign. ref pa#201110116432. | $1,600 |
| Oct 18, 2011 | Completed final sign-off Jan 2012 | 2114 Judah St | Arpol Inc | vomply w/nov 201154447 - rebuild existing exterior stairway & landings. no changes to size & location. stairs are located on west property line of bldg, replace in kind.Details
vomply w/nov 201154447 - rebuild existing exterior stairway & landings. no changes to size & location. stairs are located on west property line of bldg, replace in kind. | $5,600 |
| Oct 11, 2011 | Completed final sign-off Apr 2012 | 2398 Pine St | provide new accessible power operated door with min 32" clr opening at entry. demo of walls and fixtures at existing restroom area and construction of new unisex restroom and privacy wall, 7ft highDetails
provide new accessible power operated door with min 32" clr opening at entry. demo of walls and fixtures at existing restroom area and construction of new unisex restroom and privacy wall, 7ft high | $12,000 | |
| Aug 16, 2011 | Completed final sign-off Feb 2013 | 77 Beale St | C B 2 Builders Incorporated | office ti on level b1. install doors and turnstile with card reader access, exit doors to be free exiting, demo existing concrete ramp, install new concrete ramp at secured entry. build new partitions,relocate existing light fixtures and install new ceiling. no mechanical work.Details
office ti on level b1. install doors and turnstile with card reader access, exit doors to be free exiting, demo existing concrete ramp, install new concrete ramp at secured entry. build new partitions,relocate existing light fixtures and install new ceiling. no mechanical work. | $69,000 |
| Jul 5, 2011 | Completed final sign-off Nov 2011 | 231 Grant Av | remove existing stair, fill with floor to match existing. add 3' partition, patch walls after demo of office. space currently not occupiedDetails
remove existing stair, fill with floor to match existing. add 3' partition, patch walls after demo of office. space currently not occupied | $6,595 | |
| Jun 8, 2011 | Completed final sign-off Dec 2011 | 4080 24th St | Tom Ehline | replacement of storefront, enlargement of entry, stucco, ramp @ entry.Details
replacement of storefront, enlargement of entry, stucco, ramp @ entry. | $20,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 445 Bush St | Rudolph Commercial Interiors Inc, Rci | 1st floor - soft demolition permit - remove existing non-structural partitions (per ab-017). tenant improvements to be submitted separately.per ab-017Details
1st floor - soft demolition permit - remove existing non-structural partitions (per ab-017). tenant improvements to be submitted separately.per ab-017 | $8,900 |
| May 19, 2011 | Completed final sign-off Jun 2011 | 77 Beale St | C B 2 Builders Incorporated | revsion to appl.#201101128263 - provide epoxy coating to generator room locate roof on 5th fl. generator and fuel piping under separate permit.Details
revsion to appl.#201101128263 - provide epoxy coating to generator room locate roof on 5th fl. generator and fuel piping under separate permit. | $15,000 |
| Apr 14, 2011 | Completed final sign-off Aug 2011 | 1 Daniel Burnham Ct | Loughville Company | 3rd floor-unit #388c-demo of 65 lin ft of interior partition in vacant space. construction of new partition for 5 new exam rooms, office, storage, reception & waiting area. addition of 2 new sidelights by entry doors. minor changes to ceiling mechanical, 3fd floor, suite 388cDetails
3rd floor-unit #388c-demo of 65 lin ft of interior partition in vacant space. construction of new partition for 5 new exam rooms, office, storage, reception & waiting area. addition of 2 new sidelights by entry doors. minor changes to ceiling mechanical, 3fd floor, suite 388c | $25,000 |
| Dec 30, 2010 | Completed final sign-off Apr 2011 | 147 Monterey Bl | revision to pa# 2008-1014-4050: addition of cabinets & refrigerator in nook, deletion of 2 windows in office, deletion of closet in office & smaller windows, same location in officeDetails
