Block 3779, lot 026
575 07th St
- City’s use
- Industrial
- Built
- 1946
- Stories
- 2
- Rooms
- 3 bathrooms
- Building
- 6,000 sq ft
- Lot
- 6,000 sq ft
- Zoning
- SLI
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2025 | Completed final sign-off Feb 2025 | 575 07th St | Redwood City Alarms Inc | install a dedicated function fire alarm system for sprinkler monitoring. sprinkler ref. pa #2024-0528-3024Details
install a dedicated function fire alarm system for sprinkler monitoring. sprinkler ref. pa #2024-0528-3024 | $8,000 |
| Jul 9, 2024 | Completed final sign-off Feb 2025 | 575 07th St | Friendly Fire Systems | ref pa# 2024-0528-3024 installation of fire sprinkler underground onlyDetails
ref pa# 2024-0528-3024 installation of fire sprinkler underground only | $9,000 |
| May 28, 2024 | Completed final sign-off Feb 2025 | 575 07th St | Friendly Fire Systems | fire only- install fire sprinkler systemDetails
fire only- install fire sprinkler system | $12,000 |
| Sep 12, 2014 | Completed final sign-off Nov 2014 | 575 07th St | change of occupancy only at 1st floor from (s-2) warehouse to (f-1) light manufacturing use, assembly of small gps devices. n/a maher ordinanceDetails
change of occupancy only at 1st floor from (s-2) warehouse to (f-1) light manufacturing use, assembly of small gps devices. n/a maher ordinance | $9,000 | |
| Aug 18, 2014 | Completed final sign-off Nov 2014 | 575 07th St | revision to 201407312637. provide stair at 2nd exit per 1007.1, exception 1. elec, mech separate permitDetails
revision to 201407312637. provide stair at 2nd exit per 1007.1, exception 1. elec, mech separate permit | $100 | |
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 575 07th St | Protection Roofing Co, | reroofing, compliance with maher ordinance 155-13 not requiredDetails
reroofing, compliance with maher ordinance 155-13 not required | $10,000 |
| Jul 31, 2014 | Completed final sign-off Nov 2014 | 575 07th St | 1)interior t.i. 1st & 2nd floor. demo old restrooms at both flrs & add new restrooms, shower, & kchn at 1st flr. 2)new store front system with new entry door on 7th street. 3)nw swing dr on gilbert st. 4)voluntary seismic upgrade. elect. mech. under seperate permit.n/a for the maher.Details
1)interior t.i. 1st & 2nd floor. demo old restrooms at both flrs & add new restrooms, shower, & kchn at 1st flr. 2)new store front system with new entry door on 7th street. 3)nw swing dr on gilbert st. 4)voluntary seismic upgrade. elect. mech. under seperate permit.n/a for the maher. | $75,000 | |
| Jun 17, 2008 | Expired or cancelled expired Feb 2010 | 575 07th St | install server room at mezzanine level, install offices at ground level. reconfigure stairway with metal staircase, revision to pa's# 2007-0824-0789, 2008-0313-7084Details
install server room at mezzanine level, install offices at ground level. reconfigure stairway with metal staircase, revision to pa's# 2007-0824-0789, 2008-0313-7084 | $27,000 | |
| May 23, 2008 | Expired or cancelled cancelled Jan 2026 | 575 07th St | revision to pa# 2007/06/26/5187 to install server room at the mezzanine level, install offices at ground level, reconfigure stair way with mental stair case.Details
revision to pa# 2007/06/26/5187 to install server room at the mezzanine level, install offices at ground level, reconfigure stair way with mental stair case. | $15,000 | |
| May 9, 2008 | Completed final sign-off Aug 2008 | 575 07th St | revision to 200803137084. reconfigure existing offices, upgrade restroom to add accessible shower. install breakroom appliances, install door and windows in existing rollup opening.Details
revision to 200803137084. reconfigure existing offices, upgrade restroom to add accessible shower. install breakroom appliances, install door and windows in existing rollup opening. | $12,000 | |
| Mar 13, 2008 | Never finaled issued Mar 2008, no final | 575 07th St | Liberty Construction | mezzanine level remodel. reconfigure existing offices, upgrade existing restroom to comply with ada accessibilityDetails
mezzanine level remodel. reconfigure existing offices, upgrade existing restroom to comply with ada accessibility | $13,000 |
| Jan 14, 2008 | Expired or cancelled cancelled Jan 2026 | 575 07th St | new accessable entrance, new corridor and devide into 3 tenant spaces. mep under a seperate permit.Details
new accessable entrance, new corridor and devide into 3 tenant spaces. mep under a seperate permit. | $20,000 | |
| Oct 18, 2007 | Never finaled issued Oct 2007, no final | 575 07th St | Liberty Construction | revision to permit number 200708240789. removal of proposed wall and door. modifications to proposed men's room. delete sloped area in front of womens roomDetails
revision to permit number 200708240789. removal of proposed wall and door. modifications to proposed men's room. delete sloped area in front of womens room | |
| Aug 24, 2007 | Completed final sign-off Aug 2008 | 575 07th St | Liberty Construction | make main entrance accessible, restore storefront glazing.Details
make main entrance accessible, restore storefront glazing. | $20,000 |
| Jun 26, 2007 | Expired or cancelled expired Dec 2007 | 575 07th St | Liberty Construction | remove mezzanne and non loading bearinf interior partitions, add windows, add restroom. mep under seperate permit.Details
remove mezzanne and non loading bearinf interior partitions, add windows, add restroom. mep under seperate permit. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Liberty Construction (4), Friendly Fire Systems (2), Protection Roofing Co,, Redwood City Alarms Inc
- Architects
- Harvey J Hacker (5)
- Engineers
- Justen Peek
- Designers
- Chris Cicero
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.