Justen N. Peek
- Listed as
- engineer
- Firm
- Advanced Engineering
- Based in
- Brentwood
- On San Francisco permits
- Mar 2021 to Aug 2025
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2025 | In progress issued Aug 2026 | 301 Surrey St | Limon Electric & Construction | interior & exterior removation included convert (e) mechanical & laundry room to habitable space on main floor (115 sf). renovation to main fl & basement included 2 bathrooms & kitchen (remain in same place) addition of a roof deckDetails
interior & exterior removation included convert (e) mechanical & laundry room to habitable space on main floor (115 sf). renovation to main fl & basement included 2 bathrooms & kitchen (remain in same place) addition of a roof deck | $205,000 |
| May 10, 2022 | Completed final sign-off Sep 2023 | 2435 16th St | revision to the approved bpa 202103166591 - base building improvement. revision scope of work limited to relocate electrical room.Details
revision to the approved bpa 202103166591 - base building improvement. revision scope of work limited to relocate electrical room. | $30,000 | |
| Mar 16, 2021 | Completed final sign-off Sep 2023 | 2435 16th St | M V Construction | base bldg improvement of interior renovation of (e) 1st fl tenant spaces for future tenant. demolition of (e) non-bearing partitions, (e) demising walls, (e) restrooms, platform, (e) mezzanine & (e) ramp. new construction of partitions, finishes, accessible restroom, ada lift, exit & hvac upgrade.Details
base bldg improvement of interior renovation of (e) 1st fl tenant spaces for future tenant. demolition of (e) non-bearing partitions, (e) demising walls, (e) restrooms, platform, (e) mezzanine & (e) ramp. new construction of partitions, finishes, accessible restroom, ada lift, exit & hvac upgrade. | $170,500 |