revision to pa# 2008-1014-4050: addition of cabinets & refrigerator in nook, deletion of 2 windows in office, deletion of closet in office & smaller windows, same location in office | $100 | |
| Dec 28, 2010 | Completed final sign-off Jul 2011 | 1 Daniel Burnham Ct | Loughville Company | 3rd floor suite 265c - demo of 40" of interior wall, installation of 2 pocket doors, construction of 9 linear feet of new full height walls, installation of sidelight. installation of 2 new sinks, new hvac supply register & 1 new exit signDetails
3rd floor suite 265c - demo of 40" of interior wall, installation of 2 pocket doors, construction of 9 linear feet of new full height walls, installation of sidelight. installation of 2 new sinks, new hvac supply register & 1 new exit sign | $18,000 |
| Nov 22, 2010 | Completed final sign-off Jun 2011 | 25 Beale St | C B 2 Builders Incorporated | construct 2-hr rated electrical closet on ground floor lobby space, interior work onlyDetails
construct 2-hr rated electrical closet on ground floor lobby space, interior work only | $4,700 |
| Oct 18, 2010 | Never finaled issued Oct 2010, no final | 45 Beale St | C B 2 Builders Incorporated | construct 2 hour rated enclosure around new electrical pull can, install 2 hr rated door and frame assembly at enclosure. not affecting any stair enclosureDetails
construct 2 hour rated enclosure around new electrical pull can, install 2 hr rated door and frame assembly at enclosure. not affecting any stair enclosure | $4,500 |
| Aug 10, 2010 | Expired or cancelled expired May 2013 | 1 Daniel Burnham Ct | Loughville Company | perform work only on 150c: demo of storage room wall. removal of a sink, hot water htr. and shelf. construction of 12 lin. ft of new partitions and two doors. no struc, lighting. life safety (sprinklers and fire alarm) if necessary will be on separate permit.Details
perform work only on 150c: demo of storage room wall. removal of a sink, hot water htr. and shelf. construction of 12 lin. ft of new partitions and two doors. no struc, lighting. life safety (sprinklers and fire alarm) if necessary will be on separate permit. | $4,000 |
| Jun 24, 2010 | Never finaled issued Oct 2010, no final | 745 Marina Bl | Houseworks Enterprises Inc. | revision to 200806134355: demolition of spanish tile mansard parapet. expand roof deck 194 sf with new tempered glass and painted metal guard railing. replace 3rd story window to match 2nd story windows.Details
revision to 200806134355: demolition of spanish tile mansard parapet. expand roof deck 194 sf with new tempered glass and painted metal guard railing. replace 3rd story window to match 2nd story windows. | $15,000 |
| Mar 15, 2010 | Expired or cancelled cancelled Jan 2014 | 718 Tehama St | permitting of kitchen on 2nd floor & conversion from office to residential unit.Details
permitting of kitchen on 2nd floor & conversion from office to residential unit. | ||
| Aug 10, 2009 | Never finaled issued Aug 2009, no final | 851 Van Ness Av | replace existing lobby door with new glazed doorDetails
replace existing lobby door with new glazed door | $6,000 | |
| Jun 1, 2009 | Expired or cancelled cancelled Jan 2026 | 745 Marina Bl | addition of roof deck wood burning fireplace-pre manufactured & flue. addition of slate deck finish & drain. this work added to previously approved pa# 2008-0613-4355/s1. this permit is for the wood burning fireplace onlyDetails
addition of roof deck wood burning fireplace-pre manufactured & flue. addition of slate deck finish & drain. this work added to previously approved pa# 2008-0613-4355/s1. this permit is for the wood burning fireplace only | $5,000 | |
| Dec 3, 2008 | Completed final sign-off Jan 2009 | 1 Embarcadero Center | D Kelly Construction Inc. | 24th floor -revision to appl #200810093800 - change 12 x 12 concealed spline ceiling to new 2 x 4 at data room drop in acoustic ceiling, break room ceiling to run through continous, walls to remain ceiling height.Details
24th floor -revision to appl #200810093800 - change 12 x 12 concealed spline ceiling to new 2 x 4 at data room drop in acoustic ceiling, break room ceiling to run through continous, walls to remain ceiling height. | $2,360 |
| Nov 6, 2008 | Completed final sign-off Apr 2009 | 115 Mason St | revision to existing permit #2008/0926/2728. construction of new storefront entry door, accessible. insert front windows into existing framed openings.Details
revision to existing permit #2008/0926/2728. construction of new storefront entry door, accessible. insert front windows into existing framed openings. | $2,000 | |
| Oct 31, 2008 | Expired or cancelled cancelled Jan 2020 | 82 Rockridge Dr | 12' addition to the rear of the house and decks on 2 levels with fire stairs. remodel & relocate kitchen and bathroomsDetails
12' addition to the rear of the house and decks on 2 levels with fire stairs. remodel & relocate kitchen and bathrooms | $300,000 | |
| Oct 22, 2008 | Expired or cancelled expired Jun 2010 | 1094 De Haro St | to obtain final inspection for work approved under pa#200707126593. all work has been completed.Details
to obtain final inspection for work approved under pa#200707126593. all work has been completed. | ||
| Oct 14, 2008 | Completed final sign-off Apr 2011 | 147 Monterey Bl | revision to 200801142408. changes to ground floor bathroom and bedroom closets. elimination of exterior spiral stair. revisions to exterior windows and doors.Details
revision to 200801142408. changes to ground floor bathroom and bedroom closets. elimination of exterior spiral stair. revisions to exterior windows and doors. | ||
| Oct 9, 2008 | Completed final sign-off Jan 2009 | 1 Embarcadero Center | D Kelly Construction Inc. | 24th floor:tenant improvement to existing space, expansion demo/wall openings.Details
24th floor:tenant improvement to existing space, expansion demo/wall openings. | $98,000 |
| Oct 1, 2008 | Expired or cancelled cancelled Aug 2018 | 1794 San Jose Av | complete remodel of ground floor dental offices. addition to new second floor to include two new residential units. addition to partial third floor for second residential unit.Details
complete remodel of ground floor dental offices. addition to new second floor to include two new residential units. addition to partial third floor for second residential unit. | $100,000 | |
| Sep 26, 2008 | Completed final sign-off May 2009 | 115 Mason St | upgrades to 2 (e) restreooms to confirm to t-24 accessibility upgrades. reverse swing of main entry doors for building code compliance, rpovdie accessibility signage requirementsDetails
upgrades to 2 (e) restreooms to confirm to t-24 accessibility upgrades. reverse swing of main entry doors for building code compliance, rpovdie accessibility signage requirements | $15,000 | |
| Jul 28, 2008 | Expired or cancelled cancelled Apr 2012 | 2650 Sloat Bl | vertical addition of attic/storage on roof of building approx 396 sq.ft.Details
vertical addition of attic/storage on roof of building approx 396 sq.ft. | $17,000 | |
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 2650 Sloat Bl | foundation upgrades, addition of shearwalls and two wide flange beams in ceiling.Details
foundation upgrades, addition of shearwalls and two wide flange beams in ceiling. | $13,000 | |
| Jun 24, 2008 | Completed final sign-off Jun 2008 | 1206 18th St | renew expired pa# 2007/06/18/4244 for final inspection only.Details
renew expired pa# 2007/06/18/4244 for final inspection only. | ||
| Jun 13, 2008 | Expired or cancelled expired Jan 2011 | 745 Marina Bl | vertical addition of 4th floor with gabled roof and 2 dormers, 4th floor to have a bedroom, game room, bath and stairway up from 3rd floorDetails
vertical addition of 4th floor with gabled roof and 2 dormers, 4th floor to have a bedroom, game room, bath and stairway up from 3rd floor | $180,000 | |
| Jun 6, 2008 | Never finaled issued Jun 2008, no final | 3126 Lawton St | construction of new property line window on grouond level.Details
construction of new property line window on grouond level. | $500 | |
| May 28, 2008 | Completed final sign-off Oct 2010 | 155 Terrace Dr | new retaining wall at rear of lot (see delta 2 only), revision to pa# 2007-0611-3545Details
new retaining wall at rear of lot (see delta 2 only), revision to pa# 2007-0611-3545 | $5,000 | |
| Apr 23, 2008 | Completed final sign-off Jul 2008 | 608 Texas St | per complaint #200123325 & #200340781. relocate existing fence 3' from front property line.Details
per complaint #200123325 & #200340781. relocate existing fence 3' from front property line. | $250 | |
| Apr 21, 2008 | Completed final sign-off Feb 2010 | 532 Folsom St | installation of slab to slab chain-link fence to secure storage area in basement. new area including entrances to be accessible.Details
installation of slab to slab chain-link fence to secure storage area in basement. new area including entrances to be accessible. | $10,000 | |
| Apr 11, 2008 | Completed final sign-off Oct 2008 | 495 Jefferson St | construction of 35 lin ft of 2x4 partition to create separate retail/office space.- installation of two new doors, demolition of counters/shelves in hallway. mechanical, hvac & lighting on seperate permit.Details
construction of 35 lin ft of 2x4 partition to create separate retail/office space.- installation of two new doors, demolition of counters/shelves in hallway. mechanical, hvac & lighting on seperate permit. | $40,000 | |
| Mar 31, 2008 | Completed final sign-off Aug 2008 | 1 Daniel Burnham Ct | construction of new partition walls to create new operation room, exam room and two offices. new soffit in reception area and addition of 8 new sinks in doctor's office on the 4th floorDetails
construction of new partition walls to create new operation room, exam room and two offices. new soffit in reception area and addition of 8 new sinks in doctor's office on the 4th floor | $35,000 | |
| Mar 28, 2008 | Completed final sign-off Dec 2008 | 125 Kearny St | remove all interior partitions, finshes and display construction. remove toilet and temporarily cap for future tenant. remove soffits. ab 017. no exterior work. +Details
remove all interior partitions, finshes and display construction. remove toilet and temporarily cap for future tenant. remove soffits. ab 017. no exterior work. + | $3,000 | |
| Mar 25, 2008 | Never finaled issued Jul 2008, no final | 125 Kearny St | revision appl#200805091773 (expand scope of work) new storefront window & door system including new ada accessible entrance with ramp and entry wall.Details
revision appl#200805091773 (expand scope of work) new storefront window & door system including new ada accessible entrance with ramp and entry wall. | $4,000 | |
| Feb 1, 2008 | Completed final sign-off Feb 2008 | 1500 Sutter St | Sf Contractor | comply with physical inspection report# 3r-4817. for administrative purpose only. no work required. all work performed under pa# 2007/09/28/3991 & pa# 2007/06/20/4489.Details
comply with physical inspection report# 3r-4817. for administrative purpose only. no work required. all work performed under pa# 2007/09/28/3991 & pa# 2007/06/20/4489. | |
| Jan 31, 2008 | Completed final sign-off May 2008 | 115 Carl St | provide decorative sheet metal-12 guage to fire escape railings and at face of building. provide slate tiles to bottom face of bldg. provide new garage door of horiz. wood facing.Details
provide decorative sheet metal-12 guage to fire escape railings and at face of building. provide slate tiles to bottom face of bldg. provide new garage door of horiz. wood facing. | $18,000 | |
| Jan 17, 2008 | Completed final sign-off Jun 2008 | 1 Daniel Burnham Ct | unit #330; 4th floor-construction of 1 hr demising wall to divide office space. no mepDetails
unit #330; 4th floor-construction of 1 hr demising wall to divide office space. no mep | $2,500 |